bim from business perspective - the big 5 egypt...• bim is a 3d drafting • lake of bim...
Post on 06-Nov-2020
5 Views
Preview:
TRANSCRIPT
BIM FROM BUSINESS PERSPECTIVE
By: Hossam Raafat Farag
Contents
WHY BIM HAS BEEN INNOVATED
SHOULD WE HAVE TO CHANGE
OUR PERSPECTIVE ON
HOW WE ARE UNDERSTANDING
AND DEALING WITH BIM
VERTICAL, AND HORIZONTAL
DEVELOPMENT
ARE THE CURRENT KPIs ENOUGH TO
MEASURE BIM PROCESS
EFFICIENCY COMPARED TO
ROI?
…SO HOW CAN WE MAKE THE MOST OF BIM
AREAS WITH POTENTIALS FOR INVESTEMENT IN
BIM
What we will try to answer in this session
Is BIM a new idea (Invention)? Why construction industry development rate is less than other industries? What is the impact of Stakeholder roles on assessment of BIM? What are the comments on the current implementation of BIM in the
market? Why do we have to invest more in the horizontal development in the BIM
dimensions? Are the current KPIs enough to measure BIM process efficiency compared to
ROI? How to develop the current BIM implementation in the market? What are the areas that have potential for investment related to BIM?
Why BIM has been innovated
Sakichi & Kiichiro Toyoda
TOYOTA TPS(1)(10)(11)
Bill SmithMOTOROLA SIX
SIGMA ($17 Billion)(2)(12)
Jack WelchG.E. SIX SIGMA
($750 Million)(3)(13)
Sir John EganFormer Jaguar Chairman
Egan Report(4)(14)
Should we have to change our perspective on how we are understanding and dealing with BIM
(15)
Policy
Process
People
Technology
Should we have to change our perspective on how we are understanding and dealing with BIM(9)
• Software limitations• Infrastructure Limitations• Avoiding Cloud Apps.• No full interoperability
• Lake of the right approach• Over Detailing & Constraint• 3D Coordination is dominant• BIM is not mature enough in
Medium and small Organizations
• Poor client involvement• Lake of training Plans• Not all providers are Qualified• BIM is a 3D drafting• Lake of BIM technicians
• No enforcement by the government• Lower bidder not most efficient• BIM is a Luxury
VERTICAL, AND HORIZONTAL DEVELOPMENT
(16)
ARE THE CURRENT KPIs ENOUGH TO MEASURE BIM PROCESS EFFICIENCY COMPARED TO ROI?
- Man hours spent per project- Speed of Development (Turnaround time)- Revenue per head- IT investment per unit of revenue- Cash Flow- Percentage of cost reduction- Bids won or win percentage (7)
- Number of errors and omissions- Rework- Overall Project duration- Safety incidences - Client satisfaction
- Better reputation- Better product- Better RFIs quality- Better team- Expansion in services providing- Better collaboration between stake holders and
owner- Better cost control/Predictability- Faster client approval cycles- Faster Regulatory approval cycles
Policy
Process
People
Technology
…SO HOW CAN WE MAKE THE MOST OF BIM(9)
• Software integration• Infrastructure &
Communication development• Automation (R&D)• Database and libraries
• What do you need from BIM?• Clear demarcation and roles for
stakeholders• Start the Project in BIM• Client or End-user is the model
owner• Team development• Avoiding over detailing
• The culture of BIM for clients• Encouraging clients to start project in BIM• Client EIR & early involvement• BIM Management roles• Engineers practical on-site training • Collaboration culture in education• Technical institutes
• Government role• Quality driven market mindset• Local standards & Codes• Local BIM providers Ranking system
Information management CDE ServicesHighspeed LAN Dedicated internet lines
Site Microwave towers
Software Development Automation
Steel prefabricated prefabricated HVAC Duct
Pre-Assembled Piping systems Prefabricated Buildings
Augmented Reality 4D Planning Laser scanning
Augmented reality BIM Management Live tracking
Certifications Technicians Institutes Online Training
University new programs Training Centers
AREAS WITH POTENTIALS FOR INVESTEMENT IN BIM(9)
Education.
Communication.
Infrastructure.
Software Development
Manufacturing
Outsourcing
New services
Thank you…
Questions…
References
• (1) https://global.toyota/en/company/vision-and-philosophy/production-system/• (2) Alänge, S., 1992. Total Quality Management as a Tool for Organizational Change-The case of Motorola.• (3) Henderson, K.M. and Evans, J.R., 2000. Successful implementation of Six Sigma: benchmarking general electric company.
Benchmarking: An International Journal, 7(4), pp.260-282.• (4) Murray, M., 2003. Rethinking construction: the egan report (1998) (pp. 178-195). Blackwell Science, Oxford, UK.• (5) Wolstenholme, A., Austin, S.A., Bairstow, M., Blumenthal, A., Lorimer, J., McGuckin, S., Rhys Jones, S., Ward, D., Whysall, D., Le
Grand, Z. and Guthrie, W., 2009. Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our future.
• (6) Eleftheriadis, Stathis. (2014). BIM Integrated Optimisation Framework for Environmentally Responsible and Structurally Efficient Design Systems: A Holistic Cloud Based Approach.
• (7) Coates, P., Arayici, Y., Koskela, K., Kagioglou, M., Usher, C. and O'Reilly, K., 2010. The key performance indicators of the BIM implementation process.
• (8) Erin Rae Hoffer, 2016, IS IT TIME FOR BIM? ACHIEVING STRATEGIC ROI IN YOUR FIRM. Autodesk• (9) Farag, Hossam, 2019. Improve BIM Management process in design stage phase in construction projects. • (10) https://www.toyota-industries.com/company/items/7110436d43157cb2c372bcd07d07411c_1.jpg• (11) https://en.wikipedia.org/wiki/Kiichiro_Toyoda
References
• (12) http://leansixsigmadefinition.com/wp-content/uploads/2019/01/bill_smith_motorola_six_sigma.jpg
• (13) https://www.google.com/imgres?imgurl=https%3A%2F%2Fi.harperapps.com%2Fauthors%2F28473%2Fx300.jpg&imgrefurl=https%3A%2F%2Fwww.harpercollins.com%2Fauthor%2Fcr-101697%2Fjack-welch%2F&docid=ZgZOmrE41mZOwM&tbnid=O9Y1jCfbcINYAM%3A&vet=10ahUKEwiwofWHnZnkAhWLpY8KHd7lD3IQMwiGASgMMAw..i&w=300&h=400&bih=674&biw=1536&q=jack%20welch&ved=0ahUKEwiwofWHnZnkAhWLpY8KHd7lD3IQMwiGASgMMAw&iact=mrc&uact=8
• (14) https://3a09223b3cd53870eeaa-7f75e5eb51943043279413a54aaa858a.ssl.cf3.rackcdn.com/c511bc39fe8c361aad951255f3b58f85880752409-1301943298-4d9a1402-620x348.jpg
• (15) https://damassets.autodesk.net/content/dam/autodesk/www/solutions/bim/images/stories/Is-it-Time-for-BIM-Achieving-Strategic-ROI-in-Your-Firm-576x300.jpg
• (16) http://biblus.accasoftware.com/en/bim-dimensions-3d-4d-5d-6d-7d-bim-explained/
top related