Area 1
A: 399 meters AREA HAND-OVER: 272 meters (68.0%) Gridline 22 1/2-6f
Description Unit BOQ Qty New QtyQuantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
EARTHWORKS
SITE CLEARANCE m2 9,754.00 8,910.00 8,910.00 7,218.00 1,692.00 81.0%
FILLING TO MAKE UP LEVELS
Dredge fill over site m3 8,258.00 5,022.00 5,022.00 5,022.00 0.00 100.0%
150mm thick compacted crusher run
over sitem
3 1,464.00 1,464.00 - -
50mm thick and bedding over site m3 9,754.00 7,260.88 - -
COMPACTION TEST (PROVISIONAL)
CBR Test no. 4.00 4.00 4.00 0.00 100.0%
Field Density Test no. 4.00 4.00 4.00 0.00 100.0%
TEMPORARY HOARDING (WITHIN BOUNDARY OF SITE)
Supply & Install 2.4m high metal hoarding m 376.00 - - -
DOUBLE LEAVES SWING GATE
Supply & Install of 7.4x2.4m high metal
swing gateno.
1.00 - - -
SOFT LANDSCAPING WORKS
ALL LANDSCAPE PLANTING AREAS
Trimming , leveling , compacting bottoms Item 1.00 1.00 an ng an s ru ng nc u ng any e -
inItem 1.00 1.00
Complying with the Architect'sItem 1.00 1.00
Removal of excavated materials off-site Item 1.00 1.00
Hoisting of planting media and plant
materialsItem
1.00 1.00 - - - -
Supply and delivery to site the approved
imported filling mat.Item
1.00 1.00 - - - -
CULTIVATING
To turf area m2
500.00 500.00
To planting areas; trees & palms m2
141.00 141.00
To planting areas; shrubs m2
500.00 500.00
EARTHMOUNDING AND FINE GRADING 486.35 416.01 70.34 85.5%
Handling and delivering of sweet soil to
lantin areasm
3 490.00 306.09 306.09 262.97
Handling and delivering, contouring andfine radin of soil fillin
m3 180.26 180.26 153.04
SUPPLY AND PLANT TURF
Paspalum Vaginatum (Seashore
Pas alum); close turfinm
2 500.00 500.00
SUPPLY AND PLANT PALM AND TREES
TREE
Delonix Regia no. 15.00 15.00
Tabebuai Rosea no. 23.00 23.00
Lagerstroemia Indica no. 3.00 3.00
e op orum p erocarpum ( e ow
Flameno. 9.00 9.00
Thevitia Peruviana no. 6.00 6.00
Filicium Decipiens no. 6.00 6.00
PALM
Phoenix dactylifera (Date Palm) no. 5.00 5.00
Livistonia Rotundifolia no. 5.00 5.00
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
AREA 1- BILL OF QUANTITIES
Page 1 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
2/14
Area 1
A: 399 meters AREA HAND-OVER: 272 meters (68.0%) Gridline 22 1/2-6f
Description Unit BOQ Qty New Qty
Quantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
AREA 1- BILL OF QUANTITIES
Bismarkia Nobilis (Fan Palm) no. 5.00 5.00
SUPPLY AND PLANT SHRUBS & CLIMBERS
SHRUBS
Petunia spp. no. 740.00 740.00
Helicornia Psitacorum 'rubra' no. 230.00 230.00
Pennisetum Rubrum no. 135.00 135.00
Helicornia Psitacorum (Golden Torch) no. 100.00 100.00
Catharanthus Rosea (Madagascar
Periwinkle)no. 120.00 120.00
Bougainvilla Spectabilis no. 250.00 250.00
Petunia Hybrida no. 475.00 475.00
Hibiscus Rosa Sinensis no. 230.00 230.00
PROVISION OF MAINTENANCE
all costs and expences in connection with
maintenanceItem 1.00 1.00
Provision for Water Item 1.00 1.00
HARD LANDSCAPING WORKS
PRECAST CONCRETE PLANKS
