RESIDENTIALINSPECTIONCHECKLISTS
2009
Visit the virtual information kiosk VIK at: cityofcarrollton.com/VIK
-
8/3/2019 Carroll Ton Inspection Check List
2/40
Table of Contents
SUBJECT INSPECTION
Required Inspections by Permit Type
Reference of AbbreviationsTemporary Electrical Pole/SWPPP......................................................................................1011
Pool Electrical Bond ............................................................................................................1012
Sewer....................................................................................................................................1021
Water Service.......................................................................................................................1022
Gas Wrap/Service ................................................................................................................1023
Lawn Sprinkler.....................................................................................................................1024
Pool P-Trap..........................................................................................................................1029
Retaining Wall .....................................................................................................................1041
Sidewalks and Approach......................................................................................................1056Ham Antenna .......................................................................................................................1072
Fence....................................................................................................................................1090
Foundation Only ..................................................................................................................2001
Plumbing Rough/Energy......................................................................................................2020
Gas Rough and Test.............................................................................................................3021
Pre-Brick..............................................................................................................................3042
Plumbing Top Out/HVAC Rough/Gas Test/Energy............................................................3065
Electrical Rough/Frame/Building/Energy, Building and Electrical ....................................3066
Insulation..............................................................................................................................3067
Roof Final ............................................................................................................................4003
Utility Release/Plumbing/HVAC/Energy Final...................................................................4005
Pool Work Final...................................................................................................................4042
Electrical/Building/Energy Final, Electrical and Building ..................................................4063
Clean & Show/Construction Heat/Electric Service .............................................................6015
Clean & Show/Construction Heat/Gas Service ...................................................................6020
Clean & Show/Construction Heat/Gas & Electric Service..................................................6060
General Check/Follow-up....................................................................................................7000
BUILDING INSPECTION
BldgInsp@cityofcarrollton.com
1945 E. Jackson Road | Carrollton, Texas 75006 | P.O. Box 110535 | Carrollton, TX 75011-0535
Phone: 972/466-3225 | Fax: 972/466-3220
-
8/3/2019 Carroll Ton Inspection Check List
3/40
Required Inspections by Permit Type
ELECTRICAL
1011 - Temporary Electrical Pole/SWPPP
3066 - Electrical Rough/Frame/Building/Energy, Building and Electrical
4063 - Electrical/Building/Energy Final, Electrical and Building
FENCE1090 Fence
HAM ANTENNA1072 - Ham Antenna
LAWN SPRINKLER1024 Lawn Sprinkler
MECHANICAL
3065 - Plumbing Top Out/HVAC Rough/Gas Test/Energy
4005- Utility Release/Plumbing/HVAC/Energy Final
PLUMBING
1021 Sewer1022 - Water Service
1023 - Gas Wrap/Service2020 Plumbing Rough/Energy
3065 - Plumbing Top Out/HVAC Rough/Gas Test/Energy4005 - Utility Release/Plumbing/HVAC/Energy Final
POOLS
1012 Pool Electrical Bond
1029 - Pool P Trap
4042 - Pool Work Final
RETAINING WALL1041 - Retaining Wall
SINGLE FAMILY DWELLING
2020 - Plumbing Rough/Energy
2001 Foundation Only
3065 - Plumbing Top Out/HVAC Rough/Gas Test/Energy3066 - Electrical Rough/Frame/Building/Energy, Building and Electrical
3067 - Insulation
4005 - Utility Release/Plumbing/HVAC/Energy Final
4063 - Electrical/Building/Energy Final, Electrical and Building
-
8/3/2019 Carroll Ton Inspection Check List
4/40
Reference of Abbreviations
The following is a reference list of some abbreviations/symbols used in this handbook of
inspection checklists. Abbreviations are to be read as singular/plural in context with
material. Any reference to a code or ordinance is to be interpreted as the latest version
available of that code or ordinance. Periods have been eliminated in abbreviations for ease in
reading.
A/C Air Conditioning
Art Article
CDO Carrollton Drainage Ordinance
CFC Carrollton Fire Code
cfm Cubic Feet per Minute
Ch Chapter
COG See Amendments in Ordinance No. 2024
CSC Carrollton Sign Code
CZO (Carrollton) Comprehensive Zoning Ordinance
Dwg Drawing
GDS General Design Standards
Mfg Manufacturing
NCTCOG North Central Texas Council of Governments
NEC National Electric Code
Ord Ordinance
p Page
pp Pages
psi Pounds per Square Inch
Sec Section
Specs Specifications
Std Standard
Subdv Subdivision
Tbl Table
IMC International Mechanical Code
IPC International Plumbing Code
-
8/3/2019 Carroll Ton Inspection Check List
5/40
Temporary Electrical Pole/SWPPP
1011
Temporary Electrical Pole/SWPPP Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Panel grounded and bonded 2008 NEC
250-28
250-52&53
Breaker/outlet requirements-sizing for outlets used 2008 NEC 210-19
Wire sizes and insulation 2008 NEC 310-16
No open holes / to remain water tight 2008 NEC 314-17
Unused breaker openings filled 2008 NEC 408.7
Clearances: 18 above traffic for overhead drop.
