Archer Engineering – Drilling Facilities CapabilitiesSEMTECH 2019
Martin Nilsen, Area Manager Archer Engineering Norway
2
About Archer - Scale and reach
Over 5,000
employees
Own & operate
81 land rigsPerform Project Services
onboard > 50 assets
Own & operate 2 Modular
Drilling Rigs (MDR)
Surface Capabilities
• Integrated services
• Offshore Platform Drilling
• Offshore MODU management
• Offshore Modular Rigs
• Land Drilling / Rigs
• Rentals
• Engineering
• Survey & Inspection
Well integrity
& intervention
• Oil Tools
• Wireline
• Diagnostics
3
Archer Global Footprint
4
40Years of Drilling Facility
Design & Construction
Experience
Archer Engineering
150 Discipline Engineers
We combine operations experience, engineering excellence and asset management expertise to deliver highly effective and efficient drilling
and well solutions
• Engineering
• Drilling Facility Engineering & Modification Projects
• Multi Discipline Engineering Green & Brownfield
• Studies, Survey, FEED & Detail Engineering
• Project Management & Execution
• Construction Supervision
• Installation, Commissioning, Coordination
• Inspection and rope access
• Consulting
• Drilling, Well and Operational
• Engineering & Technology
• Management and Support
• Segments
• Fixed Platform facilities, Jack up's and floating units
Archer Engineering – Rig Concepts
Classing on Location
MODU Project
ManagementEPCIC
Inspection & Rope Access
DisciplineEngineering
Reactivation& ConditionAssessment
Archer Engineering undertake modifications of all sizes for Mobil Offshore Drilling Units (MODU) and
offshore vessels.
We always aim to provide solutions to suit project needs.
We are able to handle the entire project from initial phases including maturation processes and all the way
through execution and project close-out.
Archer Engineering – Engineering home the Future
Current Ongoing Drilling Projects conducted by Archer Engineering
Layout and structural
Engineering for Robotics project
Digitalization ofDriller’s Cabin
Shaker ModuleUpgrades
New RNX installation
New CasingModule incl.
Material Handling
Upgrade ofDriller’s cabin
New Subsea BOP’s
Upgrade BOP control system’s
New Utility & Manrider Winch
Refurbishmentsin Drilling Module
Upgrade ofMixing Unit and
Slurry Unit
New FrequencyConverters
MudpumpUpgrades
Mud CoolerModifications
3rd party Integration
Re-certification ofSubsea
Equipment
Archer Engineering – Engineering home the Future
Completed Projects: Modification of Pipehandler Cabin
Client Challenges
•Ergonomics
•Blind zones
•Noise
•Outdated Instrumentation
•Rig Layout
•Schedule & Budget
Archer Engineering – Solutions
•Modification of cabin
•New Operator’s chair on rails
•New HVAC and improved sealing
•Self-closing door
•Re-arrange instrumentation, CCTV and screens
Project Success factors
•Early involvement of users and safety delegates
•Good relationship with client
•Close follow up of suppliers and 3rd parties
•Engagement of multi-discipline engineering competency (layout, technical safety, working enviroment, structure, E&I etc)
NORSOK S-002 compliant
Archer Engineering – Engineering home the Future
Completed Projects: Upgrade Drillstring Compensator
Client Challenges
•Lack of double barrier in case of undesired closure of isolation valve
•Non-compliance with DNV rules
•Additional scope escalation (OEM recommendations, Maintenance, AHC, HPU, MRU etc)
•Weather constraints, exhaust and flaring
•Risk of lack of project control
•Tight installation window
Archer Engineering – Solutions
•Replacement of valves, cabinets, control panels etc
•New cushioning cylinders
•Structural modifications on rig
Project Success factors
•Early involvement of users and safety delegates
•Good relationship with client
•Close follow up of suppliers and 3rd parties
•High focus on risk management in project
•Strong commitment to planning lifting operations and work at height
•Thorough planning related to other drillfloor related activities
DNV-OS-E101 compliant
Archer Engineering – Engineering home the Future
Completed Projects: Upgrade Cuttings Re-injection System
Client Challenges
• Insufficient capacity of CRI Unit vs Client requirements
•Wear and tear on existing CTS and CRI system
• Insufficient deck capacity with new modification
•Tight project schedule (critical path activity during yardstay)
•Lack of as-built drawings on rig, operational changes made without proper updates in doc
Archer Engineering – Solutions
•New coarse tanks and pumps
•New pipelines and valves
•Deck Re-inforcement
•Upgrade new power supply
•Upgrade of existing CRI control system
•New weather protection for compressors
•HVAC installation
Project Success factors
•Scanning surveys
•Early focus on LLI’s
•Good cooperation with customer including users
•Hands-on Engineering with competent discipline engineers
•High focus on proper change management (TQ/VOR system, Change log etc)
•Early focus on lifting plans and lifting equipment, incl commitment with users
End-Client REQ. compliant