Amex Site Residential
Development, Tarneit
Traffic Impact Assessment Report
Client:
Amex Corporation
Project No. 114430
Final Report – 21/06/13
Suite 1, 1st Floor 132 Upper Heidelberg Road Ivanhoe Vic 3079
PO Box 417 Ivanhoe Vic 3079 Ph: (03) 9490 5900 Fax: (03) 9490 5910
www.trafficworks.com.au
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
DOCUMENT CONTROL RECORD
Document prepared by:
Trafficworks Pty Ltd
ABN 59 125 488 977
Suite 1, 1st Floor 132 Upper Heidelberg Rd Ivanhoe Vic 3079
PO Box 417 Ivanhoe Vic 3079
Ph (03) 9490 5900
Fax (03) 9490 5910
www.trafficworks.com.au
Document Control
Report Title Amex Site Residential Development, Tarneit
Traffic Impact Assessment Report
Project Number 114430
Client Amex Corporation - c/o Spiire Pty Ltd
Client Contact Andrew Ashwood - Development Manager / Elizabeth Hamila
Rev Date
Issued Revision Details / Status Prepared by Authorised by
Draft 09/04/13 Draft Ali Abdou Kate Kennedy
Draft_1 11/04/13 Draft – Spiire Comments Ali Abdou Kate Kennedy
Draft_2 20/06/13 Draft – Amex Comments Ali Abdou Kate Kennedy
Final 21/06/13 Draft_2 – Spiire Comments Ali Abdou Kate Kennedy
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
EXECUTIVE SUMMARY
Trafficworks has been engaged by Amex Corporation to undertake a traffic impact assessment of
the proposed residential development for the parcel of land that falls between Dohertys Road to
the north, Tarneit Road to the east, Leakes Road to the south and approx. 820m west of Tarneit
Road to the west, in Tarneit.
Part of the land is segregated by the proposed Regional Rail Link which will provide a new track
between West Werribee Junction to Deer Park, then along the existing rail corridor from Sunshine
to Southern Cross Station. As part of this project, a new train station within 2km of the site will be
developed at Tarneit.
The southern precinct (south of the Regional Rail Link tracks) is proposed to have access via
Leakes Road at two locations. The northern precinct (north of the Regional Rail Link tracks) is
proposed to have access via one location at Tarneit Road and one location at Dohertys Road.
Amex Corporation owns approximately 120ha over two titles on the west side of Tarneit Road,
between Leakes Road and Dohertys Road. This land falls within Precinct Structure Plan (PSP)
1089 – Tarneit North. The Growth Area Authority (GAA) is undertaking a number of background
technical studies in the Wyndham North area and has yet to release the findings of the PSP.
A Traffic Impact Assessment was carried out to:
• determine traffic generation and distribution associated with the proposed residential
development and the impact of the generated traffic on the internal and the external
road network;
• review the availability and proximity of sustainable transport options;
• identify any necessary mitigating works.
It has been identified that the proposed development:
• would not adversely affect traffic conditions on the adjacent road network; and
• would generally comply with the relevant traffic requirements set out in Austroads, Council Planning Scheme and GAA’s Engineering Design and Construction Manual for Subdivision in Growth Areas April 2011 once the suggested remedial works are undertaken.
A summary for the site and the proposed development is shown below.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
AddressAddressAddressAddress Site bounded by Dohertys Road to the north, Tarneit Road to the east, Leakes Road to the south and approx. 820m west of Tarneit Road to the west, in Tarneit.
ZoningZoningZoningZoning Urban Growth Zone (UGZ)
Proposed developmentProposed developmentProposed developmentProposed development 1,444 lot residential subdivision development
RoadRoadRoadRoad NetworkNetworkNetworkNetwork:::: Leakes Road Leakes Road Leakes Road Leakes Road
• Currently a 2 lane council road that will ultimately become a 6 lane primary arterial road.
Tarneit Road Tarneit Road Tarneit Road Tarneit Road
• Currently a 2 lane council road that will ultimately become a 4 lane secondary arterial road.
• A rail overpass is currently being constructed.
Dohertys Road Dohertys Road Dohertys Road Dohertys Road
• Currently a 2 lane council road that will ultimately become a 4 lane secondary arterial road.
Crash History:Crash History:Crash History:Crash History: 14 reported casualty crashes in the last 5 years.
Traffic & Speed Traffic & Speed Traffic & Speed Traffic & Speed
Environment:Environment:Environment:Environment:
LeaLeaLeaLeakes Road kes Road kes Road kes Road
• 1,200 vehicles per day (vpd) in 2010 west of Derrimut Road
• Speed limit is currently 70km/h (likely to be 80km/h)
Tarneit Road Tarneit Road Tarneit Road Tarneit Road
• 8,300 vpd in 2011 north of Sayers Road
• Speed limit is currently 70km/h (likely to be 80km/h)
Dohertys Road Dohertys Road Dohertys Road Dohertys Road
• 3,600 vpd in 2010 west of Derrimut Road
• Speed limit is currently 80km/h
Traffic Generation:Traffic Generation:Traffic Generation:Traffic Generation: 14,000 (vpd) to and from the proposed development
1,330 vehicles per hour (vph)
Treatments:Treatments:Treatments:Treatments: The following treatments are recommended prior to the duplication of
Leakes Road, Tarneit Road and Dohertys Road:
• the East - West Connector and Tarneit Road intersection up to the completion of stage 15 of the anticipated development program will be give-way controlled with a channelised right turn short (CHR(S)) treatment and an auxiliary left short (AUL(S)) treatment on Tarneit Road;
• the East - West Connector and Tarneit Road intersection be signalised in year 7 (calendar year 2022) of the development after the completion of stage 15 of the anticipated development program;
• traffic signals will be required as soon as the East - West Connector and Tarneit Road intersection becomes a cross intersection where the eastern leg of the intersection is built by others;
• the Western Access Street 1 and Leakes Road intersection be give-way controlled with a channelised right turn short (CHR(S)) treatment
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
and a basic left (BAL) treatment on Leakes Road;
• the Eastern Access Street 1 and Leakes Road intersection be give-way controlled with a channelised right turn short (CHR(S)) treatment and a basic left (BAL) treatment on Leakes Road;
• the North - South Access Street 2 and Dohertys Road intersection is proposed to be give-way controlled with a channelised right turn short (CHR(S)) treatment and an auxiliary left short (AUL(S)) treatment on Dohertys Road.
Sight Distance:Sight Distance:Sight Distance:Sight Distance: Minimum SISD criteria are likely to be satisfied with unimpeded sight lines
along Tarneit Road, Leakes Road and Dohertys Road at the proposed
intersections.
Other Issues:Other Issues:Other Issues:Other Issues: It is recommended that the following be undertaken to the development
internal road layout:
• design of internal roads is based on GAA’s Engineering Design and Construction Manual for Subdivision in Growth Areas, April 2011;
• incorporation of the Public Transport – Guidelines for Land Use and Development for bus routes and liaison with the Department of Transport regarding bus route and bus stop locations;
• installation of traffic calming devices along long straight sections of road;
• the location of intersections should be designed to meet the required sight line requirements;
• any landscaping within the verge in close proximity to an intersection should not obscure drivers’ line of sight.
Referenced DocumentsReferenced DocumentsReferenced DocumentsReferenced Documents
References used in the preparation of this report include the following:
• RTA Guide to Traffic Generating Developments, Version 2.2, October 2002 for traffic
generation predictions and parking requirements;
• Austroads Guide to Road Design - Part 4A: Unsignalised and Signalised Intersections for
intersection treatments and sight distance evaluation;
• GAA’s Future Urban Structure (Draft) for Wyndham North PSP;
• GAA’s Engineering Design and Construction Manual for Subdivision in Growth Areas,
April 2011 & GAA’s PSP Notes, Our Roads: Connecting People;
• Public Transport Guidelines for Land Use and Development, Department of Transport;
• Wyndham North Traffic Modelling and SIDRA Analysis Prepared for Growth Areas
Authority Prepared by AECOM Australia Pty Ltd.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
TABLE OF CONTENTS
1 INTRODUCTION ................................................................................................................. 1
2 EXISTING CONDITIONS .................................................................................................... 2
2.1 Subject Site ............................................................................................................................ 2
2.2 Road Network ......................................................................................................................... 5
2.3 Traffic Volumes.................................................................................................................... 10
2.4 Crash History ....................................................................................................................... 12
3 PROPOSED DEVELOPMENT ........................................................................................... 13
3.1 Proposed Development Summary ..................................................................................... 13
3.2 GAA Standard Cross-Sections ............................................................................................ 15
3.3 Proposed Internal Road Network ....................................................................................... 21
3.4 Connection to Surrounding Road Network ........................................................................ 22
4 TRAFFIC GENERATION & DISTRIBUTION ...................................................................... 23
4.1 Traffic Generation ............................................................................................................... 23
4.2 Traffic Generation based on Development Stages ........................................................... 23
4.3 Distribution of Traffic onto the Surrounding Road Network ............................................. 26
4.4 Proposed External Road and Development Intersection Volumes .................................. 26
4.5 Proposed Internal Road Network Volumes ....................................................................... 28
4.6 Future Road Network Volumes .......................................................................................... 29
5 SIDRA ANALYSIS ............................................................................................................. 31
5.1 Intersection Analysis ........................................................................................................... 31
5.2 Sensitivity Analysis .............................................................................................................. 32
5.3 Trigger for Traffic Signals based on Development Stages ............................................... 34
6 IMPACTS & MITIGATING WORKS ................................................................................... 36
6.1 Interaction of Existing and Proposed Roads ..................................................................... 36
6.2 Sight Distance ..................................................................................................................... 36
6.3 Turn Provisions .................................................................................................................... 38
7 SUBDIVISION INTERNAL ROAD LAYOUT ........................................................................ 43
7.1 Speed Zoning and Traffic Calming ..................................................................................... 43
7.2 Intersection Design ............................................................................................................. 43
7.3 Public Transport .................................................................................................................. 43
7.4 Pedestrian and Cycle Network ........................................................................................... 44
7.5 Cul-de-sacs .......................................................................................................................... 44
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
8 CONCLUSIONS AND RECOMMENDATIONS .................................................................. 45
ATTACHMENT A – TRAFFIC VOLUMES DATA - VICROADS
ATTACHMENT B – VICROADS CRASHSTATS DATABASE DETAILS
ATTACHMENT C – ANTICIPATED PEAK TRAFFIC DISTRIBUTION
ATTACHMENT D – SIDRA OUTPUTS
ATTACHMENT E – SISD ASSESSMENT OF OVERPASS
ATTACHMENT F – TRAFFIC GENERATION BASED ON DEVELOPMENT STAGES
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
1 1
1 INTRODUCTION
Trafficworks has been engaged by Amex Corporation to undertake a traffic impact assessment of
the proposed residential development for the parcel of land that falls between Dohertys Road to
the north, Tarneit Road to the east, Leakes Road to the south and approx. 820m west of Tarneit
Road to the west, in Tarneit.
Part of the land is segregated by the proposed Regional Rail Link which will provide a new track
between West Werribee Junction to Deer Park, then along the existing rail corridor from Sunshine
to Southern Cross Station. As part of this project, a new train station within 2km of the site will be
developed at Tarneit.
The southern precinct (south of the Regional Rail Link tracks) is proposed to have access via
Leakes Road at two locations. The northern precinct (north of the Regional Rail Link tracks) is
proposed to have access via one location at Tarneit Road and one location at Dohertys Road.
Amex Corporation owns approximately 120ha over two titles on the west side of Tarneit Road,
between Leakes Road and Dohertys Road. This land falls within Precinct Structure Plan (PSP)
1089 – Tarneit North. The Growth Area Authority (GAA) is undertaking a number of background
technical studies in the Wyndham North area and has yet to release the findings of the PSP.
A Traffic Impact Assessment was carried out to:
• determine traffic generation and distribution associated with the proposed residential
development and the impact of the generated traffic on the internal and the external
road network;
• review the availability and proximity of sustainable transport options;
• identify any necessary mitigating works.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
2 2
2 EXISTING CONDITIONS
2.12.12.12.1 Subject Subject Subject Subject SiteSiteSiteSite
The residential development site is located approximately 25km west of Melbourne’s CBD. The
development site is bounded by Dohertys Road to the north, Tarneit Road to the east, Leakes
Road to the south and approx. 820m west of Tarneit Road to the west, in Tarneit.
The development site bounded by the roads outlined above is approximately 120ha over two
titles.
Part of the site is segregated by the proposed Regional Rail Link which will provide a new track
between West Werribee Junction to Deer Park, then along the existing rail corridor from Sunshine
to Southern Cross Station. As part of this project, a new train station within 2km of the site will be
developed at Tarneit. An overpass of the regional rail line is currently being constructed and
controls the location of access to the site on Tarneit Road.
In addition to that, the site also has a transmission line easement running east west segregating
the development site, just south of Dohertys Road. However, some road access beneath the
transmission line will be provided.
The subject site is currently used for grazing. To the north and west the land use is low density
rural living surrounds, to the east the land use is farming and to the south the land use is
residential development.
The location of the site and its surrounding environment is shown in Figure 1.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
3 3
Figure 1: Location Plan (reproduced with permission from Melways Publishing Pty Ltd)
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
4 4
Figure 2: Land use zoning Wyndham City Council
Pink colour highlights Urban Growth Zone (UGZ);
Pale Pink colour highlights Residential 1 Zone (R1Z); Blue colour highlights Urban Floodway Zone (UFZ)
Pale blue colour highlights Farming Zone - Schedule 2 (FZ2); Orange colour highlights Road Zone - Category 2 (RDZ2); Green colour highlights Rural Conservation Zone (RCZ).
A photo of the site is shown in Figure 3.
Subject SiteSubject SiteSubject SiteSubject Site
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
5 5
Figure 3: Looking north on Leakes Road towards the subject site
2.22.22.22.2 Road NetworkRoad NetworkRoad NetworkRoad Network
The road network surrounding the subject site is explained in the subsequent sections.
2.2.12.2.12.2.12.2.1 Leakes RoadLeakes RoadLeakes RoadLeakes Road
Leakes Road is currently a council managed east west road that provides a connection between
Kororoit Creek Road / Fitzgerald Road intersection in the east and Shanahans Road in the west.
Leakes Road continues as Kororoit Creek Road beyond Fitzgerald Road to provide a link to
industrial suburbs of Altona North and Williamstown North with access onto the Princes Freeway.
Leakes Road between Tarneit Road and Davis Road currently has new residential development
to the south. A service road exists along the southern side of Leakes Road providing access to
residential properties. A shared path exists along the southern side of Leakes Road.
Leakes Road adjacent to the subject site is generally a 7.0m wide two-lane two-way carriageway
partly sealed (see figure 5) and a speed limit of 70km/h.
Ultimately, Leakes Road will become a 6 lane primary arterial road. Figure 4 and Figure 5 below
show typical road conditions adjacent to the subject site.
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
6 6
Figure 4: Looking east along Leakes Road adjacent to the subject site towards Tarneit Road
Figure 5: Looking west along Leakes Road adjacent to the subject site
Tarneit Road Tarneit Road Tarneit Road Tarneit Road
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
7 7
Tarneit Road is currently a council managed north south road that provides a connection
between Railway Avenue in the south and Boundary Road in the north. Tarneit Road continues as
Mount Atkinson Road beyond Boundary Road.
The land use adjacent to Tarneit Road between Leakes Road and Dohertys Road is farming.
Tarneit Road adjacent to the subject site is a 7.0m wide two-lane two-way carriageway and a
speed limit of 70km/h.
Ultimately, Tarneit Road will become a 4 lane secondary arterial road. Figure 6 and Figure 7 below show typical road conditions adjacent to the subject site.
Figure 6: Looking north along Tarneit Road adjacent to the subject site
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
8 8
Figure 7: Looking south along Tarneit Road adjacent to the subject site
Dohertys RDohertys RDohertys RDohertys Road oad oad oad
Dohertys Road is currently a council managed east west road that provides a connection
between Grieve Parade in the east and Spring Hill Road in the west.
The land use adjacent to Dohertys Road between Tarneit Road and Davis Road is currently low
density rural living/farming.
Dohertys Road adjacent to the subject site is a 6.0m wide two-lane two-way carriageway with
unsealed shoulders and a speed limit of 80km/h.
Ultimately, Dohertys Road will become a 4 lane secondary arterial road. Figure 8 and Figure 9 below show typical road conditions adjacent to the subject site.
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
9 9
Figure 8: Looking east along Dohertys Road adjacent to the subject site
Figure 9: Looking west along Dohertys Road adjacent to the subject site
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
10 10
2.32.32.32.3 Traffic Traffic Traffic Traffic VolumesVolumesVolumesVolumes
Trafficworks obtained traffic volume counts undertaken by Wyndham City Council on Leakes
Road, Tarneit Road and Dohertys Road. The traffic volume counts on those roads were
approximately as follows:
• 1,200 vehicles per day (vpd) in 2010 on Leakes Road, west of Derrimut Road;
• 8,300 vpd in 2011, on Tarneit Road, north of Sayers Road; and
• 3,600 vpd in 2010, on Dohertys Road west of Derrimut Road.
A growth rate of 5% per annum was applied along Leakes Road, Tarneit Road and Dohertys Road
in the vicinity of the proposed development. This growth rate was applied annually (compounded)
to the through traffic volumes to estimate 2013 (pre-development) volumes.
The traffic volumes on the sections of road adjacent to the proposed residential development are
expected to be lower. Nevertheless, it is conservatively assumed that these traffic volumes are
representative of the existing volumes along the sections of road adjacent to the proposed
residential development.
Traffic volume data obtained from VicRoads along these roads would then provide the directional
splits along Tarneit Road, Leakes Road and Dohertys Road during the AM and PM peak periods.
The VicRoads traffic volume data details are shown in Attachment A.
The traffic volume count is summarised in Figure 10 below.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
11 11
Figure 10: Summary of estimated 2013 (pre-development) traffic count volumes on the sections of road adjacent to the proposed residential development.
6,739
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
12 12
2.42.42.42.4 Crash History Crash History Crash History Crash History
The VicRoads CrashStats database details all injury crashes on roads throughout Victoria.
Scrutiny of these records indicates that 14 casualty crashes have occurred in the last five year
period that data is available for (1/07/2007 – 30/06/2012) on existing roads adjacent to the
proposed residential development which included:
• one loss of control type crash (DCA 170) mid-block along Tarneit Road;
• one loss of control type crash (DCA 173) mid-block along Dohertys Road;
• one loss of control type crash (DCA 171) pre installation of traffic signals, one right
through type crash (DCA 121) and one cross traffic type crash (DCA 110) post installation
of traffic signals at the intersection of Tarneit Road and Leakes Road; and
• nine cross traffic type crashes (DCA 110) pre installation of a roundabout at the
intersection of Tarneit Road / Dohertys Road.
The VicRoads CrashStats database details are shown in Attachment B.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
13 13
3 PROPOSED DEVELOPMENT
3.13.13.13.1 Proposed Development Summary Proposed Development Summary Proposed Development Summary Proposed Development Summary
The proposed development consists of the following:
• Land area of approximately 120 hectares;
• A lot yield of 12.0 dwellings per hectare;
• Yielding 1,444 dwellings
o 1,303 Dwelling houses;
o 141 Medium density;
• Public open space;
• An internal trafficable road network ranging from Access Lanes to Connector Streets.
Vehicular access to the proposed development will be via two intersections on Leakes Road, one
intersection on Tarneit Road and one intersection on Dohertys Road.
An overall plan of the development prepared by Tract Consultants Pty Ltd is shown in Figure 11.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
14 14
Figure 11: Overall plan of the proposed development
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
15 15
Figure 12: GAA’s draft Wyndham North urban structure plan
3.23.23.23.2 GAA Standard CrossGAA Standard CrossGAA Standard CrossGAA Standard Cross----SectionsSectionsSectionsSections
‘The Growth Areas Authority (GAA), in partnership with Councils, land owners developers, service
and utility providers, and key stakeholders are responsible for creating new communities in
Melbourne’s growth areas.