4500mm x 600mm x 75mm (Type I) m2 4,172.00 - - - -
1000mm x 600mm x 75mm (Type II) m2 2,971.00 - - - -
PRECAST CONCRETE PLANTER BOX (TREE PITS)
Type 1 no. 64.00 63.00 46.00 46.00 0.00 100.0%
Type 2 ; including coping no. 11.00 12.00 8.00 8.00 0.00 100.0%
PRECAST CONCRETE STEP
to rc step; along tree pits type 1 m 256.00 256.00
PRECAST CONCRETE BENCH
1000mm width x 450mm x 100mm thk;
Type 3 bench; along planter boxm 290.00
mm x mm x mm g rea e
hardwood bench with 460mm x 15mm
thk steel column Architect's approval;
no. 20.00
PRECAST CONCRETE SEAT
to sand box; 1500 girth no. 2.00 1.00 0.00
PRECAST CONCRETE STUMPmm x mm mm o ra ng
no. 100.00 - - - -
PRECAST CONCRETE TURF BOX
to turf box perimeter; 675mm high
x150mm thickno. 9.00 9.00 5.00 5.00 0.00
100.0%
JOINTS
Expansion joint to precast concrete
planks type 1m 325.00 325.00
METAL RAILING
1100 high x 125mm x 75mm Hot dipalvanized railin
m 273.00
LOOSE FURNITURE
BENCH
to bench type 1 no. 20.00
Page 2 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
3/14
Area 1
A: 399 meters AREA HAND-OVER: 272 meters (68.0%) Gridline 22 1/2-6f
Description Unit BOQ Qty New QtyQuantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
AREA 1- BILL OF QUANTITIES
DUST BIN
1100mm high x 570mm diameter ; type 1 no. 35.00 20.00
FINISHES
Cement and sand (1:3) screed as described:
20mm thick protective screed to received
homo enous tilesm
2 325.00
20mm thick protective screed to received
ranite tiles.m
2 2,971.00
20mm thick protective screed to received
Agglomerate cement tiles finish.m
2 4,172.00
400mmx400mmx15mm thick homogenous tiles
to floor ; to pavements and walkways m2 325.00
to floor ; to precast planks m2 2,971.00
to precast rc seat; bench- type 2 no. 11.00 - -
to juxtaposed green no. 1.00 1.00 - - - -
to turf box no. 9.00 9.00 6.00
to floor ; to precast planks m2 4,172.00
CHENGAL" hardwood Timber Deck
100mmx450mmx25mm m 32.00
100mmx125mmx25mm; to sides m 64.00
LUMINAIRES AND LAMPS
Pole Light no. 65.00 39.00 26.00 66.7%
a. Installation of foundation 26.00 26.00 0.00 100.0%
b. Installation of sleeves & cables 26.00 26.00 0.00 100.0%
c. Installation of Pole light 26.00 0.00 26.00 0.0%
Bollard Light no. 100.00 75.00 47.00 8.00 39.00 17.0%
Wall Light no. 40.00 10.00 0.00
Uplight no. 120.00 107.00 76.00 24.00 52.00 31.6%
LED Micro Light m 600.00 439.00
Step Light no. 70.00 28.00 20.00 0.00 20.00
UTILITIES
TELECOMMUNICATION 896.00 730.50 730.50 0.00 100.0%
Bed laying of four way D54 duct m - 316.00 267.25 267.25 0.00 100.0%
Filling of granular material bed &
backfillingm - 316.00 267.25 267.25 0.00
100.0%
Excavate, lay and backffill D56 house
connectionm - 258.00 190.00 190.00 0.00
100.0%
Installation of Type JRC 14 Manhole no. - 6.00 6.00 6.00 0.00 100.0%
ELECTRICAL 31.3%
Electrical works for substation (excluding
transformer and incoming cables)no. - 1.00 1.00 1.00
0.0%
Electrical substation civil works no. - 1.00 1.00 1.00 0.00 100.0%