Distance from public property R.O.W2008 NEC 225-18
Raceway used and installed 2008 NEC230-50
230-54
Weather resistant receptacles 115-250 volt 2008 NEC 406.8
GFCI Protection / in use covers for exposed outlets 2008 NEC 406.8
Address 2006 IRC 505
Bracing: 45 degrees to support pole Encore serviceguidelines
600
SWPPP Inspection Checklist
A. Erosion controls are to be in place at the temporary electric pole inspection.B. Erosion control fencing or soil stabilization fabric must be installed in an approved
manner and maintained throughout the construction project until the UtilityRelease/Plumbing/ HVAC final inspections.
C. Large piles of dirt are required to be protected with erosion control fencing, NOT soilstabilization fabric.
D. Erosion control protection should be proactively maintained at least once a week.E. Storm water inlet protectionF. 50 feet rock entryway on commercial projects.
-
8/3/2019 Carroll Ton Inspection Check List
6/40
Pool Electrical Bond1012
Pool Electrical Bond Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONGrounding with minimum #8 ground wire around deck
with ground clamps and all metal with 52008 NEC 680-26
Grounding of copper conduit for pool lights/fixtures 2008 NEC 680-23Position of plugs in relation to pool sides 2008 NEC 680-22Low voltage lighting / transformer ground run to
equipment ground to panel2008 NEC 680.24
-
8/3/2019 Carroll Ton Inspection Check List
7/40
Sewer Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Pipe materials2006 IRC
2006 IPCTechnical
Policy for SDR
17 Trenchless
pipe
P3002
702
Pipe sizes 2006 IRC2006 IPC
P3005
710
Grade of pipe 2006 IRC2006 IPC
P3005
Table 704.1
Sewer
1021
-
8/3/2019 Carroll Ton Inspection Check List
8/40
Water Service Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONPipe materials
NTCOG Amendment (no polybutylene pipe allowed)2006 IRC
2006 IPCP2904
605Pipe sizes 2006 IRC
2006 IPC P2903604.10Pressure test 2006 IRC
2006 IPC P2503107, 312
Water Service
1022
-
8/3/2019 Carroll Ton Inspection Check List
9/40
Gas Wrap/Service Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Pipe materials2006 IRC
2006 IFGCG2413
403Pipe sizes 2006 IRC
2006 IFGC G2413402Pressure test (gas) NTCOG Amendments 2006 IRC
2006 IFGC G2417406Connections/Joints 2006 IRC
2006 IFGC G2414Ch. 4Tracer wire for non-metallic piping 2006 IRC2006 IFGC G2415.14.3404.14.3Pipe depth NTCOG Amendments 2006 IRC
2006 IFGCG2415.9
404.9
Gas risers 2006 IRC2006 IFGC G2414.6.1Ch. 4
Gas pipes not to be bent or strained 2006 IRC2006 IFGC G2416405
Separate ditch for gas piping CarrolltonPolicy
Protection from corrosion 2006 IRC2006 IFGC G2414.8404.8
Gas Wrap/Service
1023
-
8/3/2019 Carroll Ton Inspection Check List
10/40
Irrigation Inspection
1024
Irrigation Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Check that city approved plans are on site. House bill 1656
Approved back flow prevention device required with y
strainer installed before device. Full port ball type isolation
valve between meter and back flow device. Test cocks on
B/F device are to be plugged with threaded plugs. Installed
min. 3 ft. from water service on customer side of property
line.
House bill 1656
Master valve (if required) installed on discharge side of
B/F device (full port ball type valve).House bill 1656
Check location of controllers and sensors (rain/freeze);each controller must be labeled with installers name and
company name, license number, telephone number and
warranty period.
House bill 1656
Check location and water emission devices, valves (zone,
master, and isolation).House bill 1656
Check all underground wiring for UL burial rating and
sizing to manufacturers specifications; all wire splices
must be moisture proof. All wiring is buried min. 6 inches.
House bill 1656
Check PVC piping for sizing, rating, installation and depth
(min. 6 inches).
