architectural design project pre design analysis titiwangsa
Post on 21-Jan-2018
21 Views
Preview:
TRANSCRIPT
pre-design analysis
titiwangsa : site 1+ 4
character appraisal
buildings, structures and spaces
restrictions, guidelines and requirements
micro
users + activities
precedents
character appraisal
Settlement pattern
2
(HKL)Women and chilrden’s Hospital
5
National Library
9 National Heart Institute
4
National Blood Institute
6
Istana Budaya
7
National Visual Art Museum
10 Titiwangsa Stadium
3 UKM Medical
1 Pulapol KL
8 KPJ
(HKL)North, South Ward Block, Radiotheraphy
1940
1962
1975
1977
Titiwangsa Lake Park
1982
11
1999
2000
2002
2005
2009
2011 Historical development From mining to an urban park
5
National Library 4
National Blood Centre
6
Istana Budaya
7
National Visual Art Museum
10 Titiwangsa Stadium
Management office
t in ted g las s and c lean modern lines with traditional Malay design prominent in the form of a light blue origami-style metallic roof
sirih junjung inspired roof shape (traditional arrangement or a present made of betel leaves used during Malay weddings). Serambi, rummah ibu, rumah dapur layout
building design is based on the Malay headgear o r 'tengkolok' which is a symbol of intel lectual pride and respect in Malay culture.
Traditional malay architecture Applying the past to the present
modernized
traditional
The slope Pitch roof + layering
The blue roof Public buildings : healthcare + culture
buildings, structures
and spaces
Relationship built-unbuilt Provide intimacy and sense of enclosure which defines the boundaries
Urban grain Contrast between fine and coarse creates focal point
Formal-informal Site at contiguous area, acts as the engaging point
The frame Hard edges frames area of potential users. Soft edges promotes engagement in free flowing space.
District Urban park as the heart of this district
residential
institutional
Path | major path branches out to a network that wraps around | multiple ingress points
Point of Interest Visual Cues: | National Landmark gives impression to site | Local Landmark creates familiarity
SK Jln Kuantan 1 Asrama 1M
Stadium Titiwangsa
D’SAJI KL Titiwangsa
Istana Budaya Office
Kelab Golf Titiwangsa PDRM
Foci | Sandwiched between 2 prominent nodes | physically and visually reachable from sites
school
food stall
floating restaurant
food stall
Site 1
Foci
Site 4
Restrictions, guidelines
+ requirements
ZONE : PUBLIC OPEN SPACE Class D6 Sports and Recreation Facilities
| Courts or sports and recreational spaces | Race course | Swimming Pool | Polo Ground | Clubhouse | Paintball space | Facilities for sports and recreational
Class + Activity
Height control Source: DBKL
Height control Source: DBKL
60m
40m 35m
20m
Height control
Site 1
Site 4
Future developments
micro
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
0700
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1000
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1200
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1400
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1700
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
0700
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1000
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1200
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1400
Site condition : sun orientation
Suitable placement of program depending on
orientation | morning based programme | evening based programme
1700
Site condition : lake view
Possible glare to occur at certain times of the day
Site condition : lake view
Possible glare to occur at certain times of the day
Permeability + transparencies Ambiguous boundary proposing a free moving ground
Permeability + transparencies Defined boundary defines movement
Permeability + transparencies
Intersection creates pauses
Permeability + transparencies
Directional linear flow
Visual analysis Line of sight
Visual analysis Line of sight
Visual analysis Site 1
Visual analysis Site 4
users +activities
Activity spine + nodes Sites intersect with spine which absorbs the vibrancy of the park
Temporal quality Fluctuates throughout the day
0700 1100 1500 1900 2200
User Group | Close proximity to destination, directs potential users to use that path | Potential users play a role in programme
food stalls
food stalls
plaza
school
carpark
bike rental
construction
office
Gap + Enclosure | Active + dormant | Infill + improve street quality | Influx of human flow
SWOT SITE 1
Strength : multiple ingress points
Weakness : exposed
Threat : traffic at peak hours
Opportunity : fluctuation of crowd
SWOT SITE 4
Strength : Single entry point
Opportunity : Observation platform
Threat : pedestrian’s safety questioned
Weakness : absence of node
precedent
fala park / PL
architekci
Wolsztyn, Poland
2012
location
Old abandoned industrial site
Wolsztyn lake
Wolsztyn park
context
programme ground floor plan
children play area
squash courts climbing wall
bowling alley
cafe
programme section
childrenplayarea
squashcourtsclimbingwall
cafe
promoting life at the core which punctures through levels
focal point
central dispersion + linearity in movement
core
programme first floor plan
gymnasium
lockers
extensive character
programme second floor plan
rooftop tennis courts
cityscape church towers dense roofs
Black box gym / HAD &
Epos Architects
Chengdu, China 2015
location
programme ground floor plan Traffic flow and internal-external space
transformations unfold around this courtyard
programme first floor plan Multiple and contrasting programmes
becomes center of vitality
Steel beams + columns perforated steel plates
attraction power holding power [engagement] power
[ engagement ] noun meaningful contact and connection
top related