CC 8800-1BOOM BOOSTER
CC 8800-1 BOOM BOOSTERUpgrade kit
Crawler craneDatasheet
metric
CONTENTS
Page:
Combinations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Main boom with SL(BSSL) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Fixed fly jib with SL (BSSL+LF) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Luffing fly jib with SL (BSWSL/BSFSL) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Fixed fly jib with SL (BSFVL) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Technical description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58
Transportation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
CC 8800-1 BOOM BOOSTER
2
KEY
Track
Counterweight + central ballast (ZB)
Superlift counterweight
Superlift radius
Load radius
Main boom
Fly jib
Main boom angle
Fly jib angle
Wind speed in m/s (meter per second)
„D“
S: heavy
L: light
H: Main boom
W: Luffing fly jib
F: Fixed fly jib
SL: Superlift
SGL: Heavy base length
B: Boom Booster
Central ballast
CC 8800-1 BOOM BOOSTER
3
Features:Significant increase of capacity for long system lengths
Easy and cost effective transport in standard ISO 40ft open top container
Retrofitable to any CC 8800-1
4
CC 8800-1 BOOM BOOSTERHIGHLIGHTS
Variation Lengths of luffing jib Lengths of main boom (m)(m)
m 66 72 76 82 86 92 96 102 108 114 120 126 132 138 144 150 156
BSSL X X X X X X X X X X X X X X X X X
BSSL+LF X X X X X O
BSFVL 15° X X X X X X X X X X O
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
O
O
O
O
O
O
O
O
O
O
O
O
BSWSL (88°)
BSWSL (85°)
BSWSL (75°)
BSWSL (65°)
BSFSL (15°)
36
42
48
54
60
66
72
78
84
90
96
102
108
114
120
12
5
CC 8800-1 BOOM BOOSTERCOMBINATIONS
Boom Booster Kit 72 m
Boom combination chart
O Superlift counterweight for erection > 640 t
All Superlift combinations can be erected or lowered to the ground without assisting equipment.
6
CC 8800-1 BOOM BOOSTERCOMBINATIONS
7
CC 8800-1 BOOM BOOSTERCOMBINATIONS
BSSL CC 8800-1 BOOM BOOSTER
8
m121314151618202224262830343842465052535455586062666970747778828386
m121314151618202224262830343842465052535455586062666970747778828386
0 t
76 m 82 m 86 m 92 m 96 m
t-
501,0462,0429,5397,0345,0303,0269,0240,0212,0185,0163,0126,0
97,576,058,544,739,036,233,431,024,120,1
----------
t1378,01374,01370,01349,51329,01244,01129,01031,0938,0860,0792,0734,0637,0560,0498,0447,0402,0383,5374,2365,0357,0333,0319,5306,0272,0242,0
-------
t1382,01382,01382,01355,51329,01269,01213,01162,01087,0998,0921,0853,0743,0655,0584,0525,0462,0434,0420,0406,0393,7357,0334,5316,0288,0259,0
-------
t--
443,0412,0381,0332,0292,0259,0231,0207,0184,0161,0124,0
95,573,556,042,036,233,330,428,020,8
-----------
t1271,01271,01271,01261,51252,01233,01124,01027,0935,0857,0789,0731,0634,0557,0495,0443,0399,0380,5371,2362,0354,0330,0316,0302,0278,0262,2257,0223,0
-----
t1275,01275,01275,01274,51274,01262,01206,01155,01084,0995,0918,0850,0740,0652,0581,0522,0473,0447,0434,0421,0409,2374,0352,5331,0292,0272,2267,0238,0
-----
t--
426,0396,5367,0319,0281,0248,0221,0197,0177,0156,0118,0
89,567,549,935,629,726,823,921,3
------------
t-
1222,01218,01208,51199,01180,01117,01020,0929,0850,0783,0724,0627,0550,0488,0437,0392,0373,5364,2355,0347,0323,0309,0295,0271,0255,2250,0231,0208,0
----
t-
1226,01226,01223,01220,01210,01197,01146,01078,0988,0911,0844,0733,0645,0574,0516,0466,0444,5433,7423,0411,5377,0356,0335,0297,0271,5263,0240,0222,0
----
t---
379,0353,0307,0270,0239,0212,0190,0170,0152,0114,0
85,563,045,631,325,222,2
--------------
t-
1133,01133,01125,51118,01102,01087,01013,0924,0845,0778,0719,0622,0545,0483,0432,0388,0369,0359,5350,0342,0318,0304,0290,0266,0250,2245,0226,0214,0210,0188,0181,0
-
t-
1138,01138,01136,01134,01126,01117,01093,01050,0983,0906,0839,0728,0640,0569,0511,0461,0440,0429,5419,0409,7382,0362,0342,0306,0282,0274,0243,0222,2218,0201,0195,0
-
t----
339,0295,0259,0228,0203,0180,0161,0144,0109,0
81,058,541,126,620,4
---------------
t--
1087,01079,01071,01056,01040,01008,0919,0840,0773,0714,0617,0541,0478,0427,0383,0364,0354,5345,0337,0313,0299,0285,0261,0244,5239,0221,0208,2204,0189,0183,7168,0
t--
1094,01090,01086,01078,01070,01059,01019,0978,0901,0834,0723,0636,0565,0506,0456,0435,0424,5414,0405,0378,0360,5343,0308,0284,0276,0246,0225,7219,0197,0193,0181,0
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t
BSSL
m1011121314161820222426283034384246505154575860626465
m1011121314161820222426283034384246505154575860626465
0 tmax.640 t
max.800 t
56 m
0 tmax.640 t
max.800 t
62 m
0 tmax.640 t
max.800 t
66 m
0 tmax.640 t
max.800 t
72 m
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
t-
716,0647,0593,5540,0461,0400,0352,0301,0260,0228,0202,0179,0145,0118,0
97,581,068,565,5
-------
t1556,01544,01505,01468,51432,01365,01272,01156,01054,0
961,0883,0815,0757,0660,0584,0516,0437,0374,0366,0
-------
t1558,01544,01505,01468,51432,01365,01304,01248,01197,01111,01021,0
944,0867,0723,0609,0532,0459,0388,0371,0
-------
t--
617,0567,5518,0444,0386,0340,0298,0258,0226,0199,0177,0142,0115,0
94,077,063,560,853,047,0
-----
t-
1497,01497,01460,51424,01357,01266,01151,01050,0
957,0879,0811,0753,0656,0579,0518,0466,0411,0396,0351,0316,0
-----
t-
1500,01497,01460,51424,01357,01296,01240,01189,01107,01017,0
940,0873,0762,0651,0557,0479,0431,0416,0371,0329,0
-----
t--
595,0547,5500,0428,0372,0327,0291,0252,0220,0193,0171,0135,0107,0
86,069,055,552,945,138,636,532,9
---
t-
1484,01484,01449,01414,01348,01258,01142,01042,0
950,0871,0804,0745,0648,0571,0510,0458,0414,0403,0370,0330,2317,0292,0
---
t-
1486,01486,01450,01414,01348,01287,01231,01179,01099,01009,0
932,0865,0754,0667,0573,0495,0429,0415,0388,0349,0336,0311,0
---
t---
521,0479,0412,0359,0316,0280,0250,0217,0191,0168,0132,0104,0
82,565,051,548,740,433,631,427,724,121,0
-
t-
1426,01426,01415,51405,01339,01252,01136,01038,0
945,0867,0799,0740,0644,0567,0505,0454,0409,0399,7372,0348,7341,0321,0301,0279,0268,0
t-
1428,01428,01416,51405,01339,01278,01222,01171,01094,01005,0
927,0860,0750,0662,0591,0519,0454,0439,7397,0359,5351,0334,5318,0296,6286,0
CC 8800-1 BOOM BOOSTER
9
0 t 460 t 560 t 640 t 720 t 800 t
BSSL
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
CC 8800-1 BOOM BOOSTER
10
m1415161718192022242628303438424650515458626670747882869091949698
102106107110112
m1415161718192022242628303438424650515458626670747882869091949698
102106107110112
0 t
102 m 108 m 114 m 120 m 126 mmax.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t
t --
325,0304,0283,0266,0249,0219,0195,0173,0154,0138,0107,0
78,556,038,423,820,6
-------------------
t 1010,01004,0
998,0992,0986,0980,0974,0962,0915,0837,0769,0711,0614,0537,0475,0423,0379,0369,7342,0309,0281,0257,0235,0216,0200,0185,0172,0156,0152,0
--------
t 1016,01013,01010,01007,01004,01001,0
998,0992,0971,0936,0898,0831,0720,0632,0561,0502,0453,0442,5411,0374,0343,0312,0281,0253,0227,0203,0180,0167,0164,0
--------
t ---
293,0274,0257,5241,0213,0189,0168,0150,0134,0106,0
78,055,537,723,1
--------------------
t -
927,0923,0919,5916,0912,5909,0901,0894,0836,0768,0710,0613,0536,0474,0422,0378,0368,5340,0308,0280,0255,0234,0215,0198,0183,0169,0157,6154,8145,5139,0
------
t -
933,0932,0930,5929,0928,0927,0924,0922,0893,0863,0830,0719,0631,0560,0501,0451,0440,5409,0373,0342,0314,0286,0259,0234,0211,0189,0169,0164,0153,5148,0
------
t ----
263,0247,0231,0204,0180,0160,0143,0127,0101,0
77,054,536,621,9
--------------------
t --
850,0848,0846,0844,5843,0839,0836,0825,0766,0708,0611,0534,0472,0420,0377,0367,5339,0306,0278,0253,0232,0213,0195,0180,0167,0155,0152,0138,6128,3118,0
98,5----
t --
860,0857,0857,0857,0857,0857,0857,0847,0816,0780,0709,0629,0558,0499,0450,0439,2407,0371,0339,0312,0287,0261,0237,0215,0194,0168,6162,3145,3135,6126,0103,0
----
t ----
256,0240,5225,0199,0177,0157,0140,0125,0
99,078,056,038,023,2
--------------------
t --
796,0791,5791,0790,5790,0789,0788,0787,0763,0708,0612,0535,0473,0421,0377,0367,5339,0307,0279,0254,0232,0213,0196,0181,0167,0155,0152,0143,6138,3133,0123,6114,3112,0
--
t --
803,0801,0799,0797,5797,0797,0797,0797,0781,0760,0718,0630,0559,0500,0450,0439,5408,0372,0340,0312,0288,0265,0242,0221,0201,0182,3177,6164,6156,3148,0132,0121,0119,0
--
t -----
230,0216,0191,0169,0150,0133,0118,0
93,072,553,535,620,7
--------------------
t ---
727,0726,0726,0726,0726,0726,0726,0722,0691,0609,0532,0470,0418,0374,0364,5336,0304,0276,0251,0229,0210,0193,0177,0163,0151,0148,0139,6134,3129,0119,6111,0109,0103,0
99,5
t ---
735,0735,0734,0733,0732,0730,0730,0727,0711,0679,0627,0556,0497,0447,0436,5405,0369,0337,0309,0284,0263,0241,0220,0201,0183,6179,3166,6158,3150,0135,3120,6117,0109,0105,0
0 t 460 t 560 t 640 t 720 t 800 t
BSSL
m17181920212223242628303438424345464750545862667074788286909498
102106110114117118122126128130133134137
m17181920212223242628303438424345464750545862667074788286909498
102106110114117118122126128130133134137
0 t
132 m 138 m 144 m 150 m 156 m
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
t ---
206,0194,0182,0171,5161,0142,0126,0111,0
87,067,046,7
------------------------------
t 660,0660,0660,0660,0660,0660,0660,0660,0660,0660,0643,0594,0527,0465,0452,0426,0413,0402,2370,0332,0299,0271,0246,0225,0205,0188,0172,0159,0146,3134,6124,0114,6106,1
98,591,586,5
--------
t -
668,0668,0668,0668,0668,0668,0668,0668,0668,0657,0634,0611,0551,0536,2506,7492,0479,7443,0400,0364,0332,0304,0280,0247,0234,0217,0198,0181,3165,3150,0136,0122,3109,0
97,092,0
--------
t ---
198,0186,5175,0164,5154,0136,0120,0106,0
82,562,546,542,9
-----------------------------
t -
606,0604,0604,0604,0604,0604,0604,0604,0604,0603,0563,0522,0465,0452,2426,7414,0403,0370,0332,0299,0271,0246,0224,0205,0188,0172,0158,0145,3133,6123,0113,6105,0
97,090,084,983,377,0
------
t -
612,0612,0612,0612,0612,0612,0612,0612,0612,0612,0592,0576,0551,0536,2506,7492,0479,7443,0400,0364,0332,0304,0280,0258,0237,0217,0199,0183,0167,6153,0139,0125,6113,0101,0