House bill 1656
and 2006 IPCSection 605
Pop up water emission devices must be installed a min. 4
inches from hardscape and direct flow away.House bill 1656
NOTE: Double check backflow prevention permitted in ground if protected by a box.
-
8/3/2019 Carroll Ton Inspection Check List
11/40
Pool P-Trap Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
P-Trap for pools/spas with air breakCarrollton
Policy
1 " minimum backwash/drain pipe CarrolltonPolicy
Pool P-Trap
1029
-
8/3/2019 Carroll Ton Inspection Check List
12/40
Retaining Wall Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONRetaining walls which do not require a permit are not
inspected. If under 4 feet from the bottom of footing tothe top 2006 IRC R105.2Inspect based on engineered approved plans for
retaining walls requiring permit 2006 IBC 1610.1
Retaining Wall
1041
-
8/3/2019 Carroll Ton Inspection Check List
13/40
Sidewalks and Approach Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONSand cushion for leveling only 1 (sidewalks only) GDS 2007 P-17Concrete thickness: Sidewalks/ driveways GDS 2007 P-16, P-17Location of sidewalk with respect to street and other
existing sidewalk GDS 2007 P-17Width of sidewalk is 4 or 5 GDS 2007 P-17
Tooling joints spacing GDS 2007 P-17
Construction joint requirements GDS 2007P-11, P-16,
P-17
Expansion joint spacing (no tear off strips allowed in
the sidewalks)GDS 2007 P-12, P-17
Expansion joint materials GDS 2007 P-16, P-17
Five foot flare instead of radius and curb omission for
approaches attached to alleysGDS 2007 P-16
Reinforcing steel GDS 2007P-11, P-16,
P-17
Storm drain inlet and separation from approach GDS 2007 D-1
Location of driveway from intersection
30 Residential or Alley
40 Collector / Industrial
50 Residential Arterial
Driveway OrdOrd 1604
as amended
Bollards for thin brick wall required? Note on this
inspection if needed.GDS 2007 M-4
Sidewalks and Approach
1056
-
8/3/2019 Carroll Ton Inspection Check List
14/40
Ham Antenna Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONAnchor tie and foundations per approved plans and
specifications CZOArt XXVIII
Sec D
Location of antenna (allowed only behind the main
building CZO Art XXVIIISec DLocation of antenna in the back yard CZO Art XXVIII
Sec D
Prohibited location of guy wire anchors CZOArt XXVIII
Sec D
Height of anchor points CZO Art XXVIIISec D
Setback from property lines and right of way CZOArt XXVIII
Sec D
Maximum height CZOArt XXVIII
Sec D
Fence or anti-climb devices CZOArt XXVIII
Sec D
Attachments prohibited CZO Art XXVIIISec D
NOTE: Lintels installation occurs after the pre-brick inspection and is the
responsibility of the contractors.
Ham Antenna
1072
-
8/3/2019 Carroll Ton Inspection Check List
15/40
Fence
1090
Fence Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Proper setback from drainage easements CZOXXV 11-12
A-D
Proper height restriction for front yards or certain
corner lots (key lots) 3' front yards, 4' key lotsCZO XXVI-A
Proper requirements for pool enclosure 2006 IRCCZO
Appendix G
XXVII.7
Gates across driveways as a pool enclosureTechnical
Policy
Sec V UBC
CAAB ruling
Zero lot lines (check CZO) CZO Article VIIPages 88-90
Gates across driveways (electric)Technical
PolicySec V -UBC
If electric need inspection / burial depth and conduits
secured / gfci needed ?2008 NEC
300.5
Conduit type
210.8
Gates across driveways (manual)Technical
PolicySec. I 49
Proper location for visibility from streets & alleys Visibility Ord.Ord. 1325 as
amended
No metal, barbed wire, or electric fencing permitted.
Exception: Wrought iron is allowed.
CZO
Ord. 2803
Article XXV
Sec 11
Sec 92-10
Note: CZO 3/16/04 version
-
8/3/2019 Carroll Ton Inspection Check List
16/40
Foundation Only Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Inspect based on engineered plans:
- Reinforcement size and spacing- Reinforcement supports (chairs)- Concrete thickness- Beam spacings and depth/width- Debris and mud and water on slab and beams
Read permit for special notes such as minimum
finished floor elevations.
2006 IRC R109.1
Wrap copper water lines 2006 IRC P2603
Provide protection for any horizontal plumbing pipeembedded in concrete along the length of the beams 2006 IRC
P2603.2.1
TechnicalPolicy
Driveway not allowed to street if alley exists CSO Article X
Garage not allowed to face streets certain exceptions
may be applicableOrd. 2402
Driveway separation from intersections Driveway Ord.Ord. 1604
as amended
Has the lot grade been drastically changed by cuts, fill,or other obstruction which may alter subdivision
drainage patterns from what was accepted by
Carrollton Engineering Department?