A key objective of the GAA and growth area Councils is to streamline the planning process for
creating new communities to increase certainty, reduce costs and reduce regulatory burden to
all stakeholders in the land development process through agreed common processes for
approvals and shared engineering infrastructure standards and specifications.
The Engineering Design and Construction Manual outlines a series of shared engineering
standards and specifications, prepared by the GAA, Wyndham City Council and other growth
municipalities following consultation with key stakeholders.’
The design criteria for roads, as set out in GAA’s Engineering Design and Construction Manual,
are summarised below, see sections 3.2.1 – 3.2.7. It is recommended that these criteria be
used as a base for detailed design of the internal road network.
3.2.13.2.13.2.13.2.1 Access Lane Access Lane Access Lane Access Lane
Access Lanes provide side or rear access to parking within a lot that has another street frontage.
Access Lanes are likely to be the higher density lots near proposed open spaces and interfacing
conservation areas. A summary of the design criteria for Access Lanes is:
• the traffic volumes are approximately 300 vehicles per day (vpd);
SUBJECT SITESUBJECT SITESUBJECT SITESUBJECT SITE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
16 16
• operating speeds of around 10km/h (can be shared zones with pedestrian, cycling and vehicular access);
• 6.0m carriageway width with no parking 1
3.2.23.2.23.2.23.2.2 Access Place Access Place Access Place Access Place
Access Places provide local residential access with shared traffic, however pedestrians are given
priority. A summary of the design criteria for Access Place is:
• traffic volumes between 300 and 1,000vpd;
• operating speeds of around 15km/h;
• 5.5m carriageway width with unmarked parking2;
• verge width of 4.2 – 4.5m to accommodate services;
• 1.5m footpaths should be provided on both sides with no separate cycling provision3
• road reserve width of 16.0m as shown in Figure 13a.
3.2.33.2.33.2.33.2.3 Access StreetAccess StreetAccess StreetAccess Street 1 1 1 1
Access Street 1 provides local residential access where traffic is subservient, speed and volume
are low and pedestrian movements facilitated. A summary of the design criteria for Access Street
1 is:
• traffic volumes between 1,000 and 2,000vpd;
• operating speeds of around 30km/h;
• 7.3m carriageway width with unmarked parking on both sides;
• verge width of 4.2 – 4.5m to accommodate services;
• 1.5m wide footpaths should be provided on both sides with no separate cycling provision;
• road reserve width of 16.0m as shown in Figure 13 and 14.
1 Turning requirements to access and egress parking on abutting lots may require additional carriageway width. The recommended
carriageway width of 5.5m will provide adequate access to a standard 3.5m wide single garage built to the property line.
2 Carriageway width to be 7.3m if parking is required on both sides.
3 Traffic volumes less than 300vpd, may be reduced to a footpath on one side subject to Council approval.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
17 17
Figure 13: Cross section for an Access Street 1 for a 14.1m road reserve. Source: Tract Consulting Pty Ltd.
Figure 14: Cross section for an Access Street 1 for a 19.9m road reserve. Source: Tract Consulting Pty Ltd.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
18 18
3.2.43.2.43.2.43.2.4 Access StreetAccess StreetAccess StreetAccess Street 2 2 2 2
Access Street 2 provides local residential access where traffic is subservient, speed and volume
are low and pedestrian movements facilitated. A summary of the design criteria for Access Street
2 is:
• traffic volumes between 2,000 and 3,000vpd;
• operating speeds of around 40km/h;
• 6.0m carriageway width with 2.3m marked parking on both sides;
• minimum verge width of 4.7m on both sides to accommodate services;
• 1.5m wide paths should be provided on both sides;
• optional cycling path / lane;
• road reserve width of 20.0m as shown in Figure 15 and 16.
Figure 15: Cross section for an Access Street 2 for a 25.6m road reserve. Source: Tract Consulting Pty Ltd.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
19 19
Figure 16: Cross section for an Access Street 2 for a 21.6m road reserve. Source: Tract Consulting Pty Ltd.
3.2.53.2.53.2.53.2.5 Connector StreetConnector StreetConnector StreetConnector Street
Connector Streets carry high volumes of traffic providing connections between Access Streets
and Access Places through and between neighbourhoods. The general location of Connector
Streets should provide traffic routes as direct as possible and nearby arterial roads,
neighbourhood shopping centres, neighbourhood sporting facilities etc. A summary of the design
criteria for Connector Streets is:
• traffic volumes between 3,000 and 7,000vpd;
• operating speeds of around 50km/h;
• 7.0m wide carriageway;
• 2.3m marked parking on both sides;
• minimum verge width of 5.0m on both sides to accommodate services;
• 1.5m wide footpaths on both sides;
• 1.7m wide cycle path or lane on both sides
• road reserve width of 25.0m as shown in Figure 17 and 18.
A 7.0m wide two-lane two-way Connector Street with separate designated space for cyclists and
or parking meets the requirements in ‘The Public Transport Guidelines for Land Use and
Development’.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
20 20
Figure 17: Cross section for a Connector Street for a 26.0m road reserve. Source: Tract Consulting Pty Ltd.
Figure 18: Cross section for a Connector Street for a 30.0m road reserve. Source: Tract Consulting Pty Ltd.
3.2.63.2.63.2.63.2.6 Trunk Trunk Trunk Trunk Connector StreetConnector StreetConnector StreetConnector Street
Trunk Connector Streets carry higher volumes of traffic through and between neighbourhoods. A
summary of the design criteria for Trunk Connector Streets is:
• traffic volumes between 3,000 and 7,000vpd;
• operating speeds of around 60km/h;
• 3.5m wide lane on each side;
• 2.3m marked parking on both sides;
• minimum verge width of 5.25m on both sides to accommodate services;
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
21 21
• 1.5m wide footpaths on both sides;
• 1.7m wide cycle path or lane on both sides;
• road reserve width of 16.0m as shown in Figure 17 and 18 above.
A 3.5m wide lane with 1.7m separate designated space for cyclists and or parking meets the
requirements in ‘The Public Transport Guidelines for Land Use and Development’.
3.2.73.2.73.2.73.2.7 ArtArtArtArterial Roaderial Roaderial Roaderial Road
Arterial roads provide direct access from one district to another, generally with restricted frontage
development and dual carriageway pavements. A summary of the design criteria for Arterial
roads is:
• traffic volumes between 12,000 and 60,000vpd;
• operating speeds between 60 – 80km/h;
• 2 x 10.5m wide carriageway for 6 lane arterial or 2 x 7.0m wide carriageway for a 4 lane arterial;
• 2.3m marked parking on both sides;
• minimum verge width of 5.25m on both sides to accommodate services;
• 1.5m wide footpaths on both sides;
• 1.7m wide cycle path or lane on both sides
• road reserve width of 41.0m for a 6 lane arterial;
• road reserve width of 34.0m for a 4 lane arterial.
3.33.33.33.3 Proposed Proposed Proposed Proposed Internal Road NetworkInternal Road NetworkInternal Road NetworkInternal Road Network
The internal road network, shown in Figure 11, offers a high level of road amenity, connectivity
and permeability.
All roads within the development need to provide sufficient space so that emergency service
vehicles, waste collection vehicles and street-cleaning vehicles can carry out their functions while
travelling in a forwards direction only throughout the development.
The plan shown in Figure 11 indicates that the subject land will be segregated by the proposed
Regional Rail Link. The southern precinct is proposed to have access via Leakes Road at two
locations. The northern precinct of the overall development site is proposed to have one access
via Tarneit Road and one via Dohertys Road.
An East – West Connector is proposed within the northern precinct running between Tarneit Road
in the east and the western boundary of the subject site. A series of Access Streets that
ultimately intersect with Dohertys Road feed into the Connector Street.
The southern precinct is proposed to have two Access Street 1 intersecting with Leakes Road.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
22 22
3.3.13.3.13.3.13.3.1 Proposed Cross SectiProposed Cross SectiProposed Cross SectiProposed Cross Sections of Roads adjacent to Railway Corridorons of Roads adjacent to Railway Corridorons of Roads adjacent to Railway Corridorons of Roads adjacent to Railway Corridor
Cross sections for roads adjacent to the railway corridor have been developed by Tract Consulting
Pty Ltd in consultation with various experts to minimise residential amenity issues such as noise
and vibration. This cross section has also been developed to achieve the minimum prescribed
building set-back to the railway corridor. The cross section for roads adjacent to the railway
corridor is shown in Figure 19.
Figure 19: Cross sections of roads adjacent to the railway corridor. Source: Tract Consulting Pty Ltd.
3.43.43.43.4 Connection to Connection to Connection to Connection to Surrounding Road NetworkSurrounding Road NetworkSurrounding Road NetworkSurrounding Road Network
The proposed development will have direct access onto Leakes Road via two intersections,
Tarneit Road via one intersection and Dohertys Road via one intersection. At this stage, the
development is unlikely to have access to / from adjacent land and therefore, it is anticipated
that traffic generated by this development would utilise these intersections. As further adjacent
land develops to the west, access to / from this development will be available.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
23 23
4 TRAFFIC GENERATION & DISTRIBUTION
4.14.14.14.1 Traffic GenerationTraffic GenerationTraffic GenerationTraffic Generation
The RTA Guide to Traffic Generating Developments 2002 used to estimate traffic generation
from developments recommends:
• for residential houses:
o a daily rate of 9 trips per dwelling;
o a weekday peak hour rate of 0.85 trips per dwelling;
• for residential units and townhouses (medium density):
o a daily rate of 5 – 6.5 trips per dwelling (conservatively a daily rate of 6.5 per dwelling will be adopted);
o a weekday peak hour rate of 0.5 – 0.65 trips per dwelling (conservatively a weekday peak hour rate of 0.65 trips per dwelling will be adopted).
4.1.14.1.14.1.14.1.1 The Proposed DevelopmentThe Proposed DevelopmentThe Proposed DevelopmentThe Proposed Development
The proposed development is estimated to yield 1,303 dwelling house lots and 141 medium
density lots which would result in a total traffic generation of 12,644 vehicles per day (vpd) to
and from the development, with morning and afternoon peaks of 1,199 vehicles per hour (vph).
4.24.24.24.2 Traffic GenerationTraffic GenerationTraffic GenerationTraffic Generation based on Development Stagesbased on Development Stagesbased on Development Stagesbased on Development Stages
The subject site is proposed to be developed in stages as shown in Figure 20. The traffic
generation for each stage has been determined to assess the impact on the intersections of
and is shown in Attachment F.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
24 24
Figure 20: Proposed Development Stages. Source: Tract Consulting Pty Ltd.
Table 1 shows the summary traffic generation from the proposed development.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
25
Table 1: Proposed development subdivision projected daily and peak traffic flow
PrecinctPrecinctPrecinctPrecinct Land UseLand UseLand UseLand Use LotsLotsLotsLots
RTA Traffic Generation RTA Traffic Generation RTA Traffic Generation RTA Traffic Generation RateRateRateRate Internal Development Traffic Internal Development Traffic Internal Development Traffic Internal Development Traffic
GenerationGenerationGenerationGeneration DDDDailyailyailyaily PeakPeakPeakPeak
Vehicle Trips Vehicle Trips Vehicle Trips Vehicle Trips (per (per (per (per
dwelling)dwelling)dwelling)dwelling)
Vehicle Vehicle Vehicle Vehicle Trips (per Trips (per Trips (per Trips (per dwelling)dwelling)dwelling)dwelling)
Daily Vehicle Daily Vehicle Daily Vehicle Daily Vehicle Trips (vpd)Trips (vpd)Trips (vpd)Trips (vpd)
Peak Vehicle Peak Vehicle Peak Vehicle Peak Vehicle Trips (vph)Trips (vph)Trips (vph)Trips (vph)
1 Medium Density 55 6.5 0.65 358 36
Dwelling Houses 241 9 0.85 2169 205
2 Medium Density 86 6.5 0.65 559 56
Dwelling Houses 760 9 0.85 6840 646
3 Medium Density 0 6.5 0.65 0 0
Dwelling Houses 302 9 0.85 2718 257
Precinct 1Precinct 1Precinct 1Precinct 1 2527252725272527 241241241241
Precinct 2Precinct 2Precinct 2Precinct 2 7399739973997399 702702702702
Precinct 3Precinct 3Precinct 3Precinct 3 2718271827182718 257257257257
TotalTotalTotalTotal 13995139951399513995 1329132913291329
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 26 26
4.34.34.34.3 Distribution of Traffic onto the Surrounding Road NetwoDistribution of Traffic onto the Surrounding Road NetwoDistribution of Traffic onto the Surrounding Road NetwoDistribution of Traffic onto the Surrounding Road Networkrkrkrk
Peak hour traffic flow for the proposed development would generally be distributed as follows:
AM peak 80% leaving 20% entering
PM peak 20% leaving 80% entering
This assumes that all traffic generated will be to and from the proposed development; no
allowance has been made for the low level of internal trips that may occur.
Due to the location of the proposed development on the fringes of Tarneit, and the lack of
existing significant traffic generators to the west, it is expected that there would be a tidal effect
in traffic movement with the major portion of motorists travelling to/from the east (Leakes Road),
to/from the south (Tarneit Road) and with some traffic travelling to/from the north (Dohertys
Road). These roads are generally the most direct routes leading to/from Hoppers Crossing,
Melbourne and Caroline Springs/Deer Park, where employment opportunities, schools and
activity centres exist.
As mentioned in section 2.3, Trafficworks obtained traffic volume counts undertaken by
Wyndham City Council on Leakes Road, Tarneit Road and Dohertys Road. However, these counts
were in sections east of the site along Leakes Road and Dohertys Road and south of the site
along Tarneit Road where traffic volumes are much higher. Nevertheless, it is conservatively
assumed that these traffic volumes are representative of the existing volumes along the sections
of road adjacent to the proposed residential development.
A growth rate of 5% per annum was applied along Leakes Road, Tarneit Road and Dohertys Road
in the vicinity of the proposed development. This growth rate was applied annually (compounded)
to the through traffic volumes to estimate 2013 volumes.
Traffic volume data from 2009 obtained from VicRoads also along these roads provided the
directional splits along Tarneit Road, Leakes Road and Dohertys Road during the AM and PM
peak periods.
4.44.44.44.4 Proposed Proposed Proposed Proposed External Road and External Road and External Road and External Road and DevelopmentDevelopmentDevelopmentDevelopment Intersection Intersection Intersection Intersection Volumes Volumes Volumes Volumes
The anticipated peak traffic distribution is shown in Figure 21 and replicated in Attachment C.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 27 27
Figure 21: The anticipated ultimate peak traffic distribution
4.4.14.4.14.4.14.4.1 Western Western Western Western Access Access Access Access Street Street Street Street 1 1 1 1 / Leakes Road Intersection/ Leakes Road Intersection/ Leakes Road Intersection/ Leakes Road Intersection
Key observations are:
• the movements from the Western Access Street 1 into Leakes Road are anticipated to be 48 turning left and 24 turning right during the AM peak hour;
• the movements from Leakes Road into the Western Access Street 1 are anticipated to be 12 turning left and 13 turning right during the AM peak hour;
• the movements from the Western Access Street 1 into Leakes Road are anticipated to be 8 turning left and 10 turning right during the PM peak hour;
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 28 28
• the movements from Leakes Road into the Western Access Street 1 are anticipated to be 31 turning left and 45 turning right during the PM peak hour.
4.4.24.4.24.4.24.4.2 EasternEasternEasternEastern AccessAccessAccessAccess StreetStreetStreetStreet 1111 / Leakes Road Inter/ Leakes Road Inter/ Leakes Road Inter/ Leakes Road Intersectionsectionsectionsection
Key observations are:
• the movements from the Eastern Access Street 1 into Leakes Road are anticipated to be 80 turning left and 40 turning right during the AM peak hour;
• the movements from Leakes Road into the Eastern Access Street 1 are anticipated to be 22 turning left and 12 turning right during the AM peak hour;
• the movements from the Eastern Access Street 1 into Leakes Road are anticipated to be 13 turning left and 17 turning right during the PM peak hour;
• the movements from Leakes Road into the Eastern Access Street 1 are anticipated to be 51 turning left and 71 turning right during the PM peak hour.
4.4.34.4.34.4.34.4.3 East East East East –––– West West West West Connector Connector Connector Connector //// Tarneit RoadTarneit RoadTarneit RoadTarneit Road IntersectionIntersectionIntersectionIntersection
Key observations are:
• the movements from the East – West Connector into Tarneit Road are anticipated to be 484 turning left and 144 turning right during the AM peak hour;
• the movements from Tarneit Road into the East – West Connector are anticipated to be 125 turning left and 37 turning right during the AM peak hour;
• the movements from the East – West Connector into Tarneit Road are anticipated to be 47 turning left and 109 turning right during the PM peak hour;
• the movements from Tarneit Road into the East – West Connector are anticipated to be 190 turning left and 438 turning right during the PM peak hour.
4.4.44.4.44.4.44.4.4 North North North North –––– South South South South AccessAccessAccessAccess StreetStreetStreetStreet 2222 //// Dohertys RoadDohertys RoadDohertys RoadDohertys Road IntersectionIntersectionIntersectionIntersection
• the movements from the North – South Access Street 2 into Dohertys Road are anticipated to be 21 turning left and 118 turning right during the AM peak hour;
• the movements from Dohertys Road into the North – South Access Street 2 are anticipated to be 7 turning left and 30 turning right during the AM peak hour;
• the movements from the North – South Access Street 2 into Dohertys Road are anticipated to be 27 turning left and 7 turning right during the PM peak hour;
• the movements from Dohertys Road into the North – South Access Street 2 are anticipated to be 110 turning left and 29 turning right during the PM peak hour.
4.54.54.54.5 Proposed Proposed Proposed Proposed Internal Road NetworkInternal Road NetworkInternal Road NetworkInternal Road Network VolumesVolumesVolumesVolumes
This section will discuss the likely classification of the key internal road hierarchy based on the
traffic generation and distribution established in sections 4.1 and 4.2.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 29 29
4.5.14.5.14.5.14.5.1 WWWWestern estern estern estern Access Access Access Access Street Street Street Street 1 1 1 1 intersecting Leakes Road intersecting Leakes Road intersecting Leakes Road intersecting Leakes Road
The traffic volume on the Western Access Street 1, intersecting Leakes Road, is expected to carry
approximately 1,000vpd, which is well within the design criteria for an Access Street 1, see
section 3.2.3.
4.5.24.5.24.5.24.5.2 EasternEasternEasternEastern AccessAccessAccessAccess StreetStreetStreetStreet 1111 intersecting Leakes Roadintersecting Leakes Roadintersecting Leakes Roadintersecting Leakes Road
The traffic volume on the Eastern Access Street 1, intersecting Leakes Road is expected to carry
approximately 1,500vpd, which is within the design criteria for an Access Street 1, see section
3.2.3.
4.5.34.5.34.5.34.5.3 East East East East –––– West West West West Connector Connector Connector Connector intersecting Tarneit Roadintersecting Tarneit Roadintersecting Tarneit Roadintersecting Tarneit Road
The traffic volume on the East - West Connector intersecting with Tarneit Road is expected to
carry approximately 7,900vpd, which falls above the design criteria for a Connector, see section
3.2.5. As development continues to the west, the traffic volumes are expected to dissipate and
ultimately settle below 7,000vpd.
4.5.44.5.44.5.44.5.4 North North North North –––– South South South South AccessAccessAccessAccess StreetStreetStreetStreet 2222 intersecting Dohertys Roadintersecting Dohertys Roadintersecting Dohertys Roadintersecting Dohertys Road
The traffic volume on the North – South Access Street 2 intersecting with Dohertys Road, is
expected to carry approximately 1,800vpd, which is within the design criteria for an Access Street
2, see section 3.2.4.