WATER SUPPLY 764.00 680.00 679.00 1.00 99.9%
Bed laying of 150mm GRE pipes m - 318.00 276.00 276.00 0.00 100.0%
Filling of granular material bed &
backfillingm - 318.00 276.00 276.00 0.00
100.0%
Page 3 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
4/14
Area 1
A: 399 meters AREA HAND-OVER: 272 meters (68.0%) Gridline 22 1/2-6f
Description Unit BOQ Qty New QtyQuantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
AREA 1- BILL OF QUANTITIES
Install buried type 150mm Gate Valve no - 1.00 1.00 0.00 1.00 0.0%
Testing of waterline unit - 1.00 1.00 1.00 0.00 100.0%
Waterhouse connection tapping oun
150mm GRP lineno - 12.00 12.00 12.00 0.00
100.0%
Lay HDPE 1" house connection hose
between taping point and kioskm - 114.00 114.00 114.00 0.00
100.0%
IRRIGATION WORKS 85.1%
Main Irrigation Lines 578.00 578.00 0.00 100.00%
Main irrigation 4" uPVC pipe including
5m taping point at grid 12m - 400.00 303.00 303.00 0.00
100.0%
Main irrigation 1.5" Conduit pipe m - 400.00 275.00 275.00 0.00 100.0%
Main irrigation 2.0" Conduit pipe m - 45.00 30.00 30.00 0.00 100.0%
Irrigation Lateral Drip Lines 904.00 904.00 0.00 100.00%
Irrigation lateral drip uPVC pipe lines m - 1,175.00 810.00 810.00 0.00 100.0%
Drip riser 16mm classC LDPE pipe m - 200.00 90.00 90.00 0.00 100.0%
Solenoid & gate valves for drip no - 6.00 4.00 4.00 0.00 100.0%
Irrigation Lateral Spray Lines 470.00 191.00 279.00 40.64%
Irrigation lateral spray uPVC pipe lines m - 215.00 191.00 191.00 0.00 100.0%
Spray riser 16mm classC LDPE pipe m - - - -
Solenoid & gate valves for spray no - 6.00 4.00 0.00 4.00 0.0%
In drip line at 2.3lph at 50cm spacing m - 400.00 275.00 275.00 0.0%
2,006.00 1,998.00 8.00 99.60%
15 series spray nozzles no - 63.00 42.00 42.00 0.00 100.0%
Pop-up spray head body no - 63.00 42.00 42.00 0.00 100.0%
Pull boxes no - 12.00 9.00 9.00 0.00 100.0%
4" dia size Isolation valve with manhole no - 1.00 1.00 1.00 0.0%
Irrigation controller no - 1.00 1.00 1.00 0.0%
Water tank (5000 gallons) no - 1.00 1.00 1.00 0.0%
Valve boxes no - 9.00 6.00 2.00 4.00 33.3%
Satellite Controller no - 1.00 1.00 1.00 0.0%
Common wire AWG (Red, Black, Green,
White)m - 1,600.00 1,600.00 1,600.00 0.00
100.0%
Underground warning tapes m - 400.00 303.00 303.00 0.00 100.0%SEWERAGE 791.00 1,029.00 1,010.00 19.00 98.2%
uPVC pipes laid & jointed as specified
Depth not exceeding 3m
200mm UPVC pipes m - 301.00 200.00 200.00 0.00 100.0%200mm UPVC (Connection to main
additionalm - 140.00 140.00 0.00 100.0%
100mm UPVC house connection m - 200.00 200.00 0.00 100.0%
Depth not exceeding 4m
200mm UPVC pipes m - 40.00 40.00 40.00 0.00 100.0%
200mm HDPE Pipe m - 15.00 15.00 0.00 15.00 0.0%
Filling of granular material bed &
backfilling
m - 380.00 380.00 380.00 0.00
100.0%Reinforced Concrete Manhole
Manhole no - 4.00 3.00 3.00 0.00 100.0%
Chamber no 4.00 4.00 0.00 4.00 0.0%
Page 4 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
5/14
Area 1
A: 399 meters AREA HAND-OVER: 272 meters (68.0%) Gridline 22 1/2-6f