Carrollton
Drainage Ord.
Ord. 1964
as amended
NOTE: Effective May 1, 2003, all foundation inspections must have an engineers
inspection letter of approval.
Foundation Only
2001
-
8/3/2019 Carroll Ton Inspection Check List
17/40
Plumbing Rough/Energy p. 1 of 2
2020
Plumbing Rough/Energy Inspection Checklist
p. 1 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Check for setback survey CZO Use Districts
Drainage piping materials 2006 IRC P3002
Drainage pipe installation 2006 IRC P3005.1
Drainage pipe joints 2006 IRC P3003
Drainage pipe slope 2006 IRC P3005.4.2
Drainage system sizing 2006 IRC P3005.4
Drainage prohibited items 2006 IRC P3003
P3005.1.5
P3005.2.11
Drainage system clean outs 2006 IRC P3005.2.3
P3005.2.10
P3005.2.9
P3005.2
Backwater valves 2006 IRC P3008
Fixtures stack vented 2006 IRC P3102
P-trap installation requirements 2006 IRC P3201
P-trap sizing 2006 IRC P3201.7
Water distribution 2006 IRC P2903.6
Water manifold sizing 2006 IRC P2903.8.1
2 Hose bibs required on SFD ( front/side and rear) 1
required on Town houses and Condo's (rear)
COC Technical
Policy
Water piping materials
Polybutylene Pipe not allowed ( COG Amend.)
2006 IRC P2904
Trenching, excavation, and backfill 2006 IRC P2604
Back flow prevention 2006 IRC P2902
-
8/3/2019 Carroll Ton Inspection Check List
18/40
Plumbing Rough/Energy Inspection Checklist
p. 2 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Plumbing Rough/Energy p. 2 of 2
2020
CODE ITEM CODE SECTION
Cut-off valves 2006 IRC P2903.9
P2903.9.1
P2903.9.3
P2903.9.2
Testing and inspection 2006 IRC P2503
Gas pipe sizing 2006 IRC G2413&17
Gas pipe labeling 2006 IRC G2412.5
Gas pipe materials 2006 IRC G2414
Gas pipe system installation & Testing 2006 IRC G2415 &
G2417
Gas tracer wire 2006 IRC 2415.14.3
Protection of piping 2006 IRC G2415.8
G2415.8.2
Insulate hot water lines 2006 IECC 504.5
-
8/3/2019 Carroll Ton Inspection Check List
19/40
Gas Rough and Test Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Pipe materials2006 IRC
2006 IFGC
G2414
403
Pipe sizes 2006 IRC2006 IFGC
G2413
402
Pressure test (gas) 2006 IRC2006 IFGC
G2417
404
Connections/joints2006 IRC
2006 IFGC
G2414
Ch. 4
Tracer wire for non-metallic piping 2006 IRC2006 IFGC G2415.14.3404.14.3
Pipe depth2006 IRC
2006 IFGC
G2415.9
404.9
COG
Amendment
Gas risers2006 IRC
2006 IFGC
G2414.6.1
Ch. 4
Gas pipes not to be bent or strained
2006 IRC
2006 IFGC
G2416
405
Separate ditch for gas pipingCarrollton
Policy
Protection from corrosion2006 IRC
2006 IFGC
G2414.8
404.8
Gas Rough and Test
3021
-
8/3/2019 Carroll Ton Inspection Check List
20/40
Pre Brick Inspection Checklist
p. 1 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Sheathing will be free of all holes 2006 IRC R703
No framing shall be visible 2006 IRC R703
The roofing process has been completed Tech Policy 6-21-99
Exterior openings exposed to weather shall be flashed 2006 IRC R703
Exterior veneer shall not be attached to wood frame
construction at or point more than 30 in height2006 IRC Table R703.7
When wall ties are installed: ties shall be spaced tosupport not more than 2.67 sq. ft. of wall; wall ties shall
not be more than 24 on centers horizontally &
vertically
2006 IRC R703.7.4.1
When anchored veneer is applied over 2x4 stud
construction, stud spacing shall not exceed 16Tech. policy Sec. V 32-33c
When anchored veneer is applied over 2x6 stud
construction, stud spacing shall not exceed 24Tech. policy Sec. V 32-33c
Flashing and counter flashing2006 IRC
Tech Policy
R703.7.5
R703.7.8
Sec v 32
Brick
Supported by
Wood 9-93
Veneer height and support limitations 30 max height
to footing rafter size per 2006 IRC, then doubled
2006 IRC
Tech Policy
703.7.2
703.7.2.1
703.7.2.2
703.7.3
Sec v 32
BrickSupported by
Wood 9-93
Pre Brick p. 1 of 2
3042
-
8/3/2019 Carroll Ton Inspection Check List
21/40
Pre Brick Inspection Checklist
p. 2 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Pre Brick p. 2 of 2
CODE ITEM CODE SECTION
Brick on wood rafters
3 2x8
2006 IRC
Tech Policy
R703Sec V 32
Brick
Supported by
Wood 9-93
Wind sheer
Scab 2x4 on side of each stud
2006 IRC
Tech Policy
R703.4.1.2
Sec v 32
Brick
Supported by
Wood 9-93
Wall bracing 2006 IRC
R602.10
Table
R602.3.(1)
Water resistance barrier
Exterior wall envelope2006 IRC R703.2
Seal exterior wall envelope 2006 IECC 402.4
*NOTE:
Lintel installation occurs after the pre-brick inspection and is the responsibility ofthe contractors.