4.64.64.64.6 Future Road Network VolumesFuture Road Network VolumesFuture Road Network VolumesFuture Road Network Volumes
Traffic modelling information version 3 released by the GAA (in an email dated 25 February
2013) for the proposed Wyndham North PSP was reviewed. Some of the modelling had excluded
some development areas and future roadworks north of Boundary Road. This is being addressed
by the GAA.
The Wyndham North Precinct Structure Plan, Transport Assessment has yet to be released which
is likely to discuss the model calibration, model limitations and land use forecasts reflecting the
Wyndham North Draft Urban Structure Plan. A review of the Transport Assessment report once
released would provide clarification of the assumptions used in the model.
The model outputs indicated that:
• Leakes Road will have estimated traffic volumes of 25,400 vpd in the eastbound direction and 24,900 vpd in the westbound direction (two - way volumes of 50,300 vpd);
• Tarneit Road will have estimated traffic volumes of 8,700 vpd in the northbound direction and 8,900 vpd in the southbound direction (two - way volumes of 17,600 vpd);
• Dohertys Road will have estimated traffic volumes of 18,200 vpd in the eastbound direction and 18,100 vpd vehicles in the westbound direction (two - way volumes of 36,300 vpd).
Wyndham City Council considers it appropriate for a road to be duplicated when traffic volumes
reach 18,000 vpd. Leakes Road, Dohertys Road and Tarneit Road will more than likely require
duplication into the future; the timing of this will be governed by the rate of development in the
area.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 30 30
The estimated traffic volumes from the subject development will be less than the need for
duplication.
The GAA Development Contribution Plan indicates that a cross intersection would be formed at
the Western Access Street 1 / Leakes Road and Cottesloe Boulevard. However, Wyndham City
Council have indicated that the cross intersection would be further to the west, to better align
with the future train station and an existing subdivision road.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 31 31
5 SIDRA ANALYSIS
SIDRA software was utilised to analyse the intersections to determine the anticipated
intersection operations for the proposed development.
The program produces statistics and information on the operation of an intersection but typically
the main characteristic used to assess the operation of the intersection is the Degree of
Saturation (DOS) which takes into account the 95th percentile queue lengths and delay.
An explanation of the intersection operating characteristics is shown in Table 2.
Table 2: Definitions of intersection operation characteristics
Degree of
Saturation
(DOS)
Intersection Operation
Less than 0.60 Excellent operating conditions, minimal delays
0.60 – 0.70 Very good operating conditions, minimal delays
0.70 – 0.80 Good operating conditions, delays and queuing increasing
0.80 – 0.90 Acceptable operating conditions, delays and queues growing. Any interruption
to flow such as minor incidents causes increasing delays
0.90 – 0.95 Poor operating conditions, flows starting to breakdown and queues and delays
increase rapidly.
Above 0.95
Very poor operating conditions with queues and delays increasing rapidly.
Once queues develop it takes a significant time for queues to dissipate
resulting in long delays to traffic movements
5.15.15.15.1 Intersection AnalysisIntersection AnalysisIntersection AnalysisIntersection Analysis
The proposed development will ultimately have the following four intersections providing access:
• North – South Access Street 2 intersecting Dohertys Road;
• East – West Connector intersecting Tarneit Road;
• Eastern Access Street 1 intersecting Leakes Road;
• Eastern Access Street 1 intersecting Leakes Road.
The results of the analysis are provided in Table 3.
5.1.15.1.15.1.15.1.1 The Proposed DevelopmentThe Proposed DevelopmentThe Proposed DevelopmentThe Proposed Development
To establish the impact the proposed generated and distributed traffic from the development
would have on the intersections, the operating characteristics were determined for the following
intersection layouts:
• Give-way controlled intersections for single carriageway roads for all intersections;
• Traffic signals at East – West Connector intersecting Tarneit Road;
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 32 32
• Give-way controlled intersections with channelised right turn and auxiliary left turn lane on Leakes Road and Tarneit Road and separate left and right lane on the development roads at:
o North – South Access Street 2 intersecting Dohertys Road;
o Eastern Access Street 1 intersecting Leakes Road;
o Western Access Street 1 intersecting Leakes Road.
Even though analysis was undertaken for give-way controlled intersection at the East – West
Connector and Tarneit Road, this intersection should be controlled with traffic signals because it
will form a cross intersection with a future road to the east of Tarneit Road introducing a high
number of conflict points and therefore potentially causing road safety issues.
In addition to that, VicRoads require that traffic turning from major roads into minor roads at give-
way controlled intersections do not delay through traffic, which therefore requires right turns and
sometimes left turns occurring from within their own lanes in the form of right turn lanes or left
turn lanes.
The Wyndham North Traffic Modelling and SIDRA Analysis Prepared for Growth Areas Authority by
AECOM Australia Pty Ltd indicated that signalised intersections at Leakes Road and Tarneit Road
and at Tarneit Road and Dohertys Road will be able to accommodate the additional traffic
generated by the subject development and surrounding areas. These intersections were
observed to currently operate under their capacity.
The SIDRA results are shown in Table 3 and full SIDRA results are shown in Attachment B.
5.25.25.25.2 Sensitivity Analysis Sensitivity Analysis Sensitivity Analysis Sensitivity Analysis
A design life sensitivity analysis was also undertaken to determine the intersection performance
post the development of the subject site. A compounded growth rate of 5% to through traffic
movements was assumed to determine the design life in years of an intersection.
VicRoads require that intersections for proposed developments to operate satisfactorily (under
capacity) 10 years post the development.
A practical DOS of 0.80 for give-way controlled intersections and 0.90 for signalised intersections
was used as the maximum acceptable degree of saturation.
A DOS below 0.80 for give-way controlled intersections results in good or better operating
conditions. Above 0.80, the intersection results in an increase in delays and queues.
A DOS below 0.90 for signalised intersections results in acceptable or better operating
conditions. Above 0.90, the intersection results in flows starting to breakdown and queues and
delays increase rapidly.
The SIDRA design life sensitivity analysis results are also shown in Table 3. Full SIDRA results are
shown in Attachment D.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 33
Table 3: SIDRA model results for the proposed development and sensitivity analysis of give-controlled intersections, give-controlled intersections with channelised right turn lane and auxiliary left turn lane and signalised intersection
MovementsMovementsMovementsMovements
GiveGiveGiveGive----Way Controlled IntersectionsWay Controlled IntersectionsWay Controlled IntersectionsWay Controlled Intersections Traffic SignalsTraffic SignalsTraffic SignalsTraffic Signals GiveGiveGiveGive----Way Controlled Intersection with Channelised Right Turn Lane Way Controlled Intersection with Channelised Right Turn Lane Way Controlled Intersection with Channelised Right Turn Lane Way Controlled Intersection with Channelised Right Turn Lane
and and and and Left Turn LaneLeft Turn LaneLeft Turn LaneLeft Turn Lane
DOSDOSDOSDOS 95% 95% 95% 95% Queue Queue Queue Queue
(m)(m)(m)(m) Average Delay Average Delay Average Delay Average Delay
(sec)(sec)(sec)(sec)
Design Life Design Life Design Life Design Life ---- Practical Practical Practical Practical
Capacity (Yrs)Capacity (Yrs)Capacity (Yrs)Capacity (Yrs) DOSDOSDOSDOS
95% Queue 95% Queue 95% Queue 95% Queue (m)(m)(m)(m)
Average Delay Average Delay Average Delay Average Delay (sec)(sec)(sec)(sec)
Design Life Design Life Design Life Design Life ---- Practical Practical Practical Practical
Capacity (Yrs)Capacity (Yrs)Capacity (Yrs)Capacity (Yrs) DOSDOSDOSDOS
95% Queue 95% Queue 95% Queue 95% Queue (m)(m)(m)(m)
Average Delay Average Delay Average Delay Average Delay (sec)(sec)(sec)(sec)
Design Life Design Life Design Life Design Life ---- Practical Practical Practical Practical
Capacity (Yrs)Capacity (Yrs)Capacity (Yrs)Capacity (Yrs)
AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM
Western Access Street 1 Western Access Street 1 Western Access Street 1 Western Access Street 1 / Leakes Rd/ Leakes Rd/ Leakes Rd/ Leakes Rd
Intersection - All Vehicles
0.099 0.068 3.8 2.8 3.2 3.1 20 20 0.061 0.063 1.2 1.0 3.0 3.1 20 20
Eastern AccEastern AccEastern AccEastern Access Street 1 ess Street 1 ess Street 1 ess Street 1 / Leakes Rd/ Leakes Rd/ Leakes Rd/ Leakes Rd
Intersection - All Vehicles
0.092 0.113 2.2 4.3 4.1 4.4 20 20 0.083 0.061 2.2 1.7 3.9 4.2 20 20
East East East East ---- West Connector / West Connector / West Connector / West Connector / Tarneit RdTarneit RdTarneit RdTarneit Rd
Intersection - All Vehicles
0.957 1.339 125.1 124.3 19.7 33.6 0 0 0.767 0.735 91.0 77.5 19.7 17.8 12 20
North North North North ---- South Access South Access South Access South Access Street 2 / Dohertys RdStreet 2 / Dohertys RdStreet 2 / Dohertys RdStreet 2 / Dohertys Rd
Intersection - All Vehicles
0.248 0.256 11.2 4.2 3.7 3.0 16 20 0.240 0.193 6.8 0.9 3.3 2.6 18 20
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 34 34 34
Key observations are:
• the give-way controlled intersections would perform at excellent operating conditions for all of the intersections except for the East – West Connector and Tarneit Road intersection. This intersection would operate with very poor operating conditions in the AM and PM peak period;
• the signalised intersection at East - West Connector and Tarneit Road would perform at good operating conditions in the AM peak period and in the PM peak period at full development.
• the give-way controlled intersections with a right turn lane and a left turn lane would perform at excellent operating conditions at:
o Western Access Street 1 and Leakes Road;
o Eastern Access Street 1 and Leakes Road;
o North - South Connector Street and Dohertys Road;
• the design life for the Western Access Street 1 and Leakes Road intersection is 20 years which is greater than the 10 years VicRoads require;
• the design life for the Eastern Access Street 1 and Leakes Road intersection with a right turn lane and a left turn lane is 20 years which is greater than the 10 years VicRoads require;
• the design life for the East - West Connector and Tarneit Road signalised intersection is 12 years, greater than the 10 years VicRoads require;
• the design life for the North - South Access Street 2 and Dohertys Road give-way controlled intersection with a right turn lane and an auxiliary left turn lane is 18 years, meeting VicRoads design life requirement of 10 years;
• In summary the:
o Western Access Street 1 and Leakes Road intersection is proposed to be give-way controlled with a right turn lane and a left turn lane;
o Eastern Access Street 1 and Leakes Road intersection is proposed to be give-way controlled with a right turn lane and a left turn lane;
o East - West Connector and Tarneit Road intersection is proposed to be signalised at full development; and
o North - South Access Street 2 and Dohertys Road intersection is proposed to be give-way controlled with a right turn lane and a left turn lane.
5.35.35.35.3 Trigger for Traffic Signals Trigger for Traffic Signals Trigger for Traffic Signals Trigger for Traffic Signals based on Development Stagesbased on Development Stagesbased on Development Stagesbased on Development Stages
A give-way controlled intersection with right and left turn lanes could be installed on the East –
West Connector and Tarneit Road in the interim as a T-intersection. The timing of when the traffic
signals will be required will depend on the rate of development.
A DOS below 0.80 for give-way controlled intersections results in good operating conditions.
Above 0.80, the intersection results in an increase in delays and queues and is when it would
require traffic signals (upgrade).
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 35 35 35
The assessment has been based on the subject site being fully developed prior to any
development of the land to the east of the subject site. If the developer of the land east of Tarneit
Road constructs an access to the East – West Connector forming a cross intersection, traffic
signals will be required prior to gaining access at this intersection.
The SIDRA analysis indicating the trigger for traffic signals is shown in Table 3. Full SIDRA results
are shown in Attachment D.
Table 4: SIDRA model results for the trigger for traffic signals at East – West Connector and Tarneit Road intersection.
MovementsMovementsMovementsMovements
GiveGiveGiveGive----Way Controlled IntersectionsWay Controlled IntersectionsWay Controlled IntersectionsWay Controlled Intersections
DOSDOSDOSDOS 95% Queue (m)95% Queue (m)95% Queue (m)95% Queue (m) Average Delay Average Delay Average Delay Average Delay
(sec)(sec)(sec)(sec)
AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM AMAMAMAM PMPMPMPM
East East East East ---- West Connector / West Connector / West Connector / West Connector /
Tarneit Rd Tarneit Rd Tarneit Rd Tarneit Rd (Year 7 (Year 7 (Year 7 (Year 7 ---- Including Stage Including Stage Including Stage Including Stage
15151515, 2022), 2022), 2022), 2022)
Intersection - All Vehicles
0.655 0.799 35.1 28.7 8.4 9.3
Key observations are:
• the give-way controlled intersection would perform at very good operating conditions in the AM peak period;
• the give-way controlled intersection would perform at good operating conditions in the PM peak period;
• however, the give-way controlled intersection would require an upgrade to traffic signals in year 7 (calendar year 2022) of the development after the completion of stage 15 of the anticipated development program.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 36 36 36
6 IMPACTS & MITIGATING WORKS
The impacts of the development on the through-traffic along Leakes Road, Tarneit Road and
Dohertys Road are primarily related to the need to accommodate low-speed turning manoeuvres.
These impacts are quantified below and appropriate mitigating works are recommended.
6.16.16.16.1 Interaction Interaction Interaction Interaction of Existing and Proposed Roadsof Existing and Proposed Roadsof Existing and Proposed Roadsof Existing and Proposed Roads
The proposed Eastern Access Street 1 and Leakes Road intersection is proposed to be located
far enough west of Tarneit Road to allow for any possible future extension of the right turn lane at
Tarneit Road (west to south) to increase capacity as the intersection. It will also allow the
implementation of a channelised right turn treatment on Leakes Road on approach to the
Eastern Access Street 1.
The distance between the proposed Eastern Access Street 1 intersection and Eagleridge
Promenade is sufficient, removing potential road safety issues for vehicles travelling between
these two roads.
When Leakes Road and Dohertys Road is duplicated, the proposed Western Access Street 1,
Eastern Access Street 1 and the North - South Connector Street will be restricted to left in /left
out with possible right turn in.
Dohertys Road and Tarneit Road do not have any existing intersecting roads adjacent to the
subject development.
6.26.26.26.2 Sight DistanceSight DistanceSight DistanceSight Distance
The visibility criterion normally applied to intersections is Safe Intersection Sight Distance (SISD).
This is nominated in the Austroads Guide to Road Design, Part 4A as the minimum distance
which should be provided on the major road at any intersection (refer to Section 3.2.2 in the
Austroads Guide) and provides sufficient distance for a driver of a vehicle on the major road to
observe a vehicle from the minor access approach moving into a collision situation (e.g. in the
worst case, stalling across the traffic lanes) and to decelerate to a stop before reaching the
collision point (refer Figure 22 below). SISD should also be provided for drivers of vehicles stored
in the centre of the road when undertaking a crossing or right-turning movement.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 37 37 37
Figure 22: Safe Intersection Sight Distance (SISD). Source: Figure 3.2 from Austroads Guide to Road Design Part 4A.
The minimum SISD criterion specified in Table 3.2 of the Austroads Guide requires clear visibility
for a desirable minimum distance of 214m, relating to the general reaction time (RT) of 2
seconds and a design speed of 90 km/h. This sight distance is currently applicable to
intersections along Dohertys Road and will ultimately be applicable to intersections along Leakes
Road and Tarneit Road which are likely to have design speeds of 90km/h.
This visibility requirement, measured at 5.0m from the edge of traffic lane, is likely to be satisfied
at the proposed subdivision road connections of Leakes Road and Dohertys Road due to flat
terrain in the area.
Tarneit Road is proposed to have a road overpass over the Regional Rail tracks. Therefore, the
desirable SISD criteria specified in the Austroads Guide for an intersection along Tarneit Road
with a design speed of 90km/h for a reaction time (RT) of 2 seconds and a downgrade of 6% due
to the overpass (currently under construction) requires clear visibility of 232m.
An assessment of SISD from the crest of the overpass to the proposed East - West Connector and
Tarneit Road intersection revealed available sight lines of 270m. This is in excess of the required
visibility to meet SISD assuming that no other roadside objects or trees obscure or obstruct sight
lines (not currently present).
The SISD available from the crest of the overpass is demonstrated in Attachment E.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 38 38 38
6.36.36.36.3 Turn ProvisionsTurn ProvisionsTurn ProvisionsTurn Provisions
As stated previously, the East - West Connector and Tarneit Road intersection are proposed to be
signalised. The intersection layouts will be determined from SIDRA.
The Western Access Street 1 and Leakes Road intersection, the Eastern Access Street 2 and
Leakes Road intersection and the North - South Connector Street and Dohertys Road intersection
are proposed to be give-way controlled with right turn and left turn lanes.
Leakes Road is only partly sealed. Wyndham City Council has revealed that Leakes Road
reconstruction detailed design will commence in the financial year 2012/2013.
The anticipated traffic generated along Leakes Road and along Dohertys Road is shown in Figure
19 for the proposed development. The formulas (shown in Figure 22) were used to determine the
major road volumes (QM) on Leakes Road and on Dohertys Road (major roads) and are
summarised in Table 4 for the right turn warrants and Table 5 for the left turn warrants. The
results were then applied in Figure 23 and Figure 24 to determine the turn treatment warrants.
Figure 22: Formulas used to determine the major road traffic along Leakes Road and along Dohertys Road
IntersectionIntersectionIntersectionIntersection Turn TypeTurn TypeTurn TypeTurn Type Major Major Major Major Road Road Road Road VolumeVolumeVolumeVolume
(i(i(i(impacted by mpacted by mpacted by mpacted by tttturning urning urning urning ttttrafficrafficrafficraffic))))
QQQQMMMM
Leakes RoadLeakes RoadLeakes RoadLeakes Road
Left Turn from the West - Leakes
Road into Western or Eastern
Access Street 1
QL QT2
Right Turn from the East - Leakes
Road into Western or Eastern
Access Street 1
QR QT1 + QT2 + QL
Dohertys RoadDohertys RoadDohertys RoadDohertys Road
Left Turn from the East - Dohertys
Road into North - South Access
Street 2
QL QT2
Right Turn from the South -
Dohertys Road into North - South
Access Street 2
QR QT1 + QT2 + QL
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 39 39 39
The warrants for the right turn treatments QQQQRRRR is shown below in Table 4 which was applied in
Figure 23.
Table 4: Warrants for the right turn treatments on Leakes Road and Dohertys Road
IntersectionIntersectionIntersectionIntersection PeriodPeriodPeriodPeriod QQQQT1T1T1T1 vphvphvphvph
QQQQT2T2T2T2 vphvphvphvph
QQQQLLLL vphvphvphvph
QQQQRRRR vphvphvphvph
QQQQM vphvphvphvph
WarrantsWarrantsWarrantsWarrants
Western Access Street Western Access Street Western Access Street Western Access Street 1 / 1 / 1 / 1 / Leakes RoadLeakes RoadLeakes RoadLeakes Road
AMAMAMAM 104 97 12 13 213 BAR
PMPMPMPM 113 62 31 45 206 CHR(S)
Eastern Access Street Eastern Access Street Eastern Access Street Eastern Access Street 1 / 1 / 1 / 1 / Leakes RoadLeakes RoadLeakes RoadLeakes Road
AMAMAMAM 71 143 22 12 236 BAR
PMPMPMPM 99 69 51 71 219 CHR(S)
North North North North –––– South Access South Access South Access South Access Street 2 / Street 2 / Street 2 / Street 2 / Dohertys Dohertys Dohertys Dohertys
RoadRoadRoadRoad
AMAMAMAM 371 92 7 30 473 CHR(S)
PMPMPMPM 92 348 110 29 646 CHR (S)
BAR – Basic Right turn treatment on the major road, features a widened area (usually in place of parking) on the major road (Leakes
Road or Dohertys Road) that allows through vehicles to pass to the left of turning vehicles.
