BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

PAN-EUROPEAN TRANSPORT CORRIDOR XSTEERING COMMITTEE MEETING

Belgrade, January 22, 2010

Status Report

for Austrian sections

of Corridor X

Roman KirnbauerFederal Ministry of Transport, Innovation and Technology

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

Road sections

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

MOTORWAYS AND EXPRESSWAYS IN AUSTRIA

Tauern - Axis

Phyrn - Axis

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

Salzburg

Stateborder AT / SLO

Tauerntunnel

Katschbergtunnel

Tunnelkette Werfen,

Ofenauertunnel, Hieflertunnel

Wolfsbergtunnel

Karawankentunnel

Tunnel Projects

(A10 Tauernautobahn)

Additionally, environmental measures (noise protection, etc.) are taken along the entire route within a long term programme (2004 – 2020).

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

Rail sections

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

Angertalbrücke (New Bridge)

Start of construction works: Sept. 2006Oct. 2008: Construction works suspended for legal reasons(newly required environmental impact assessment - „Umweltverträglichkeitsprüfung“).

Completion of works expected in 2010.Construction cost: 18,5 Mio. €

Section Type Status Construction

Cost

Kolbnitz –Mühldorf

Upgrade

(Doubletrack)

Completed 2006

49,7 Mio. €

Mühldorf – Pusarnitz

Upgrade

(Doubletrack)

Completed 2009

48,7 Mio. €

The 80 km long „Tauernbahn“ from Schwarzach-St.Veit to Spital-Millstättersee is

the transport backbone for cross alpine transit.

With the completion of the Kolbnitz-Pusarnitz section in 2009 a total of 85% (69 of 80 km)

of the „Tauernbahn“ is now in double track configuration.

Salzburg

State border AT / SLO

AngertalbrückeKolbnitz - Pusarnitz

Kolbnitz – Pusarnitz (Doubletrack configuration)

Start of construction works: 2002

Tauern-Axis

Rosenbach (Remodelling of Station, Removal of low speed sections)

Start of construction works: March 2009Completion of works expected for Dec. 2010.Construction cost: 11,9 Mio. €

Rosenbach (Station)

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

„Tauernbahn“ - Construction works

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

Phyrn – Axis

Graz Werndorf – Spielfeld (State border)

under construction

planning phase

completed

BMVIT - Shaping the FutureFederal Ministry of Transport, Innovation and Technology

„Graz/Werndorf“ - Construction works and completed sections