Lintel = the horizontal beam forming the upper member of a door or window framesupporting part of the structure above it.
3042
-
8/3/2019 Carroll Ton Inspection Check List
22/40
Plumbing Top Out/HVAC Rough/Gas Test/Energy p. 1 of 33065
Plumbing Top Out/HVAC Rough/Gas Test/Energy Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONPlumbing vent termination with respect to openings 2006 IRC P3103
Water heater vent location 2006 IRC M1804
Gas pipe sizing and tests. CSST must be supported
every 4ft. and a min. of 12" clearance from roof deckunless installed in a flexible metal sleeve must be
bonded from manifold to breaker panel with min. # 6wire or equivalent. Tested 10lbs. on 20 lb. 3 1/2"
diaphragm test gauge and 3lbs. on a 6lb. 3 1/2
diaphragm test gauge on low side with currentcalibration sticker.
2006 IRC &
COC TechnicalPolicy
G2413&17
Ventilation 2006 IRC M1507
Protection of piping (freeze or damage) 2006 IRC P2603.6
Fixture drainage lines 2006 IRC P3005
Tests and inspection (sanitary drainage and potable
water2006 IRC P2503
Required Hose bibs ( 2 on SFD front & rear) 1 on
Town homes and Condo's
COC Tech.
Policy
Showers (material, installation and testing)COG
AmendmentP2708
Island fixture venting 2006 IRC P3112
Vent connection and grades 2006 IRC P3104
Stack venting 2006 IRC P3102
Wet venting limitations 2006 IRC P3108
Trap arm and p-trap 2006 IRC P3201.5
Prohibited traps 2006 IRC P3201.5
Clothes washer trap and tail piece height requirement2006 IRC
Table 3201.7
P2706.2
-
8/3/2019 Carroll Ton Inspection Check List
23/40
Plumbing Top Out/HVAC Rough/Gas Test/Energy Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Plumbing Top Out/HVAC Rough/Gas Test/Energy p. 2 of 33065
CODE ITEM CODE SECTION
Piping support
2006 IRC &
COC TechnicalPolicy for
CSST
P2605
Water heaters: Regulations and installation2006 IRC &
COC Technical
Policy
P2801.5.1P2801.5
Insulate hot water lines 2006 IECC 504.5
Above ceiling pan and drain for water heater 2006 IRC P2801
Combustion air 2006 IRC M1701
Ducts (HVAC) 2006 IRC M1601.2
Duct insulation2006 IRC
2006 IECC
1601.3.4
C.O.G.Table.
503.3.3.3
Refrigerant piping insulation 2006 IECC 503.2.8 C.O.G
Hot water pipe insulation 2006 IECC 504.5 C.O.G
Plenums: Sealed & secure 2006 IECC 503.2.7
HVAC equipment: access and service space 2006 IRC M1305.1
Condensation 2006 IRC M1411
Return air 2006 IRC M1602
Exhaust fans: vent termination 2006 IRC M1507
Clothes dryer duct
2006 IRC
COGAmendment
M1502504.6
Chimney & vents 2006 IRCChapter 10
M1805
-
8/3/2019 Carroll Ton Inspection Check List
24/40
Plumbing Top Out/HVAC Rough/Gas Test/Energy Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Plumbing Top Out/HVAC Rough/Gas Test/Energy p. 3 of 33065
CODE ITEM CODE SECTION
Specific appliances (fireplace and fuel burning
equipment)
Specific
appliances(fireplace and
fuel burning
equipment)
2006 IRC
M1901
Water heaters 2006 IRC M2005
-
8/3/2019 Carroll Ton Inspection Check List
25/40
Electrical Rough/Frame/Building/Energy
Building Sheet p. 1 of 23066
Electrical Rough/Frame/Building/Energy Inspection Checklist
Building Sheet p. 1 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONWall heights/stud heights 2006 IRC R602.3.1
Carrollton Tbl
Safety glazing 2006 IRC R308.4
Wind bracing 2006 IRCR602.10.3
R602.10.6
C.O.G.