92,089,082,0
------
t ----
177,0166,0156,0146,0129,0113,0
99,576,057,041,137,630,7
----------------------------
t --
555,0554,0554,0554,0554,0554,0554,0554,0552,0530,0497,0460,0447,2421,7409,0398,0365,0328,0295,0267,0242,0220,0200,0183,0167,0153,0141,0129,6119,0109,0100,0
92,084,679,477,871,565,162,0
----
t --
560,0560,0560,0560,0560,0560,0560,0560,0560,0538,0513,0490,0481,7467,2460,0451,7427,0393,0358,0326,0297,0265,0232,0201,0177,0168,0158,6149,3140,0130,6121,0111,0100,0
91,789,078,067,362,0
----
t -----
163,0153,5144,0127,0112,0
99,076,057,041,638,231,528,225,1
--------------------------
t --
512,0512,0511,0510,0509,5509,0508,0507,0506,0500,0456,0434,0428,5417,5412,0401,0368,0330,0298,0269,0245,0223,0203,0186,0158,0140,0132,0124,0116,0108,0100,0
92,084,077,975,867,559,555,551,445,4
--
t --
517,0517,0517,0517,0517,0517,0517,0517,0517,0508,0482,0455,0446,5429,5421,0410,0384,0356,0328,0300,0272,0243,0215,0193,0161,0144,0135,3126,6118,0110,0101,8
93,585,178,976,868,560,156,051,845,5
--
t ------
146,0137,0120,0106,0
92,570,552,036,633,326,723,520,5
--------------------------
t ---
468,0468,0468,0468,0468,0467,0465,0462,0456,0436,0396,0384,7374,0369,0363,0345,0320,0294,0265,0240,0218,0193,0167,0142,0118,0106,6
98,591,584,177,070,062,657,255,448,341,037,433,728,326,521,1
t ---
472,0472,0472,0472,0472,0471,0468,0465,0458,0437,0417,0412,0402,0397,0390,7372,0335,0303,0274,0249,0227,0203,0174,0148,0119,0110,3102,1
94,586,879,372,064,358,656,849,642,038,334,528,927,121,4
CC 8800-1 BOOM BOOSTER
11
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t 0 t
max.640 t
max.800 t
0 t 460 t 560 t 640 t 720 t 800 t
BSSL+LF CC 8800-1 BOOM BOOSTER
12
BSSL+LF
0 t 140 t 240 t 340 t 440 t 540 t 640 t
m21222324262830343842434446505354555862667074788286909498
102106110114118119122124126129130134138140142145
0t-640t0 t 0t-640t0 t 0t-640t0 t 0t-640t0 t 0t-640t0 t 0t-640t0 t
114 m 120 m 126 m 132 m 138 m 144 m
t 215,0202,0190,5179,0160,0142,0127,5101,5
80,262,258,154,047,234,525,823,220,6
---------------------------
t 400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0386,5361,3349,6338,0310,0282,5257,5232,6209,3195,5184,0172,0160,0148,3137,0127,2117,7107,8
97,685,582,0
----------
t 206,0194,0183,0172,0153,0136,0121,5
95,775,057,553,549,642,730,021,4
-----------------------------
t 400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0385,0360,0350,3340,6309,0275,5252,0228,0204,0183,0171,5160,5149,5138,5127,5119,0113,0106,0
98,089,086,576,970,5
--------
t-
185,0174,5164,0145,0129,0115,0
89,769,051,747,8
---------------------------------
t-
400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0383,0356,7347,5338,2311,0273,0250,5227,5204,5181,0163,5152,7142,2131,4120,3110,7102,2
95,891,685,383,377,173,067,258,5
------
t-
177,0166,5156,0138,0122,0108,5
83,763,246,342,538,7
--------------------------------
t-
400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0398,0374,0340,5329,0317,5283,5241,0214,0193,5174,5154,0133,0118,5109,5100,2
90,781,372,164,760,256,856,053,652,050,448,047,244,0
----
t--
159,0150,0132,0116,0102,7
78,558,642,138,234,427,7
-------------------------------
t--
400,0400,0400,0400,0400,0400,0400,0400,0400,0400,0393,0357,0329,7320,5311,2284,0248,0216,0194,0174,0156,0137,3117,5105,0
95,686,878,069,060,353,248,047,144,643,041,438,938,034,731,329,7
--
t--
151,0142,0124,0109,0
96,072,252,736,432,628,922,1
-------------------------------
t--
397,0397,0397,0397,0395,5390,5384,0377,5375,7374,0371,0343,5322,0315,0308,0286,5257,5229,0204,0183,5163,0143,0123,5106,0
95,586,577,568,559,550,542,741,038,436,735,032,431,628,124,723,021,320,5
m21222324262830343842434446505354555862667074788286909498
102106110114118119122124126129130134138140142145
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
CC 8800-1 BOOM BOOSTER
13
BSWSL /BSFSL CC 8800-1 BOOM BOOSTER
14
m232425262829303438424650525455586266677074788286909498
102106
t --
250,0241,0224,0216,0208,0183,0162,0145,0127,0112,0106,0
92,589,5
--------------
t 535,0522,0509,0497,0474,0566,0553,0502,0453,0391,0342,0303,0282,0256,0243,0
--------------
t ------ - ----
443,0411,0383,0370,0336,0298,0266,0252,0
----------
t ------ - -----------
329,0312,0290,0261,0
-------
t -----
573,0573,0573,0573,0557,0519,0485,0462,5440,0430,2401,0366,0329,0320,7296,0267,0240,0215,0193,0178,0161,0142,0123,5105,0
t -
166,0161,0142,0126,0113,0102,0
92,083,074,072,066,559,553,550,541,1
---------------
t 367,0354,0348,0383,0376,0351,0316,0282,0253,0229,0222,5204,0180,0158,0152,5135,0
---------------
t ------ - ---
302,0278,0250,0226,0221,0206,0187,0176,0166,0143,0
-----------
t ------ - ----------
231,0220,0201,0184,0169,0159,0
--------
t ---
385,0385,0385,0383,0371,0348,0327,0322,6309,0292,0277,0273,5263,0239,0228,5218,0198,0180,0162,0154,2146,5135,0125,0112,0
99,086,073,560,5
BSWSL /BSFSL 15°
m192021222425262830343840424344465054555859626670747882869094
66 m + 36 m
66 m + 48 m66 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
CC 8800-1 BOOM BOOSTER
15
66 m + 60 m
t --
316,0302,0278,0267,5257,0238,0222,0195,0170,0158,0138,0133,5129,0
---------------
t 647,0629,0612,0595,0563,0666,0647,0612,0580,0498,0421,0390,0363,0347,0331,0
---------------
t ------ - ------
558,0531,0485,0412,0356,0345,0
-----------
t ------ - -------------
390,0367,0341,0
-------
t -----
683,0683,0683,0683,0670,0654,0624,0594,0578,5563,0532,0480,0435,0424,0391,0380,5349,0312,0278,0248,0222,0205,0181,0158,0135,0
m2728293034384246505457586263666770747678828689909498
102106110114118
75° 65°88°/85°88°/85° 88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
203,0196,0172,0152,0136,0122,0109,0
97,589,587,078,076,063,061,5
---------------
t 444,0434,0425,0416,0474,0436,0401,0354,0313,0280,0257,5250,0218,0210,0185,0176,0
---------------
t ------ - ---
358,0347,0308,0299,0275,0268,0249,0226,0210,0194,0
-----------
t ------ - -----------
276,0268,0242,0221,0205,0
--------
t ----
484,0484,0484,0467,0436,0409,0391,0385,0363,0357,5341,0333,0309,0280,0267,0254,0230,0208,0193,0188,0169,0156,0141,5127,0112,0
97,082,0
****
m31333438424650545862636670747578828486909498
100102106110114118122126130
For explanations see page 16
*****
**********
************
***
**************
*****
***********
16
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
m3437384243465054586266707478828690929498
102106110112114118122126130134138142
66 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
66 m + 96 m
t -
136,0132,0117,0113,5104,0
93,083,575,068,060,555,550,044,639,835,422,1
------- - -------
t 296,0289,0287,0304,0304,0298,0290,0280,0253,0229,0208,0189,0172,0154,0137,0120,5103,0
------- - -------
t ------ - ----
250,0226,0205,0187,0171,0158,0151,0144,0128,0111,0
--- - -------
t ------ - ----------
191,0183,0168,0154,0142,0132,0124,0
- -------
t ----
305,0303,0300,0297,0291,0285,0280,0266,0252,0238,0226,0215,0205,0197,0190,0173,0157,5142,0128,5123,0118,0108,5
99,087,576,065,354,543,2
m384142464750545862667074767882869094969798
101102106110112114118122124126130134138142146150
75° 65°88°/85°88°/85° 88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
112,0108,0
96,093,285,576,568,561,054,547,539,938,136,332,729,125,521,820,0
------------------
t 226,0223,0222,0217,0226,0223,0220,0217,0214,0206,0188,0171,0164,0157,0145,0131,0117,5105,0
99,095,792,582,5
---------------
t ------ - -----
210,0203,0185,0169,0155,0143,0137,0134,5132,0124,5122,0111,0
99,092,5
-----------
t ------ - --------------
155,0152,0140,0129,0124,0120,0111,0102,0
96,5-------
t ----
226,0225,0223,0222,0219,0216,0213,0209,0207,5206,0202,0196,0187,0178,0173,5171,2169,0161,8159,5150,0137,0130,5124,0112,3103,0
98,894,786,576,566,557,147,838,2
****
***
***************
******************
17
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
66 m + 108 m
m42454650515458626670747881828586909498
102106109110113114118122124126130134136138142146150154158162
75° 65°88°/85°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
91,088,578,075,769,560,552,546,840,634,528,324,123,020,1
--------- - --------------
t 168,0165,0165,0161,0166,0164,0161,0159,0156,0154,0152,0149,0143,0140,0131,2128,5118,5108,5
98,088,078,270,868,260,5
- --------------
t ------ - -----
151,0151,0150,0150,0149,0138,0127,0117,0108,0102,0100,0
94,793,084,074,069,0
-----------
t ------ - --------------
127,0124,0117,5115,0106,0
98,594,591,084,578,073,0
-------
t ----
166,0165,0163,0161,0159,0157,0154,0152,0149,7149,0147,5147,0144,0141,0139,0136,5134,0132,0131,1129,0127,0118,4108,0102,8
97,790,082,578,775,066,558,049,641,332,924,6
****
**************
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
66 m + 120 m
m464950545658626670747879828687909498
102106110114117118120122124126130134136138142146150154158162166169
75° 65°88°/85°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
73,071,062,056,552,044,036,531,526,521,520,3
------------ - ---------------
t 121,0119,0118,0115,0117,0116,0114,0111,0109,0107,0105,0104,5103,0101,0100,5
99,297,794,788,580,272,064,058,156,252,548,444,4
-------------
t ------ - -------
103,0102,0101,0100,0
99,598,595,588,082,781,078,075,072,069,061,554,049,9
---------
t ------ - ---------------
90,590,590,590,589,586,079,573,570,568,063,057,5
------
t ----
118,0117,0115,0113,0111,0109,0107,0106,5105,0103,0102,5101,0
99,598,096,094,092,591,089,589,188,387,586,786,084,580,278,176,069,662,555,047,540,132,825,520,1
****
***********
18
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m19202122242526283034384142444546505457586266697074788286909498
72 m + 36 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
305,0292,0269,0259,0249,0231,0216,0190,0169,0149,0136,0127,0
-----------------
t 615,0604,0588,0572,0542,0649,0632,0599,0569,0509,0429,0383,0369,0343,0
-----------------