Description Unit BOQ Qty New Qty
Quantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
AREA 1- BILL OF QUANTITIES
600mm Chamber & connections no 25.00 25.00 25.00 0.00 100.0%
200mm backdrop no 2.00 2.00 2.00 0.00 100.0%
Relocation of 1200mm manholes no - 3.00 3.00 3.00 0.00 100.0%
Relocation of 600mm manholes no - 5.00 5.00 5.00 0.00 100.0%
Straight specials as rocker pipes at
bends and manholesno - 12.00 12.00 12.00 0.00
100.0%
Description Unit Qty New QtyQuantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
ADDITIONAL LUMINAIRES & LAMPS
Pillar Light no - 20.00 50.0%
a. Installation of foundation 14.00 14.00 0.00 100.0%
b. Installation of Pillar light 14.00 0.00 14.00 0.0%
Recessed Light no - 23.00 20.00 2.00 18.00 10.0%
ELECTRICAL MANHOLES no - 12.00 12.00
a. Installation of electrical manhole 14.00 12.00 12.00 0.00 100.0%
b. Casting of manhole cover 14.00 12.00 12.00 0.00 100.0%
SIGNAGE
Advertising Signage no - 2.00
a. Installation of foundation 1.00 1.00 0.00 100.0%
b. Installation of advertising signage 1.00 1.00 0.0%
Directional Signage no - 3.00
a. Installation of foundation 2.00 2.00 0.00 100.0%
b. Installation of directional signage 2.00 2.00 0.0%
DUST BIN
Supply & installation of
1450x400x1200mm high dust bin
fabricated from aluminum sheet andangles including GI mesh bushket. Finish
shall be owder coated to standard RAL
no. 35.00
LOOSE FURNITURE
BENCH
Bench type 1 (curved shape) no. 34.00
Bench type 2 (rectangular shape) no. 20.00
PRECAST CONCRETE PLANKS 0.00
Pedestrian (2200x500x125) m2
- - 73.39%
Fixed Size m2 2,532.20 2,274.80 257.40 89.8%
Custom Size no. 671.00 75.90 595.10 11.3%
Vehicular (2250x500x150) m2
- - 66.79%Fixed Size m
2 1,068.75 806.63 262.12 75.5%
Custom Size no. 139.00 0.00 139.00 0.0%
Modified Vehicular (2410x500x150) m2
- - 0.00%
Fixed Size m2 589.25 0.00 589.25 0.0%
Custom Size no. 103.00
AREA 1- VARIATIONS
Page 5 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
6/14
Area 1
A: 399 meters AREA HAND-OVER: 272 meters (68.0%) Gridline 22 1/2-6f
Description Unit BOQ Qty New QtyQuantity as per
Hand-over (A)
Actual
Installed (B)
Remaining
Qty (A-B)
% Accom
(B / A)
PALM DEIRA
PROMENADE AT DEIRA ISLAND FRONT
AREA 1- BILL OF QUANTITIES
PRECAST CONCRETE STEPS 16.67%
to rc step; along grid D m 35.00
a. Perma beams for steps set 7.00 6.00 2.00 4.00 33.3%
b. Precast planks for steps
PC2- (S1) no 28.00 24.00 8.00 16.00 33.3%
PC2- (S2) no 28.00 24.00 24.00 0.0%
PC2- (S3) no 28.00 24.00 24.00 0.0%
PRECAST CONCRETE BENCH 450.40 450.40 440.40 10.00 97.8%
Bench type 3 (61nosx2.5m) m 100.00
100.00 97.50 2.50 97.5% Bench type 2 (Along T-wall)-48nos x2.5m m 120.00 120.00 117.50
2.50 97.9%
Precast Boundary Wall (88nosx2.5m) m 220.00 220.00 215.00 5.00 97.7%
Precast Sidewall (10nos) m 10.40 10.40 10.40 0.00 100.0%
FINISHES
For Foot Path Tiles ln 973.00 735.00 644.00 91.00 87.6%
500mm x 500mm 20mm thk Consent
Traniex tiles, Sand Blast finish.
