c at colorado · pdf fileuniversity of colorado colorado springs university hall boiler...

Post on 18-Mar-2018

216 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

TBS

DJS

TBS

COVER

G0.01

UNIVERSITY OF COLORADOAT COLORADO SPRINGS

REPLACE BOILERS AT UNIVERSITY HALLPROJECT NO. EM 610

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

TBS

DJS

TBS

MECHANICALDEMOLITION

FLOORPLAN

MD1.01

MECHANICAL ROOM DEMOLITION PLAN

GENERAL DEMOLITION NOTES

DEMOLITION KEYNOTES

PARTIAL MECHANICALDEMOLITION ROOF PLAN

KEY PLAN

RSB

DJS

TBS

PARTIAL MECHANICALDEMOLITIONROOF PLAN

MD1.02

GENERAL DEMOLITION NOTES

KEYNOTES

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

TBS

DJS

TBS

MECHANICALLEGEND

M0.01

DUCTWORKHEATINGVALVES & FITTINGS

MISCELLANEOUS SYMBOLS

TEMPERATURE CONTROLS

MISCELLANEOUS PIPINGREFRIGERATION

PLUMBING

ABBREVIATIONS

GENERAL NOTES:

DRAWING INDEX

DRAWING INDEXDRAWING NO. DRAWING TITLE

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

TBS

DJS

TBS

MECHANICALNEW WORK

FLOORPLAN

M1.01MECHANICAL ROOM NEW WORK PLAN

GENERAL NOTES

KEYNOTES

PARTIAL MECHANICAL NEWWORK ROOF PLAN

KEY PLAN

RSB

DJS

TBS

PARTIAL MECHANICALNEW WORKROOF PLAN

M1.02

GENERAL NOTES

KEYNOTES

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

TBS

DJS

TBS

MECHANICALSCHEDULES

ANDDETAILS

M5.01

BOILER SCHEDULEMARKSERVICEMANUFACTURERMODEL NO.TYPEHEATING CAPACITY

BURNER TYPEGAS PRESSURE (INWC)BURNER TURNDOWN RATIOBOILER EFFICIENCY (%)HEAT EXCHANGER MATERIALDESIGN PRESSUREWATER FLOW

ELECTRICAL REQUIREMENTS

CONNECTION SIZES

PHYSICAL DIMENSIONS

OPERATING WEIGHT (LB)REMARKS:REMARKS:

NOMINAL INPUT CAP. (MBH)NOMINAL OUTPUT CAP. (MBH)ACTUAL OUTPUT CAP. (MBH)SITE ELEVATION (FT.)

MINIMUM FLOW (GPM)MAXIMUM FLOW (GPM)DESIGN FLOW (GPM)PRESSURE DROP (FT)INLET WATER TEMP. (°F)OUTLET WATER TEMP. (°F)WATER VOLUME (GAL)

MOTOR SIZE (HP)VOLTSPHASEHERTZFULL LOAD AMPSMIN. CIRCUIT AMPACITYMAX. OVERCURRENT PROT.

COMBUSTION AIR (IN.)FLUE (IN.)GAS (IN.)WATER INLET/OUTLET (IN.)CONDENSATE DRAIN (IN.)

DEPTH (IN.)WIDTH (IN.)HEIGHT (IN.)

B-1 B-2 B-3 B-4 B-1 B-2

PUMP SCHEDULEMARKSERVICEPUMP DATA

MOTOR DATA

REMARKS:REMARKS:

MANUFACTURERTYPESIZESERIAL NO.FLOW (GPM)HEAD (FT)IMPELLER SIZE (IN)SPEED (RPM)EFFICIENCY (%)

MANUFACTURERHORSEPOWERFRAME SIZESPEED (RPM)VOLTSPHASEHERTZFULL LOAD AMPSSERVICE FACTORDUTY

BP-1 BP-2 BP-3 BP-4 HWP-1 HWP-2 SMP-1 SMP-2 SMP-3

HEAT EXCHANGER SCHEDULEMARKMANUFACTURERMODEL NO.TUBE MATERIALSHELL MATERIALSERVICEHEAT TRANSFER CAPACITY (MBH)HOT SIDE DATA:

COLD SIDE DATA:

DIMENSIONS

OPERATING WEIGHT (LB)REMARKSREMARKS:

FLOW (GPM)ENTERING WATER TEMP. (°F)LEAVING WATER TEMP. (°F)MAX. WATER PRES. DROP (FT)PROPYLENE GLYCOL CONC. (%)FOULING FACTOR

FLOW (GPM)ENTERING WATER TEMP. (°F)LEAVING WATER TEMP. (°F)MAX. WATER PRES. DROP (FT)PROPYLENE GLYCOL CONC. (%)FOULING FACTOR

LENGTH (IN)HEIGHT (IN)WIDTH (IN)

HX-1 HX-2CONCRETE HOUSEKEEPING PAD DETAIL

BOILER FLUE DETAIL

BOILER PIPING DETAIL

GAS WATER HEATER SCHEDULEMARKMANUFACTURERMODEL NO.SITE ELEVATIONSEA LEVEL INPUT (MBH)ACTUAL INPUT (MBH)ACTUAL OUTPUT (MBH)ENTERING WATER TEMPERATURE (°F)SUPPLY WATER TEMPERATURE (°F)RECOVERY RATE (GPH)STORAGE CAPACITY (GAL.)ELECTRICAL REQUIREMENTS

DIMENSIONS

OPERATING WEIGHT (LB)REMARKSREMARKS:

VOLTSPHASEHERTZAMPS

HEIGHT (IN.)DIAMETER (IN.)