t ------ - -------
545,0519,0437,0375,0339,0
------------
t ------ - -------------
366,0341,0323,0
--------
t -----
655,0655,0655,0655,0655,0632,0600,5590,0559,0543,5528,0475,0431,0401,7392,0358,0321,0296,2288,0258,0230,0205,0185,0170,0149,0129,0
88°/85°
*****
**********
m232425262830343842465052545658626668707478808286909498
102106110
72 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
243,0233,0217,0202,0177,0157,0141,0126,0111,0105,0
90,585,5
----------------
t 512,0500,0489,0477,0456,0539,0491,0450,0397,0347,0307,0287,0262,0235,0
----------------
t ------ - ----
435,0404,0376,0352,0311,0278,0258,0
------------
t ------ - -----------
312,0291,0273,0263,0
--------
t -----
550,0550,0550,0538,0531,0481,0458,5436,0416,5397,0363,0334,0318,5303,0274,0247,0235,0223,0201,0180,0161,0149,0133,0117,0100,0
88°/85°
*****
**********
19
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m27282930343842465054586263666770747880828690929498
102106110114118122
72 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
197,0191,0167,0148,0132,0119,0107,0
97,587,578,576,562,561,0
----------------
t 424,0416,0407,0399,0453,0425,0392,0362,0320,0285,0256,0223,0215,0190,0182,0
----------------
t ------ - ---
367,0324,0315,0289,0281,0260,0236,0207,0190,0
------------
t ------ - ----------
269,0261,0253,0235,0215,0202,0
--------
t ----
456,0456,0456,0454,0448,0422,0397,0369,0361,0339,0332,2312,0288,0261,0249,5238,0216,0196,0186,5177,0159,0143,0132,0120,0106,0
92,278,5
88°/85°
****
***********
m31333438394246505458626566707475787982868790929498
102106110114118122126130134
72 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
161,0156,0138,0134,0122,0110,0
98,589,080,573,567,565,558,552,551,039,538,4
----------------
t 344,0335,0331,0310,0359,0354,0339,0319,0289,0259,0232,0212,5206,0182,0160,0154,5137,0131,0
----------------
t ------ - ----
301,0292,0263,0237,0232,0216,0211,0195,0173,0167,5151,0139,0
-----------
t ------ - -------------
226,0216,0206,0197,0181,0161,0
--------
t ----
362,0362,0362,0361,0358,0353,0339,0324,7320,0304,0288,0282,7267,0261,0243,0222,0217,0202,0193,0184,0167,0152,0137,0123,0113,0102,5
92,080,468,556,5
88°/85°
****
***************
20
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m343738424346505458626670717478828690949598
102106110114118122126130134138142146
72 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
131,0127,0113,0109,5100,0
90,081,072,565,557,052,551,247,843,038,333,522,2
---------------
t 274,0271,0270,0259,0285,0281,0276,0269,0257,0235,0213,0193,0188,0174,0155,0138,5122,0105,0
---------------
t ------ - -----
257,0238,0216,0197,0180,0165,0149,0145,0133,0117,0
-----------
t ------ - ------------
192,0180,0165,0152,0141,0125,0
--------
t ----
285,0285,0284,0283,0278,0273,0268,0263,0261,5257,0249,0237,0225,0211,0193,0189,0177,0161,5146,0133,0120,0108,0
98,591,581,070,760,550,239,9
88°/85°
****
****************
m3841424647505458626670747778828690939498
102103106110114118122126130134138142146150154158
72 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
108,0104,0
92,590,082,573,565,558,551,544,436,934,133,329,826,322,820,3
------------------
t 214,0211,0210,0207,0215,0213,0210,0207,0204,0201,0193,0176,0165,5162,0146,5132,0118,5109,0106,0
93,580,5
---------------
t ------ - -----
200,0200,0195,0178,0163,0153,5150,0138,0128,0124,5115,0103,0
90,5-----------
t ------ - --------------
160,0150,0138,0128,0118,0109,0
97,5--------
t ----
215,0214,0213,0211,0209,0207,0204,0201,0198,0197,0194,0190,0186,0183,0182,0177,0165,5162,6154,0140,6128,0116,0104,0
93,785,578,070,561,552,543,534,525,3
88°/85°
****
*****************
21
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m424546505254586266707478818286909498
102106109110112113114118122126130134138142146150154158162166
72 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
87,585,075,070,566,556,549,343,337,431,525,621,1
-------------------------
t 160,0157,0157,0154,0158,0157,0155,0152,0150,0148,0146,0144,0141,7140,5132,5121,0109,5
98,788,578,771,569,064,061,5
--------------
t ------ - ------
144,0144,0144,0143,0134,0123,0114,0107,0105,0101,0
98,796,587,077,567,5
----------
t ------ - ---------------
127,0125,0123,0114,0105,0
97,590,583,574,0
-------
t ----
159,0158,0156,0155,0153,0151,0148,0146,0144,5144,0141,0139,0136,0134,0131,4129,0127,1126,5125,2124,6124,0117,8111,0100,7
90,581,373,567,561,053,045,037,129,321,3
88°/85°
****
************
m464950545658626670747678828688909498
102106110114118120122125126130134138142146150154158162166170171
72 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
70,068,058,052,548,240,432,928,223,421,0
----------------------------
t 115,0113,0113,0110,0113,0111,0109,0107,0105,0103,0102,0101,0
99,297,596,595,794,293,289,380,772,564,556,753,048,942,8
-------------
t ------ - -------
99,599,098,097,096,595,595,092,585,582,079,073,571,564,056,548,4
---------
t ------ - ----------------
86,086,086,086,085,579,073,067,561,554,0
------
t ----
113,0112,0110,0109,0107,0105,0104,0103,0102,0100,0
99,098,096,094,592,590,588,887,585,784,884,083,082,781,578,576,067,760,054,448,942,735,628,621,720,0
88°/85°
****
**********
22
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m2022242628303438414245465054586264667074788286909498
102
76 m + 36 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
285,0262,0243,0225,0210,0185,0165,0151,0133,0121,0
----------------
t 590,0559,0529,0615,0582,0553,0499,0434,0387,0373,0329,0
----------------
t ------ - ----
533,0455,0389,0338,0
------------
t ------ - ---------
346,0335,0313,0
--------
t ---
630,0630,0630,0630,0616,0592,0584,0537,5522,0470,0425,0387,0353,0337,0321,0289,0259,0232,0207,0184,0165,0152,0133,0113,0
88°/85°
***
********
m232426283034384246505253545658626669707274788286909498
102106110114
76 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
227,0211,0197,0173,0154,0137,0124,0111,0104,0
91,789,084,0
-----------------
t 499,0491,0468,0447,0526,0478,0437,0401,0350,0309,0292,0280,5269,0242,0
-----------------
t ------ - ----
435,0419,0389,0364,0320,0285,0261,0
-------------
t ------ - ------------
297,0287,0269,0253,0
--------
t ----
532,0532,0532,0525,0523,0477,0455,0444,0433,0413,5394,0360,0330,0310,5304,0290,0276,0249,0225,0203,0182,0163,0145,0134,0120,0104,2
88,5
88°/85°
****
*********
23
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m2728303435384246505458596264666870747880828690939498
102106110114118122126
76 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
186,0163,0158,0144,0129,0116,0104,0
95,086,584,278,072,561,058,0
-----------------
t 419,0410,0394,0443,0441,0414,0382,0354,0322,0288,0259,0251,5227,0211,0195,0177,0
-----------------
t ------ - ----
367,0334,0314,0297,0281,0267,0241,0217,0201,0
-------------
t ------ - ------------
257,0249,0235,0221,0208,0
---------
t ----
451,0451,0451,0450,0445,0428,0398,0389,5364,0349,0334,0321,0308,0284,0261,0249,0237,0216,0196,0181,7177,0160,0144,0128,0117,0107,0
94,081,067,5
88°/85°
****
***********
m3134383942465054586266707475787982868990929498
102104106110114118122126130134138
76 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
152,0134,0130,0119,0107,0
96,086,578,571,064,558,052,050,538,037,0
------------------
t 348,0329,0306,0369,0356,0334,0310,0289,0261,0235,0209,0185,0163,0157,5141,0135,0
------------------
t ------ - ---
301,0269,0242,0236,0220,0215,0200,0180,0163,5158,0147,0
-------------
t ------ - -----------
216,0213,0206,0201,0186,0171,0160,0
---------
t ---
372,0372,0372,0372,0369,0364,0344,0325,0308,0284,0278,7263,0257,7242,0221,0206,6202,0193,0184,0167,0152,0144,5137,0123,3110,0100,2
92,580,969,558,447,3
88°/85°
***
*************
24
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m3537384243465054586266707374788286899091949798
102104106110114116118122126130134138142146150
76 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
128,0124,0110,0106,5
98,087,578,570,563,554,549,746,245,140,535,931,320,5
---------- - ---------
t 282,0276,0273,0258,0294,0290,0283,0271,0255,0235,0213,0194,0181,0176,0158,0141,5125,0112,6108,3104,0
------ - -----------
t ------ - -----
249,0243,0220,0200,0183,0171,0167,0164,0154,0142,0138,0123,0114,0
- - -----------
t ------ - --------------
188,0185,0170,0163,0156,0144,0133,0125,0
---------
t ----
294,0293,0292,0291,0287,0282,0277,0271,0266,5265,0251,0239,0228,0214,3210,0205,5192,0180,0176,0161,0153,5146,0133,0120,0114,0108,0
96,086,880,070,561,051,041,431,3
88°/85°
****
****************
m38414246485054586266707478798286909498
102105106110114116118122126128130134138142146150154158160
76 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
104,0101,0
90,084,580,071,063,556,049,141,834,630,829,927,424,020,6
---------------------
t 220,0218,0217,0211,0220,0219,0216,0213,0209,0203,0193,0176,0161,0158,0148,0134,0120,5108,0
95,783,0
------------------
t ------ - ------
206,0198,0181,0166,0152,0140,0129,0121,5119,0107,0
95,088,5
-------------
t ------ - -------------
157,0154,0142,0131,0126,0121,0112,0103,0
97,5---------
t ----
221,0220,0219,0217,0216,0213,0210,0207,0204,0203,0200,0196,0193,0188,0180,0166,5156,3153,0139,8127,0121,2115,5104,0
93,588,283,074,768,560,552,043,635,226,522,0
88°/85°
****
****************
25
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m42454650525458626670747880828486909498
102106109110114118122126130134138140142146150154158162166
76 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
85,082,072,568,063,053,546,240,434,729,023,320,4
-------------------------
t 164,0162,0161,0158,0162,0161,0159,0156,0154,0151,0149,0147,0146,0142,0138,0132,5122,0111,5100,7
90,580,773,571,060,5
--------------
t ------ - -------
148,0147,0147,0146,0135,0125,0115,0108,0106,0
98,590,081,071,0
-----------
t ------ - ----------------
126,0116,0107,0
99,592,585,578,574,0