Amend.
Struts and purlins 2006 IRC R802.5.1
Brick supported by wood members 2006 IRCNCTCOG
Policy
Cutting, notching and boring 2006 IRC
R502.8
R502.8.1
R502.8.2
602.6.1
Floor joist bearing 2006 IRC R502.6
Bathroom and laundry room ventilation 2006 IRC R303.3
Attic ventilation (This only for a reminder at this stage.
Shall not cause inspection disapproval.)2006 IRC
R806.1
R806.2
R806.3
Rafter, joist, header construction 2006 IRC
R802.3
R502.4
R602.7
R804.3
New additions or remodel, smoke detector
requirements/wiring 2006 IRC R313.1.1
Bottom plates anchor - bolts or shot 2006 IRC R403.1.6
Perimeter bottom plates treated 2006 IRC R320.1
Fire blocking - holes and openings in top plates 2006 IRC R602.8
-
8/3/2019 Carroll Ton Inspection Check List
26/40
Electrical Rough/Frame/Building/Energy Inspection Checklist
Building Sheet p. 2 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Electrical Rough/Frame/Building/Energy
Building Sheet p. 2 of 23066
CODE ITEM CODE SECTIONDraft stop 2006 IRC R502.12
Stairs: run, rise, width 2006 IRC R311.5
Fireplace lintel support 2006 IRC R1003.7
Windows / Skylights U-Factor, SHGC 2006 IECC
N1102.1
C.O.G.
Amend.
Proper lumber grade stamps 2006 IRCR802.1
R320.1.1
Roof and ceiling framing 2006 IRC R802
Exterior wood protection/sheathing 2006 IRC R703
Framing at skylights 2006 IRC R802.9
Line up of floor and ceiling joists to studs 2006 IRC R602.3.3
Size & location of emergency bedroom windows 2006 IRC R310.1
Driveway not allowed to street if alley exists CZOOrd 1604 as
amended
Nailing Patterns on exterior sheathing 2006 IRC R 602.10
No green board allowed in bathroom shower/tub areas 2006 IRC R702.3.8
-
8/3/2019 Carroll Ton Inspection Check List
27/40
Electrical Rough/Frame/Building/Energy
Electrical Sheet p. 1 of 23066
Electrical Rough/Frame/Building/Energy Inspection Checklist
Electrical Sheet p. 1 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM
CODE
SECTION
Required outlet spacing / location2008 NEC 210.52
210.63
Required outlets/switches circuits
Kitchen counter top spacing
2008 NEC 210-52
210.70
Protection of wires run through framing/studs2008 NEC 300.4
334
Support of NM cables (staples) 2008 NEC 314.17334
NM cable in wet locations / kitchen islands (not allowed)2008 NEC 334.12
Grouping / bundling of cables ( no more than 4- #12 & #14 )2008 NEC 334.8
Damaged, pinched or torn cables2008 NEC 110
Sealing penetrations top plates and fire blocking 2008 NEC 300.21
Recessed lighting fixtures clearances / energy2008 NEC 410
Bonding of metal boxes / ground pigtails / grounding
2008 NEC 250.148
314.4
404.9
Ceiling fan rated boxes 2008 NEC 314.27
Smoke / fire alarm locations IRC 2006 R313
-
8/3/2019 Carroll Ton Inspection Check List
28/40
Electrical Rough/Frame/Building/Energy Inspection Checklist
Electrical Sheet p. 2 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Electrical Rough/Frame/Building/Energy
Electrical Sheet p. 2 of 23066
CODE ITEM CODE SECTION
Atticspace requirements: switches , service outlet , a/c
disconnect & exhaust fan controls
2008 NEC 210.70
210.63
320.23
Jacuzzi tub requirements: circuits, gfci, & bonding
2008 NEC 680.71
Through
681.74
Conductor fill for boxes / number or cables in box 2008 NEC 314.16
Panel service conductor size2008 NEC 310.15
Neutral identification (white tape)2008 NEC 200.6
One neutral per termination point on bar/ buss
Grounds may be doubled
2008 NEC
C.O.C
408.41
Sub- panel isolation / no bond at to neutral at sub-panel2008 NEC 250.24
Coverage of panel during contruction2008 NEC 110.12
Bonding / grounding : all metal enclosures / cold water
bonding
2008 NEC 250.28
250.52
250.53
250.92
Concrete encased electrode /other electrodes / access2008 NEC 250.32
250.64
Panel identification / marking phases /amps/ voltage2008 NEC 408.58
Panel maximum 42 circuits 2008 NEC 408.54
-
8/3/2019 Carroll Ton Inspection Check List
29/40
Insulation Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Insulation walls, ceilings, floors 2006 IECC102
402502
2006 C.O.G. Amendments 2006 IRC 1102.1Water resistance barrier on exterior wall envelope 2006 IRC R 703.2
Insulation
3067
-
8/3/2019 Carroll Ton Inspection Check List
30/40
Roof Final Inspection
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
Minimum class C roof2006 IRC
COGAmendment
R902
Minimum deck thickness 7/16 2006 IRC TableR503.2.1(1)
Clearance from combustibles 2006 IRC M1306.1Note:
Inspection shall be requested at the completion of the deck replacement process. The contractor is completely responsible for installing the roof in accordance
with the manufacturers specifications.
