baharka camp profile · 2015-10-30 · 6-11 0-5 3% 20% 6% 9% 10% 2% 21% 9% 8% 12% ... september...
Post on 10-Aug-2020
0 Views
Preview:
TRANSCRIPT
Erbil Governorate, IraqSeptember 2015
Baharka Camp Profile
Date opened: 10/06/2014Population:* 3953 Individuals / 787 HouseholdsAccommodation: 1338 TentsOngoing extension: PlannedPlanned capacity: 2182 TentsCamp area: 0.36 km2
Camp OverviewLocation Map
Baharka Camp Map Lat. 36° 17’ 40.022” N Long. 43° 59’ 39.655” E
Agencies
Management agency: GovernmetManager/Focal point: Ahmed Ramadan AbdoContact details: 07505838869, Keskike@gmail.comRegistration actor: ERC, BCF
For more information on this profile please contact: CCCM Cluster: iraqimo@cccmcluster.org
REACH Initiative, Philip Bato: philip.bato@reach-initiative.org
EDUCATION: UNICEF, UNISCO, DoE
FOOD: BCF
HEALTH: Jian, IMC, UNFPA, ERC
NFI: UNHCR, FREM
PROTECTION: Government
SHELTER: UNHCR
WASH: Government
Target Progress
Education% of children aged 6-11 enrolled in primary school% of children aged 12-17 enrolled in secondary school
100%100%
63%68%
Food % of households accessed Family Food Parcel or equivalent in the past month 100% 80%NFIs % of households accessed NFI assistance in the camp in the past three months 100% 37%Health* Health services are available on-site or within walking distance Yes YesCCCM Average open area per household min. 30m2 384m2
Protection % of IDPs registered on an individual basis (MODM/DDM) 100% 99%
Shelter
% of households accessed shelter assistance since arrival at the campAverage covered area per personAverage number of individuals per tent
100%min. 3.5m2
max.5
100%9m2
3
Water & Sanitation
Litres of water available per person per day*# of persons per latrine # of persons per shower Frequency of solid waste disposal from the settled environment
min. 20Lmax. 20max. 20min. weekly
75L44Once per day
Sectoral Overview
Target reached, Target more than 50% reached, Target less than 50% or not at all reached. Targets are based on minimum standards agreed with the CCCM Cluster, Iraq.
The following structures are in place: Camp management code of conduct* Complaints mechanism*
46% of HH reported issues are addressed IDP committee(s) established*
83% report awareness of camp committee(s), of these 43% report IDP representatives are elected
Female committee representation *(either in camp management committee or a gender specific committee)
Child Friendly Space
CCCM Mechanisms
Priority ConcernsThe camp population and camp management ranked their areas of priority concern as follows:
Camp population
Camp management
Education High MediumFood High HighHealth Very high Very highNFI High Very highShelter Very high MediumSocial Cohesion Medium High
WASH Very high Very high
Proportion of shelters meeting minimum criteria for winterisation reported by the camp population were:
Second fly sheet 31 %At least one stove/space heater per household 39 %At least one blanket per person 67 %
WinterisationVulnerabilityProportion of households reporting individuals with the following specific needs:Civil documents missing 13%
Members with disabilities 18%
Unaccompanied/ separated minors 0%
Pregnant/lactating women 26%
Demographics52% male / 48% female 3+20+6+9+10
2+21+9+8+12 0ver 60
18-60
12 -17
6-11
0-5
3%20%6%9%10%
2%21%
9%8%
12%
This profile provides an overview of conditions in Baharka camp. Primary data was collected through household surveys on the 09/09/2015. Households were randomly sampled to a 95% confidence level and 10% margin of error based on population figures provided by CCCM.Additional information from camp managers, marked (*) is correct as of 09/09/2015.
Summary
Population Change
46% of households reported not earning income in the month preceding assessment
Key Concern
For more information on this profile please contact: CCCM Cluster: iraqimo@cccmcluster.org
REACH Initiative, Philip Bato: philip.bato@reach-initiative.org
In the past month:
66 individuals left*
186 individuals arrived*
30% of households reported restrictions on movement for those entering or exiting the camp in the past month
Erbil Governorate, IraqSeptember 2015
Baharka Camp Profile Management agency: GovernmetManager/Focal point: Ahmed Ramadan AbdoContact details: 07505838869, Keskike@gmail.comRegistration actor: ERC, BCF
top related