Activity
INDUSTRY OILEXTRACTION
CONSTRUCTIONINDUSTRY
ENVIRONMENTALPROTECTION ENERGY
SCOPE OF SERVICES
1
ENGINEREENG
DESIGN
PROJECT MANAGEMENT
EXECUTION OF ELECTRICAL & CONTROL SYSTEMS
PREFABRICATION OF DISTRIBUTION BOARDS / PLC CABINETS
COMMISSIONING
SERVICE
What we do?
SCO
PE O
F O
PERA
TIO
NS
2
Electrical installations
ELECTRICAL & CONTROL SYSTEMS
We construct ’turnkey’ energetic systems.
Our employees have the required qualifications.
The company is equipped with proper tools, transport resources and connectivity vital for providing services.
Rigorous checking procedures at every stage of project execution ensure a high level of performance.
4
Electrical installations
ORGANIZATION OF THE DEPARTMENTVarious works – specialized employees
Managers Engineers Workers for:
MV systems LV panels systems control systems cabling cable connections measuring works earth works installation
of cable trays
5
Service & engineering team
6
24/7 – Service in Poland 24/7 – On-call logistic In four working days anywhere in Europe People with necessary permissions and trainings to work offshore:
Olf Card HUET - Helicopter Underwater Escape Training BOSIET - Basic Offshore Safety Induction & Emergency Training
C&I Projects – general scope
Scope
Management • Project Management / Site Management• supervision
Designing • concept of the structure for automation system• Technical documentation
Software Engineering • PLC programming, • SCADA - visualization, reporting, trends, data archiving
Delivery • engineering / operation stations, synoptic boards, servers, • software license• PLC cabinet with I/O cards, interfaces, cross box• process Instrumentation with all necessary equipment• cable trays, cable ducts • fiber optic networks, communication networks• signal / power supply cables• pneumatic equipment
Installation • installation all delivery equipment • installation packages equipment if necessary• connections
Commissioning • instrumentation adjusting• loop testing, • participation in „hot” commissioning• participation in process optimizations
7
Site organization chart
CLIENT REPRESENTATIVEPROJECT MANAGER
MANAGING DIRECTOR OF DEPARTMENT
ELECTRICAL SITE FOREMAN
HEALTH & SAFETY MANAGER
DESIGNER ( ENGINEER )
PRODUCTION PREPARATION
QUALITY CONTROL
PURCHASING & DELIVERY
CONTROLING
ON - SITE WAREHOUSE
PRESIDENT OF THE BOARD
CONSTRUCTION ENGENEER 1 CONSTRUCTION ENGINEER 2
WORK TEAM NO 1
START UP AND MAITNANCE TEAM
WORK TEAM NO 2
5
5
4
PERMANENT ON SITE SERVICES
WORK TEAM NO 1
WORK TEAM NO 3
WORK TEAM NO 2
5
5
5
PERMANENT ON SITE SERVICES
CONTROL AND AUTOMATICS SITE FOREMAN
SITE MANAGER
WORK TEAM NO 3 5
SERVICE TEAM
WORK TEAM NO 1
WORK TEAM NO 3
WORK TEAM NO 2
5
5
5
ON-DEMAND WORK TEAMS
That`s the way we work:
9
Average annually installation of:
Cable trays – 50 km Cables – 300 km Busbars – 6 km
Cable trays installations:
5 km – average length on each Project
That`s the way we work:
60 cubicles – average annually installation of Main LV Panels
10
LV Panels& Distribution boards installations
12
Comprehensive project implementation
BIOETHANOL PRODUCTION FACILITYGoświnowice
WIND FARMŁęki Dukielskie
28 technological installations over an area of 11 haInstalled power 12,8 MVADelivery and assembly: 8x1,6 MVA transformers MV 8HD10 switchgear LV 3200A distribution boards from LV1 to LV7
Installed power 10 MWInstallation of 15 kV internal connectionsInstallation of 5 transformer stationsConnection to National Grid
13
Comprehensive project implementation
Design and modernizationPower station equipped with: Two boilers 17,5 MVA/6,3 kV generator LV switchgears 22 cubicles, 2 ATSE, 2500 A Main MV switchgear
THERMAL-ELECTRIC POWER PLANT at PCC ROKITABrzeg Dolny
NGK CERAMICSGliwice
Installation of five 3150 kVA transformers with Siemens 5000 A busbars
Installation of four 2500 kVA transformers with Siemens 4000 A busbars
Installation of one 1600 kVA transformers with Siemens 2500 A busbars
Delivery and installation of SIMOSEC 24kV, 630 A
Prefabrication and delivery of eight units of LV Sivacon 5000 A
14
Comprehensive project implementation
Installation of two 2500 kVA transformers with Siemens 4000A busbars
Installation of five1600 kVA transformers with Siemens 2500A busbars
Delivery and installation of SIMOSEC 24kV, 630 A
Prefabrication and delivery of eight units of LV Sivacon 5000 A
KIRCHHOFF Polska Ltd. ASSEMBLY, GliwicePlant No. 1, 2, 3 and power suplly
Toyota Foundry with accompanying ACCUROMM and NTK facilities, Jelcz Laskowice
Installation of six 2000 kVA transformers with Siemens 5000A busbars
Delivery and installation of SIMOSEC 24kV, 630 A
Prefabrication and delivery of eight units of LV Sivacon 5000 A