The final roof inspection is limited to materials and clearance fromcombustibles.
Roof Final
4003
-
8/3/2019 Carroll Ton Inspection Check List
31/40
Utility Release/Plumbing, HVAC/Energy Final p. 1 of 2
4005
Utility Release/Plumbing, HVAC/Energy Final Inspection Checklist
p. 1 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONGas hooked up to appliances 2006 IRC G2422All plumbing fixtures in place, connected and water on 2006 IRC P2503
No leaks in fixture drains 2006 IRC P2503.5.2Gas shut-off valves and connectors 2006 IRC G2420
Water heater temperature and pressure relief valve 2006 IRC P2803
Water heater clearance (if installed) 2006 IRC M2005
Service water heating 2006 IECC 504
Furnace AFUE rating (seasonal) 2006 IECC Tbl.503.2
Valve box at house 2006 IRC P2903.9.1
Vacuum breakers/frost proof hose bibbs 2006 IRCP2903.8.7
P2903.10
Seal firebox where penetrated by gas log lighter Mfg Specs
A/C pad 2006 IRC 1403.2
Catwalk and working space for attic units 2006 IRC 1305.1
Appliance venting (if installed) *Vent-A-Hood not
included2006 IRC M1801
Electrical safely capped (or fixture installed) 2008 NEC 410-5
A/C overcurrent protection to manufacturers specs 2008 NEC 440.22
Electric panel feeder size 2008 NEC 310.15
Grounding electrode system 2008 NEC 250
Jacuzzi motor 2008 NEC 680 & 681
No unused openings in panel 2008 NEC 110.12
-
8/3/2019 Carroll Ton Inspection Check List
32/40
Utility Release/Plumbing, HVAC/Energy Final Inspection Checklist
p. 2 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Utility Release/Plumbing, HVAC/Energy Final p. 2 of 2
4005
CODE ITEM CODE SECTIONCity clean out GDS S11
Water meter can GDS W-7
Controls / Temperature 2006 IECC 503.3.2.2
Clearance from combustibles 2006 IRC M1306.1
Termite certification 2006 IRC R320
Bollards behind driveways for subdivision screening
walls
GDS M-4
-
8/3/2019 Carroll Ton Inspection Check List
33/40
Pool Work Final
4042
Pool Work Final Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTION
P-Trap2006 IPC
CarrolltonPolicy
802.1.4802.2.1
GFCI for pool lights 2008 NEC 680GFCI location & testing 2008 NEC 680
Grounding terminations 2008 NEC 680Fence enclosure, gates and latches 2006 IRC
AG105.2
AG105.2.4
Backflow protection 2006 IPC 608
Backwash/drain pipeCarrollton
Policy
Any gas line related items
Lo pressure 3 lbs on 6 lb visibly certifiable diaphragm
gauge
High or med. 60 lbs on 100 lb visibly certifiable
diaphragm gauge
2006 IRC
2006 IFGCApp. G
Pool heaters ON-OFF switch 2006 IECC 504.3.1
Pool cover for heated pools 2006 IECC 504.3.2
Pool time clocks setting 2006 IECC 504.3.3
DrainageCDO
2006 IRC
Ord. 1964
R401.3
Entrapment protection / svrs system in place 2006 IRCAppendix G
AG 106
-
8/3/2019 Carroll Ton Inspection Check List
34/40
Electrical/Building/Energy Final Inspection Checklist
Building Sheet p. 1 of 2
4063
Electrical/Building/Energy Final Inspection Checklist
Building Sheet p. 1 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONSafety glass and glazing 2006 IRC R308Attic access and appliance access 2006 IRC R807.1
M1305
Smoke detectors (with battery backup) 2006 IRC R313
Front and rear address (minimum 4 inch numbers) Policy Fire Dept.
