B e l s i z e P a r k

A p a r t m e n t

R e f u r b i s h e m n t

Completed within 6 weeks, this

project was a high end

refurbishment in Camden, London.

Our team refurbished the lounge

area, bedroom, bathrooms, and

kitchens all the the highest of

specification. Due to the old age of

the building, various bespoke &

handmade elements were

incorporated, all created in our in-

house joinery workshop. We worked

closely with the homeowner on the

design to ensure the end-result was

exactly as initially envisioned.

Value: £55,000