BAL – Basic Left turn treatment on the major road (Leakes Road or Dohertys Road), has a radius large enough to accommodate a
design vehicle turning left into the minor road without crossing the centre line of the minor road. This type of treatment is usually
suitable in low volume, low speed environments.
AUL – Auxiliary Left turn treatment is a left turn lane on the major road (Leakes Road or Dohertys Road) that allows through vehicles
to pass to the right of turning vehicles.
AUL (S) – Auxiliary Left turn treatment is a shorter version of the Auxiliary Left turn treatment which is reduced by allowing some
deceleration to occur in the through lane on the major road (Leakes Road or Dohertys Road). This turn treatment also allows through
vehicles to pass to the right of turning vehicles.
CHR – Channelised Right turn treatment has two vehicle travel paths (through and right turns) separated by physical or painted
medians or islands.
CHR(S) – Channelised Right Short turn is a shorter version of the Channelised Right turn treatment which is reduced by removing
space provided for storage in the right lane. This type can only be used with line marking.
Key observations are:
• Leakes Road meets the warrants for a CHR(S) treatment.
• Dohertys Road meets the warrants for a CHR(S) treatment.
The warrants for the left turn treatment QL on Leakes Road and Dohertys Road is shown below in
Table 5 which was applied in Figure 23.
Table 5: Warrants for the left turn treatments on Leakes Road and on Dohertys Road
IntersectionIntersectionIntersectionIntersection PeriodPeriodPeriodPeriod QQQQT2T2T2T2 vphvphvphvph
QQQQLLLL vphvphvphvph
QQQQM vphvphvphvph
WarrantsWarrantsWarrantsWarrants
Western Access Western Access Western Access Western Access Street 1 / Street 1 / Street 1 / Street 1 / Leakes Leakes Leakes Leakes
RoadRoadRoadRoad
AMAMAMAM 97 12 97 BAL
PMPMPMPM 62 31 62 BAL
Eastern Access Street Eastern Access Street Eastern Access Street Eastern Access Street 1 / 1 / 1 / 1 / Leakes RoadLeakes RoadLeakes RoadLeakes Road
AMAMAMAM 143 22 143 BAL
PMPMPMPM 69 51 69 BAL
North North North North –––– South Access South Access South Access South Access Street 2 / Street 2 / Street 2 / Street 2 / Dohertys Dohertys Dohertys Dohertys
RoadRoadRoadRoad
AMAMAMAM 92 7 92 BAL
PMPMPMPM 348 110 348 AUL(S)
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 40 40 40
Key observations are:
• Leakes Road meets the warrants for a BAL treatment.
• Dohertys Road meets the warrants for an AUL(S) treatment.
Separate turn lanes are normally provided to avoid delay to through traffic where turn
movements reach the threshold values outlined in Figure 23 (reproduced from the Austroads
Guide). Traffic volumes from Table 4 and Table 5 were placed on Figure 23 to obtain indicative
turn treatments at the intersection.
Figure 23: Graph used to determine the warrants for the right turn treatments on Leakes Road and on Dohertys Road
6.3.16.3.16.3.16.3.1 Right TurnsRight TurnsRight TurnsRight Turns
As indicated above, Leakes Road and Dohertys Road meet the warrants for a CHR(S) treatment.
The minimum dimensions of the CHR(S) treatment is detailed in Figure 24 below (reproduced
from the Austroads Guide) for a design speed of 90km/h90km/h90km/h90km/h and, subject to detailed design,
intersection analysis and road grades, should comprise the following:
• Taper length T = 25m;
• Nominal width of turn lane WT = 3.0m;
• Lateral movement length A = 75m;
• Distance from start of taper to 2.0m width E = 50m;
• Desirable radius R = 350m;
• Nominal through lane width W = 3.5m;
• Length of deceleration which includes the taper length of 25m, D = 55m;
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 41 41 41
• Total length of auxiliary lane including taper length and storage B = 67.5m;
• Storage length S = 12.5m (single unit truck / bus design vehicle);
• Distance X = 10 – 15m, dependent on detailed design consideration of design vehicle turning paths.
Figure 24: Channelised right turn – short CHR(S) on an urban road
6.3.26.3.26.3.26.3.2 Left TurnsLeft TurnsLeft TurnsLeft Turns
As indicated above, Leakes Road meets the warrants for a BAL treatment. Basic Left turn
treatment on Leakes Road should have a radius large enough to accommodate a design vehicle
turning left into the minor road without crossing the centre line of the minor road. This type of
treatment is considered suitable due to the anticipated low volumes turning left.
Dohertys Road meets the warrants for an auxiliary left turn treatment (AUL(S)). The minimum
dimensions of the AUL(S) treatment is detailed in Figure 25 below (reproduced from the
Austroads Guide) for a design speed of 90km/h and subject to detailed design, intersection
analysis and road grades, should comprise the following:
• Taper length T = 25m;
• Deceleration length D = 55m for AUL(S);
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 42 42 42
• Nominal width of turn lane WT = 3.0m;
• Nominal through lane width W = 3.5m.
Figure 25: Auxiliary left-turn – short treatment AUL(S) on an urban road
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 43 43 43
7 SUBDIVISION INTERNAL ROAD LAYOUT
The proposed subdivision road layout and access to the abutting road network generally meets
good urban design principles and provides a permeable road layout. Comments are provided
below on a number of matters that will benefit the development.
7.17.17.17.1 Speed Speed Speed Speed ZonZonZonZoniiiingngngng and Traffic Calmingand Traffic Calmingand Traffic Calmingand Traffic Calming
It is expected that the proposed development will operate under the default urban 50 km/h
speed limit, except possibly the East – West Connector which is likely to be signed at 60km/h.
Design of the Access Street 1 and 2 should aim to meet the GAA’s Engineering Design and
Construction Manual target speeds of 30-40km/h, be self-enforceable through the installation of
calming devices along long straight sections of road. Descriptions of slow point treatments are
provided in the Austroads Guide to Traffic Engineering, Part 10 – Local Area Traffic Management
and Chapter 8 of the VicRoads Traffic Engineering Manual Volume 1 – Traffic Management.
7.27.27.27.2 Intersection DesignIntersection DesignIntersection DesignIntersection Design
Most intersections within the development are ‘T” intersections and where there are cross
intersections, roundabouts are recommended.
The “T” intersections appear to be reasonably positioned to provide suitable safe intersection
sight distances. The location of intersections should be designed to meet the required sight line
requirements. “T” intersections enhance safety and minimise potential confusion with motorists.
Any landscaping within the verge in close proximity to an intersection should not obscure or
obstruct drivers’ line of sight.
7.37.37.37.3 Public TransportPublic TransportPublic TransportPublic Transport
The Department of Transport (DoT) has published a set of guidelines that assists new
subdivisional developments to integrate provision for bus routes at the planning stage. The
Public Transport Guidelines for Land Use and Development provides a series of road cross
sectional options that should be referenced in the detailed design of the collector road.
The Public Transport – Guidelines for Land Use and Development indicates that 95% of
residential land uses be designed to allow access to public transport services within 400 - 500
metres safe walking distance. It also states that as a guideline, bus stops should be located
every 300 metres along a bus route.
To meet the requirements as indicated in the Public Transport – Guidelines for Land Use and
Development, provision should be made for bus routes and bus stops within the proposed
development that meet the requirements of the DoT.
Currently, route 442 operates between Hoppers Crossing and Tarneit via Werribee Plaza
Shopping Centre. This bus service is approximately 550m from Leakes Road.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 44 44 44
An extension of route 442 and the introduction of other bus services should be provided to meet
the requirements in the Public Transport Guidelines for Land Use and Development.
Furthermore as part of Regional Rail Link, a new train station within 2km of the site will be
developed at Tarneit.
7.47.47.47.4 Pedestrian and Cycle NetworkPedestrian and Cycle NetworkPedestrian and Cycle NetworkPedestrian and Cycle Network
Tract Consulting Pty Ltd overall development plan shown in Figure 11 indicates a shared path
along Regional Rail Link within the southern precinct.
A network of pedestrian and cycling (on-road and off-road) linkages within the development
including open space areas will support recreational and commuter paths and ultimately
providing sustainable travel options.
To augment the existing shared path running east – west along Leakes Road, the provision of
cyclist linkages will be provided throughout the development to meet the design criteria for roads,
as set out in GAA’s Engineering Design and Construction Manual.
The segregation of the development site by the Regional Rail Link will result in a physical barrier
between the two precincts for pedestrians and cyclists. A grade separated connection would
provide an important link to the proposed shared path along Regional Rail Link in the southern
precinct and beyond to the shared path running east – west along Leakes Road.
7.57.57.57.5 CulCulCulCul----dededede----sacssacssacssacs
The internal roads that lead into access places or have a dead end need to allow service vehicles
to travel in a forwards direction at all times. In order to achieve this, Cul-de-sacs should be of
bowl geometry or where the road leads to an Access Lane (which usually provides access to the
rear of higher density lots) a driveway access or threshold type treatment should be installed.
Any internal roads with dead ends should not have “T” or “Y” cul-de-sac heads but be a court
bowl.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 45 45 45
8 CONCLUSIONS AND RECOMMENDATIONS
The proposed development site is located in Tarneit between Dohertys Road to the north, Tarneit
Road to the east, Leakes Road to the south and approx. 820m west of Tarneit Road to the west,
in Tarneit.
Amex Corporation owns approximately 120ha over two titles on the west side of Tarneit Road,
between Leakes Road and Dohertys Road. This land falls within Precinct Structure Plan (PSP)
1089 – Tarneit North.
Part of the land is segregated by the proposed Regional Rail Link which will provide a new track
between West Werribee Junction to Deer Park, then along the existing rail corridor from Sunshine
to Southern Cross Station. As part of this project, a new train station within 2km of the site will be
developed at Tarneit.
The southern precinct of the overall development site is proposed to have access via Leakes
Road at two locations. The northern precinct of the overall development site is proposed to have
access via one location at Tarneit Road and Dohertys Road.
The proposed development would not adversely impact on the safety or operation of the
surrounding road network, provided the recommended mitigating works are undertaken.
It is concluded that:
• the proposed development is estimated to yield 1,303 dwelling houses and 141 Medium density lots resulting in a total traffic generation of 12,644 vehicles per day (vpd) to and from the development, with morning and afternoon peaks of approximately 1,199 vehicles per hour (vph);
• the traffic volume on the Western Access Street 1, intersecting Leakes Road, is expected to carry approximately 1,000vpd, which is within the design criteria for a Access Street 1;
• the traffic volume on the Eastern Access Street 1, intersecting Leakes Road is expected to carry approximately 1,500vpd, which is within the design criteria for an Access Street 1;
• the traffic volume on the East - West Connector intersecting with Tarneit Road is expected to carry approximately 7,900vpd, which falls above the design criteria for a Connector. As development continues to the west, the traffic volumes are expected to dissipate and ultimately settle below 7,000vpd;
• the traffic volume on the north – south Access Street 2 intersecting with Dohertys Road, is expected to carry approximately 1,800vpd, which is within the design criteria for an Access Street 2;
• the distance between the proposed Eastern Access Street 1 intersection and Eagleridge Promenade is sufficient, removing potential road safety issues for vehicles travelling between these two roads;
• when Leakes Road and Dohertys Road are duplicated, the proposed Western Access Street 1, Eastern Access Street 1 and the North - South Access Street 2 will be restricted to left in /left out with possible right turn in;
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 46 46 46
• the give-way controlled intersections with a right turn lane and a left turn lane would perform at excellent operating conditions and meet VicRoads design life requirement of 10 years at:
o Western Access Street 1 and Leakes Road;
o Eastern Access Street 1 and Leakes Road;
o North - South Access Street 2 and Dohertys Road;
• the give-way controlled intersection at East - West Connector and Tarneit Road would require an upgrade to traffic signals in year 7 (calendar year 2022) of the development after the completion of stage 15 of the anticipated development program;
• the signalised intersection at East - West Connector and Tarneit Road would perform at good operating conditions and meet VicRoads design life requirement of 10 years at full development;
• the safe intersection sight distance (SISD) requirement is likely to be satisfied at the proposed subdivision road connections of Leakes Road and Dohertys Road due to flat terrain in the area; and
• an assessment of SISD from the crest of the overpass to the proposed East - West Connector and Tarneit Road intersection revealed sight lines in excess of the required visibility to meet SISD assuming that no other roadside objects or trees obscure or obstruct sight lines.
It is recommended that:
• the East - West Connector and Tarneit Road intersection up to the completion of stage 15 of the anticipated development program will be give-way controlled with a channelised right turn short (CHR(S)) treatment and an auxiliary left short (AUL(S)) treatment on Tarneit Road;
• the East - West Connector and Tarneit Road intersection be signalised in year 7 (calendar year 2022) of the development after the completion of stage 15 of the anticipated development program;
• traffic signals will be required as soon as the East - West Connector and Tarneit Road intersection becomes a cross intersection where the eastern leg of the intersection is built by others;
• the Western Access Street 1 and the Eastern Access Street 1 intersections with Leakes Road be give-way controlled with a channelised right turn short (CHR(S)) treatment and a basic left (BAL) treatment on Leakes Road;
• the North - South Access Street 2 and Dohertys Road intersection be give-way controlled with a channelised right turn short (CHR(S)) treatment and an auxiliary left short (AUL(S)) treatment on Dohertys Road;
• design of internal roads is based on GAA’s Engineering Design and Construction Manual for Subdivision in Growth Areas, April 2011;
• incorporation of the Public Transport – Guidelines for Land Use and Development for bus routes and liaison with the Department of Transport regarding bus route and bus stop locations;
• installation of traffic calming devices along long straight sections of road;
• the location of intersections should be designed to meet the required sight line requirements;
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013 47 47 47
• any landscaping within the verge in close proximity to an intersection should not obscure drivers’ line of sight.
Provided the recommendations outlined in this report are implemented, there are no traffic
related reasons that would prevent this development from occurring.
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
ATTACHMENT A – TRAFFIC VOLUMES DATA - VICROADS
Road Information Services Hourly Traffic Volumes
Survey No: 18365 Scram: Lanes: 0 0
Location: 1 1
Source: Auto Classification VehType: All Vehs
Location: Leakes Rd btw Nighthawk Rd & Tarneit Rd
Flow: E BD AllMvs METRO NORTH WESTERN
MapRef: 202 B01 Srrs/Chn: 0 0 WYNDHAM CITY
Report 435 of 911
Hour Mon 14Dec09 Tue 15Dec09 Wed 16Dec09 Thu 17Dec09 Fri 18Dec09 Sat Sun 13Dec09
Start All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks
00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
02:00 1 0 0 0 0 0 2 0 0 0 0 0 1 0
03:00 0 0 0 0 0 0 1 0 0 0 0 0 2 0
04:00 1 0 1 0 0 0 0 0 0 0 0 0 0 0
05:00 2 0 1 0 1 0 0 0 0 0 0 0 1 0
06:00 5 2 4 1 3 1 2 0 0 0 0 0 1 0
07:00 4 1 14 4 10 3 6 2 4 2 0 0 2 1
08:00 14 10 8 2 2 0 5 2 2 0 0 0 1 0
09:00 6 3 5 2 1 0 2 0 1 0 0 0 3 0
10:00 6 1 3 1 5 1 2 1 0 0 0 0 3 0
11:00 3 0 5 2 3 0 6 1 2 1 0 0 1 0
12:00 4 1 4 3 6 1 6 1 3 0 0 0 3 0
13:00 4 1 6 2 1 0 0 0 6 1 0 0 3 0
14:00 4 0 5 0 6 0 3 0 5 0 0 0 0 0
15:00 11 3 7 1 1 0 0 0 4 0 0 0 1 0
16:00 6 2 6 4 3 0 2 0 3 0 0 0 5 0
17:00 7 2 0 0 2 0 1 0 0 0 0 0 6 0
18:00 5 0 2 0 4 1 2 0 3 0 0 0 1 0
19:00 2 0 1 1 1 0 0 0 2 0 0 0 4 0
20:00 4 1 1 0 1 0 3 0 1 0 0 0 1 0
21:00 4 1 1 0 0 0 1 0 0 0 0 0 2 0
22:00 1 0 6 3 2 0 1 0 0 0 0 0 3 0
23:00 0 0 0 0 0 0 0 0 0 0 0 0 1 1
<return> to continue...
AM Peak 14 10 14 4 10 3 6 2 4 2 0 0 3 1
PM Peak 11 3 7 4 6 1 6 1 6 1 0 0 6 1
24 HOUR 94 28 80 26 52 7 45 7 36 4 0 0 45 2
All Vehs: 59 Avg MdWk AMPK 10 Trucks: 13 22.6%
All Vehs: 61 Avg MdWk PMPK 6 Trucks: 14 23.5%
All Vehs: n.a. Trucks: n.a. n.a.
Latest Non-Holiday Validated Data by Day of Week n.a. statistics unavailable due to incomplete data
Average Midweek (Tue/Wed/Thu)
Average 5 day (Monday - Friday)
Average 7 day (Monday - Sunday)
PROFILESAustroads Classes &
Speed Statistics
NEXT
PREV
Avg Weekday Group Hourly
Road Information Services Hourly Traffic Volumes
Survey No: 18365 Scram: Lanes: 0 0
Location: 2 1
Source: Auto Classification VehType: All Vehs
Location: Leakes Rd btw Nighthawk Rd & Tarneit Rd
Flow: W BD AllMvs METRO NORTH WESTERN
MapRef: 202 B01 Srrs/Chn: 0 0 WYNDHAM CITY
Report 436 of 911
Hour Mon 14Dec09 Tue 15Dec09 Wed 16Dec09 Thu 17Dec09 Fri 18Dec09 Sat Sun 13Dec09
Start All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks
00:00 0 0 0 0 0 0 0 0 0 0 0 0 0 0
01:00 0 0 0 0 0 0 0 0 0 0 0 0 1 0
02:00 0 0 0 0 0 0 0 0 0 0 0 0 1 0
03:00 0 0 0 0 1 0 0 0 0 0 0 0 0 0
04:00 0 0 0 0 0 0 1 0 0 0 0 0 1 0
05:00 3 0 0 0 2 1 0 0 0 0 0 0 0 0
06:00 3 1 7 2 4 1 6 0 2 1 0 0 3 1
07:00 7 2 6 1 7 3 5 1 2 2 0 0 0 0
08:00 6 0 6 0 0 0 1 0 1 0 0 0 1 0
09:00 5 3 5 2 2 0 4 3 0 0 0 0 0 0
10:00 1 0 0 0 6 1 3 0 0 0 0 0 0 0
11:00 1 0 4 1 3 0 4 0 2 1 0 0 5 0
12:00 3 1 1 0 4 2 1 0 1 0 0 0 7 0
13:00 4 0 5 2 1 0 0 0 3 0 0 0 2 0
14:00 7 1 5 1 3 0 1 0 2 1 0 0 2 0
15:00 11 3 5 2 5 2 2 0 1 0 0 0 1 0
16:00 15 3 1 0 1 0 1 0 3 1 0 0 8 1
17:00 11 0 1 0 4 0 3 0 3 1 0 0 1 0
18:00 6 0 3 0 3 1 2 0 1 0 0 0 2 0
19:00 2 0 1 1 1 0 0 0 0 0 0 0 4 0
20:00 2 0 3 0 1 0 1 0 3 1 0 0 0 0
21:00 5 0 0 0 0 0 0 0 0 0 0 0 3 0
22:00 0 0 1 0 0 0 1 0 1 0 0 0 2 0
23:00 1 0 0 0 0 0 0 0 0 0 0 0 0 0
<return> to continue...