Hearth size 2006 IRC R1001.10Combustibles clearance from fireplace opening 2006 IRC Tbl 1001.011001.11
1003.18
Separation between garage and house 2006 IRC R309.2
Percentage of exterior brick(SF@70%) CZO Art. VII
Water meter cans (boxes) 2007 GDS W-7
City walks and approaches
Subdv Ord
GDS
Art. X, Sec. G
& X1sec B
P-15, P-22P-26
Sewer cleanouts, water valves, manholes; level and
accessible2007 GDS
Water &
Sewer
Chapters
Any work done without permit such as fences
exceeding 20 feet in length, lawn sprinkler, dish, pool,
etc.
General
Brochure
Attic ventilation*Includes Vent-A-Hood duct
2006 IRC R806
Exterior refrigerant piping 2006 IECC 402.4.1
Blown-in insulation shall comply with IECC2006 IECC
2006 IRC
102.11,1101.4
402.1.2
-
8/3/2019 Carroll Ton Inspection Check List
35/40
Electrical/Building/Energy Final Inspection Checklist
Building Sheet p. 2 of 2
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
Electrical/Building/Energy Final Inspection Checklist
Building Sheet p. 2 of 2
4063
CODE ITEM CODE SECTIONSurface drainage shall be directed to swales to ensure
drainage away from foundation.2006 IRC R401.3
Stair and handrail requirements2006 IBC
2006 IRC
1009.1& 1012.4
311.51
-
8/3/2019 Carroll Ton Inspection Check List
36/40
Electrical/Building/Energy Final Inspection Checklist
Electrical Sheet
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline
CODE ITEM CODE SECTIONCovers, face plates & canopies
a. Outlet boxesb. Snap switchesc. Receptaclesd. Damp locationse. Fixturesf. Closet fixtures
2005 NEC314.25
314.41
GFCI locations
a. Bathroomb. Garagec. Outdoord. Crawl spacee. Unfinished basementf. Kitcheng. Bar sink
2005 NEC 210-8
Appliance installation 2005 NEC 422Stair and handrail requirements
2006 IBC
2006 IRC
1009.1& 1012.4
311.51
Electrical panel
Grounding electrode system 2005 NEC250.50
250-52
310.16
A/C disconnect, wire & fuse size
2005 NEC 440-11
440.12
440.22
Protection of wiring in attics 2005 NEC 320.23
Electrical panel installation 2005 NEC
110-26
408
Service conductor size 2005 NEC220
310-16
Other electrical conductor sizes 2005 NEC 310-16
Electrical/Building/Energy Final Inspection Checklist
Electrical Sheet
4063
-
8/3/2019 Carroll Ton Inspection Check List
37/40
Clean and Show/Construction Heat/Electric Service
6015
Clean and Show/Construction Heat/Electric Service Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONProper breaker size for heating unit 2008 NEC 424
Panel cover installed 2008 NEC 408access to electrical equipment 2008 NEC 110No holes in panel or unused openings 2008 NEC
408
110-12
Capping of all loose wires and installed outlet covers 2008 NEC 110.14
Identification of panel service on meter base or
disconnect 2008 NEC
408
110230
-
8/3/2019 Carroll Ton Inspection Check List
38/40
Clean and Show/Construction Heat/Gas Service Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONPipe materials (gas) 2006 IFGC 403Pipe sizes (gas) 2006 IFGC 402Connections (gas) 2006 IFGC 403Pressure test (gas) 2006 IFGC 406
Proper installation 2006 IFGC 305
Venting of appliance 2006 IFGC Chapter 5
Clean & Show/Const. Heat/Gas Service
6020
-
8/3/2019 Carroll Ton Inspection Check List
39/40
Clean and Show/Construction Heat/Gas and Electric Service Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONCombine 6015 & 6020 inspections
Clean and Show/Construction Heat/Gas and Electric Service
6060
-
8/3/2019 Carroll Ton Inspection Check List
40/40
General Check/Follow-up Inspection Checklist
This checklist is not to be construed as all-inclusive; it is only to be used as a guideline.
CODE ITEM CODE SECTIONGeneral Check/Follow-up