-------
t ----
163,0162,0160,0159,0157,0155,0152,0150,0149,0148,0146,5145,0143,0140,0138,0136,0133,0131,5131,0128,0119,0110,0100,0
90,080,771,567,263,758,051,344,637,029,421,8
88°/85°
****
************
m46495054575862667074788286909498
102106110114118121122125126130134138142146150154158162166170
76 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
67,064,554,547,244,937,430,025,420,7
--------------------------
t 118,0116,0115,0112,0115,0114,0112,0109,0107,0105,0103,0101,0
99,297,796,094,290,082,574,066,058,252,550,544,5
------------
t ------ - ------
101,0100,0
99,098,097,596,593,586,081,279,575,073,566,559,051,0
--------
t ------ - ---------------
88,088,088,087,580,574,569,063,558,0
-----
t ----
115,0115,0113,0111,0110,0108,0106,0104,0102,0100,0
98,597,095,093,091,290,088,587,387,085,885,584,079,575,066,758,551,245,039,934,828,021,3
88°/85°
****
*********
26
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m20222426283034384142454648505458596266707374788286909498
102106
82 m + 36 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
275,0253,0235,0218,0204,0180,0160,0148,0128,0118,0
-------------------
t 566,0538,0511,0600,0570,0542,0490,0442,0393,5379,0341,0
-------------------
t ------ - -----
502,0480,0411,0355,0344,0
-------------
t ------ - -----------
327,0306,0292,0
---------
t ---
606,0606,0606,0606,0593,0585,5583,0536,5521,0495,0469,0424,0385,0376,7352,0322,0295,0273,2266,0240,0215,0193,0172,0152,0138,0122,5107,0
88°/85°
***
********
m242628303134384246505254575862667071747578828486909498
102106110114118
82 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
220,0204,0191,0185,0168,0149,0133,0120,0109,0103,0
86,580,0
-------------------
t 471,0450,0430,0411,0501,0468,0429,0394,0355,0313,0296,0274,0233,0
-------------------
t ------ - ----
437,0396,0383,0335,0297,0267,0253,0
--------------
t ------ - ------------
277,0265,0249,0241,0
---------
t ----
511,0511,0511,0510,0501,0474,0451,5429,0399,7390,0356,0326,0300,0294,0276,0270,0252,0228,0217,3206,0186,0167,0150,0133,5119,0107,5
96,081,5
88°/85°
****
**********
27
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m2728303435384246505458616264666870747882838690949698
102106110114118122126130
82 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
179,0158,0153,0140,0125,0112,0101,0
92,083,578,276,573,559,056,0
------------------
t 401,0393,0377,0348,0427,0404,0374,0347,0322,0291,0262,0238,5230,0214,0198,0181,0
------------------
t ------ - ----
361,0350,0329,0310,0293,0277,0250,0227,0196,0
--------------
t ------ - -------------
241,0230,0217,0205,0200,0
---------
t ----
431,0431,0431,0431,0425,0424,0394,0368,5360,0345,0330,0317,0304,0280,0259,0238,0232,6217,0197,0179,0170,5162,0146,5131,0117,6104,0
96,086,073,761,5
88°/85°
****
************
m3134384042465054586266687074757880828690919498
102106108110114118122126130134138142
82 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
147,0129,0122,0115,0103,0
93,083,575,568,562,559,556,551,049,436,133,3
------------------
t 329,0314,0294,0343,0339,0325,0303,0283,0264,0238,0212,0199,0187,0165,0159,5143,0131,0
------------------
t ------ - ----
296,0280,0252,0246,0228,0218,0208,0187,0166,0160,5143,0
-------------
t ------ - -------------
205,0197,0186,0176,0162,0151,0
---------
t ---
345,0345,0345,0345,0344,0342,0341,0331,0317,5304,0280,0274,7259,0249,0239,0221,0202,0197,5184,0168,0153,0138,0131,5125,0112,0100,0
88,080,573,062,552,041,9
88°/85°
***
**************
28
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m3538424446505458626670747882868790919498
100102106110114118122126130134138142146150154
82 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
119,0106,0100,0
94,084,075,567,560,051,046,341,937,433,028,524,2
-------------------
t 263,0258,0247,0273,0271,0267,0262,0249,0233,0218,0198,0178,0160,0142,6126,0122,0109,3105,0
-----------------
t ------ - ----
254,0230,0209,0191,0187,0175,0171,5160,0144,0136,0128,0111,0
------------
t ------ - -------------
177,0172,0163,0154,0142,0126,0
---------
t ---
274,0274,0274,0274,0273,0269,0265,0260,0255,0250,0243,0225,0221,0209,0204,7192,0176,0168,7161,5147,0133,8121,0109,5
98,087,276,569,563,054,045,035,826,6
88°/85°
***
***************
m39424648505458626670747880828687909498
102103106108110114116118122126130134138142146150154158162
82 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
97,586,581,576,567,059,552,545,738,731,727,826,124,421,220,4
----------------------
t 206,0203,0199,0210,0208,0206,0203,0200,0196,0192,0181,0166,0158,0150,0135,0131,5121,5109,0
96,784,080,5
-----------------
t ------ - -----
195,0195,0190,0186,0174,0159,0147,0135,0132,5123,0117,0111,0
99,093,0
------------
t ------ - ---------------
154,0150,0140,0134,0129,0119,0110,0
98,5--------
t ---
210,0209,0208,0207,0206,0203,0201,0198,0195,0193,5192,0188,0187,0184,0181,0178,0165,0161,7152,0145,5139,0127,0121,5116,0105,0
94,784,575,065,558,552,545,137,629,521,5
88°/85°
***
***************
29
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m4246505354586266707478828586909498
102106109110114116118122126128130134138142146150154158162166168
82 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
78,569,561,058,549,842,236,731,225,720,1
---------------------------
t 156,0153,0150,0154,0154,0152,0149,0147,0145,0143,0141,0139,0136,0134,0124,0112,0101,0
91,081,374,071,561,5
----------------
t ------ - -----
141,0141,0140,0140,0140,0131,0120,0113,5111,0103,0
98,093,084,074,069,5
-----------
t ------ - ---------------
123,0123,0115,0106,0102,0
98,591,584,074,5
-------
t ---
155,0154,0153,0152,0150,0148,0146,0144,0142,0139,6139,0137,0135,0132,0129,8127,0125,5125,0123,0119,7116,5110,0100,0
95,290,581,572,564,256,048,240,435,531,023,820,3
88°/85°
***
**********
m46505457586266707478828690919498
102106110114118121122125126130134138140142146150154158162166170
82 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
60,050,043,040,633,426,1
------------------------------
t 112,0110,0107,0110,0109,0107,0105,0103,0101,0
99,097,295,794,293,892,791,288,782,774,566,558,552,650,744,942,7
------------
t ------ - ------
96,596,095,594,594,093,593,090,585,283,578,576,569,061,553,549,8
--------
t ------ - ----------------
83,583,583,583,580,077,074,068,562,054,5
----
t ---
110,0110,0108,0107,0105,0104,0102,0100,0
98,596,596,195,093,091,289,587,886,084,783,883,582,382,080,577,775,071,067,059,051,744,437,430,524,520,5
88°/85°
***
******
30
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m2022242627283034384142464950545860626668707475788286909498
102106110
86 m + 36 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
267,0247,0229,0221,0213,0199,0175,0156,0144,0123,0111,0
--------------------
t 553,0525,0499,0474,0569,0554,0527,0477,0435,0398,0383,0326,0
--------------------
t ------ - -----
484,0474,0428,0368,0343,0
---------------
t ------ - ------------
308,0298,0280,0276,0
---------
t ----
583,0583,0583,0583,0575,0571,2570,0516,0477,0464,0419,0380,0363,0346,0317,0303,5290,0264,0257,5238,0214,0192,0171,0152,0134,0120,0108,0
92,5
88°/85°
****
*********
m242628303134384246505354565758626670727476788286909498
102106110114118122
86 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
214,0199,0186,0180,0163,0145,0130,0117,0106,0
96,583,079,077,0
-------------------
t 463,0442,0422,0403,0489,0456,0418,0383,0354,0316,0289,0280,0255,0241,0
-------------------
t ------ - -----
413,0405,0396,0346,0306,0273,0256,0
--------------
t ------ - -------------
266,0258,0243,0229,0
---------
t ----
495,0495,0495,0495,0489,0469,0435,0424,0404,5394,7385,0351,0321,0294,0282,5271,0260,0249,0226,0204,0184,0166,0149,0133,0117,0105,0
96,082,268,5
88°/85°
****
**********
31
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m283034363842465054586264666970747882848586909498
102106110114118122126130134
86 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
174,0153,0144,0136,0121,0109,0
98,589,081,074,071,056,051,0
-------------------
t 387,0372,0343,0411,0395,0364,0338,0313,0291,0263,0235,0218,0203,0177,0
-------------------
t ------ - ---
361,0339,0319,0292,0284,0256,0232,0206,0189,0
--------------
t ------ - ------------
228,0225,0212,0200,0190,0
---------
t ---
420,0420,0420,0420,0415,0415,0390,0356,0341,0326,0305,7299,0275,0254,0234,0224,6219,3214,0195,0177,0160,0145,0130,0116,5103,0
91,183,572,561,550,0
88°/85°
***
***********
m3134384042465054586266697074757880828690939498
102106108110114118122126130134138142146
86 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
142,0126,0118,0112,0100,0
90,081,072,566,060,055,554,048,346,832,630,4
-------------------
t 327,0312,0290,0349,0338,0317,0295,0275,0257,0240,0215,0196,5191,0168,0162,5146,0134,0
-------------------
t ------ - ----
296,0288,0258,0252,0234,0223,0213,0194,0172,0156,5151,0
--------------
t ------ - -------------
194,0191,0181,0171,0162,0158,0
----------
t ---
353,0353,0353,0353,0352,0349,0349,0327,0306,7300,0276,0270,5254,0244,5235,0217,0199,0185,5181,0165,0150,0136,0129,5123,0110,0
98,286,576,069,061,551,541,731,9
88°/85°
***
**************
32
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m353842444650545862667074757882868790929498
101102106110114118120122126130134138142146150154156
86 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
116,0102,0
96,591,081,573,065,057,048,643,439,138,034,830,526,125,1
---------- - ----------
t 270,0259,0245,0282,0279,0275,0258,0242,0226,0212,0199,0181,0176,0162,0145,0129,0125,0112,3103,0
-------- - ----------
t ------ - -----
254,0235,0213,0194,0190,0178,0170,0163,0149,0137,0133,0117,0
--- - ----------
t ------ - --------------
169,0167,0158,0149,0142,0134,0126,0
----------
t ---
282,0282,0282,0282,0281,0277,0273,0268,0263,0261,5257,0239,0221,0217,0205,0197,0189,0173,0162,1158,5144,0131,1118,0107,0101,5
96,085,575,065,358,551,243,935,126,421,9
