Case study of an ECBC Compliant, Energy Efficient Building: Aranya Bhawan, Jaipur
Prashant Bhanware
Indo-Swiss Building Energy Efficiency Project (BEEP)
2nd REGIONAL WORKSHOP ON ECBC IMPLEMENTATION IN STATES
March 15 & 16, 2017 | Hyatt, Ahmedabad
2Indo-Swiss Building Energy Efficiency Project
Outline of the Presentation
• About Indo-Swiss Building Energy Efficiency
Project (BEEP)
– Overview of BEEP charrettes
• Case study: Aranya Bhawan, Jaipur
• Learnings
3Indo-Swiss Building Energy Efficiency Project
Indo-Swiss Building Energy Efficiency Project (BEEP)
Phase I: 2012-2016
Phase II: 2017-2021
To assist Government of India
in mainstreaming thermally
comfortable and energy
efficient building design in
India
4Indo-Swiss Building Energy Efficiency Project
Building Design Design support to large building projects
Energy Efficient Building EnvelopeBuilding
Technology
Design Guidelines for Residential & Public Buildings Building
Policy
Trainings, Seminars , Web , …Training &
Information
Indo-Swiss Building Energy Efficiency Project (BEEP)
5Indo-Swiss Building Energy Efficiency Project
Energy Efficient Building Design
Hospital Educational campus Residential township
World Trade Centre
Training institute & govt. office
Office & Retail complex
• Technical support to18 building projects (IT buildings, hospital, offices, residential complexes, academic institutions,..)
• >1.4 million m2 built-up area• 25-40% estimated energy savings
6Indo-Swiss Building Energy Efficiency Project
Integrated Design Charrette Approach for ECBC Compliance
Business As Usual
Passive Measures (Orientation, WWR,
glazing, Shading, Insulation, natural
ventilation, daylight…)
Active Measures (Free cooling, ERW,
Evap. Cooling, Chiller selection &
operation, innovative
technologies,…)
On-site Renewable Energy Generation
Ene
rgy
Co
nsu
mp
tio
n
100%
Net Energy
Minimize heat gain,
Maximize Daylight
Efficient HVAC &
lighting system
7Indo-Swiss Building Energy Efficiency Project
Integrated Design Charrette Approach for ECBC Compliance
Integrated Design during Early-Design Phase
8Indo-Swiss Building Energy Efficiency Project
What is Energy Performance Index (EPI)?
Source: BEE Star rating for Office Building & BEE Star rating for BPO
Main Meter
Renewable electricity
Grid Electricity
DG Electricity
Built-up area (m2)
✓
✓
Total electricity (kWh/y)
Built-up area: Total built-up area excluding the basements used for services and/or parking
9Indo-Swiss Building Energy Efficiency Project
70
78
11
4
15
8
13
2
13
4
13
4
12
9
44
85
12
2
15
5
46 5
3
80 8
5
84
55
89
84
35
65 68
12
0
PU
BL
IC O
FF
ICE
, B
EN
GA
LU
RU
AR
AN
YA
B
HA
WA
N,
JAIP
UR
IIID
EM
, N
EW
D
EL
HI
MIX
ED
-US
E
DE
VE
LO
PM
EN
T,
PU
NE
MIX
ED
-US
E
DE
VE
LO
PM
EN
T,
BE
NG
AL
UR
U
WO
RL
D T
RA
DE
C
EN
TE
R (
WT
C),
G
AN
DH
I N
AG
AR
PR
IVA
TE
OF
FIC
E
BU
ILD
ING
, B
EN
GA
LU
RU
MIX
ED
US
E
DE
VE
LO
PM
EN
T,
NO
IDA
INT
ER
NA
TIO
NA
L
TR
AIN
ING
C
EN
TR
E,
PU
NE
SY
MB
IOS
IS
UN
IVE
RS
ITY
OF
A
PP
LIE
D
SC
IEN
CE
S,
IND
OR
E
MIT
UN
IVE
RS
ITY
, U
JJA
IN
JUP
ITE
R
HO
SP
ITA
L,
PU
NE
ESTIMATED ENERGY PERFORMANCE INDEXES OF CHARRETTE PROJECTSEnergy Performance Index (EPI) - kWh/m2.yBefore Charrette
Energy Performance Index (EPI) - kWh/m2.yAfter Charrette
EPI of BEEP Charrette Projects: Commercial Buildings
PUBLIC OFFICE BUILDING PRIVATE OFFICE/IT BUILDING EDUCATIONAL INSTITUTE HOSPITALTRAINING
Click to edit Master title styleClick to edit Master title style
10Indo-Swiss Building Energy Efficiency Project
CASE STUDY:ARANYA BHAWAN, JAIPUR
11Indo-Swiss Building Energy Efficiency Project
Jaipur: Climate
Jaipur
12Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan
• Built-up area: ~10,000 m2 (excluding basement parking and service area)
• Number of floors: Five (G+4) + one basement for parking and services
• Number of users: ~350
• Types of spaces: Offices, museum, library, auditorium, guest rooms
Aranya Bhawan is the new office building of the Rajasthan Forest
Department in Jaipur, inaugurated in March 2015.
13Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan: Project Timeline
• Client: Rajasthan Forest Department
• Executing Agency: Rajasthan State
Road Development and Construction
Corporation Ltd. (RSRDC)
• Architects: Mathur, Ugam and
Associates
December 2012
•Design Charrette
2013-2015
•Construction
•Technical support by BEEP
March 2015
• Inauguration
2015-2016
•Energy Monitoring
14Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan: Passive Measures
Roof Insulation
Wall Insulation
Double-Glazed Windows
Reduction in Glazed Area
U-value: 1.8 W/m2.K
SHGC: 0.24
VLT: 36%
U-value: 0.6 W/m2.K
U-value*: 0.5 W/m2.K
15Indo-Swiss Building Energy Efficiency Project
Reduction in Cooling System Size
0
50
100
150
200
250
Before the charrette After charrette
Cooling system size (TR)
28% reduction
16Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan: Cooling System
Water Cooled Energy Efficient Chiller (using water after waste water treatment)
17Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan: Solar Energy Generation
Grid connected rooftop solar PV• Capacity: 45 kWp (annual production:
~60,000 kWh)
18Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan – Energy Monitoring
• Detailed monitoring of 2 weeks in Winter (Jan.16) & 2 weeks in Summer
(May.16) + Monthly electricity bills for 1 year
19Indo-Swiss Building Energy Efficiency Project
Monitoring results Aranya Bhawan
Lighting17%
Office Equipment
69%
STP10%
Miscellaneous4%
HVAC0%
Winter (Nov-Feb)
Lighting5%
Office Equipment
26%
STP2%
Miscellaneous7%
HVAC60%
Summer (Mar-Oct)
Lighting6%
Office Equipment
31%
STP3%
Miscellaneous7%
HVAC53%
Annual Energy Consumption
Chiller54%
Primary Pump5%
Secondary Pump10%
CT Fan4%
Condenser Pump12%
AHU15%
Break-up of HVAC energy consumption
20Indo-Swiss Building Energy Efficiency Project
5.5
5.3 5
.4
5.2
4.6
4.5
3.9
3.4
3.3
3.2
3.9
4.5
6.1
6.7
5.7
4.9
5.3
3.4
1.1 1.2 1
.3 1.4
2.0
3.9
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
May-15 Jun-15 Jul-15 Aug-15 Sep-15 Oct-15 Nov-15 Dec-15 Jan-16 Feb-16 Mar-16 Apr-16
kWh
/m2.m
on
th
Monthly EPI Comparison: Simulated vs. Actual
Simulated EPI Actual EPI
Electricity Consumption: Simulation & Actual (EPI)
Actual EPI: 43 kWh/m2.yearBEE 5 star benchmark: 90 kWh/m2.year
21Indo-Swiss Building Energy Efficiency Project
Aranya Bhawan: Overall Cost and Performance Summary
22Indo-Swiss Building Energy Efficiency Project
ECBC Compliance
Buildings applying for ECBC Compliance
Meet Mandatory Provisions
Prescriptive Method
All building components need to comply the code individually
Other building components need to comply the code individually
Envelope Trade-off Method
Whole Building Performance Method
Annual Energy Simulation of Whole Building
kWhproposed ≤ kWhprescriptive
Allows trade-off among envelope components (Wall, Roof & Fenestration) based on total Envelope Performance Factor
EPFproposed ≤ EPFprescriptive
23Indo-Swiss Building Energy Efficiency Project
ECBC Compliance of Aranya Bhawan: Whole Building Performance Method
ECBC Prescreptive* Proposed#
Opaque Wall U-value (W/m2.K) 0.44 0.5
Roof U-value (W/m2.K) 0.409 0.6
Fenestration- SHGC- VLT- U-value (W/m2.K)
0.250.273.3
0.240.361.8
LPD ("building area method") (W/m2) 10.8 7
HVAC: Centralised system - Water cooled screw chiller (COP)- AHU
4.7Constant volume
5.8Constant volume AHUs + FCUs
*Day use office building in Composite climate; Glazing distributed in all 4 sides equally; Baseline model simulated for 0, 90, 180 & 270 degree orientation and average value taken
#Same building operation assumptions (thermostat setpoints, schedules, internal gains, occupant loads, etc.); Finalized based on calibrated energy simulation model
24Indo-Swiss Building Energy Efficiency Project
ECBC Compliance of Aranya Bhawan
5,13,657
4,04,554
2,95,245
-
1,00,000
2,00,000
3,00,000
4,00,000
5,00,000
6,00,000
ECBC Prescriptive(Simulated)
Proposed(Simulated)
Actual(Measured)
kW
h/y
Annual Energy Consumption
An ECBC compliant building design:
~20% energy saving
Net Grid Electricity consumption to
reduce by 60,000 kWh/y (Estimated
generation from 45 kWp SPV system)
25Indo-Swiss Building Energy Efficiency Project
Learnings
• The approach for energy efficiency/ECBC
compliance should always be reducing the
demand first through passive measures, use
efficient systems with controls and then
integrate renewable energy system.
• Integrated approach at early design stage for
energy efficiency results in 20-40% energy
savings. Charrettes help in estimating the
techno-economics of energy efficiency measures;
helping in decision making and identifying
acceptable measures for implementation; thus
help in achieving ECBC compliance.
Click to edit Master title styleClick to edit Master title style
26Indo-Swiss Building Energy Efficiency Project
THANK YOU !!!