before an after remodels

Post on 19-Feb-2017

48 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

All before the remodel, removed old tile floor,old tub housing, lighting, vanity, sink, faucet, plumbing etc

After new shower housing and faucet, new vanity, all in one counter top, faucet, plumbing, flooring, tiles tub and custom design, mirror, lights, fixtures.

Before: tore out tub, walls, toilet, lighting, vanity, plumbing,etc.

Designed and installed cultured marble full shower, installed new drain in concrete slab, new plumbing, custom seat, flooring, paint, vanity, lighting switched door from left to right swing.

Before and after pic of upstairs bath

This bath was a complete install from the concrete to framing, electrical, plumbing, toilet drain, flooring, waterproofing walls. And more.

top related