88°/85°
***
****************
m394246495054586266707478828486909498
102103106110114118122126130132134138142146150154158162
86 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
94,583,576,274,063,556,049,242,435,728,924,921,720,2
----------------------
t 213,0209,0204,0215,0214,0212,0209,0205,0195,0186,0175,0165,0151,5145,0137,5123,5111,0
98,785,882,5
----------------
t ------ - -----
200,0200,0193,0176,0161,0148,0137,0134,0126,0115,0103,0
90,5------------
t ------ - --------------
145,0137,0130,0122,0113,0104,0
98,5--------
t ---
215,0215,0214,0213,0212,0209,0207,0204,0202,0198,0196,5195,0191,0188,0178,0163,2159,7149,0136,5124,0113,3102,0
92,282,577,873,264,055,448,242,136,128,420,7
88°/85°
***
*************
33
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m434650535458626670747578828688909498
102106110114115118122126130134138142144146150154158162166167
86 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
75,565,557,254,546,238,633,328,022,621,3
---------------------------
t 159,0157,0154,0159,0158,0155,0153,0151,0148,0146,0145,5144,0139,0133,0130,0124,5113,5103,0
93,083,073,563,160,5
---------------
t ------ - -------
144,0144,0143,0143,0132,0122,0112,0104,0102,0
96,087,077,567,5
-----------
t ------ - ----------------
123,0117,0108,0100,0
93,086,579,574,5
-------
t ---
159,0158,0157,0156,0154,0152,0150,0149,5148,0146,0143,0142,0141,0139,0137,0134,7132,0130,0128,0125,3117,5107,0
97,388,079,270,562,258,154,046,438,831,527,222,020,7
88°/85°
***
**********
m475054586266707478828690939498
102106110114118121122126127130134138142146150154158162166167
86 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
55,546,437,030,022,9
- ----------------------------
t 115,0112,0110,0112,0110,0107,0105,0103,0101,0
99,097,295,794,694,292,089,284,076,068,060,054,152,244,3
------------
t ------ - -----
98,598,097,096,595,595,094,091,585,784,077,576,071,564,056,548,5
-------
t ------ - ----------------
85,585,585,581,575,069,564,058,5
----
t ---
112,0111,0109,0108,0106,0104,0103,0101,0
99,598,097,595,593,892,090,488,587,286,386,084,584,183,078,473,065,057,049,742,435,528,722,120,5
88°/85°
***
*****
34
CC 8800-1 BOOM BOOSTER
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
BSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m242627283032343842465053545758626670747879828689909498
102106110114118122126
92 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
199,0192,0179,0168,0158,0140,0125,0113,0102,0
95,578,573,071,5
-------------------
t 444,0425,0415,0406,0389,0466,0445,0409,0377,0348,0320,0293,5285,0245,5232,0
-------------------
t ------ - ------
399,0391,0363,0320,0284,0247,0
---------------
t ------ - -------------
246,0236,0222,0212,0
----------
t -----
475,0475,0475,0475,0468,0460,0431,5422,0392,6383,0349,0319,0292,0268,0247,0242,0227,0206,0191,0186,0168,0152,0136,0121,0107,0
93,083,774,562,0
88°/85°
*****
**********
m28303134363842465054586264666970747882848687909498
100102106110114118122126130134138
92 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
163,0148,0139,0131,0117,0105,0
95,086,078,571,568,552,047,6
----------- - ---------
t 371,0357,0350,0330,0399,0384,0356,0331,0307,0286,0266,0237,0221,0205,0180,0
----------- - ---------
t ------ - -----
347,0333,0305,0296,0266,0240,0217,0201,0
------ - ---------
t ------ - --------------
215,0206,0194,0184,0179,0
- - --------
t ----
402,0402,0402,0402,0401,0394,0385,0352,0337,0322,0301,7295,0271,0250,0230,0221,0212,0207,2193,0176,0160,0152,5145,0130,0117,0104,0
92,080,071,764,553,943,3
88°/85°
****
***********
35
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m32343841424650545862667074767881828690949698
102106110112114118122126130134138142146150
92 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
137,0121,0111,0108,0
96,586,578,069,062,056,550,545,138,628,524,9
--------------------
t 307,0297,0278,0324,0321,0309,0288,0270,0252,0236,0221,0198,0174,0163,0152,0134,0
--------------------
t ------ - ----
307,0275,0261,0248,0230,5225,0206,0184,0162,0151,0
---------------
t ------ - -------------
185,0179,0170,0161,0153,0149,0
----------
t ---
327,0327,0327,0327,0326,0323,0322,0322,0300,0276,0265,5255,0240,0235,0217,0201,0184,0176,0168,0153,3139,0126,5120,2114,0102,5
91,080,269,562,056,046,637,327,8
88°/85°
***
*************
m353842454650545862667074777882868790929498
102104106108110114118122126130134138142146150154158
92 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
111,098,590,287,578,069,561,553,545,239,835,832,731,727,623,522,5
-------------- - ------
t 252,0245,0234,0262,0260,0255,0247,0236,0221,0208,0195,0182,0168,0163,0146,5130,0126,0113,5105,0
----------- - -------
t ------ - -----
249,0244,0221,0202,0197,5184,0177,0169,0154,0138,0130,0122,0114,0
----- - -------
t ------ - ---------------
157,0152,0148,0144,0137,0130,0123,0
- - -------
t ---
262,0262,0262,0262,0262,0260,0257,0254,0250,0244,7243,0237,0219,0215,0203,0195,5188,0173,0159,0152,0145,0138,7132,5120,0108,7
97,587,277,067,558,050,245,137,329,621,4
88°/85°
***
****************
36
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m39424649505458626670747879828486909498
102104106110112114118120122126130134138142146150154158162
92 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
90,079,572,269,559,051,545,038,532,125,621,520,7
-------------------------
t 198,0195,0191,0204,0203,0201,0198,0196,0188,0181,0171,0161,0158,5151,0146,0138,5124,5112,0
99,786,880,0
-----------------
t ------ - -------
190,0190,0184,0168,0155,0143,0137,0131,0119,0113,0107,0
95,088,0
-----------
t ------ - ----------------
136,0132,0125,0122,0119,0113,0107,0
99,5-------
t ---
204,0204,0203,0202,0201,0199,0197,0195,0192,0191,2189,0187,0185,0182,0178,0175,0160,6153,8147,0134,5128,2122,0111,5106,2101,0
91,281,572,563,555,246,939,032,927,221,5
88°/85°
***
************
m4346505458626670737478828689909498
102106110114115118121122126130134138142146150154158162164
92 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
71,560,550,042,034,529,424,220,4
---------------------------
t 151,0149,0146,0150,0148,0146,0144,0142,0140,5140,0138,0134,0130,0125,2123,5114,5103,7
93,583,573,863,661,0
--------------
t ------ - ------
137,0137,0137,0137,0136,0127,0117,0108,0106,0
99,592,290,080,571,0
---------
t ------ - ----------------
113,0112,0106,0100,0
95,090,084,575,0
-----
t ---
151,0149,0148,0147,0146,0143,7143,0141,0139,0137,0135,5135,0133,0131,0128,6126,0123,5121,0119,1113,5108,0105,0
95,786,577,669,061,053,045,838,531,424,421,0
88°/85°
***
********
37
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m475054586265667074788286909498
102106110114118121122126127129130134138142146150154158162166167
92 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t -
50,541,932,925,920,9
- -----------------------------
t 109,0107,0104,0107,0105,0103,5103,0101,0
99,097,095,293,792,190,788,786,282,776,268,060,254,552,644,642,5
------------
t ------ - ------
94,093,592,592,091,591,090,590,088,081,579,575,573,566,058,551,0
-------
t ------ - -----------------
80,580,580,580,578,574,068,562,555,0
---
t ---
107,0106,0104,5104,0103,0102,0100,0
98,597,095,093,592,090,288,586,785,083,682,482,080,780,479,879,575,271,063,255,548,441,434,628,021,620,1
88°/85°
***
*****
m2426272830323438424650535458626670747578818286909498
102106110114118122126130
96 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
193,0186,0174,0163,0153,0136,0122,0110,0
99,593,074,567,5
---------------- - ---
t 436,0417,0408,0399,0381,0455,0435,0399,0367,0339,0315,0295,0287,0239,0
---------------- - ---
t ------ - ------
385,0357,0329,0292,0262,0250,0
---------- - ----
t ------ - -------------
232,0228,0215,0202,0
----- - ----
t -----
460,0460,0460,0460,0451,0444,0423,7417,0378,0344,0314,0287,0263,0257,7242,0227,0222,0202,0183,0165,0148,0133,0118,0104,6
91,079,772,061,149,3
88°/85°
*****
**********
38
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m2830313437384246505458626566707478828689909498
102106110114118122126130134138142
96 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
158,0143,0131,0127,0113,0102,0
92,083,575,569,059,047,841,6
-------------------
t 366,0352,0344,0324,0384,0376,0347,0322,0299,0279,0260,0242,0217,0209,0176,0
-------------------
t ------ - -----
335,0329,0305,0273,0246,0223,0194,0
---------------
t ------ - ------------
202,0199,0187,0177,0168,0
----------
t ----
391,0391,0391,0391,0390,0379,0373,0347,0324,5317,0290,0266,0245,0225,0207,0193,5189,0172,0156,0141,2127,0114,0101,0
89,778,067,060,551,342,132,0
88°/85°
****
***********
m323435384142465054586266707274767881828690949798
102106110114118122126130134138142146150152
96 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
128,0117,0107,0104,0
93,083,575,066,058,553,047,845,142,339,524,821,9
---------------- - ---
t 306,0295,0290,0274,0327,0322,0301,0281,0263,0245,0229,0215,0201,0189,0178,0167,0155,0138,0
---------------- - ---
t ------ - ------
294,0282,0268,0254,0236,5231,0210,0191,0169,0152,0146,0
---------- - ---
t ------ - ---------------
176,0173,0164,0155,0147,0140,0
----- - ----
t ----
330,0330,0330,0330,0330,0323,0315,0310,0296,0284,0272,0261,0250,0235,5231,0213,0196,0180,0168,0164,0149,6136,0123,0110,0
99,188,077,567,057,650,543,035,626,622,2
88°/85°
****
**************
39
CC 8800-1 BOOM BOOSTERBSWSL /BSFSLBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m3638394246505458626670747882868790939498
102106108110114118122124126130134138142146150154157
96 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
104,095,084,074,066,058,050,041,936,632,728,925,021,120,2
--------------- - -----
t 253,0245,0242,0231,0266,0259,0245,0229,0215,0201,0189,0177,0166,0148,5132,0128,0115,5103,0
------------ - ------
t ------ - -----
244,0227,0206,0201,5188,0176,5173,0158,0143,0127,0119,0
------ - -------