AM Peak 7 3 7 2 7 3 6 3 2 2 0 0 5 1
PM Peak 15 3 5 2 5 2 3 0 3 1 0 0 8 1
24 HOUR 93 14 54 12 48 11 36 4 25 8 0 0 44 2
All Vehs: 46 Avg MdWk AMPK 7 Trucks: 9 19.6%
All Vehs: 51 Avg MdWk PMPK 4 Trucks: 10 19.1%
All Vehs: n.a. Trucks: n.a. n.a.
Latest Non-Holiday Validated Data by Day of Week n.a. statistics unavailable due to incomplete data
Average Midweek (Tue/Wed/Thu)
Average 5 day (Monday - Friday)
Average 7 day (Monday - Sunday)
PROFILESAustroads Classes &
Speed Statistics
NEXT
PREV
Avg Weekday Group Hourly
Road Information Services Hourly Traffic Volumes
Survey No: 18364 Scram: Lanes: 0 0
Location: 1 1
Source: Auto Classification VehType: All Vehs
Location: Tarneit Rd 200 M North of Leakes Rd
Flow: N BD AllMvs METRO NORTH WESTERN
MapRef: 202 B01 Srrs/Chn: 0 0 WYNDHAM CITY
Report 743 of 911
Hour Mon 14Dec09 Tue 15Dec09 Wed 16Dec09 Thu 17Dec09 Fri 18Dec09 Sat Sun 13Dec09
Start All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks
00:00 8 0 12 0 9 0 6 0 11 0 0 0 25 0
01:00 7 0 9 0 15 0 9 0 12 1 0 0 12 1
02:00 6 0 6 1 4 1 9 2 7 1 0 0 15 1
03:00 22 0 14 0 21 0 25 0 24 0 0 0 4 0
04:00 36 1 46 2 47 2 35 2 32 0 0 0 6 0
05:00 141 4 161 8 178 15 182 11 153 7 0 0 19 2
06:00 274 17 273 13 299 22 312 23 290 22 0 0 24 1
07:00 391 32 394 42 422 38 417 28 407 37 0 0 46 4
08:00 265 24 295 21 290 18 281 22 263 19 0 0 61 3
09:00 123 20 105 10 143 19 121 16 146 20 0 0 108 5
10:00 82 21 94 20 92 11 106 20 126 14 0 0 73 3
11:00 79 16 112 21 100 9 97 9 114 21 0 0 129 4
12:00 85 15 72 16 127 21 122 33 110 15 0 0 120 6
13:00 101 20 98 18 129 21 106 20 143 23 0 0 117 10
14:00 126 21 107 13 140 28 130 30 133 15 0 0 114 5
15:00 159 23 152 23 150 21 177 27 180 37 0 0 112 6
16:00 157 24 173 27 141 13 154 13 145 20 0 0 107 11
17:00 149 13 180 19 122 6 108 11 157 12 0 0 117 3
18:00 119 7 120 8 115 5 95 6 149 10 0 0 86 4
19:00 62 4 67 6 59 1 65 2 96 8 0 0 88 3
20:00 53 3 56 2 61 1 70 2 84 2 0 0 69 3
21:00 46 2 57 1 54 3 60 2 61 3 0 0 51 2
22:00 34 2 35 0 29 0 35 3 53 0 0 0 35 0
23:00 13 0 14 1 17 0 19 0 26 1 0 0 16 0
<return> to continue...
AM Peak 391 32 394 42 422 38 417 28 407 37 0 0 129 5
PM Peak 159 24 180 27 150 28 177 33 180 37 0 0 120 11
24 HOUR 2538 269 2652 272 2764 255 2741 282 2922 288 0 0 1554 77
All Vehs: 2719 Avg MdWk AMPK 411 Trucks: 270 9.9%
All Vehs: 2723 Avg MdWk PMPK 169 Trucks: 273 10.0%
All Vehs: n.a. Trucks: n.a. n.a.
Latest Non-Holiday Validated Data by Day of Week n.a. statistics unavailable due to incomplete data
Average Midweek (Tue/Wed/Thu)
Average 5 day (Monday - Friday)
Average 7 day (Monday - Sunday)
PROFILESAustroads Classes &
Speed Statistics
NEXT
PREV
Avg Weekday Group Hourly
Road Information Services Hourly Traffic Volumes
Survey No: 18364 Scram: Lanes: 0 0
Location: 2 1
Source: Auto Classification VehType: All Vehs
Location: Tarneit Rd 200 M North of Leakes Rd
Flow: S BD AllMvs METRO NORTH WESTERN
MapRef: 202 B01 Srrs/Chn: 0 0 WYNDHAM CITY
Report 744 of 911
Hour Mon 14Dec09 Tue 15Dec09 Wed 16Dec09 Thu 17Dec09 Fri 18Dec09 Sat Sun 13Dec09
Start All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks
00:00 21 0 23 1 22 2 25 1 31 0 0 0 37 0
01:00 6 0 17 0 19 0 19 0 14 0 0 0 22 0
02:00 5 1 10 2 10 0 12 0 7 0 0 0 12 0
03:00 2 0 9 0 8 0 8 0 16 0 0 0 15 2
04:00 12 1 10 1 7 1 8 1 6 1 0 0 9 1
05:00 29 4 28 6 41 7 32 10 29 5 0 0 11 0
06:00 93 14 95 16 119 33 99 23 102 28 0 0 18 1
07:00 112 32 125 33 97 23 121 25 110 30 0 0 25 6
08:00 126 21 134 17 121 15 124 17 118 22 0 0 43 5
09:00 82 21 70 13 89 13 83 17 92 13 0 0 48 7
10:00 61 7 66 12 67 7 78 17 79 11 0 0 51 1
11:00 65 11 74 17 80 5 59 11 87 16 0 0 87 7
12:00 68 11 66 6 112 16 71 7 108 17 0 0 92 9
13:00 95 10 90 10 111 10 82 11 131 12 0 0 103 5
14:00 114 11 136 15 126 9 168 12 160 12 0 0 107 5
15:00 185 12 205 13 196 14 203 17 214 21 0 0 127 5
16:00 313 14 323 24 301 14 326 14 306 24 0 0 112 7
17:00 334 17 383 19 352 9 409 22 376 18 0 0 117 5
18:00 196 7 214 7 198 7 385 13 232 5 0 0 111 3
19:00 104 8 96 7 93 2 169 4 106 8 0 0 87 2
20:00 74 3 96 5 97 4 74 1 85 4 0 0 75 7
21:00 67 3 81 0 64 1 73 1 87 1 0 0 61 1
22:00 51 0 73 2 66 1 74 0 74 1 0 0 39 1
23:00 41 2 42 2 48 0 42 0 61 1 0 0 24 0
<return> to continue...
AM Peak 126 32 134 33 121 33 124 25 118 30 0 0 87 7
PM Peak 334 17 383 24 352 16 409 22 376 24 0 0 127 9
24 HOUR 2256 210 2466 228 2444 193 2744 224 2631 250 0 0 1433 80
All Vehs: 2551 Avg MdWk AMPK 126 Trucks: 215 8.4%
All Vehs: 2508 Avg MdWk PMPK 381 Trucks: 221 8.8%
All Vehs: n.a. Trucks: n.a. n.a.
Latest Non-Holiday Validated Data by Day of Week n.a. statistics unavailable due to incomplete data
Average Midweek (Tue/Wed/Thu)
Average 5 day (Monday - Friday)
Average 7 day (Monday - Sunday)
PROFILESAustroads Classes &
Speed Statistics
NEXT
PREV
Avg Weekday Group Hourly
Road Information Services Hourly Traffic Volumes
Survey No: 18362 Scram: Lanes: 0 0
Location: 1 1
Source: Auto Classification VehType: All Vehs
Location: Dohertys Rd 300 M East of Woods Rd
Flow: E BD AllMvs METRO NORTH WESTERN
MapRef: 360 D11 Srrs/Chn: 0 0 WYNDHAM CITY
Report 225 of 911
Hour Mon 14Dec09 Tue 15Dec09 Wed 16Dec09 Thu 17Dec09 Fri 18Dec09 Sat Sun 13Dec09
Start All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks
00:00 16 2 8 0 10 1 13 1 20 3 0 0 28 0
01:00 12 1 12 0 13 3 24 3 18 3 0 0 12 1
02:00 19 4 17 4 20 2 16 1 24 7 0 0 17 1
03:00 49 2 38 1 41 4 43 2 42 1 0 0 14 1
04:00 111 3 124 4 133 6 116 9 118 3 0 0 18 0
05:00 458 22 485 25 548 31 515 32 459 17 0 0 50 2
06:00 735 53 767 58 754 45 766 55 734 44 0 0 72 3
07:00 716 34 757 46 737 49 737 39 739 48 0 0 89 4
08:00 487 23 512 28 512 21 523 35 489 45 0 0 79 4
09:00 236 25 239 24 258 30 245 35 251 29 0 0 132 6
10:00 147 34 152 28 168 18 170 31 183 31 0 0 141 7
11:00 145 31 153 23 142 18 160 32 156 22 0 0 175 11
12:00 131 27 114 20 133 17 149 21 152 23 0 0 162 7
13:00 160 18 174 24 189 35 189 31 172 20 0 0 131 7
14:00 177 32 159 27 173 23 213 32 193 26 0 0 144 5
15:00 183 29 185 31 166 23 201 20 195 25 0 0 119 7
16:00 175 15 172 22 139 18 150 11 169 12 0 0 129 2
17:00 165 10 172 17 157 8 146 8 173 8 0 0 143 14
18:00 123 7 145 11 142 6 109 5 139 18 0 0 118 8
19:00 90 9 98 10 69 4 93 3 120 4 0 0 89 5
20:00 64 2 76 5 88 5 72 3 94 6 0 0 75 2
21:00 67 1 88 2 98 4 79 3 78 3 0 0 70 3
22:00 49 2 55 3 65 3 50 3 62 4 0 0 48 2
23:00 31 2 28 1 28 3 39 1 36 0 0 0 34 1
<return> to continue...
AM Peak 735 53 767 58 754 49 766 55 739 48 0 0 175 11
PM Peak 183 32 185 31 189 35 213 32 195 26 0 0 162 14
24 HOUR 4546 388 4730 414 4783 377 4818 416 4816 402 0 0 2089 103
All Vehs: 4777 Avg MdWk AMPK 762 Trucks: 402 8.4%
All Vehs: 4739 Avg MdWk PMPK 196 Trucks: 399 8.4%
All Vehs: n.a. Trucks: n.a. n.a.
Latest Non-Holiday Validated Data by Day of Week n.a. statistics unavailable due to incomplete data
Average Midweek (Tue/Wed/Thu)
Average 5 day (Monday - Friday)
Average 7 day (Monday - Sunday)
PROFILESAustroads Classes &
Speed Statistics
NEXT
PREV
Avg Weekday Group Hourly
Road Information Services Hourly Traffic Volumes
Survey No: 18362 Scram: Lanes: 0 0
Location: 2 1
Source: Auto Classification VehType: All Vehs
Location: Dohertys Rd 300 M East of Woods Rd
Flow: W BD AllMvs METRO NORTH WESTERN
MapRef: 360 D11 Srrs/Chn: 0 0 WYNDHAM CITY
Report 226 of 911
Hour Mon 14Dec09 Tue 15Dec09 Wed 16Dec09 Thu 17Dec09 Fri 18Dec09 Sat Sun 13Dec09
Start All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks All Vehs Trucks
00:00 22 1 58 3 61 2 59 1 65 1 0 0 68 0
01:00 16 0 38 0 39 1 35 1 34 0 0 0 34 1
02:00 14 1 33 1 50 0 41 0 36 2 0 0 25 0
03:00 4 0 39 0 26 0 38 2 44 0 0 0 22 1
04:00 15 1 26 3 35 3 28 3 26 0 0 0 13 1
05:00 24 6 50 8 49 9 52 13 35 3 0 0 16 0
06:00 83 13 100 17 119 23 100 21 107 21 0 0 41 2
07:00 109 19 114 19 109 23 116 19 104 21 0 0 44 5
08:00 102 21 94 18 127 18 92 14 122 25 0 0 50 10
09:00 116 21 105 21 94 19 118 29 105 29 0 0 53 10
10:00 118 25 109 23 121 18 130 38 127 28 0 0 100 8
11:00 122 19 100 19 137 20 122 26 143 22 0 0 131 13
12:00 136 21 172 35 187 35 165 27 217 21 0 0 167 10
13:00 181 27 166 31 232 26 176 17 228 28 0 0 157 8
14:00 331 26 346 30 366 32 344 25 346 24 0 0 140 9
15:00 454 28 505 29 480 31 508 31 527 41 0 0 179 9
16:00 680 35 686 30 701 28 668 32 651 47 0 0 176 8
17:00 753 32 760 39 625 12 768 32 650 23 0 0 159 7
18:00 420 15 409 12 367 19 565 25 385 22 0 0 138 4
19:00 176 19 168 12 195 7 216 6 188 15 0 0 134 3
20:00 125 4 155 9 154 9 159 5 142 5 0 0 98 3
21:00 95 4 116 2 116 5 115 4 137 5 0 0 84 1
22:00 113 4 142 7 141 2 141 2 125 4 0 0 80 4
23:00 72 2 88 3 84 5 93 0 126 4 0 0 48 0
<return> to continue...
AM Peak 122 25 114 23 137 23 130 38 143 29 0 0 131 13
PM Peak 753 35 760 39 701 35 768 32 651 47 0 0 179 10
24 HOUR 4281 344 4579 371 4615 347 4849 373 4670 391 0 0 2157 117
All Vehs: 4681 Avg MdWk AMPK 127 Trucks: 364 7.8%
All Vehs: 4599 Avg MdWk PMPK 743 Trucks: 365 7.9%
All Vehs: n.a. Trucks: n.a. n.a.
Latest Non-Holiday Validated Data by Day of Week n.a. statistics unavailable due to incomplete data
Average Midweek (Tue/Wed/Thu)
Average 5 day (Monday - Friday)
Average 7 day (Monday - Sunday)
PROFILESAustroads Classes &
Speed Statistics
NEXT
PREV
Avg Weekday Group Hourly
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
ATTACHMENT B – VICROADS CRASHSTATS DATABASE
DETAILS
Road Crash Statistics: Victoria Accident Details Page 1Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 1Accident No T20110019858 Light DayDate/Time 17/5/2011 Tue 14:30 Road DrySeverity Other Injury Atmosphere ClearTraffic Control No control Total Vehciles Total Veh=2Map Refs MEL ED35 202 B1 Killed 0Road Number 166526 Serious Injury 0KM from Start 4.893 Km , Wyndham Other Injury 1Speed Zone 70 km/hr Not Injury 1Urbanisation Rural Location Leakes Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, E(1) Driver Not injured M 28Unknown, S(2) Driver Injured, needed treatment F 34
Police Location Description: Melway: 202B1 VCD: 435G10 At LEAKES RD & TARNEIT RD, LGA TARNEIT Brief Description: Off veh XJQ088 travelling east on Leakes Road. TTM404 travelling south on Tarneit Road. XJQ088 failed to stop at red light and collided with TTM404. Major damamge to both veh. Minor injuries
to driver of TTM404.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 2Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 2Accident No T20120005338 Light DayDate/Time 4/3/2012 Sun 17:12 Road DrySeverity Other Injury Atmosphere ClearTraffic Control Stop go lights Total Vehciles Total Veh=2Map Refs MEL ED35 202 B1 Killed 0Road Number 166526 Serious Injury 0KM from Start 4.893 Km , Wyndham Other Injury 1Speed Zone 70 km/hr Not Injury 2Urbanisation Rural Location Leakes Road& DCA/Accident 121 Right through (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, S(1) Driver Not injured M 24Unknown, N(2) Passenger Injured, needed treatment M 10
Driver Not injured M 28
Police Location Description: Melway: 202B1 VCD: 435G10 At TARNEIT RD & LEAKES RD, LGA TARNEITBrief Description: At approximately 5.00pm on the 04/03/2012 Avvinder SINGH (18/04/1987) who hold an International Licence only was driving a white ford falcon (QEW550) in a south direction on Derrimutt road.
SINGH has approached the intersection of Derimutt Road and Leaks Road and made a right turn into Leaks. The traffic signals were green for North and South bound traffic on Derrimut Road. When SINGH has turned right into Leaks he has failed to giveway to a vehicle traveling in a North direction on Derrimut road. As a result of the failing to giveway, SINGH has driven into the path of Blue Holden Commodore (WRB392) driven by Takai ULUAKIAHOIA (02/07/1983) who is unlicenced. Damage to vehicle (WRB392) was server causing it to be a right off. Both airbags in front of vehicle were deployed. In vehicle (WRB392) was Dwayne PURY (04/11/1981) uninjured, Levi ULUAKIAHOIA (23/07/2001). Levi has suffered a possible broken left collar bone, MAS on scene. Levi had vissible bruising and shoulder was swallon. Levi was taken to Hospital by mother on advise from MAS. SINGH did not receive any injury from the collision. Fire from Truganina assist in a wash away of debris and fluid on intersection. Both drivers did not have any insurance on vehicles.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 3Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 3Accident No T20070034902 Light Dark, street lights onDate/Time 26/9/2007 Wed 06:20 Road UnknownSeverity Other Injury Atmosphere ClearTraffic Control No control Total Vehciles Total Veh=1Map Refs MEL ED35 202 B1 Killed 0Road Number 166526 Serious Injury 0KM from Start 4.893 Km , Wyndham Other Injury 1Speed Zone 100 km/hr Not Injury 0Urbanisation Rural Location Leakes Road& DCA/Accident 171 Left off carriageway into object/parked (Road Names) Tarneit Road
vehicleSub DCA Hit Fences (including gates)
No vehicle mounted/struckSub DCA Code Q03,V01
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(1) Driver Injured, needed treatment F 36
Police Location Description: Melway: 202B1 VCD: 78C7 At TARNEIT RD & LEAKES RD, LGA TARNEITBrief Description: Vehicle NZH 250 travelling north along Tarneit Road, Tarneit attempted to turn right into Leakes Road. Unknown vehicle described as a light blue Falcon has overtaken vehicle NZH 250 on the
drivers side causing vehicle NZH 250 to collided with a wired fence in order to avoid the light blue falcon.