WH-1

INSULATION SCHEDULE

MECHANICAL SYSTEMS TO BE INSULATEDPIPING SYSTEM

EXISTING PIPING, DUCTWORK AND EQUIPMENT INSULATION

REMARKS:

TEMPERATURERANGE(°F)

PIPE OR DUCTSIZE

INSULATIONMATERIAL

INSULATION FORM

INSULATIONTHICKNESS

(INCHES)R-VALUE

(BTU/HR-SF-°F)

VAPORBARRIER

REQUIRED REMARKS

1

H

G

F

E

2 3 4

D

C

B

A

1 2 3 4

5 6 7 8

SHEET

SHEET TITLE

DESIGNED BY

PROJECT NO.

DRAWN BY

DATE

CHECKED BY

REVISIONS

5 6 7

C * P

H. (

719)

637

-885

0 *

* F

AX

(71

9) 6

32-0

300

*se

c@se

ceng

r.co

m29

12 B

EA

CO

N S

T. C

OLO

RA

DO

SP

RIN

GS

, CO

809

07

ON

SU

LT

ING

N

GIN

EE

RS

OR

PO

RA

TIO

NN

GIN

EE

RIN

G

CH

EN

DT

S E

CE

8

UN

IVE

RS

ITY

OF

CO

LOR

AD

OC

OLO

RA

DO

SP

RIN

GS

UN

IVE

RS

ITY

HA

LLB

OIL

ER

RE

PLA

CE

ME

NT

10120

09/27/10

TBS

DJS

TBS

MECHANICALCONTROLS

M7.01

HYDRONIC SYSTEM CONTROL SCHEMATIC

HYDRONIC SYSTEM SEQUENCE OF OPERATION

PROJECT:

HEATING HOT WATER SYSTEMSYSTEM/POINT DESCRIPTION Q

UA

NTI

TY R

EQ

UIR

ED

GR

AP

HIC

DIS

PLA

Y

CO

NTR

OL

RE

LAY

(IN

STA

NTA

NE

OU

S)

CO

NTR

OL

RE

LAY

(LA

TCH

ING

)

DIGITAL

OFF

/AU

TO

OP

EN

/CLO

SE

OUTPUT

4-20

MIL

LIA

MP

CO

NTR

OL

PO

INT

AD

JUS

TME

NT

ANALOG

PO

SIT

ION

AD

JUS

TME

NT

ELE

CTR

IC-P

NE

UM

ATI

C T

RA

NS

DU

CE

R

HARDWARE

PR

ES

SU

RE

SW

ITC

H

DIF

FER

EN

TIA

L P

RE

SS

UR

E S

WIT

CH

THE

RM

OS

TAT

CU

RR

EN

T S

WIT

CH

DIGITAL

AU

XIL

IAR

Y C

ON

TAC

T

STA

TUS

CO

NTA

CT

SM

OK

E D

ETE

CTO

R

INPUT

PU

LSE

TEM

PE

RA

TUR

E

HU

MID

ITY

I/O SUMMARY TABLE

CA

RB

ON

DIO

XID

E

ANALOG

PR

ES

SU

RE

FLO

W

CO

ND

UC

TIV

ITY

CU

RR

EN

T

CO

NTA

CT

CLO

SU

RE

DIGITAL

SA

FETY

SH

UTD

OW

N

ALARMS

HIG

H L

IMIT

ANALOG

LOW

LIM

IT

RU

N T

IME

SC

HE

DU

LED

STA

RT/

STO

P

OP

TIM

UM

STA

RT/

STO

P

EV

EN

T

TEM

PE

RA

TUR

E C

ON

TRO

L

DA

Y/N

IGH

T S

ETB

AC

K

EC

ON

OM

IZE

R

EN

THA

LPY

VE

NTI

LATI

ON

/RE

CIR

CU

LATI

ON

APPLICATION PROGRAMS

HU

MID

ITY

CO

NTR

OL

SOFTWARE

SE

TPO

INT

TEM

PE

RA

TUR

E R

ES

ET

CH

ILLE

R D

EM

AN

D L

IMIT

CO

ND

UC

TIV

ITY

CO

NTR

OL

PR

ES

SU

RE

CO

NTR

OL

FLO

W C

ON

TRO

L

ALA

RM

INS

TRU

CTI

ON

ALL

PO

INTS

LO

G

ALA

RM

SU

MM

AR

Y L

OG

STA

TUS

SU

MM

AR

Y L

OG

LOGS

TIM

E E

VE

NT

LOG

TRE

ND

LO

G

PO

WE

R F

AIL

UR

E M

OD

E

CO

MM

UN

ICA

TIO

NS

FA

ILU

RE

MO

DE

NE

W (

N)

EX

ISTI

NG

(E

) P

OIN

T

REMARKS

“ ”

“ ”“ ”

“ ”

“ ”“ ”

“ ”

COMBUSTION AIR DAMPER CONTROL SCHEMATIC

top related