Grid A ln 399.00 297.00 267.00 30.00 89.9%
Grid B ln 175.00 141.00 131.00 10.00 92.9%
Grid C ln 399.00 297.00 246.00 51.00 82.8%
For Granite Cladding m2 547.88 485.43 265.03 220.40 54.6%
Bench type 3 m2 91.25 91.25 63.05 28.20 69.1%
Bench type 2 (Along T-wall) m2 96.00 96.00 58.00 38.00 60.4%
Precast Boundary Wall & Side Wall m2 175.75 175.75 60.00 115.75 34.1%
Turf Box (9 nos) m2 30.00 19.94 19.94 0.00 100.0%
Sand Box (1 nos) m2 25.37 0.00 0.00 0.00
-
Juxtaposed (1 nos) m2 37.50 37.50 37.50 0.00
100.0%
Tree pits Type 1 (63 Nos) m2 57.45 41.95 23.66 18.29 56.4%
Tree pits Type 2 (12 Nos) m2 34.56 23.04 2.88 20.16 12.5%
For Wood Cladding m2 194.46 180.98 3.28 177.70 1.8%
Bench type 3 m2 110.00 110.00 0.00 110.00 0.0%
Bench type 2 (Along T-wall) m2 42.00 42.00 0.00 42.00 0.0%
Sand Box (1 nos) m2 13.48 0.00 0.00 0.00
-
Tree Pit Type 2 (12 Nos) m2 22.09 22.09 3.28 18.81 14.8%
Juxtaposed Green (1 Nos) m2 6.89 6.89 0.00 6.89 0.0%
Page 6 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
7/14
Area 1
Remarks
med as per payment.
ted as per ERI No. 7
pplicable.
plete
plete
ted as per ERI No. 4
ted as per ERI No. 6
plete
Page 7 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
8/14
Area 1
Remarks
ed sizes.
ed sizes.
plete
plete
not ready.
pplicable.
plete
Page 8 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
9/14
Area 1
Remarks
ange to new design.
plete
lled sleeves & cable
not ready.
nits uplight boxes.
lled sleeves & cable
plete
plete
plete
plete
er DEWA scope
plete
plete
plete
Page 9 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
10/14
Area 1
Remarks
yet installed
plete
plete
plete
plete
plete
plete
plete
plete
plete
plete
aining
aining
pleteplete
plete
aining
aining
aining
aining
aining
plete
plete
plete
plete
plete
plete
plete
ers not installed.
Page 10 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
11/14
Area 1
Remarks
plete
plete
plete
plete
plete
Remarks
plete
led sleeves & cable
k-up
plete
plete
led sleeves & cable
plete
led sleeves & cable
Page 11 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
12/14
Area 1
Remarks
aining @grid (22-
(12-13)
aining @grid (22-
(12-13)aining @grid (12-
15
plete
Hand-overed to
O.
plete
Handover to ARCO.
