ccrf workplan proposals daniel millar may 30, 2007 libby dam bas-relief

Post on 14-Jan-2016

215 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

CCRF Workplan Proposals

Daniel MillarMay 30, 2007

Libby Dam bas-relief

2

CCRF MoU

• 3.0 The participants will attempt to fulfill the following responsibilities…– a) develop, update and report on a multi-year workplan

• The steering committee proposes 7 projects for the initial workplan

3

Proposed projects

1. Existing processes2. Annual Canadian

forum3. Biennial Canada-US

forum

4. Treaty structure and content5. Driving forces in water

management6. Climate change impacts7. Centre of knowledge

Fisher Peak near Cranbrook

4

Identifying current processes

• Identify Canadian river management processes and agencies involved in the transboundary Columbia

Waneta powerhouse, Pend d’Oreille River

5

Canadian forum

• Annual table for Canadian agencies to discuss processes, issues and future prospects for the transboundary Columbia

Arrow Lakes Generating Station

6

Transboundary forum

• Biennial Canada US Columbia River forum• Transboundary context• Highlight and discuss existing and emerging issues

Northport, Washington bridge – Columbia River

7

Examine the Columbia River Treaty

• Present structure• Agency roles• Termination clauses

and their implications

Mica

8

Transboundary water management

• Analyze issues that may affect transboundary water management– Overview of issues and agencies involved– What drives the various perspectives?– What changes are sought?

Seven Mile pool, Pend d’Oreille River

9

Climate change

• Model climate change impact on water resources

• Examine areas of concern

• Provide planning tools

Columbia wetlands

10

Centre of knowledge

• Virtual repository• Link existing webs/libraries

• Multi-agency/institution• Canada-US

Keenleyside

top related