ACCIDENT COUNT: 4Accident No T20080011679 Light Dark, no street lightsDate/Time 30/3/2008 Sun 01:45 Road DrySeverity Other Injury Atmosphere ClearTraffic Control No control Total Vehciles Total Veh=1Map Refs MEL ED35 202 B1 (359 B12) Killed 0Road Number 214295 Serious Injury 0KM from Start 2.232 Km , Wyndham Other Injury 1Speed Zone 100 km/hr Not Injury 0Urbanisation Rural Location On Tarneit RoadDCA/Accident 170 Off carriageway to left (Road Names) btw Dohertys RoadSub DCA No vehicle mounted/struck & Leakes RoadSub DCA Code V01 (314 m N of Leakes)
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(1) Driver Injured, needed treatment M 25
Police Location Description: Melway: 359B12 VCD: 78C7 At TARNEIT RD & [null] [null], LGA TARNEITBrief Description: Single vehicle roll-over. Driver left road to left side and veered sharply to right to correct his error, rear ofvehicle then began to 'fishtail' as driver attempted to regain control. Driver unable to
maintain control of vehicle and vehicle began to slide sideways, leaving road to left side onto dew covered grass shoulder before dropping into ditch before rolling into paddock on west side of the road.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 6Accident No T20080036759 Light Dark, no street lightsDate/Time 6/10/2008 Mon 21:49 Road DrySeverity Serious injury Atmosphere ClearTraffic Control No control Total Vehciles Total Veh=1Map Refs MEL ED35 228 J9 (359 B9) Killed 0Road Number 132262 Serious Injury 1KM from Start 8.797 Km , Wyndham Other Injury 0Speed Zone 100 km/hr Not Injury 0Urbanisation Rural Location On Dohertys RoadDCA/Accident 173 Right off carriageway into object/parked (Road Names) btw Davis Road
vehicle & Tarneit RoadSub DCA No vehicle mounted/struck (254 m W of Tarneit)
Hit Fences (including gates)Sub DCA Code V01,Q03
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, W(1) Driver Sent to hospital M 30
Police Location Description: Melway: 359B9 VCD: 78C7 At DOHERTYS RD & [null] [null], LGA TARNEITBrief Description: Driver has been travelling home from work west along Dohertys Road, Tarneit. The road is a straight road, conditions were dry at the time but had been raining earlier in the day. Driver says
another vehicle was travelling towards him the wrong lane. Driver swerved left to avoid vehicle and then had no where to go so swerved right and lost control. Vehicle skidded across road and hit the rock wall on the northern side of the road, where it flew over the fence and landed on its roof.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 4
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 7Accident No T20120005033 Light DayDate/Time 1/3/2012 Thu 09:15 Road WetSeverity Other Injury Atmosphere Raining, Strong windsTraffic Control No control Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 0KM from Start 9.052 Km , Wyndham Other Injury 1Speed Zone 80 km/hr Not Injury 1Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, E(2) Driver Not injured M 57Unknown, S(1) Driver Injured, needed treatment F 32
Police Location Description: Melway: 359C9 VCD: 435G9 At TARNEIT RD & DOHERTYS RD, LGA TARNEIT Brief Description: VEH 1 ESO 520 A 1990 MERCEDES BENZ SED BLACK WS TRAVELLING EAST ALONG DOHERTYS ROAD IN TARNEIT AT PPROXIMATELY 80KLM, WHEN APPROACHED
INTERSECTION OF TARNEIT ROAD OBSERVED VEH 2 A 2008 MAZDA CX7 WAGON BLACK APPROACHING INTERSECTION FROM THE LEFT. VEH 2 ENTERED THE INTERSECTION CAUSING VEH 1 TO COLLIDE WITH SAME MAKING CONTACT WITH RIGHT HAND FRONT CORNER OF VEH 2. VEH 2 FAILED TO SEE VEH 1 APPROACHING DUE TO INCLEMENT WEATHER CONDITIONS, AND COULD NOT STOP IN TIME TO AVOID A COLLISION. NIL MAJOR INJURIES TO ANY OCCUPANTS.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 5
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 8Accident No T20090040518 Light DayDate/Time 18/10/2009 Sun 12:05 Road DrySeverity Serious injury Atmosphere ClearTraffic Control Stop sign Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 1KM from Start 9.052 Km , Wyndham Other Injury 4Speed Zone 80 km/hr Not Injury 3Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(2) Passenger Injured, needed treatment F 39
Driver Not injured M 38Passenger Not injured F 9Passenger Not injured M 4
Unknown, E(1) Passenger Sent to hospital F 69Driver Injured, needed treatment F 47Passenger Injured, needed treatment M 76Passenger Injured, needed treatment M 16
Police Location Description: Melway: 359C9 VCD: 78C7 At TARNEIT RD & DOHERTYS RD, LGA TARNEITBrief Description: 2vehicle accidnet. SQG 418, driven by RANA north in Tarneit Road has driven through the intersection with Dohertys Road without stopping at the stop sign/line and colliding into WEX 933, driven
by TRAMONTANA.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 6
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 9Accident No T20080019221 Light DayDate/Time 27/5/2008 Tue 11:35 Road WetSeverity Serious injury Atmosphere RainingTraffic Control Stop sign Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 1KM from Start 9.052 Km , Wyndham Other Injury 1Speed Zone 100 km/hr Not Injury 1Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(1) Driver Sent to hospital F 74
Passenger Injured, needed treatment M 72Unknown, W(2) Driver Not injured F 59
Police Location Description: Melway: 359C9 VCD: 78C7 At TARNEIT RD & DOHERTYS RD, LGA TARNEITBrief Description: unit 1 travelling north on tarneit road, failed to stop and give way at intersection of dohertys road were a stop sign applied. subsequently colliding into unit 2 travelling west on Dohertys road. injuires
to passenger and driver
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 7
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 10Accident No T20080036338 Light DayDate/Time 3/10/2008 Fri 16:30 Road WetSeverity Serious injury Atmosphere RainingTraffic Control Stop sign Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 1KM from Start 9.052 Km , Wyndham Other Injury 1Speed Zone 80 km/hr Not Injury 2Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, S(1) Driver Injured, needed treatment F 20
Passenger Not injured M 0Unknown, W(2) Passenger Sent to hospital F 10
Driver Not injured M 41
Police Location Description: Melway: 359C9 VCD: 78C7 At DOHERTYS RD & TARNEIT RD, LGA TARNEITBrief Description: Two vehicle accident. Disobeying stop sign and struck other car.
ACCIDENT COUNT: 11Accident No T20070032232 Light DayDate/Time 4/9/2007 Tue 06:15 Road DrySeverity Other Injury Atmosphere ClearTraffic Control Stop sign Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 0KM from Start 9.052 Km , Wyndham Other Injury 2Speed Zone 80 km/hr Not Injury 0Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCASub DCA Code
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(1) Driver Injured, needed treatment M 22Unknown, W(2) Driver Injured, needed treatment F 19
Police Location Description: Melway: 359C9 VCD: 78C7 At TARNEIT RD & DOHERTYS RD, LGA TARNEIT Brief Description: 2 x car c12, Unit 1 trav North along Tarneit Road has failked to stop at stop sign and subsequently collided with Unit 2 travelling West along Doherty's Road.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 8
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 12Accident No T20090001856 Light DayDate/Time 17/1/2009 Sat 11:35 Road DrySeverity Serious injury Atmosphere ClearTraffic Control No control Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 1KM from Start 9.052 Km , Wyndham Other Injury 1Speed Zone 100 km/hr Not Injury 1Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(1) Passenger Sent to hospital F 32
Driver Injured, needed treatment M 32SEMI TRLR PT, E(2) Driver Not injured M 51
Police Location Description: Melway: 359C9 VCD: 78C7 At TARNEIT RD & DOHERTYS RD, LGA TARNEITBrief Description: UEL486 travelling north on Tarneit road. fail to stop and give way at intersection of Dohertys road. UEL486 drove out into the path of NAU783 who was travelling east on Dohertys Road. minor
injureis to 2 occupants in UEL486.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 9
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 13Accident No T20100019902 Light DayDate/Time 22/5/2010 Sat 11:35 Road DrySeverity Fatal Atmosphere ClearTraffic Control Stop sign Total Vehciles Total Veh=3Map Refs MEL ED35 359 C9 Killed 3Road Number 132262 Serious Injury 1KM from Start 9.052 Km , Wyndham Other Injury 1Speed Zone 80 km/hr Not Injury 2Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, N(1) Driver Killed/died in 30 days M 27
Passenger Killed/died in 30 days M 62Passenger Killed/died in 30 days F 61Passenger Sent to hospital M 0 Passenger Injured, needed treatment F 27
HV-RIGID>4.5T, W(2) Driver Not injured M 59Unknown, E(8) Driver Not injured M 57
Police Location Description: Melway: 359C9 VCD: 78C7 At TARNEIT RD & DOHERTYS RD, LGA TARNEITBrief Description: Driver ZHAO, in vehicle OVJ 292, was driving north in Tarneit Road, Tarneit, when it appears he has disobeyed the stop sign and entered the intersection and his vehicle has struck by a truck, DLV
393, driven by GATT. 2 rear passengers killed instantly and ZHAO has died shortly after. Vehicle SLI 237, driven by BHANGU was struck by the truck, DLV 393.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 10
Location is LGA(s): WYNDHAM; Query: Casualty accidents; Sites: Intersection of Dohertys Road and Tarneit Road, Intersection of Leakes Road and Tarneit Road, On Tarneit Road (2.018 km) between Dohertys Road and Leakes Road, On Leakes Road (4.625 km) between Davis Road and Tarneit Road, On Tarneit Road (2.232 km) between Dohertys Road and Leakes Road, On Dohertys Road (8.797 km) between Davis Road and Tarneit Road, On Tarneit Road (1.904 km) between Leakes Road and Harrington Avenue, Int 29366 Intersection of Dohertys Road and Tarneit Road, Int 56625 Intersection of Leakes Road and Tarneit Road, RdSeg 357364 on Tarneit Road btw Dohertys Road and Leakes Road, RdSeg 357365 on Leakes Road btw Davis Road and Tarneit Road; Date range is 01/07/2007 to 30/06/2012; Sorted by location. ACCIDENT COUNT: 14Accident No T20090011489 Light DayDate/Time 30/3/2009 Mon 17:50 Road DrySeverity Serious injury Atmosphere ClearTraffic Control Stop sign Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 1KM from Start 9.052 Km , Wyndham Other Injury 1 NO IMAGE AVAILABLESpeed Zone 100 km/hr Not Injury 0Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, S(1) Driver Injured, needed treatment M 38Unknown, W(2) Driver Sent to hospital F 49
Police Location Description: Melway: 359C9 VCD: 78C7 At TARNEIT RD & DOHERTYS RD, LGA TARNEITBrief Description: 2 car c12 Dohertys/Tarneit Rd truganina
ACCIDENT COUNT: 15Accident No T20080004833 Light DayDate/Time 10/2/2008 Sun 10:55 Road DrySeverity Serious injury Atmosphere ClearTraffic Control No control Total Vehciles Total Veh=2Map Refs MEL ED35 359 C9 Killed 0Road Number 132262 Serious Injury 2KM from Start 9.052 Km , Wyndham Other Injury 1Speed Zone 80 km/hr Not Injury 0Urbanisation Rural Location Dohertys Road& DCA/Accident 110 Cross traffic(intersections only) (Road Names) Tarneit RoadSub DCA Not RequiredSub DCA Code NRQ
PERSON INJURY DETAILS
Vehicle,DIR.(+DCA arrow) Road User Injury Level Sex AgeUnknown, W(2) Driver Sent to hospital F 40
Passenger Sent to hospital F 5Unknown, N(1) Driver Injured, needed treatment M 47
Police Location Description: Melway: 359C9 VCD: 78C7 At DOHERTYS RD & TARNEIT RD, LGA TARNEITBrief Description: Veh 1 failed to stop at stop sign and has collided with Veh 2. Occ in Veh 1 rec minor injuries. Occupants in Veh 2 also rec minor injuries, all parties taken to hospital for observation.
(c) 2004 VicRoads (1) Road users are listed by the vehicles they are occupants of. Note that the pedestrians have no vehicles.(2) Refer last page for Vehicle Type description.
Road Crash Statistics: Victoria Accident Details Page 11
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
ATTACHMENT C – ANTICIPATED PEAK TRAFFIC
DISTRIBUTION
RESIDENTIAL TRAFFIC DISTRIBUTIONRESIDENTIAL TRAFFIC DISTRIBUTIONRESIDENTIAL TRAFFIC DISTRIBUTIONRESIDENTIAL TRAFFIC DISTRIBUTION
AM
PM
29 30
Growth Rate 5% 5 110
371 21 118
92 27 7
67
345
438
36
47 484
109 144
121
190
497
151
507
215
97
62
49
84
10 8
24 48
17 13
40 80
31 12
6 42
51 20
10 69
ULTIMATE TRAFFIC DISTRIBUTIONULTIMATE TRAFFIC DISTRIBUTIONULTIMATE TRAFFIC DISTRIBUTIONULTIMATE TRAFFIC DISTRIBUTION
92 371
AM 29 30 92 348
PM 7 110
21 118
27 7
438 499
37 173
47 484
109 144
125 528
190 219
10 8
24 48
17 13
40 80
31 12
62 97 13 45
104 113 51 22
69 143 12 71
71 99
YEAR 7 (INC STAGE 15) - 2022 TRAFFIC DISTRIBUTION AT EAST - WEST CONNECTOR & TARNEIT ROADYEAR 7 (INC STAGE 15) - 2022 TRAFFIC DISTRIBUTION AT EAST - WEST CONNECTOR & TARNEIT ROADYEAR 7 (INC STAGE 15) - 2022 TRAFFIC DISTRIBUTION AT EAST - WEST CONNECTOR & TARNEIT ROADYEAR 7 (INC STAGE 15) - 2022 TRAFFIC DISTRIBUTION AT EAST - WEST CONNECTOR & TARNEIT ROAD
336 497
28 151
36 371
84 110
97 528
146 219
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
ATTACHMENT D – SIDRA OUTPUTS
MOVEMENT SUMMARY Site: Western Access Street 1 /
Leakes Rd - AM
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 109 4.0 0.068 0.4 LOS A 0.4 2.8 0.24 0.00 55.3
6 R 14 1.0 0.068 8.8 LOS A 0.4 2.8 0.24 0.91 48.9
Approach 123 3.7 0.068 1.4 NA 0.4 2.8 0.24 0.10 54.5
North: Western Access Street 1 - North Approach
7 L 51 1.0 0.047 8.7 LOS A 0.2 1.2 0.21 0.62 48.0
9 R 25 1.0 0.049 10.8 LOS B 0.1 1.1 0.40 0.69 46.2
Approach 76 1.0 0.049 9.4 LOS A 0.2 1.2 0.27 0.65 47.4
West: Leakes Rd - West Approach
10 L 13 1.0 0.061 8.2 LOS A 0.0 0.0 0.00 1.02 49.0
11 T 102 4.0 0.061 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 115 3.7 0.061 0.9 NA 0.0 0.0 0.00 0.11 58.5
All Vehicles 314 3.0 0.068 3.1 NA 0.4 2.8 0.16 0.24 53.9
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:07 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: WesternAccess Street 1 /
Leakes Rd - PM
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 119 4.0 0.099 0.4 LOS A 0.5 3.8 0.22 0.00 55.4
6 R 47 1.0 0.099 8.7 LOS A 0.5 3.8 0.22 0.84 48.7
Approach 166 3.1 0.099 2.8 NA 0.5 3.8 0.22 0.24 53.3
North: Western Access Street 1 - North Approach
7 L 8 1.0 0.008 8.5 LOS A 0.0 0.2 0.17 0.61 48.2
9 R 11 1.0 0.020 10.9 LOS B 0.1 0.4 0.41 0.67 46.1
Approach 19 1.0 0.020 9.8 LOS A 0.1 0.4 0.30 0.65 47.0
West: Leakes Rd - West Approach
10 L 33 1.0 0.052 8.2 LOS A 0.0 0.0 0.00 0.89 49.0
11 T 65 4.0 0.052 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 98 3.0 0.052 2.7 NA 0.0 0.0 0.00 0.30 55.8
All Vehicles 283 3.0 0.099 3.2 NA 0.5 3.8 0.15 0.29 53.7
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:07 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Western Access Street 1 / Leakes Rd - AM Sensitivity
Analysis
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 290 4.0 0.166 1.4 LOS A 1.2 8.9 0.45 0.00 52.0
6 R 14 1.0 0.166 9.8 LOS A 1.2 8.9 0.45 0.93 49.2
Approach 304 3.9 0.166 1.8 NA 1.2 8.9 0.45 0.04 51.9
North: Western Access Street 1 - North Approach
7 L 51 1.0 0.057 9.7 LOS A 0.2 1.4 0.37 0.68 47.4
9 R 25 1.0 0.073 16.9 LOS C 0.3 1.8 0.64 0.88 40.9
Approach 76 1.0 0.073 12.1 LOS B 0.3 1.8 0.46 0.75 45.0
West: Leakes Rd - West Approach
10 L 13 1.0 0.149 8.2 LOS A 0.0 0.0 0.00 1.06 49.0
11 T 271 4.0 0.149 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 284 3.9 0.149 0.4 NA 0.0 0.0 0.00 0.05 59.4
All Vehicles 663 3.5 0.166 2.4 NA 1.2 8.9 0.26 0.12 53.8
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:07 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Western Access Street 1 / Leakes Rd - PM Sensitivity
Analysis
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 316 4.0 0.206 1.0 LOS A 1.4 10.3 0.39 0.00 52.8
6 R 47 1.0 0.206 9.4 LOS A 1.4 10.3 0.39 0.89 48.9
Approach 363 3.6 0.206 2.1 NA 1.4 10.3 0.39 0.12 52.3
North: Western Access Street 1 - North Approach
7 L 8 1.0 0.009 9.0 LOS A 0.0 0.2 0.29 0.62 47.7
9 R 11 1.0 0.029 15.9 LOS C 0.1 0.7 0.60 0.81 41.7
Approach 19 1.0 0.029 12.8 LOS B 0.1 0.7 0.46 0.73 44.2
West: Leakes Rd - West Approach
10 L 33 1.0 0.109 8.2 LOS A 0.0 0.0 0.00 0.99 49.0
11 T 173 4.0 0.109 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 206 3.5 0.109 1.3 NA 0.0 0.0 0.00 0.16 57.9
All Vehicles 588 3.5 0.206 2.2 NA 1.4 10.3 0.25 0.15 53.8
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:08 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Western Access Street 1 / Leakes Rd - AM - Urban CHR (S) &
BAL
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 109 4.0 0.058 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 14 1.0 0.011 8.7 LOS A 0.0 0.3 0.21 0.62 47.9
