anna osello bim: il catasto del futuro bim:the cadastre of ... - made...
Post on 17-Jul-2020
0 Views
Preview:
TRANSCRIPT
In collaborazione con
BIM: Il Catasto del futuroBIM:The Cadastre of the future
Milano, 10 marzo 2017
Anna Osello
• drawing TO the future
• BIM – Tradition and Innovation
• BIM Process
• Building Information Modelling
• Data Collection
• Use of BIM Models
• BIM: the cadastre of the future
• Technologies for Augmented and Virtual Reality
• What the cadastre of the future is?
• Conclusions
Summary
drawing TO the future
BIM – Tradition and InnovationInnovationTradition
Drawing CAD BIMPolyhedral forms
1960 1970 1980 2000 2016
Object-basedparametricmodelling
BIM – Tradition and Innovation
Existing 3D models
Facility Management
ParametricModel
BIM
3D Interoperability
Levels of Development/Levels of Detail
Construction drawingsPlants
ElevationsSectionsShedules
Data Collection Data Restitution Simulation tests
Urban Land data(shapefiles, GIS model)
MEP systems drawings
Survey dataGeometricalPhotographic
Laser Scanner
Database
Lighting
Thermal
Structural
…
Workflow
Systems
Architecture
Energy Usage
AR
/ V
R V
isua
lizat
ion
the Technological dimension;the Organizational dimension;the Procedural dimension.
BIM PROCESS
LOD
Properties
Shared Parameters
Case Study: HistoricalArchives of the City of Turin
Building Information Modelling
Data Collection
Case Study:
Office building, Piazza di Città 7
GEOMETRY + DATA
BUILDING
SYSTEMSSPACES
BIMMODELS
SurveyCAD
Image-based modelling
As-Built
INDICATORS• % NFA/GFA• % NLA/NUA• % Utilization rate of spaces• m2/Zones - Tenant- Category - Type• m2Heated-Conditioned /Tenant-Zones• m3Heated-Conditioned /Tenant-Zones• m2 Public spaces/Zones-Tenant• m2 Suspended ceiling/NLA• # Occupants/Floor –Zones-Tenant• m2/per Occupants-Workstation• # Equipments /room-level-building
COSTS• € TCO/ m2 GFA• € Maintenance / m2 GFA-User-Tenant• € Cleaning /m2-User• € Utilities /m2-User• Electric energy consumption kWh/m2
GFA -User-Tenant
… Space Management
Case study: Office building, via Meucci 4
Use of BIM Models
… Energy Simulations
… Illuminotechnical Simulations
Use of BIM Models
Case study: Public Works Archive
Caso studio: Palazzo di CittàAs-is
Proposal #1: Relamping and devices increasing
Proposal #2: The LED technology
Use of BIM Models
VR
… Maintenance
AR
Case study: Santorre di Santarosa Primary School
Case study: Office building via Giolitti 42
BIM: The Cadastre of the future
New technologies
AUGMENTED REALITY “ AR is the integration of digital information with the user's environment in real time ”
� Aurasma App� QR Code
VIRTUAL REALITY“ VR is an realistic and immersive simulation of a three dimensional environment, created using interactive software and hardware, and experienced or controlled by movement of the
body ”
� A360 App� Oculus� Fire Protection App
Aurasma
Oculus
A360QR
Technologies for Augmented and Virtual Reality Case study: Palazzo di città
Case study: School «Primo Liceo Artistico»
Case study: Palazzo di Città 7
Case study: New Building Bertola
What the cadastre of the future is?
Conclusions
Conclusions
Contact
top related