Page 12 of 14 Updated as of February 12, 2009
-
8/2/2019 Area 1 Accomplishment
13/14
Week no. 56
Week Ending: 12-Mar-09
Planned Actual Planned Actual Planned Actual
AREA 1 - WATER (297 meters H/O)
1 Earthworks 1.45% 1.45% 1.45% 1.45% 1.45% Completed
2 Hard Landscape 10.56%
a. Planter Box 0.66% 0.66% 0.66% 0.66% 0.66% 0.00% Completed
b.Turf Flat / Juxtaposed Green 0.18% 0.18% 0.18% 0.18% 0.18% 0.00% Completed
b. Linear Bench 0.93% 0.93% 0.91% 0.00% 0.93% 0.91% -0.02% 97.84% Completed
Bench type 3 0.28% 97.50% 97.50%Bench type 2 (Along T-wall) 0.28% 97.90% 97.90%
Precast Boundary Wall 0.28% 97.70% 97.70%
Precast Sidewall 0.09% 95.00% 5.00% 100.00%
c. Permatrak Planks 3.58% 3.58% 2.18% 0.09% 3.58% 2.27% -1.40% 63.4% Completed
Pedestrian (2200x500x125) 2.33% 69.64% 3.75% 73.39%
Vehicular (2250x500x150) 0.84% 66.14% 0.65% 66.79%
Modified Vehicular (2410x500x150) 0.41% 0.00% 0.00%
d. Precast Concrete Steps 1.18% 1.18% 0.20% 0.00% 1.18% 0.20% -0.98% 17% Completed
to rc step; along grid D 1.18% 16.67% 16.67%
e. Finishes 4.03% 4.03% 2.44% 0.15% 4.03% 2.59% -1.59% 64% Completed
For Foot Path Tiles 2.02% 87.60% 87.60%
For Granite Cladding 1.49% 44.80% 9.80% 54.60%
For Wood Cladding 0.52% 1.80% 1.80%
3 Soft Landscape 1.17% 1.17% 0.15% 0.00% 1.17% 0.15% -1.02% 13% Completed
All Landscape Planting Material 0.14%
Cultivating 0.1313%
Earth Mounding and Fine Grading 0.23% 63.40% 63.40%
Supply and Plant Palm & Trees 0.20%
Provision of Maintenace 0.47%
4 Landscape Fixtures & Finishes 3.38%
a. Pole Lights 0.66% 0.66% 0.44% 0.66% 0.44% -0.22% 66.7% Completed
b. Bollard Lights 0.45% 0.45% 0.08% 0.45% 0.08% -0.37% 18% Completed
c. Wall Lights 0.09% 0.09% 0.09% 0.00% -0.09% Area not ready
d. Up Lights 0.46% 0.46% 0.15% 0.46% 0.15% -0.31% 33% Completed
e. LED Lights 0.97% 0.97% 0.97% 0.00% -0.97%
f. Step Lights 0.11% 0.11% 0.11% 0.00% -0.11%
g. Precast Seat to Sand Box 0.16% 0.16% 0.16% 0.00% -0.16%
h. Metal Railing 0.35% 0.35% 0.35% 0.00% -0.35%
i. Dust Bin 0.13% 0.12% 0.008% 0.13% 0.00% -0.13%
5 Utili ties/ MEP 3.18% 0.00% 0.00%
a. Telecommunication 0.48% 0.48% 0.48% 0.48% 0.48% 0.00% Completed
b. Electrical (Substation) 0.48% 0.48% 0.15% 0.48% 0.15% -0.33% 31% Completed
c. Water Supply 0.79% 0.79% 0.78% 0.79% 0.78% -0.01% 99% Completed
d. Irrigation 0.48% 0.48% 0.41% 0.48% 0.41% -0.07% 81% Completed
e. Sewerage 0.95% 0.95% 0.93% 0.95% 0.93% -0.02% 98% Completed
6 Kiosk Construction 34.49% 33.30% 1.99% 1.23% 34.53% 1.99% -32.54% 5.8% Completed
Sub-structure 15.52% 12.81%
Super structure 18.97%
7 Water Features/ Reflected Pool 31.97% 28.17% 1.28% 29.45% 0.00% -29.45%
Sub-structure 14.39%
Super structure 17.58%
8 Metal Sculpture 13.80% 12.77% 1.06% 13.83% 0.00% -13.83%
100.00% 93.97% 13.39% 3.58% 0.24% 97.55% 13.63% -83.98%
Total Cumulative Progress Percentage Of Area 1 TO DATE (Actual) 13.63%
Sr.