Approach 123 3.7 0.058 1.0 NA 0.0 0.3 0.02 0.07 58.4
North: Western Access Street 1 - North Approach
7 L 51 1.0 0.047 8.7 LOS A 0.2 1.2 0.21 0.62 48.0
9 R 25 1.0 0.049 10.7 LOS B 0.1 1.0 0.40 0.69 46.3
Approach 76 1.0 0.049 9.4 LOS A 0.2 1.2 0.27 0.65 47.4
West: Leakes Rd - West Approach
10 L 13 1.0 0.061 8.2 LOS A 0.0 0.0 0.00 1.02 49.0
11 T 102 4.0 0.061 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 115 3.7 0.061 0.9 NA 0.0 0.0 0.00 0.11 58.5
All Vehicles 314 3.0 0.061 3.0 NA 0.2 1.2 0.08 0.22 55.4
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:08 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: WesternAccess Street 1 / Leakes Rd - PM - Urban CHR (S) &
BAL
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 119 4.0 0.063 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 47 1.0 0.039 8.7 LOS A 0.1 1.0 0.20 0.63 48.0
Approach 166 3.1 0.063 2.5 NA 0.1 1.0 0.06 0.18 56.0
North: Western Access Street 1 - North Approach
7 L 8 1.0 0.008 8.5 LOS A 0.0 0.2 0.17 0.61 48.2
9 R 11 1.0 0.020 10.8 LOS B 0.1 0.4 0.40 0.67 46.2
Approach 19 1.0 0.020 9.8 LOS A 0.1 0.4 0.30 0.64 47.0
West: Leakes Rd - West Approach
10 L 33 1.0 0.052 8.2 LOS A 0.0 0.0 0.00 0.89 49.0
11 T 65 4.0 0.052 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 98 3.0 0.052 2.7 NA 0.0 0.0 0.00 0.30 55.8
All Vehicles 283 3.0 0.063 3.1 NA 0.1 1.0 0.05 0.25 55.2
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:08 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Western Access Street 1 / Leakes Rd - AM - Urban CHR (S) &
BAL Sensitivity Analysis
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 290 4.0 0.153 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 14 1.0 0.013 9.5 LOS A 0.0 0.3 0.36 0.64 47.3
Approach 304 3.9 0.153 0.4 NA 0.0 0.3 0.02 0.03 59.3
North: Western Access Street 1 - North Approach
7 L 51 1.0 0.057 9.7 LOS A 0.2 1.4 0.37 0.68 47.4
9 R 25 1.0 0.070 16.3 LOS C 0.2 1.8 0.62 0.87 41.3
Approach 76 1.0 0.070 11.9 LOS B 0.2 1.8 0.45 0.74 45.2
West: Leakes Rd - West Approach
10 L 13 1.0 0.149 8.2 LOS A 0.0 0.0 0.00 1.06 49.0
11 T 271 4.0 0.149 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 284 3.9 0.149 0.4 NA 0.0 0.0 0.00 0.05 59.4
All Vehicles 663 3.5 0.153 1.7 NA 0.2 1.8 0.06 0.12 57.3
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:08 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: WesternAccess Street 1 / Leakes Rd - PM - Urban CHR (S) &
BAL Sensitivity Analysis
Western Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 316 4.0 0.166 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 47 1.0 0.040 9.1 LOS A 0.2 1.1 0.31 0.64 47.5
Approach 363 3.6 0.166 1.2 NA 0.2 1.1 0.04 0.08 58.0
North: Western Access Street 1 - North Approach
7 L 8 1.0 0.009 9.0 LOS A 0.0 0.2 0.29 0.62 47.7
9 R 11 1.0 0.028 15.4 LOS C 0.1 0.7 0.59 0.80 42.0
Approach 19 1.0 0.028 12.6 LOS B 0.1 0.7 0.45 0.72 44.4
West: Leakes Rd - West Approach
10 L 33 1.0 0.109 8.2 LOS A 0.0 0.0 0.00 0.99 49.0
11 T 173 4.0 0.109 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 206 3.5 0.109 1.3 NA 0.0 0.0 0.00 0.16 57.9
All Vehicles 588 3.5 0.166 1.6 NA 0.2 1.1 0.04 0.13 57.4
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:08 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 /
Leakes Rd - AM
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 75 4.0 0.050 0.7 LOS A 0.3 2.1 0.30 0.00 54.2
6 R 13 1.0 0.050 9.0 LOS A 0.3 2.1 0.30 0.88 48.9
Approach 87 3.6 0.050 1.9 NA 0.3 2.1 0.30 0.13 53.4
North: Eastern Access Street 1 - North Approach
7 L 84 1.0 0.083 9.0 LOS A 0.3 2.2 0.28 0.64 47.7
9 R 42 1.0 0.082 11.1 LOS B 0.3 1.8 0.42 0.71 45.9
Approach 126 1.0 0.083 9.7 LOS A 0.3 2.2 0.33 0.67 47.1
West: Leakes Rd - West Approach
10 L 23 1.0 0.092 8.2 LOS A 0.0 0.0 0.00 1.00 49.0
11 T 151 4.0 0.092 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 174 3.6 0.092 1.1 NA 0.0 0.0 0.00 0.13 58.3
All Vehicles 387 2.7 0.092 4.1 NA 0.3 2.2 0.17 0.31 53.1
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:09 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 /
Leakes Rd - PM
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 104 4.0 0.113 0.5 LOS A 0.6 4.3 0.25 0.00 54.6
6 R 75 1.0 0.113 8.9 LOS A 0.6 4.3 0.25 0.79 48.5
Approach 179 2.7 0.113 4.0 NA 0.6 4.3 0.25 0.33 51.9
North: Eastern Access Street 1 - North Approach
7 L 14 1.0 0.013 8.6 LOS A 0.0 0.3 0.20 0.61 48.1
9 R 18 1.0 0.035 11.3 LOS B 0.1 0.8 0.44 0.70 45.7
Approach 32 1.0 0.035 10.2 LOS B 0.1 0.8 0.33 0.66 46.7
West: Leakes Rd - West Approach
10 L 54 1.0 0.067 8.2 LOS A 0.0 0.0 0.00 0.85 49.0
11 T 73 4.0 0.067 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 126 2.7 0.067 3.5 NA 0.0 0.0 0.00 0.36 54.8
All Vehicles 337 2.6 0.113 4.4 NA 0.6 4.3 0.17 0.37 52.4
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:09 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 / Leakes Rd - AM Sensitivity
Analysis
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 198 4.0 0.143 2.7 LOS A 1.1 8.0 0.55 0.00 50.2
6 R 34 1.0 0.143 11.0 LOS B 1.1 8.0 0.55 0.94 48.2
Approach 232 3.6 0.143 3.9 NA 1.1 8.0 0.55 0.14 49.9
North: Eastern Access Street 1 - North Approach
7 L 223 1.0 0.310 11.8 LOS B 1.4 9.7 0.54 0.86 45.3
9 R 112 1.0 0.381 22.9 LOS C 1.7 12.1 0.77 1.00 36.7
Approach 335 1.0 0.381 15.5 LOS C 1.7 12.1 0.62 0.90 42.0
West: Leakes Rd - West Approach
10 L 61 1.0 0.243 8.2 LOS A 0.0 0.0 0.00 1.00 49.0
11 T 399 4.0 0.243 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 461 3.6 0.243 1.1 NA 0.0 0.0 0.00 0.13 58.3
All Vehicles 1028 2.7 0.381 6.4 NA 1.7 12.1 0.33 0.39 50.1
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:09 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 / Leakes Rd - PM Sensitivity
Analysis
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 277 4.0 0.340 2.4 LOS A 2.7 19.1 0.55 0.00 49.4
6 R 198 1.0 0.340 10.7 LOS B 2.7 19.1 0.55 0.87 47.7
Approach 475 2.7 0.340 5.9 NA 2.7 19.1 0.55 0.36 48.7
North: Eastern Access Street 1 - North Approach
7 L 36 1.0 0.040 9.6 LOS A 0.1 1.0 0.35 0.66 47.4
9 R 47 1.0 0.190 22.2 LOS C 0.7 4.7 0.76 0.93 37.1
Approach 84 1.0 0.190 16.8 LOS C 0.7 4.7 0.59 0.82 41.0
West: Leakes Rd - West Approach
10 L 142 1.0 0.179 8.2 LOS A 0.0 0.0 0.00 0.85 49.0
11 T 193 4.0 0.179 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 335 2.7 0.179 3.5 NA 0.0 0.0 0.00 0.36 54.8
All Vehicles 894 2.6 0.340 6.0 NA 2.7 19.1 0.35 0.41 49.9
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:09 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 / Leakes Rd - AM Urban CHR (S) &
BAL
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 75 4.0 0.039 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 13 1.0 0.010 9.0 LOS A 0.0 0.3 0.27 0.62 47.7
Approach 87 3.6 0.039 1.3 NA 0.0 0.3 0.04 0.09 57.8
North: Eastern Access Street 1 - North Approach
7 L 84 1.0 0.083 9.0 LOS A 0.3 2.2 0.28 0.64 47.7
9 R 42 1.0 0.082 11.0 LOS B 0.3 1.8 0.42 0.71 46.0
Approach 126 1.0 0.083 9.7 LOS A 0.3 2.2 0.32 0.67 47.1
West: Leakes Rd - West Approach
10 L 23 1.0 0.092 8.2 LOS A 0.0 0.0 0.00 1.00 49.0
11 T 151 4.0 0.092 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 174 3.6 0.092 1.1 NA 0.0 0.0 0.00 0.13 58.3
All Vehicles 387 2.7 0.092 3.9 NA 0.3 2.2 0.11 0.30 54.0
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:10 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 / Leakes Rd - PM Urban CHR (S) &
BAL
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 104 4.0 0.055 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 75 1.0 0.061 8.8 LOS A 0.2 1.7 0.23 0.63 47.8
Approach 179 2.7 0.061 3.7 NA 0.2 1.7 0.10 0.26 54.3
North: Eastern Access Street 1 - North Approach
7 L 14 1.0 0.013 8.6 LOS A 0.0 0.3 0.20 0.61 48.1
9 R 18 1.0 0.035 11.2 LOS B 0.1 0.8 0.43 0.70 45.8
Approach 32 1.0 0.035 10.1 LOS B 0.1 0.8 0.33 0.66 46.7
West: Leakes Rd - West Approach
10 L 54 1.0 0.067 8.2 LOS A 0.0 0.0 0.00 0.85 49.0
11 T 73 4.0 0.067 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 126 2.7 0.067 3.5 NA 0.0 0.0 0.00 0.36 54.8
All Vehicles 337 2.6 0.067 4.2 NA 0.2 1.7 0.08 0.34 53.6
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:10 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 / Leakes Rd - AM Urban CHR (S) &
BAL Sensitivity Analysis
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 198 4.0 0.104 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 13 1.0 0.014 10.2 LOS B 0.1 0.4 0.45 0.67 46.8
Approach 211 3.8 0.104 0.6 NA 0.1 0.4 0.03 0.04 59.0
North: Eastern Access Street 1 - North Approach
7 L 84 1.0 0.114 10.8 LOS B 0.4 2.9 0.47 0.76 46.2
9 R 42 1.0 0.125 17.5 LOS C 0.5 3.2 0.66 0.90 40.4
Approach 126 1.0 0.125 13.0 LOS B 0.5 3.2 0.53 0.81 44.1
West: Leakes Rd - West Approach
10 L 23 1.0 0.223 8.2 LOS A 0.0 0.0 0.00 1.05 49.0
11 T 399 4.0 0.223 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 423 3.8 0.223 0.5 NA 0.0 0.0 0.00 0.06 59.3
All Vehicles 760 3.4 0.223 2.6 NA 0.5 3.2 0.10 0.18 56.0
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:10 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: Eastern Access Street 1 / Leakes Rd - PM Urban CHR (S) &
BAL Sensitivity Analysis
Eastern Access Street 1 / Leakes RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hEast: Leakes Rd - East Approach
5 T 277 4.0 0.145 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
6 R 75 1.0 0.066 9.4 LOS A 0.3 1.8 0.34 0.66 47.4
Approach 351 3.4 0.145 2.0 NA 0.3 1.8 0.07 0.14 56.8
North: Eastern Access Street 1 - North Approach
7 L 14 1.0 0.014 9.3 LOS A 0.0 0.4 0.31 0.63 47.6
9 R 18 1.0 0.049 15.9 LOS C 0.2 1.2 0.60 0.84 41.6
Approach 32 1.0 0.049 13.0 LOS B 0.2 1.2 0.48 0.75 44.0
West: Leakes Rd - West Approach
10 L 54 1.0 0.131 8.2 LOS A 0.0 0.0 0.00 0.95 49.0
11 T 193 4.0 0.131 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 246 3.3 0.131 1.8 NA 0.0 0.0 0.00 0.21 57.2
All Vehicles 629 3.2 0.145 2.5 NA 0.3 1.8 0.06 0.20 56.1
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:10 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector /
Tarneit Rd - AM
East - West Connector / Tarneit RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 132 1.0 0.364 8.2 LOS A 0.0 0.0 0.00 0.97 49.0
2 T 556 4.0 0.364 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 687 3.4 0.364 1.6 NA 0.0 0.0 0.00 0.19 57.5
North: Tarneit Rd - North Approach
8 T 182 4.0 0.159 5.3 LOS A 1.4 10.4 0.68 0.00 48.3
9 R 39 1.0 0.159 13.6 LOS B 1.4 10.4 0.68 1.00 45.9
Approach 221 3.5 0.159 6.7 NA 1.4 10.4 0.68 0.18 47.8
West: East - West Connector - West Approach
10 L 509 1.0 0.957 41.3 LOS E 17.7 125.1 0.97 2.08 28.1
12 R 152 1.0 0.761 47.8 LOS E 4.7 33.1 0.94 1.27 25.8
Approach 661 1.0 0.957 42.8 LOS E 17.7 125.1 0.96 1.89 27.5
All Vehicles 1569 2.4 0.957 19.7 NA 17.7 125.1 0.50 0.90 38.7
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:10 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector /
Tarneit Rd - PM
East - West Connector / Tarneit RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 200 1.0 0.230 8.2 LOS A 0.0 0.0 0.00 0.84 49.0
2 T 231 4.0 0.230 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 431 2.6 0.230 3.8 NA 0.0 0.0 0.00 0.39 54.3
North: Tarneit Rd - North Approach
8 T 525 4.0 0.787 11.7 LOS B 17.0 121.7 1.00 0.00 40.5
9 R 461 1.0 0.787 20.0 LOS C 17.0 121.7 1.00 1.41 40.3
Approach 986 2.6 0.787 15.6 NA 17.0 121.7 1.00 0.66 40.4
West: East - West Connector - West Approach
10 L 84 1.0 0.101 10.1 LOS B 0.4 2.6 0.42 0.71 46.8
12 R 80 1.0 1.339 439.2 LOS F 17.6 124.3 1.00 1.99 4.5
Approach 164 1.0 1.339 220.0 LOS F 17.6 124.3 0.70 1.34 8.5
All Vehicles 1581 2.4 1.339 33.6 NA 17.6 124.3 0.70 0.65 30.6
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:11 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - AM Sentivity Analysis
East - West Connector / Tarneit RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 0 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 132 1.0 0.364 8.2 LOS A 0.0 0.0 0.00 0.97 49.0
2 T 556 4.0 0.364 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 687 3.4 0.364 1.6 NA 0.0 0.0 0.00 0.19 57.5
North: Tarneit Rd - North Approach
8 T 182 4.0 0.159 5.3 LOS A 1.4 10.4 0.68 0.00 48.3
9 R 39 1.0 0.159 13.6 LOS B 1.4 10.4 0.68 1.00 45.9
Approach 221 3.5 0.159 6.7 NA 1.4 10.4 0.68 0.18 47.8
West: East - West Connector - West Approach
10 L 509 1.0 0.957 41.3 LOS E 17.7 125.1 0.97 2.08 28.1
12 R 152 1.0 0.761 47.8 LOS E 4.7 33.1 0.94 1.27 25.8
Approach 661 1.0 0.957 42.8 LOS E 17.7 125.1 0.96 1.89 27.5
All Vehicles 1569 2.4 0.957 19.7 NA 17.7 125.1 0.50 0.90 38.7
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:11 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - PM Sensitivity
Analysis
East - West Connector / Tarneit RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 0 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 200 1.0 0.230 8.2 LOS A 0.0 0.0 0.00 0.84 49.0
2 T 231 4.0 0.230 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 431 2.6 0.230 3.8 NA 0.0 0.0 0.00 0.39 54.3
North: Tarneit Rd - North Approach
8 T 525 4.0 0.787 11.7 LOS B 17.0 121.7 1.00 0.00 40.5
9 R 461 1.0 0.787 20.0 LOS C 17.0 121.7 1.00 1.41 40.3
Approach 986 2.6 0.787 15.6 NA 17.0 121.7 1.00 0.66 40.4
West: East - West Connector - West Approach
10 L 85 1.0 0.103 10.2 LOS B 0.4 2.6 0.42 0.71 46.8
12 R 80 1.0 1.339 439.2 LOS F 17.6 124.3 1.00 1.99 4.5
Approach 165 1.0 1.339 218.7 LOS F 17.6 124.3 0.70 1.33 8.5
All Vehicles 1582 2.4 1.339 33.6 NA 17.6 124.3 0.70 0.65 30.6
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:11 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - AM Signals
East - West Connector / Tarneit RdSignals - Fixed Time Cycle Time = 50 seconds (Practical Cycle Time)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 132 1.0 0.171 12.0 LOS B 1.2 8.8 0.41 0.72 45.1
2 T 556 4.0 0.731 15.6 LOS B 12.6 91.0 0.91 0.85 39.6
Approach 687 3.4 0.731 14.9 LOS B 12.6 91.0 0.81 0.82 40.5
North: Tarneit Rd - North Approach
8 T 182 4.0 0.150 3.9 LOS A 1.8 12.8 0.42 0.35 52.3
9 R 39 1.0 0.176 31.2 LOS C 0.9 6.5 0.93 0.73 32.2
Approach 221 3.5 0.176 8.7 LOS A 1.8 12.8 0.51 0.42 47.2
West: East - West Connector - West Approach
10 L 509 1.0 0.767 26.7 LOS C 12.5 88.3 0.94 0.92 34.6
12 R 152 1.0 0.685 34.2 LOS C 4.0 28.2 1.00 0.86 30.9
Approach 661 1.0 0.767 28.4 LOS C 12.5 88.3 0.96 0.91 33.7
All Vehicles 1569 2.4 0.767 19.7 LOS B 12.6 91.0 0.83 0.80 38.0
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Intersection and Approach LOS values are based on average delay for all vehicle movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:11 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - PM Signals
East - West Connector / Tarneit RdSignals - Fixed Time Cycle Time = 50 seconds (Practical Cycle Time)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 200 1.0 0.358 18.6 LOS B 3.2 22.9 0.69 0.77 39.7
2 T 231 4.0 0.674 22.9 LOS C 5.8 41.8 0.98 0.86 34.8
Approach 431 2.6 0.674 20.9 LOS C 5.8 41.8 0.85 0.82 36.9
North: Tarneit Rd - North Approach
8 T 525 4.0 0.432 4.9 LOS A 6.4 46.6 0.53 0.47 50.6
9 R 461 1.0 0.735 26.4 LOS C 11.0 77.5 0.94 0.90 34.7
Approach 986 2.6 0.735 14.9 LOS B 11.0 77.5 0.72 0.67 41.7
West: East - West Connector - West Approach
10 L 49 1.0 0.046 13.1 LOS B 0.5 3.7 0.45 0.71 44.1
12 R 115 1.0 0.519 32.6 LOS C 2.9 20.2 0.98 0.78 31.6
Approach 164 1.0 0.519 26.7 LOS C 2.9 20.2 0.82 0.76 34.5
All Vehicles 1581 2.4 0.735 17.8 LOS B 11.0 77.5 0.77 0.72 39.5
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Intersection and Approach LOS values are based on average delay for all vehicle movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:12 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - AM Signals Sensitivity
Analysis
East - West Connector / Tarneit RdSignals - Fixed Time Cycle Time = 120 seconds (Practical Cycle Time)Design Life Analysis (Practical Capacity): Results for 12 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 132 1.0 0.168 9.7 LOS A 1.2 8.5 0.17 0.69 47.3
2 T 998 4.0 0.888 29.6 LOS C 55.6 402.6 0.94 0.93 31.5
Approach 1130 3.7 0.888 27.3 LOS C 55.6 402.6 0.85 0.90 32.8
North: Tarneit Rd - North Approach
8 T 327 4.0 0.249 7.2 LOS A 7.0 50.4 0.40 0.35 48.5
9 R 39 1.0 0.422 72.2 LOS E 2.4 16.8 1.00 0.73 20.0
Approach 366 3.7 0.422 14.2 LOS B 7.0 50.4 0.46 0.39 42.1
West: East - West Connector - West Approach
10 L 509 1.0 0.896 64.1 LOS E 33.5 236.8 1.00 0.97 21.7
12 R 152 1.0 0.696 54.8 LOS D 8.0 56.4 0.91 0.83 23.9
Approach 661 1.0 0.896 61.9 LOS E 33.5 236.8 0.98 0.94 22.2
All Vehicles 2157 2.8 0.896 35.7 LOS D 55.6 402.6 0.82 0.83 29.6