t ------ - --------------
146,0142,0138,0131,0124,0118,0115,0
- - -------
t ----
268,0268,0268,0268,0265,0259,0256,0252,0242,0232,0215,0211,0199,0187,7184,0169,0155,0141,0134,7128,5116,0104,6
94,089,084,074,064,955,547,038,532,227,521,6
88°/85°
****
**************
m3942434650545862667074757882858690949899
102104106110114118120122126130134136138142146150154158
96 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
84,076,565,055,547,741,435,228,922,621,1
--------------------------
t 202,0199,0198,0193,0209,0206,0202,0198,0188,0176,0166,0163,5156,0146,5139,7137,5126,5114,0101,7
98,689,082,5
----------------
t ------ - -------
194,0193,0187,0171,0157,0153,5144,0139,0133,0123,0111,0
99,092,5
-----------
t ------ - -----------------
126,0120,0116,0113,0107,0102,0
97,094,5
------
t ----
209,0208,0208,0207,0205,0203,0200,0199,5198,0193,0188,5187,0181,0175,0169,0166,0156,3149,6143,0131,0119,0107,8102,5
97,587,678,069,264,860,552,344,136,428,721,3
88°/85°
****
**********
40
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m4346475054586266707478828690919498
102106110114116118122126130132134138142146148150154158162163
96 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
64,556,546,238,330,925,921,0
----------------------------
t 155,0153,0152,0150,0154,0152,0150,0147,0145,0143,0141,0135,0127,5120,0118,0113,0105,0
95,085,075,265,560,0
---------------
t ------ - -------
140,0140,0140,0139,0129,0118,0109,0105,0101,0
93,083,574,069,0
----------
t ------ - ----------------
106,0100,0
95,092,590,085,581,077,075,0
-----
t ----
155,0153,0152,0151,0149,0147,0145,0143,0141,0139,0138,2136,0134,0131,5129,0126,6122,0117,0112,0102,0
92,583,078,774,566,058,050,046,442,835,728,821,920,3
88°/85°
****
*******
m475051545859626366707478828690949698
102106110114118121122126127130131134138142144146150154158162165
96 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
44,237,729,027,222,320,7
-------------------------------
t 112,0109,0109,0107,0104,0109,0107,0107,0105,0103,0101,0
99,097,095,293,792,291,590,086,582,577,069,561,555,653,746,144,0
------------
t ------ - ---------
95,595,094,093,593,092,592,090,589,082,080,275,574,068,561,053,549,6
------
t ------ - ---------------------
82,582,578,574,071,569,566,062,058,5
--
t -----
109,0108,0108,0107,0106,0104,0103,0101,0
99,597,596,095,294,592,791,089,287,585,984,183,581,581,079,578,575,567,559,956,152,545,438,431,825,220,5
88°/85°
*****
******
41
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m2426272830333438424650535458596062667074767882848690939498
102106110114118122126130134138
102 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
186,0179,0168,0152,5148,0131,0117,0106,0
96,089,570,063,561,5
------------------------
t 414,0401,0392,0384,0367,0433,0424,0390,0360,0334,0310,0293,5288,0244,0230,0
------------------------
t ------ - --------
360,0347,0324,0302,0272,0256,0
------------------
t ------ - ----------------
213,0206,0195,0186,0
------------
t -----
442,0442,0442,0442,0435,0411,0397,5393,0373,0364,7356,5340,0310,0283,0259,0248,0238,0218,0208,0198,0180,0167,2163,0147,0132,5118,0105,0
92,079,767,559,551,540,930,1
88°/85°
*****
**********
m28303134373842465054586265666770747882868890929498
102104106110114118122126130134138142146147
102 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
152,0138,0126,0122,0109,0
98,088,580,073,065,559,542,941,637,7
-----------------------
t 350,0337,0331,0312,0371,0365,0339,0315,0293,0274,0256,0240,0220,0212,0204,0179,0
-----------------------
t ------ - -------
303,0289,0272,0255,0231,0206,0189,0
------------------
t ------ - ---------------
185,0180,0170,0161,0157,0
------------
t ----
374,0374,0374,0374,0374,0357,0340,0325,0312,2308,0302,5286,0262,0241,0221,0203,0194,0185,0176,5168,0153,0138,7131,8125,0112,5100,0
88,577,566,857,050,343,033,724,522,1
88°/85°
****
***********
42
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m323435384246505458626670737476788286909498
100102106110114116118122126130134138142146150153
102 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
123,0112,0100,0
89,580,072,061,554,549,644,440,539,236,620,9
---------------------
t 289,0280,0276,0263,0303,0293,0274,0257,0240,0225,0211,0198,0185,0179,0168,0157,0133,0
--------------------
t ------ - -----
257,0253,0247,0240,0228,0215,0199,0176,0154,0
----------------
t ------ - --------------
161,0157,0148,0140,0133,0130,0
----------
t ----
306,0306,0306,0306,0298,0286,0277,0267,0256,5253,0245,5238,0224,0209,0192,0176,0160,0153,2146,5133,0120,2108,0102,6
97,286,576,566,557,248,039,934,727,321,3
88°/85°
****
*************
m36383942465054586266707478808284868890939498
102106109110114118122126128130134138142146150154155
102 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
99,590,580,569,561,053,545,938,232,829,225,523,721,920,1
------------- - ---------
t 235,0231,0228,0221,0248,0242,0233,0223,0210,0197,0185,0174,0164,0158,0149,5141,0133,0125,0116,5104,0
--------- - ---------
t ------ - ------
213,0209,0204,0200,0195,0191,0182,0178,0164,0148,0132,0120,5116,0
---- - --------
t ------ - -----------------
134,0132,0125,0118,0112,0106,0104,0
--------
t ----
248,0248,0248,0248,0246,0238,0231,0225,0216,0210,5205,0199,5194,0189,0184,0175,7173,0162,0149,5137,0128,0125,0113,0102,6
92,082,277,372,563,354,546,238,030,022,220,3
88°/85°
****
**************
43
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m4042434650545862667073747882868790949899
102105106110114117118122126130134138142146150154158
102 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
80,072,060,050,543,237,231,325,420,9
--------------------------
t 188,0186,0185,0181,0196,0193,0190,0186,0179,0171,0164,0162,0153,0143,5135,5133,7126,5114,5102,0
99,089,679,5
---------------
t ------ - --------
173,0169,0164,0158,0156,5150,0141,0138,0127,0114,0105,0102,0
90,0---------
t ------ - ------------------
112,0110,0105,0100,0
95,090,586,5
-----
t ----
196,0196,0195,0195,0194,0190,0187,7187,0183,0179,0171,0169,0163,0156,0148,0146,0140,0134,0132,0123,5115,0107,3104,7
94,585,075,567,058,550,542,635,127,720,6
88°/85°
****
*********
m43464750545558626667707478828690939498
102106110114116118122125126130134138142146150154158162
102 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
59,051,041,439,433,726,421,820,6
---------------------------
t 146,0145,0144,0142,0138,0146,0145,0142,0141,0140,5139,0137,0135,0130,5123,5117,0112,2110,5103,5
95,285,575,765,860,5
-------------
t ------ - ---------
133,0133,0132,0129,0126,0122,0114,0110,0105,0
96,088,786,577,067,0
-------
t ------ - -------------------
90,089,085,081,577,574,070,567,0
---
t -----
146,0146,0144,0143,0142,7142,0140,0138,0137,0135,0131,0128,0127,0123,0118,5114,0109,4105,0101,8
98,792,587,686,079,571,863,555,948,341,234,127,420,7
88°/85°
*****
********
44
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m4750515458596062667074788286909498
102106110114118122126128130134138142146150154158162164
102 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
38,932,724,522,720,9
----------------------------
t 106,0104,0103,0101,0
99,0104,0103,0102,0100,0
98,596,594,593,091,289,788,286,883,780,075,769,561,754,046,142,1
----------
t ------ - ---------
90,590,089,589,589,088,588,085,582,578,570,563,055,547,9
-----
t ------ - -------------------
68,566,063,561,058,055,552,550,5
-
t -----
104,0103,6103,0102,0100,0
99,598,096,595,093,591,590,088,286,585,083,581,278,573,571,269,064,560,054,949,942,936,129,723,320,2
88°/85°
*****
*****
m25262830333438424650535458596266707478828690949598
102106110114118122126130134138142
108 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
173,0162,0147,5143,0127,0113,0102,0
92,586,566,559,057,0
----------------------
t 391,0383,0367,0353,0412,0407,0380,0353,0328,0305,0289,5284,0250,0237,0
----------------------
t ------ - -------
302,0280,0261,0243,0227,0
-----------------
t ------ - -------------
190,0178,0166,0163,0
------------
t ----
413,0412,0407,0405,0400,0375,0356,2350,0324,0319,0304,0283,0263,0242,0222,0207,0191,0175,0160,0156,0146,0131,5117,0104,7
92,581,069,558,752,043,833,924,0
88°/85°
****
*********
45
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
m28303234384246505458626566687071747882868890949598
102106110114118122126130134138142146150
108 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
142,0133,0118,0105,0
94,585,576,569,562,557,038,936,534,132,9
------------- ---------
t 322,0317,0309,0298,0339,0326,0307,0287,0269,0251,0236,0223,5218,0202,0185,0176,0
------------- ---------
t ------ - ------
257,0249,0245,0234,0219,0206,0193,0187,0
--------- --------
t ------ - ----------------
156,0149,0139,0131,0
---- -------
t ----
341,0337,0335,0334,0320,0302,0284,0270,5266,0258,0250,0245,7233,0216,0200,0184,0177,5171,0158,0155,0146,0133,5121,0111,0101,0
91,081,070,761,051,443,336,529,420,6
88°/85°
****
**********
m323435384246505458626670747576788286909498
100102103106110114118122126130134138141
108 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
119,0108,0
96,586,077,068,058,551,046,341,336,435,133,9
-------------------
t 265,0260,0258,0250,0278,0270,0262,0249,0234,0220,0207,0195,0182,0176,5171,0159,0136,0
-----------------
t ------ - ------
215,0212,0206,0194,0183,0173,0163,0154,0150,0
------------
t ------ - ----------------
128,0122,0115,0109,0102,0
------
t ----
278,0275,0272,0271,0265,0253,0242,0231,0218,0214,5211,0204,0191,0177,0164,0152,0141,0135,5130,0127,2119,0108,5
98,089,581,072,764,555,947,641,3
88°/85°
****
*************
46
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m3638394246505458626670747880828688909498
102106110111112114118122126130134138142146150151
108 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
95,587,076,565,057,049,942,635,229,626,122,620,8
----------------------