No.Project Components/Activities %
Cumulative Progress-Previous Progress This Week Cumulative Progress To DateVariance REMARKS
TOTAL PROGRESS OF AREA 1
Total Cumulative Progress Percentage Of Area 1 TO DATE (Planned) 97.55%
-
8/2/2019 Area 1 Accomplishment
14/14
PLANNED VS. ACTUAL % AGE FOR AR
18-22 23-29 1-7 8-14 15-21 22-28 29-4 5-11 12-18 19-25 26-2 3-9 10-16 17-23 24-30 31-6 7-13 14-20 21-27 28-4 5-11 12-18 19-25 26-1 2-8 9-15 16-22 23-29 30-5 6-12 13-19
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31
1 Earthworks 0.145% 0.145% 0.145% 0.145% 0.145% 0.145% 0.145% 0.145% 0.145% 0.145%
2 Hard Landscaping
a. Planter Box 0.66% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060% 0.060%
b. Turf Flat 0.18% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015% 0.015%
c. Linear Bench 0.93% 0.072% 0.072% 0.072%
d. Permatrak Planks 3.58% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163% 0.163%
e. Precast Concete Steps 1.18%
f. Finishes 4.03%
3 Soft Landscaping
4 Landscape Fixtures
a. Pole Lights 0.66% 0.025% 0.025% 0.025%
b. Bollard Lights 0.45% 0.017% 0.017% 0.017%
c. Wall Lights 0.09% 0.003% 0.003% 0.003%
d. Uplights0.46% 0.018% 0.018% 0.018%
e. LED Lights 0.97% 0.037% 0.037% 0.037%
f. Step Lights 0.11% 0.004% 0.004% 0.004%
g.Precast Seat to Sand Box 0.16% 0.012%
h. Metal Railing 0.35%
i. Dust Bin 0.13%
5 Utilities/ MEP
a. Telecommunication 0.48% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044% 0.044%
b. Electrical 0.48% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028% 0.028%
c. Water Supply 0.79% 0.049% 0.049% 0.049% 0.049% 0.049% 0.049% 0.049% 0.049% 0.049% 0.049%
d. Irrigation 0.48% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030% 0.030%
e. Sewerage 0.95% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045% 0.045%
6 Kiosk Construction 1.232% 1.232% 1.232%
7 Water Features/ Reflected Pool
8 Metal Sculture
TOTAL
Planned Weekly Progress % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.15% 0.05% 0.08% 0.08% 0.28% 0.28% 0.41% 0.41% 0.41% 0.43% 0.43% 0.43% 0.43% 1.84% 1.84% 1.81%
Cumulative Planned Progress % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.15% 0.30% 0.45% 0.60% 0.75% 0.90% 1.05% 1.20% 1.35% 1.50% 1.55% 1.63% 1.71% 1.99% 2.27% 2.68% 3.09% 3.50% 3.93% 4.36% 4.79% 5.22% 7.06% 8.90% 10.71%
Actual Weekly Progress % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.12% 0.15% 0.21% 0.21% 0.95% 0.65% 0.26% 0.60% 0.31% 0.60% 0.60% 0.30% 0.18% 0.56% 0.00% 0.45% 0.84% 0.56%
Cumulative Actual Progress % 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.12% 0.27% 0.48% 0.69% 1.64% 2.29% 2.55% 3.15% 3.46% 4.06% 4.66% 4.96% 5.14% 5.70% 5.70% 6.15% 6.99% 7.55%
Apr-08
Sr.No.
Project Components/Activities Wt. %
Feb-08 Mar-08 May-08 Jun-08 Jul-08 Aug-08 Sep-08
34.49%
31.97%
13.80%
100.00%
AREA 1 - WATER (297 meters H/O)
1.45%
10.56%
1.17%
3.38%
3.18%