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Intersection and Approach LOS values are based on average delay for all vehicle movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:12 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - PM Signals Sensitivity
Analysis
East - West Connector / Tarneit RdSignals - Fixed Time Cycle Time = 110 seconds (Practical Cycle Time)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 200 1.0 0.575 25.2 LOS C 6.0 42.7 0.61 0.76 35.4
2 T 612 4.0 0.885 46.1 LOS D 35.9 259.8 1.00 1.03 25.4
Approach 812 3.3 0.885 40.9 LOS D 35.9 259.8 0.90 0.97 27.3
North: Tarneit Rd - North Approach
8 T 1394 4.0 0.896 11.9 LOS B 55.8 403.8 0.75 0.74 42.8
9 R 461 1.0 0.891 46.8 LOS D 23.1 163.2 0.86 0.91 26.2
Approach 1855 3.3 0.896 20.6 LOS C 55.8 403.8 0.78 0.78 37.0
West: East - West Connector - West Approach
10 L 49 1.0 0.051 21.5 LOS C 1.3 8.9 0.51 0.72 37.7
12 R 115 1.0 0.856 72.0 LOS E 6.9 48.9 1.00 0.94 20.1
Approach 164 1.0 0.856 56.8 LOS E 6.9 48.9 0.85 0.87 23.4
All Vehicles 2831 3.1 0.896 28.5 LOS C 55.8 403.8 0.82 0.84 32.6
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Intersection and Approach LOS values are based on average delay for all vehicle movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:12 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - AM
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 22 1.0 0.028 8.7 LOS A 0.1 0.5 0.20 0.62 48.1
3 R 124 1.0 0.248 14.2 LOS B 1.0 7.1 0.60 0.89 43.0
Approach 146 1.0 0.248 13.4 LOS B 1.0 7.1 0.54 0.85 43.7
East: Dohertys Rd - East Approach
4 L 7 1.0 0.055 8.2 LOS A 0.0 0.0 0.00 1.04 49.0
5 T 97 4.0 0.055 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 104 3.8 0.055 0.6 NA 0.0 0.0 0.00 0.07 59.1
West: Dohertys Rd - West Approach
11 T 391 4.0 0.230 0.5 LOS A 1.6 11.2 0.27 0.00 54.9
12 R 32 1.0 0.230 8.8 LOS A 1.6 11.2 0.27 0.93 49.0
Approach 422 3.8 0.230 1.1 NA 1.6 11.2 0.27 0.07 54.4
All Vehicles 673 3.2 0.248 3.7 NA 1.6 11.2 0.29 0.24 52.3
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:13 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - PM
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 28 1.0 0.042 10.7 LOS B 0.1 0.9 0.46 0.72 46.3
3 R 7 1.0 0.015 13.4 LOS B 0.1 0.4 0.55 0.75 43.7
Approach 36 1.0 0.042 11.3 LOS B 0.1 0.9 0.48 0.73 45.8
East: Dohertys Rd - East Approach
4 L 116 1.0 0.256 8.2 LOS A 0.0 0.0 0.00 0.94 49.0
5 T 366 4.0 0.256 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 482 3.3 0.256 2.0 NA 0.0 0.0 0.00 0.23 56.9
West: Dohertys Rd - West Approach
11 T 97 4.0 0.087 2.6 LOS A 0.6 4.2 0.52 0.00 50.4
12 R 31 1.0 0.087 11.0 LOS B 0.6 4.2 0.52 0.91 47.8
Approach 127 3.3 0.087 4.6 NA 0.6 4.2 0.52 0.22 49.8
All Vehicles 645 3.2 0.256 3.0 NA 0.6 4.2 0.13 0.25 54.6
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:13 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - AM Sensitivity
Analysis
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 16 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 22 1.0 0.030 9.3 LOS A 0.1 0.6 0.31 0.64 47.6
3 R 124 1.0 0.729 50.2 LOS F 3.6 25.7 0.95 1.20 25.1
Approach 146 1.0 0.729 44.0 LOS E 3.6 25.7 0.85 1.12 27.0
East: Dohertys Rd - East Approach
4 L 7 1.0 0.115 8.2 LOS A 0.0 0.0 0.00 1.07 49.0
5 T 211 4.0 0.115 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 219 3.9 0.115 0.3 NA 0.0 0.0 0.00 0.04 59.5
West: Dohertys Rd - West Approach
11 T 852 4.0 0.476 1.9 LOS A 5.4 39.2 0.56 0.00 50.4
12 R 32 1.0 0.476 10.2 LOS B 5.4 39.2 0.56 0.91 49.3
Approach 884 3.9 0.476 2.2 NA 5.4 39.2 0.56 0.03 50.3
All Vehicles 1249 3.6 0.729 6.8 NA 5.4 39.2 0.50 0.16 46.9
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:13 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - PM Sensitivity
Analysis
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 28 1.0 0.134 23.8 LOS C 0.4 2.8 0.84 0.95 36.2
3 R 7 1.0 0.072 42.0 LOS E 0.2 1.5 0.91 0.97 27.7
Approach 36 1.0 0.134 27.6 LOS D 0.4 2.8 0.86 0.95 34.1
East: Dohertys Rd - East Approach
4 L 116 1.0 0.574 8.2 LOS A 0.0 0.0 0.00 1.02 49.0
5 T 972 4.0 0.574 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 1088 3.7 0.574 0.9 NA 0.0 0.0 0.00 0.11 58.6
West: Dohertys Rd - West Approach
11 T 257 4.0 0.254 19.0 LOS C 4.4 31.6 1.00 0.00 36.7
12 R 31 1.0 0.254 27.3 LOS D 4.4 31.6 1.00 1.05 36.5
Approach 287 3.7 0.254 19.9 NA 4.4 31.6 1.00 0.11 36.7
All Vehicles 1411 3.6 0.574 5.4 NA 4.4 31.6 0.23 0.13 51.4
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:13 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - AM Urban CHR
(S) & AUL(S)
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 22 1.0 0.028 8.7 LOS A 0.1 0.5 0.20 0.62 48.1
3 R 124 1.0 0.240 13.7 LOS B 1.0 6.8 0.59 0.88 43.5
Approach 146 1.0 0.240 13.0 LOS B 1.0 6.8 0.53 0.84 44.2
East: Dohertys Rd - East Approach
4 L 7 1.0 0.004 8.2 LOS A 0.0 0.0 0.00 0.67 49.0
5 T 97 4.0 0.051 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 104 3.8 0.051 0.6 NA 0.0 0.0 0.00 0.05 59.1
West: Dohertys Rd - West Approach
11 T 391 4.0 0.205 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
12 R 32 1.0 0.026 8.7 LOS A 0.1 0.7 0.20 0.62 48.0
Approach 422 3.8 0.205 0.7 NA 0.1 0.7 0.02 0.05 58.9
All Vehicles 673 3.2 0.240 3.3 NA 1.0 6.8 0.12 0.22 55.0
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:13 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - PM Urban CHR
(S) & AUL(S)
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 28 1.0 0.042 10.6 LOS B 0.1 0.9 0.45 0.71 46.5
3 R 7 1.0 0.015 13.0 LOS B 0.1 0.4 0.54 0.74 44.1
Approach 36 1.0 0.042 11.1 LOS B 0.1 0.9 0.47 0.71 46.0
East: Dohertys Rd - East Approach
4 L 116 1.0 0.063 8.2 LOS A 0.0 0.0 0.00 0.67 49.0
5 T 366 4.0 0.193 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 482 3.3 0.193 2.0 NA 0.0 0.0 0.00 0.16 56.9
West: Dohertys Rd - West Approach
11 T 97 4.0 0.051 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
12 R 31 1.0 0.035 10.5 LOS B 0.1 0.9 0.47 0.71 46.5
Approach 127 3.3 0.051 2.5 NA 0.1 0.9 0.11 0.17 56.1
All Vehicles 645 3.2 0.193 2.6 NA 0.1 0.9 0.05 0.19 56.0
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:14 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - AM Urban CHR (S) & AUL(S) Sensitivity Analysis
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 18 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 22 1.0 0.030 9.3 LOS A 0.1 0.6 0.32 0.64 47.5
3 R 124 1.0 0.742 52.3 LOS F 3.8 26.7 0.95 1.21 24.5
Approach 146 1.0 0.742 45.8 LOS E 3.8 26.7 0.86 1.13 26.5
East: Dohertys Rd - East Approach
4 L 7 1.0 0.004 8.2 LOS A 0.0 0.0 0.00 0.67 49.0
5 T 233 4.0 0.123 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 240 3.9 0.123 0.3 NA 0.0 0.0 0.00 0.02 59.6
West: Dohertys Rd - West Approach
11 T 940 4.0 0.495 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
12 R 32 1.0 0.028 9.3 LOS A 0.1 0.8 0.33 0.64 47.4
Approach 971 3.9 0.495 0.3 NA 0.1 0.8 0.01 0.02 59.5
All Vehicles 1358 3.6 0.742 5.2 NA 3.8 26.7 0.10 0.14 52.5
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:14 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: North - South Access Street 2 / Dohertys Rd - PM Urban CHR (S) & AUL(S) Sensitivity Analysis
North - South Access Street 2 / Dohertys RdGiveway / Yield (Two-Way)Design Life Analysis (Practical Capacity): Results for 20 years
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: North - South Access Street 2 - South Approach
1 L 28 1.0 0.144 25.7 LOS D 0.5 3.2 0.83 0.94 35.2
3 R 7 1.0 0.090 51.0 LOS F 0.3 1.9 0.92 0.97 24.9
Approach 36 1.0 0.144 30.9 LOS D 0.5 3.2 0.85 0.95 32.4
East: Dohertys Rd - East Approach
4 L 116 1.0 0.063 8.2 LOS A 0.0 0.0 0.00 0.67 49.0
5 T 972 4.0 0.511 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 1088 3.7 0.511 0.9 NA 0.0 0.0 0.00 0.07 58.6
West: Dohertys Rd - West Approach
11 T 257 4.0 0.135 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
12 R 31 1.0 0.079 16.8 LOS C 0.3 1.9 0.75 0.92 41.0
Approach 287 3.7 0.135 1.8 NA 0.3 1.9 0.08 0.10 57.2
All Vehicles 1411 3.6 0.511 1.8 NA 0.5 3.2 0.04 0.10 57.1
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Thursday, 20 June 2013 10:04:14 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - AM - Trigger Yr 7 Inc Stage 15 2022 - Urban CHR (S) &
AUL(S) -
East - West Connector / Tarneit RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 102 1.0 0.055 8.2 LOS A 0.0 0.0 0.00 0.67 49.0
2 T 556 4.0 0.292 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 658 3.5 0.292 1.3 NA 0.0 0.0 0.00 0.10 58.0
North: Tarneit Rd - North Approach
8 T 159 4.0 0.084 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
9 R 29 1.0 0.041 11.7 LOS B 0.2 1.1 0.55 0.77 45.3
Approach 188 3.5 0.084 1.8 NA 0.2 1.1 0.09 0.12 57.1
West: East - West Connector - West Approach
10 L 391 1.0 0.655 17.6 LOS C 5.0 35.1 0.75 1.13 40.4
12 R 116 1.0 0.474 28.5 LOS D 2.2 15.7 0.84 1.05 33.6
Approach 506 1.0 0.655 20.1 LOS C 5.0 35.1 0.77 1.12 38.6
All Vehicles 1353 2.6 0.655 8.4 NA 5.0 35.1 0.30 0.48 48.8
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Friday, 21 June 2013 11:12:49 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
MOVEMENT SUMMARY Site: East - West Connector / Tarneit Rd - PM - Trigger Yr 7 Inc Stage 15 2022 - Urban CHR (S) &
AUL(S) -
East - West Connector / Tarneit RdGiveway / Yield (Two-Way)
Movement Performance - Vehicles
95% Back of QueueMov ID Turn
DemandFlow HV
Deg.Satn
AverageDelay
Level ofService
Prop. Queued
Effective Stop Rate
AverageSpeed Vehicles Distance
veh/h % v/c sec veh m per veh km/hSouth: Tarneit Rd - South Approach
1 L 154 1.0 0.083 8.2 LOS A 0.0 0.0 0.00 0.67 49.0
2 T 231 4.0 0.121 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
Approach 384 2.8 0.121 3.3 NA 0.0 0.0 0.00 0.27 55.0
North: Tarneit Rd - North Approach
8 T 523 4.0 0.275 0.0 LOS A 0.0 0.0 0.00 0.00 60.0
9 R 354 1.0 0.360 10.9 LOS B 2.0 13.9 0.53 0.80 46.2
Approach 877 2.8 0.360 4.4 NA 2.0 13.9 0.21 0.32 53.6
West: East - West Connector - West Approach
10 L 38 1.0 0.044 9.8 LOS A 0.2 1.1 0.38 0.67 47.3
12 R 88 1.0 0.799 84.0 LOS F 4.1 28.7 0.97 1.24 18.1
Approach 126 1.0 0.799 61.8 LOS F 4.1 28.7 0.79 1.07 22.2
All Vehicles 1387 2.6 0.799 9.3 NA 4.1 28.7 0.21 0.37 47.8
Level of Service (LOS) Method: Delay (HCM 2000).
Vehicle movement LOS values are based on average delay per movement
Minor Road Approach LOS values are based on average delay for all vehicle movements.
NA: Intersection LOS and Major Road Approach LOS values are Not Applicable for two-way sign control since the average delay is not a good LOS measure due to zero delays associated with major road movements.
SIDRA Standard Delay Model used.
Processed: Friday, 21 June 2013 11:12:09 AMSIDRA INTERSECTION 5.1.13.2093
Copyright © 2000-2011 Akcelik and Associates Pty Ltdwww.sidrasolutions.com
Project: T:\1112 Jobs\114430\Analysis\AMEX site Draft_2.sip8000785, TRAFFICWORKS PTY LTD, SINGLE
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
ATTACHMENT E – SISD ASSESSMENT OF OVERPASS
114430: Amex Site Residential Development, Tarneit – Traffic Impact Assessment Final: 21/06/2013
ATTACHMENT F – TRAFFIC GENERATION BASED ON
DEVELOPMENT STAGES
TRAFFIC GENERATION BASED ON DEVELOPMENT STAGES TRAFFIC GENERATION BASED ON DEVELOPMENT STAGES TRAFFIC GENERATION BASED ON DEVELOPMENT STAGES TRAFFIC GENERATION BASED ON DEVELOPMENT STAGES
DailyDailyDailyDaily PeakPeakPeakPeak
Vehicle Trips Vehicle Trips Vehicle Trips Vehicle Trips
(per dwelling)(per dwelling)(per dwelling)(per dwelling)
Vehicle Trips Vehicle Trips Vehicle Trips Vehicle Trips
(per dwelling)(per dwelling)(per dwelling)(per dwelling)
Daily Daily Daily Daily
Vehicle Vehicle Vehicle Vehicle
Trips Trips Trips Trips
(vpd)(vpd)(vpd)(vpd)
Peak Vehicle Peak Vehicle Peak Vehicle Peak Vehicle
Trips (vph)Trips (vph)Trips (vph)Trips (vph)(%)(%)(%)(%) RoadRoadRoadRoad
Peak Peak Peak Peak
Vehicle Vehicle Vehicle Vehicle
Trips (vph)Trips (vph)Trips (vph)Trips (vph)
(%)(%)(%)(%) RoadRoadRoadRoad
Peak Peak Peak Peak
Vehicle Vehicle Vehicle Vehicle
Trips Trips Trips Trips
(vph)(vph)(vph)(vph)
RoadRoadRoadRoadPeak Vehicle Peak Vehicle Peak Vehicle Peak Vehicle
Trips (vph)Trips (vph)Trips (vph)Trips (vph)
Medium Density 2 6.5 0.65 13 1 Western Connector Street / Leakes Road 91
Dwelling Houses 51 9 0.85 459 43 Eastern Access Street 2 / Leakes Road 150
Medium Density 4 6.5 0.65 26 3 East - West Trunk Connector / Tarneit Road 784
Dwelling Houses 51 9 0.85 459 43 North - South Connector Street / Dohertys Road 174
Medium Density 6 6.5 0.65 39 4
Dwelling Houses 41 9 0.85 369 35
Medium Density 13 6.5 0.65 85 8
Dwelling Houses 29 9 0.85 261 25
Medium Density 14 6.5 0.65 91 9
Dwelling Houses 31 9 0.85 279 26
Medium Density 16 6.5 0.65 104 10
Dwelling Houses 38 9 0.85 342 32
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 28 9 0.85 252 24
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 37 9 0.85 333 31
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 67 9 0.85 603 57
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 25 9 0.85 225 21
Medium Density 7 6.5 0.65 46 5
Dwelling Houses 25 9 0.85 225 21
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 49 9 0.85 441 42
Medium Density 20 6.5 0.65 130 13
Dwelling Houses 55 9 0.85 495 47
Medium Density 16 6.5 0.65 104 10
Dwelling Houses 59 9 0.85 531 50
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 40 9 0.85 360 34
Medium Density 23 6.5 0.65 150 15
Dwelling Houses 45 9 0.85 405 38
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 42 9 0.85 378 36
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 51 9 0.85 459 43
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 67 9 0.85 603 57
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 50 9 0.85 450 43
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 87 9 0.85 783 74
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 37 9 0.85 333 31
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 41 9 0.85 369 35
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 32 9 0.85 288 27
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 48 9 0.85 432 41
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 73 9 0.85 657 62
Medium Density 0 6.5 0.65 0 0
Dwelling Houses 71 9 0.85 639 60
Medium Density 20 6.5 0.65 130 13
Dwelling Houses 33 9 0.85 297 28
Medium
Density141 1444 12644 1199 1148 51
Dwelling
Houses1303
Internal Development Internal Development Internal Development Internal Development
Traffic GenerationTraffic GenerationTraffic GenerationTraffic Generation
Year 6 - 2021
Year 7 - 2022
STAGE 1 (SOUTH)
STAGE 3 (SOUTH)
STAGE 2 (SOUTH)Year 1 - 2016 1
2 & 3
2
2
RTA Traffic Generation RateRTA Traffic Generation RateRTA Traffic Generation RateRTA Traffic Generation Rate
STAGE 3 (NORTH)
STAGE 4 (NORTH)
STAGE 5 (NORTH)
STAGE 6 (NORTH)
STAGE 7 (NORTH)
STAGE 4 (SOUTH)
STAGE 5 (SOUTH)
STAGE 6 (SOUTH)
STAGE 1 (NORTH)
STAGE 2 (NORTH)
Land Use Lots
STAGE 17 (NORTH)
STAGE 18 (NORTH)
STAGE 19 (NORTH)
STAGE 8 (NORTH)
STAGE 9 (NORTH)
STAGE 10 (NORTH)
STAGE 11 (NORTH)
STAGE 12 (NORTH)
STAGE 13 (NORTH)
Year Precinct
100%
Access Via
Year 8 - 2023 3
Year 9 - 2024 2 & 3
Stage
STAGE 20 (NORTH)
STAGE 21 (NORTH)
STAGE 22 (NORTH)
Year 2 - 2017 1 & 2
Year 3 - 2018 2
Year 4 - 2019 2
Year 5 - 2020
STAGE 14 (NORTH)
STAGE 15 (NORTH)
STAGE 16 (NORTH)
100%
100%
100%
East - West Trunk Connector
/ Tarneit Road
East - West Trunk Connector
/ Tarneit Road
East - West Trunk Connector
/ Tarneit Road
20%
30%
30%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
90%
90%
80%
70%
70%
100%
100%
100%
100%
100%
100%
100%
46
East - West Trunk
Connector / Tarneit Road
33
35
43
24
43
74
31
31
24
33
61
34
53
36
Western Connector
Street / Leakes Road
Western Connector
Street / Leakes Road
Eastern Access Street 2 /
Leakes Road
Eastern Access Street 2 /
Leakes Road
Eastern Access Street 2 /
Leakes Road
Eastern Access Street 2 /
Leakes Road
East - West Trunk
Connector / Tarneit Road
45
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
31
57
21
26
42
60
39
North - South Connector
Street / Dohertys Road
North - South Connector
Street / Dohertys Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk Connector
/ Tarneit Road 10%
10%East - West Trunk Connector
/ Tarneit Road
43
42
41
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
North - South Connector
Street / Dohertys Road
North - South Connector
Street / Dohertys Road
North - South Connector
Street / Dohertys Road
East - West Trunk
Connector / Tarneit Road
East - West Trunk
Connector / Tarneit Road
43
57
18
3
3
8
19
Suite 1, 1st Floor 132 Upper Heidelberg Rd Ivanhoe Vic 3079 PO Box 417 Ivanhoe Vic 3079
ABN: 59 125 488 977 Ph: (03) 9490 5900 Fax: (03) 9490 5910
www.trafficworks.com.au
top related