t 215,0211,0209,5205,0223,0219,0214,0208,0200,0192,0181,0171,0161,0157,0150,0135,0127,0118,5101,0
-----------------
t ------ - -------
178,0169,0165,0161,0152,0144,0137,0129,0122,0118,0114,0
-----------
t ------ - ----------------
104,0102,0
99,594,088,583,579,0
------
t ----
224,0222,0220,0218,0215,0209,0202,0195,0187,0181,5176,0166,0160,5155,0144,0133,0123,5114,0105,0102,7100,5
96,087,078,070,663,556,449,442,235,027,826,0
88°/85°
****
************
m404243465051545862667071747882868890949899
102105106110114118119122124126130134138142146150154156
108 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
76,067,555,553,246,839,133,427,822,120,7
---------------------------
t 172,0169,0168,0165,0160,0176,0174,0170,0167,0163,0159,0158,0154,0147,0140,0132,5129,0125,5115,5103,2100,3
91,181,0
----------------
t ------ - ---------
148,0145,0138,0132,0130,5126,0121,5120,0114,0108,0103,0101,5
95,088,0
---------
t ------ - --------------------
83,580,078,075,571,567,563,560,0
----
t -----
177,0175,0174,0172,0170,0167,0166,0163,0159,0156,0148,0144,0140,0132,0124,0121,8115,5109,1107,0100,0
92,084,282,376,572,668,761,054,948,942,736,530,324,221,1
88°/85°
*****
**********
47
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m4346475054555862667074788286909498
102106110111114117118122126128130134136138142146150154157
108 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
54,046,937,335,329,822,6
----------------------------
t 133,0132,0131,0129,0126,0135,0134,0132,0130,0127,0125,0122,0118,5116,0113,0108,0102,0
95,286,576,774,366,759,0
-------------
t ------ - --------
116,0114,0111,0106,0102,0101,0
97,594,593,589,085,083,080,070,565,5
------
t ------ - -------------------
64,562,559,057,055,552,049,446,6
--
t -----
136,0135,0133,0132,0131,0128,0126,0123,0120,0117,0111,0106,0100,7
95,590,188,884,579,878,272,065,562,259,052,649,446,340,735,430,024,620,6
88°/85°
*****
******
m4750515458606266707478828690949899
102106110114118122126128130134136138142146148150154158162
108 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
34,328,420,6
- - -----------------------------
t 98,096,596,094,092,096,595,594,092,090,589,087,285,784,583,281,781,379,576,573,569,262,554,747,042,8
-----------
t ------ - ---------
84,584,584,083,581,579,576,573,572,070,567,566,064,558,050,5
-----
t ------ - --------------------
47,946,443,640,939,638,235,833,431,4
t -----
96,596,095,094,093,092,090,589,087,586,083,082,179,776,573,270,066,763,558,355,653,047,845,242,737,432,229,5
----
88°/85°
*****
***
48
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m25262830343842465054586062636670747879828689909498
102106110114118122126130134138142143
114 m + 48 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
166,0155,0137,0122,0109,0
98,089,081,054,050,5
------------ - ------------
t 358,0355,0348,0336,0374,0360,0339,0315,0293,0274,0256,0229,0
----------- - -------------
t ------ - ------
326,0308,0286,0266,0249,0245,0
---- - -------------
t ------ - --------------
180,0178,0167,0158,0
------------
t ----
376,0375,0375,0375,0366,0360,0355,0345,0332,0324,5302,0275,0251,0229,0223,7208,0190,0176,5172,0156,0141,0127,3114,0101,7
89,578,267,056,946,839,533,023,821,6
88°/85°
****
********
m2930323438424650545862656670717478828690949798
102106110114118122126130134138142146149
114 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
136,0127,0113,0101,0
90,581,572,065,558,553,533,829,428,3
--------- - -----------
t 296,0293,0287,0280,0310,0301,0289,0274,0258,0241,0227,0216,5213,0190,0181,0
-------- - ------------
t ------ - ------
287,0282,0267,0250,0234,0220,0200,0
--- - ------------
t ------ - --------------
159,0157,0148,0140,0133,0
----------
t ----
311,0311,0311,0311,0307,0306,0304,0303,2303,0283,0277,0259,0237,0217,0198,0181,0165,0153,7150,0136,5123,0111,1
99,588,778,068,258,549,340,231,526,021,7
88°/85°
****
**********
49
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m33343638424346505458626670747778828386909498
102106110114118120122126130134138142146150151
114 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
110,0103,0
91,589,082,073,063,554,547,142,437,733,025,6
--------- - ------------
t 241,0239,0234,0230,0221,0253,0247,0240,0232,0223,0211,0198,0187,0176,0166,5162,0139,0133,0
----- - -------------
t ------ - -------
249,0244,0229,0225,0215,0202,0190,0171,0149,0
- -------------
t ------ - ----------------
134,0127,0120,0114,0111,0
---------
t -----
254,0254,0254,0254,0254,0251,0251,0251,0249,0241,5239,0220,0215,2201,0185,0169,0154,0141,0128,0116,0105,0
94,089,084,074,565,056,247,539,231,023,121,2
88°/85°
*****
*************
m36384042464750545862667074767882838688909498
102106110114118122126130132134138142146150154
114 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
88,082,571,068,260,052,045,438,331,325,722,420,7
---------- - ------------
t 196,0193,0190,0187,0181,0206,0202,0197,0191,0186,0181,0172,0163,0159,0154,0145,5143,2135,0129,0120,5104,0
-- - -------------
t ------ - ---------
199,0199,0199,0194,0182,0171,0160,0144,0128,0112,0
-----------
t ------ - ---------------- - -
111,0105,0
99,594,089,087,0
------
t -----
206,0206,0206,0206,0206,0204,0202,0202,0201,5201,0197,0195,7192,0186,5181,0168,0154,0141,2128,0116,5105,0
95,285,576,067,062,758,550,042,334,727,320,0
88°/85°
*****
************
50
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m4042444650525458626668707478828689909498
100102106110114118122126130134138142144146150154157
114 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
67,561,550,546,342,034,429,023,620,9
--------------------------
t 157,0155,0152,0150,0146,0163,0162,0159,0155,0151,0149,0147,0144,0138,0133,0126,5121,2119,5112,5104,0
99,092,579,5
--------------
t ------ - ---------
153,0153,0153,0153,0153,0153,0146,0135,0123,0111,0
99,586,5
---------
t ------ - -------------------
94,588,584,579,575,571,569,5
----
t -----
164,0164,0163,0163,0163,0163,0162,0161,0159,0157,0154,0151,7151,0149,0144,0140,0136,0128,0120,0109,0
99,289,580,772,063,655,548,044,340,633,626,621,6
88°/85°
*****
*********
m44464850545658616266707478828690949598
102106110111114117118122126130134136138142146150154158159
114 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
46,241,632,528,625,220,1
------------------------------
t 122,0121,0119,0118,0115,0125,0124,0123,5123,0121,0119,0116,0114,0112,0109,5106,5102,2100,8
96,590,585,277,775,368,060,5
-------------
t ------ - ----------
114,0114,0114,0114,0114,0114,0114,0112,5111,0103,0
93,083,574,069,5
-------
t ------ - ---------------------
75,070,568,567,063,560,557,053,5
--
t -----
126,0125,0125,0125,0124,0123,0123,0121,0119,0117,0116,0114,0113,5112,0109,0107,0105,0104,5103,0
99,798,690,081,272,564,760,857,049,742,535,729,022,621,1
88°/85°
*****
******
51
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m485054586062667074788286909498
102103106110114118122126129130134138142145146148150154
114 m + 120 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t------ - --------------------------
t90,589,587,585,590,089,087,586,085,083,582,080,779,278,077,075,074,272,069,065,762,055,547,641,6
---------
t------ - ---------
77,577,577,577,577,574,570,567,266,063,060,057,054,553,549,7
--
t------ - -------------------
30,126,524,423,822,922,120,4
t----
90,089,588,587,586,585,584,082,581,079,578,076,976,575,574,072,565,558,551,045,944,237,831,425,020,2
----
88°/85°
****
m293032343839424650545862656670727478828690929498
100102106110112114118122126130134138142146147
120 m + 60 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
130,0122,0108,0105,0
97,087,078,068,061,555,050,029,125,023,0
-----------------------
t 271,0268,0263,0258,0247,0283,0276,0267,0257,0246,0234,0220,0209,5206,0194,0176,0
-----------------------
t ------ - --------
267,0258,0241,0226,0212,0200,0194,0
-----------------
t ------ - -----------------
145,0141,0133,0126,0123,0
----------
t -----
284,0284,0284,0284,0284,0281,0281,0281,0281,0276,0264,0252,0230,0211,0192,0176,0168,0160,0146,0139,5133,0120,0108,0102,0
96,586,276,066,256,548,039,330,922,720,7
88°/85°
*****
***********
52
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m33343638424346505458626670747778828386909498
102104106108110114118122124126130134138142146150151
120 m + 72 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
105,099,088,085,577,068,059,550,543,238,734,229,725,9
------------------------
t 220,0218,0215,0211,0203,0232,0227,0221,0213,0206,0199,0191,0181,0170,0163,0161,0142,0136,0
---------------------
t ------ - --------
227,0221,0217,5207,0194,0183,0173,0157,0146,0
---------------
t ------ - ------------------
123,0120,0113,0107,0101,0
99,0--------
t -----
232,0232,0232,0232,0232,0230,0229,0229,0229,0225,2224,0211,0207,0195,0179,0164,0149,0136,5130,2124,0118,2112,5101,0
91,081,076,371,762,554,045,537,529,722,120,3
88°/85°
*****
*************
m3638404246485054586266707274788285868890949598
102106110114116118122126130134138142146150153
120 m + 84 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
83,578,566,060,555,547,841,134,427,722,120,5
-------------------------
t 178,0177,0174,0171,0165,0187,0185,0181,0175,0170,0165,0160,0158,0156,0148,0140,0134,0132,0128,0121,0106,0101,0
----------------
t ------ - ---------
180,0180,0180,0180,0175,0172,0164,0155,0146,0134,0118,0109,0
----------
t ------ - --------------------
101,098,593,087,583,078,5
-----
t -----
189,0189,0189,0189,0189,0187,0184,0183,5183,0182,0180,0177,7177,0173,0169,0159,0156,5149,0136,0123,0112,0101,0
96,191,281,572,563,555,547,640,032,425,320,0
88°/85°
*****
***********
53
CC 8800-1 BOOM BOOSTERBSWSL /BSFSL 15°
6 m steps of luffing jib length is standard
* Main boom angle 88°
Main boom angle 88°, 85°, 75° and 65°; capacities for intermediate boom positions are calculated by the crane control system IC-1
0 t 280 t 400 t 520 t 640 t 720 t 800 t
