INTRODUCTION

THE BUILDING PROJECT SUBCOMMITTEE ON BEHALF OF

THE MANAGEMENT COMMITTEE OF THE SWIMMING

SECTION WELCOMES YOU TO THE PRESENTATION OF ITS

REPORT WITH RESPECT TO THE PROPOSED CHANGING

ROOMS, TOILET & TERRACE BAR PROJECT.

PROJECT JUSTIFICATION

• APPROVED IN THE 5-YEAR SECTION MASTER PLAN•DETERIORATING FACILITIES•GROWING MEMBERSHIP BASE

•GENDER SENSITIVITY•PROJECTING A MORDERN OUTLOOK

•IMPROVED CLUB IMAGE

PROJECT DELIVERY

• CONSTITUTION OF BUILDING SUB-COMMITTEE• ARCHITECTURAL DESIGN & SERVICES•TRANSPARENT TENDER PROCESS

•AWARD OF CONTRACT•FUND RAISING

•PROJECT DELIVERY

OLD BUILDING FRONT VIEW

AERIAL VIEW

FRONT VIEW

SIDE VIEW

GROUND FLOOR PLAN VIEW

FACILITIES PROVIDED

The Ground Floor accommodates:

•Reception•Mother’s Den•Swimming Store•Toilets (Male & Female)•Changing Room/Showers (Male & Female;10 each)

•Lockers (54 each for both Male & Female)

FIRST FLOOR PLAN VIEW

FACILITIES PROVIDED

The First Floor accommodates:

•Chairman’s office•Committee room•Toilets (Male & Female)•Bar•Relaxation/Events’ area

PROJECT COSTFOLLOWING A TRANSPARENT BIDDING PROCESS CONDUCTED BY THE LAGOS COUNTRY

CLUB TENDERS COMMITTEE THE FOLLOWING COST FOR THE COMPLETION OF THE PROJECT WAS ARRIVED AT.

S/NO. PHASES COST NAIRA

1. PHASE 1 13,100,793:50

2. PHASE 2 2,435,062:50

3. PHASE 3 5,568,962:50

4. TOTAL 21,104,818:50

5. ADD M&E 4,000,000:00

6. ESTIMATED COST 25,104,818:50

APPEAL FOR FUNDING