PRECAST BRIDGES

http://www.cpi-team.com

Science Art Religion Politics Scholarly Articles For Mathematics and Productivity

http://www.twitlonger.com/show/n_1sp9pjo?new_post=trueMICROSOFT OneDrive PPT’s PDF’s BOOK LESSONS

Dr f Dejahang BSc CEng, BSc (Hons) Construction Mgmt, MSc, PhD

PRECAST BRIDGES

ABC Precast Concrete County Bridge Construction - YouTube.htm

construction of bridge - YouTube.htm

Bridge-arch installation 02.VOB - YouTube.htm

Bridge-Construction - Macrete FlexiArch Bridge System - YouTube.htm

PRECAST CONCERTE BRIDGES

Low Initial CostPrecast prestressed concrete

bridges are usually lower in first cost than other types of bridges.

Savings in maintenance, precast bridges offer maximum economy.

PRECAST CONCERTE BRIDGES

Minimum MaintenanceThe overall economy of a structure is

measured in terms of life-cycle costs. These include the initial cost of the

structure plus the total expected maintenance costs.

The lifetime cost of repainting steel bridges can amount to 10 to 20% of the original cost of the original cost of the bridge.

PRECAST CONCRETE BRIDGES

PRECAST CONCERTE BRIDGES

PRECAST CONCERTE BRIDGESPrecast prestressed concrete bridges built in

accordance with provincial government requirements should require very little if any maintenance.

They are constructed using high quality materials to exacting manufacturing tolerances.

Fatigue problems are minimal because traffic loads induce only minor stresses.

PRECAST CONCERTE BRIDGESFast Easy Construction

Precast prestressed bridge girders require minimal lead times because they are locally manufactured in standard shapes and sizes.

The precast components are easy to erect in any weather.

Simple connections join the deck girders to the substructure.

PRECAST CONCERTE BRIDGES

Formwork for the superstructure can be eliminated when the tops of girders are placed together to form the entire deck slab.

PRECAST CONCERTE BRIDGES

Ties between adjacent units often consist of a grouted keyway and welded or transverse post-tensioned connections.

PRECAST CONCERTE BRIDGES

For logging or low volume secondary roads, traffic can run directly on the girder deck.

PRECAST CONCERTE BRIDGESCarefully planned details will speed the construction

process and save money.Minimum Traffic InterruptionMaintaining traffic and eliminating detours are difficult

problems for bridge owners.Precast prestressed concrete integral deck bridges can

minimize traffic interruptionThis is because of the availability of long span, plant-

produced sections and the speed of erecting a bridge

PRECAST CONCERTE BRIDGES

In emergencies, precast girders can be rush ordered and a bridge reopened in a matter of days or weeks using standard components.

PRECAST CONCERTE BRIDGES

PRECAST CONCERTE BRIDGESSimple span precast bridge deck girders can be

pinned to the abutments to resist horizontal earth pressures

Or designed as integral abutments to eliminate troublesome expansion joints

Multi-span bridges can be made continuous for a smoother ride and to reduce the number of expansion joints

Minimum Span/Depth Ratio

PRECAST CONCERTE BRIDGES

Assured Plant Quality

Assured Plant Quality

Assured Plant Quality

Durable

Durable

Durable

PRECAST BRIDGES

PRECAST BRIDGES

PRECAST BRIDGES

PRECAST BRIDGES

PRECAST CONCERTE BRIDGES

Precast concrete structural elementsFactory site

PRECAST CONCERTE BRIDGES

PRECAST CONCERTE BRIDGES

Stockpiled in Advance

PRECAST BRIDGES

PRECAST BRIDGES

Supply and Chain- Just-In-TimePRECAST BRIDGES

PRECAST BRIDGES

PRECAST BRIDGES

PRECAST CONCERTE BRIDGES

PRECAST CONCERTE BRIDGES

PRECAST CONCERTE BRIDGES

PRECAST CONCERTE BRIDGES

PRECAST BRIDGES

PRECAST BRIDGES

Piers can be made of precast concrete pieces quickly assembled in the field.

PRECAST CONCERTE BRIDGESAttractivePrecast prestressed concrete bridges can be designed to

elegantly blend harmoniously with their surroundingsIt can offer an attractive view from above, beside and below.StrongToughDurableCan be constructed using the low depth/span ratios possible

using high strength precast prestressed concrete and the simple clean shapes of locally available sections.

Bridge deck erection gantries for pre-cast concrete viaducts

Bridge deck erection gantries for pre-cast concrete viaducts

Concrete bridge deck erection gantry Picture shows one of the self launching bridge

deck erection gantry for erection of precast concrete segments on the 75m approach spans

Used for Sutong cable stayed bridgeThe gantry was designed to handle precast

concrete segments weighing up to 160 tonnes each

Bridge deck erection gantries for pre-cast concrete viaductswhich were erected by the balanced cantilever

methodand to suspend a half span of segments adjacent

to deck movement joints weighing up to 1100 tonnes.

The gantry was designed to handle deck longitudinal gradients of +/- 3%, deck plan minimum curvature of 950m and to skid sideways to erect adjacent box girders.