Multi-Modal Bridges:Lessons from Portland OR
Cambridge InnovationCenter
May 26, 2009
Phil GoffLEED AP
www.altaplanning.com
Charles River Basin
B.U
. Bri
dge
Ma
ss A
ve B
ridg
e
N B
eaco
n S
t Bri
dge
Downtown Portland and the Willamette River
BroadwayBroadwaySteelSteel
BurnsideBurnsideMorrisonMorrison
HawthorneHawthorne
I-405I-405 I-5I-5
Downtown Portland and the Willamette River
BROADWAY BRIDGE
BROADWAY BRIDGE
BROADWAY BRIDGE
STEEL BRIDGE
EASTBANK ESPLANADE
BURNSIDE BRIDGE
MORRISON BRIDGE
MORRISON BRIDGE
Pre-1998 conditions
1998 temporary two-way path
MORRISON BRIDGE
The Bridge of Green
Morrison Bridge Esplanade project
MORRISON BRIDGE
15’ shared path condition
View Points
HAWTHORNE BRIDGE
HAWTHORNE BRIDGE
HAWTHORNE BRIDGE
15 years of bicycle infrastructure:
$100 million
Interchange along Rt. 26:
$125 million
Portland Daily Vehicle Miles Traveled/Person