19-30 m 10,5 m 9.8 m/s 360° ISO295 t + 60 t
m4042444650525458626566707478828690919498
100102106110114118122125126130134138142146150154156
120 m + 96 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
61,556,545,941,637,630,124,921,1
---------------------------
t 143,0141,0139,0137,0132,0150,0148,0145,0142,0139,0138,0134,0131,0127,0124,0119,0113,0111,5107,5102,0
99,093,281,0
--------------
t ------ - ----------
139,0139,0139,0139,0139,0139,0135,0127,0116,0104,0
94,791,5
--------
t ------ - --------------------
83,082,078,073,569,565,562,0
---
t -----
150,0150,0150,0149,0149,0149,0148,0147,0145,0143,0142,0139,0137,2135,0133,0129,7126,5120,0113,0105,0
95,285,578,976,768,060,252,545,137,931,124,321,0
88°/85°
*****
********
m4446485054565862667074788286909498
102106110111114118122126130133134138142146148150154158
120 m + 108 m
75° 65°88°/85°
BSWSL BSFSL0 t 0 t -800 t
t --
40,936,628,024,220,9
----------------------------
t 111,0110,0108,0106,0103,0115,0114,0113,0111,0109,0106,0103,0101,0
98,796,293,089,285,581,276,575,269,059,0
------------
t ------ - ---------
104,0104,0103,0103,0103,0103,0103,0103,0
96,587,080,077,568,0
------
t ------ - -------------------
65,564,560,557,053,552,050,548,445,5
t -----
115,0115,0114,0113,0113,0112,0111,0109,0107,0106,0104,0102,0100,0
98,095,795,193,589,785,577,269,063,161,253,546,339,335,9
---
88°/85°
*****
*****
BSFVL CC 8800-1 BOOM BOOSTER
54
BSFVL
m16171819202224262830343842465051525455586266707274777881828690
m16171819202224262830343842465051525455586266707274777881828690
t --
350,0327,5305,0269,0238,0212,0189,0169,0129,0
98,073,554,038,535,131,725,022,5
------------
t 1065,01040,01015,0992,5970,0929,0891,0857,0796,0735,0636,0557,0493,0440,0395,0385,2375,5356,0347,7323,0294,0253,0214,0201,0
-------
t 1065,01040,01015,0992,5970,0929,0891,0857,0826,0797,0742,0652,0579,0512,0446,0431,7417,5389,0376,5339,0304,0269,0230,0211,0
-------
t --
329,0314,0294,0258,0229,0203,0181,0162,0125,0
94,069,550,034,030,727,521,0
-------------
t -
1062,01039,01016,5994,0954,0917,0860,0791,0730,0631,0552,0488,0435,0390,0380,2370,5351,0342,7318,0289,0264,0237,0220,0203,0178,0
-----
t -
1062,01039,01016,5994,0954,0917,0883,0851,0822,0737,0647,0574,0514,0461,0447,0433,0405,0392,7356,0313,0274,0251,0234,5218,0193,0
-----
t ---
303,0283,0248,0219,0194,0172,0153,0120,0
89,064,544,528,525,021,5
--------------
t -
1020,0999,0979,5960,0924,0891,0855,0785,0725,0625,0546,0482,0429,0384,0374,2364,5345,0336,7312,0283,0258,0236,0224,0212,0188,7181,0158,0
---
t -
1020,0999,0979,5960,0924,0891,0861,0833,0807,0732,0642,0569,0508,0458,0446,2434,5411,0398,7362,0319,0280,0245,0235,0225,0202,5195,0172,0
---
t ----
272,0238,0210,0186,0165,0146,0115,0
86,561,542,025,522,0
---------------
t --
988,0984,5981,0955,0922,0851,0782,0722,0622,0543,0479,0426,0381,0371,2361,5342,0333,5308,0279,0254,0232,0222,0212,0199,2195,0176,2170,0143,0
-
t --
992,0991,0990,0955,0922,0891,0862,0836,0728,0638,0565,0505,0454,0443,2432,5411,0401,0371,0329,0292,0258,0242,5227,0207,5203,0187,2182,0156,0
-
CC 8800-1 BOOM BOOSTER
55
0 tmax.640 t
max.800 t
66 m
0 tmax.640 t
max.800 t
72 m
0 tmax.640 t
max.800 t
76 m
0 tmax.640 t
max.800 t
82 m
19-30 m 12 m 15° 10,5 m 9.8 m/s 360° ISO295 t + 60 t
0 t 460 t 560 t 640 t 720 t 800 t
BSFVL
m1819202122232426283034384246474849505458626670747882868990949598
102103106
m1819202122232426283034384246474849505458626670747882868990949598
102103106
t ---
244,0229,0215,0201,0177,0156,0138,0107,0
80,555,536,031,827,623,5
------------------
t 960,0956,5953,0937,5922,0907,0892,0845,0776,0715,0616,0537,0472,0419,0407,7396,5385,2374,0335,0302,0273,0247,0225,0205,0188,0172,0149,0130,0
-------
t 965,0959,0953,0937,5922,0907,0892,0865,0839,0815,0722,0632,0559,0498,0485,2472,5459,7447,0404,0367,0329,0293,0259,0229,0200,0180,0161,0142,0
-------
t ---
234,0219,0205,5192,0169,0149,0131,0101,0
77,554,534,530,326,122,0
------------------
t -
883,0883,0877,0871,0862,0853,0836,0774,0714,0614,0535,0470,0417,0405,7394,5383,2372,0333,0300,0270,0245,0223,0203,0185,0169,0155,0142,2138,0116,0110,0
----
t -
888,0888,0888,0888,0888,0888,0879,0867,0834,0720,0630,0557,0496,0483,2470,5457,7445,0402,0364,0332,0299,0266,0237,0210,0185,0162,0152,2149,0127,0122,0
----
t ----
210,0196,5183,0160,0141,0123,0
93,569,548,528,524,220,0
-------------------
t --
855,0848,0841,0832,5824,0808,0768,0707,0607,0528,0464,0411,0399,7388,5377,2366,0327,0293,0264,0238,0216,0196,0178,0162,0148,0138,2135,0118,0113,0
98,0---
t --
860,0860,0860,0860,0860,0850,0825,0799,0714,0623,0550,0490,0477,2464,5451,7439,0395,0358,0325,0296,0264,0235,0209,0184,0161,0145,2142,0129,0124,0109,0
---
t -----
187,0175,0153,0133,0116,0
87,564,045,024,520,5
--------------------
t --
791,0786,5782,0776,5771,0760,0750,0703,0603,0524,0459,0406,0394,7383,5372,2361,0322,0289,0259,0234,0211,0191,0174,0158,0143,0133,2130,0119,0115,7106,0
88,083,0
-
t --
797,0795,0795,0795,0795,0795,0768,0736,0676,0619,0546,0485,0472,2459,5446,7434,0391,0353,0321,0292,0264,0236,0211,0187,0165,0150,0145,0125,0122,5115,0
98,093,5
-
CC 8800-1 BOOM BOOSTER
56
19-30 m 12 m 15° 10,5 m 9.8 m/s 360° ISO295 t + 60 t
0 tmax.640 t
max.800 t
86 m
0 tmax.640 t
max.800 t
92 m
0 tmax.640 t
max.800 t
96 m
0 tmax.640 t
max.800 t
102 m
0 t 460 t 560 t 640 t 720 t 800 t
BSFVL
m21222324252628303438414243444650545862667074788286909498
102106108110114118119
m21222324252628303438414243444650545862667074788286909498
102106108110114118119
t --
179,0167,0156,5146,0127,0110,0
82,059,044,5
------------------------
t 728,0721,0718,0715,0712,0709,0703,0697,0601,0521,0473,0457,0443,7430,5404,0359,0320,0286,0257,0231,0209,0189,0171,0155,0140,0127,0116,0105,0
95,579,070,5
----
t 737,0733,0731,0731,0731,0731,0731,0731,0686,0616,0561,2543,0528,0513,0483,0432,0388,0351,0318,0289,0264,0237,0212,0190,0169,0149,0130,0113,0101,0
88,080,0
----
t ---
159,0148,5138,0120,0103,0
76,053,539,635,030,5
----------------------
t 676,0669,0667,5666,0664,5663,0660,0657,0598,0519,0470,2454,0440,7427,5401,0356,0317,0283,0254,0228,0206,0186,0168,0152,0137,0124,0112,0101,0
91,582,575,769,054,0
--
t 681,0680,0678,0676,0674,5674,0674,0674,0649,0613,0558,2540,0525,0510,0480,0429,0385,0348,0315,0286,0261,0236,0212,0190,0170,0151,0133,0116,0100,0
88,583,077,563,0
--
t ----
141,0132,0113,0
98,071,049,035,130,526,522,5
---------------------
t -
616,0613,0613,0613,0613,0613,0612,0594,0515,0467,0451,0437,5424,0397,0353,0314,0280,0250,0225,0202,0182,0164,0148,0133,0120,0108,0
98,088,079,074,770,559,546,042,5
t -
623,0623,0623,0623,0623,0623,0623,0606,0579,0547,5537,0521,7506,5476,0425,0382,0344,0311,0263,0242,0221,0201,0180,0159,0149,0133,0117,0102,0
87,580,276,067,054,051,0
CC 8800-1 BOOM BOOSTER
57
19-30 m 12 m 15° 10,5 m 9.8 m/s 360° ISO295 t + 60 t
0 tmax.640 t
max.800 t
108 m
0 tmax.640 t
max.800 t
114 m
0 tmax.640 t
max.800 t
120 m
0 t 460 t 560 t 640 t 720 t 800 t
TECHNICAL DESCRIPTION
Assembly of side frames
Assembly of front and rear frame
CC 8800-1 BOOM BOOSTER
58
TECHNICAL DESCRIPTION
Assembly boom section
CC 8800-1 BOOM BOOSTER
59
TRANSPORTATION
60
CC 8800-1 BOOM BOOSTER
Container versions
Open TopsOur special open top containers are available in lengths of 12.20 m and have been designed for over-sized cargo that does not fit into astandard container.
They are equipped with removable roof bows and tarpaulin covers, and the cargo can easily be secured with lashing bars and bull ring.
Size Max. Gross Weight*
32 700 kg
30 480 kg
* Dimensions vary within container series. For dimension of specific units, please contact your nearest shipping agency.
40 Open Top12.20 m x 2.44 m x 2.59 m
40 Open Top12.20 m x 2.44 m x 2.90 m
Standard
High-Cube
61
CC 8800-1 BOOM BOOSTERTRANSPORTATION
Transport versionsBoom booster kit 72 m consists of 2 adapters and 5 intersections
It is designed to fit into 40’ (12.20 m) – open top – standard ISO containersection weight ~ 20.2 t – 21.2 tlower adapter ~ 34.5 tupper adapter ~ 37.0 t
Standard ContainersFor single international containerised transport
If customers intents future local transport not in containers i.e. partly assembled Terex can arrange the first shipping in standard containers and neccesary non-returnable transport securing.
5 x for intersections (incl. walkways)4 x for the adapters (incl. walkways)
9 x standard open top containers
Special High-Cube ContainersFor multiple international containerised transport
A comfortable storage of the parts in special high-cube containersand storage racks for multiple use
5 x for intersections3 x for the adapters2 x for walkways
10 x specialized High-Cube containers44 x specialized storage racks
Effective Date: November 2014.Product specifications and prices are subject to change without notice or obligation. The photographs and/or drawings in this document are for illustrativepurposes only. Refer to the appropriate Operator’s Manual for instructions on the proper use of this equipment. Failure to follow the appropriate Operator’sManual when using our equipment or to otherwise act irresponsibly may result in serious injury or death. The only warranty applicable to our equipment isthe standard written warranty applicable to the particular product and sale and Terex makes no other warranty, express or implied. Products and services listed may be trademarks, service marks or trade-names of Terex Corporation and/or its subsidiaries in the USA and other countries. All rights are reserved. Terex® is a registered trademark of Terex Corporation in the USA and many other countries.
Copyright Terex Cranes 2014
Terex Cranes, Global Marketing, Dinglerstraße 24, 66482 Zweibrücken, GermanyTel. +49 (0) 6332 830, Email: info.cranes@terex.com, www.terexcranes.com
www.terex.com/cranes Brochure Reference: TC-DS-M-E-CC8800-1 Boom Booster – 11/14
top related