canada gmp site microgrid - green mountain power

Post on 25-Mar-2022

4 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I II I I I I I

I I I I I I

I I I II I I I I I

VERMONT

N

N

E

W

H

A

M

P

S

H

IR

E

MASSACHUSETTS

N

E

W

Y

O

R

K

CANADA

Mears Road

Milton, Vermont

SOURCE DATA LEGEND

KL&

Krebs & Lansing Consulting Engineers, Inc.

164 Main Street, Suite 201

Colchester, VT 05446

T: (802) 878-0375

F: (802) 878-9618

email@krebsandlansing.com

KrebsandLansing.com

MILTON

GMP

MICROGRID

MILTON

PROJECT

LOCATION MAP

SCALE: 1" =

1

2

Mile

LOCATION MAP

SCALE: 1" =

1

2

Mile

ISSUED FOR PERMIT REVIEW

NOT FOR CONSTRUCTION

Proposed Solar

Array and Battery

Powerpack System

SITE

LAT: N44° 39' 27.7"

LONG: W73° 10' 45.3"

“ ”

SOIL DISTURBED BY EXCAVATION

NECESSARY TO INSTALL ACCESS DRIVE,

PAS STORAGE ADJACENT TO ACCESS

DRIVE, PULL BOXES, PAD MOUNTED

EQUIPMENT, BATTERY EQUIPMENT,

SECONDARY OIL CONTAINMENT,

UNDERGROUND ELECTRIC LINES, AND

TEMPORARY STAGING AREA

COMBINATION SILT FENCE AND

CONSTRUCTION LIMIT BARRIER FENCE,

SEE 'GENERAL EPSC' NOTE.

EROSION CONTROL MIX BERM MAYBE

SUBSTITUTED FOR SILT FENCE OR

USED IN ADDITION TO SILT FENCE.

EROSION CONTROL MIX BERM SHALL

NOT BE USED IN AREAS OF

CONCENTRATED FLOW.

PRIME AGRICULTURAL SOILS (PAS)

STORAGE AREAS, PAS SOILS STRIPPED

FROM THE PROJECT WILL BE STORED IN

THESE AREAS FOR FUTURE RESTORATION

USE DURING DECOMMISSIONING OF THE

PROJECT. GRADE AND PROVIDE

TEMPORARY AND PERMANENT

STABILIZATION, SEE NOTE REGARDING

STORAGE OF DISTURBED PRIMARY

AGRICULTURAL SOILS (PAS).

EPSC-0

OVERALL EROSION

PREVENTION AND

SEDIMENT CONTROL PLAN

LEGEND

APPROXIMATE PROPERTY LINES

EXISTING GRADE CONTOUR LINES

(10 FOOT INTERVALS)

EXISTING TREELINE

EXISTING OVERHEAD POWER LINES

PROPOSED PERIMETER FENCE

EXISTING GRADE CONTOUR LINES

(2 FOOT INTERVALS)

PROPOSED ACCESS DRIVES

EXISTING BARBED WIRE FENCE

PROJECT SETBACKS

PROPOSED UNDERGROUND POWER LINES

EXISTING POWER POLE /

PROPOSED POLE

IRON PIPE FOUND

PROPOSED OVERHEAD POWER LINES

PROPOSED SOLAR ARRAY

VHB ENVIRONMENTAL

RESOURCE STUDY AREA

SOIL BOUNDARIES FROM VCGI

PROPOSED PROJECT LEASE LIMITS

I I I I I IPROPOSED STING INVERTERS

top related