SITE PLAN / EXISTING CONDITIONSCALE 1/16"-1'-0"
DEMO PLANSCALE 1/16"-1'-0"
BUILDING
BUILDING
ALLEY
DO
CK
BUILDING
BUILDING
634 SOUTH STATE STREET
BUILDING
BUILDING
GARAGE
PROPERTY LINE
LEGEND
ADJACENT BUILDING
SUBJECT BUILDING
FENCED AREA
DEMO ELEVATION/WESTNOT TO SCALE
SITE PLAN / NEW BACKYARDSCALE 1/8"-1'-0"
EXI
STI
NG
BU
ILD
ING
13 new parking stalls
Build-outCONSTRUCTION DOCUMENT Circa BuildingSalt Lake City, UtahBNA
SITE PLAN / DEMO PLAN
A1.0
REFERENCE NOTES:
1. fenced area
DEMO NOTES:
demolish and remove all existing1.partition walls, raised platforms, stairs,interior door and windows
all wood frames from west exterior walldemolish and remove all glazing and2.
demolish and remove existing wood flooring3.demolish and remove existing overhead door4.
demolish and remove all wood fence and5.garage structure located at backyarddemolish and remove all raised planters w/soil
demolish and remove all existing skylights 6.all opening to be closed to match existing wood decking ( see structure for structural support)
demolish and remove all existing floor tilefrom main entrance area
7.
for demolishing at rear elevation see sheet A3.08.
save and protect all structural column as neccessary9.
existing garage structure2.4" thick sidewalk at same level as subject 3.building finish floor sidewalk to be raised 6" above adjacentasphalt surface
sidewalk to have 1.5% cross slope away from buildingcut controled joint as shown4.construction joint5.6" concrete curb above asphalt surface6.concrete wheel-stop7.2" asphalt pavement over 9" road base8.slope to drain w/ 1% slope see: civil dwg4" painted stall divider strip, as shown, on asphalt
RA
MP
UP
1:12
demolish and remove all roof parapet ornaments10.
saw cut existing concrete curb to acomodate11.for new storefront window system
remove existing gas meter see: mechanical12.remove existing carpet at this area13.remove existing gypsum board on this wall14.remove existing concrete platform15.aproximate location of boiler room below 16.see: structural
9. electric service see: electrical
BUILDING
existing pole to remain10.existing hose bib to remain11.
remove existing top soil from all backyard areato accomodate for base road and asphalt pavement
see: structural
and opetator
1.5 % slope down
1.5% slope
bollard pipe (6" dia metal pipe - painted w/12.concrete infill - 2'-6" deep foundation)
demolish and remove existing roof membrane and 17.existing roof insulation
van accessibleparking stallac
cess
ible
rout
e
1:12RAMP UP cross slope 1:48 max
at accesible ramp SCALE 1/2"-1'-0"SCALE 1/2"-1'-0"
at accessible ramp
(exterior side)
SECTION CROSS SECTION
4" high side curb at accessible ramp13.existing building15.
1.5 % slope down
1.5 % slope down
1.5 % slope down
1.5 % slope down
1.5 % slope down
1.5 % slope down
1.5 % slope down
parking surface to slope down to planter max. 1.5 %
FRONT ELEVATION (WEST)SCALE: 1/4" = 1'-0"
Build-outCONSTRUCTION DOCUMENT Circa BuildingSalt Lake City, UtahBNA
EXTERIOR ELEVATIONS
A3.0
REFERENCE NOTES:
1. metal panel (aluminum, to match store front finish)
REAR ELEVATION (EAST)SCALE: 1/4" = 1'-0"
double pane glazing, outside pane to be tinted2.
aluminum store front (EFCO system 403 or similar)3.existing metal beam to be repainted, color by arch.4.
new brick wall to match existing brick5.delete roof parapet masonry wall 6.
6" metal stud w/ plywood sheating and EIFS outside7.and 5/8" painted gypsum board insidebatt insulation in betweennew window to match existing window system8.
new door see: door schedule9.existing brick to be clean and repainted10.
existing concrete11.
existing door to be repaired reglazed and repainted12.
location of entrance canopy (to be removed)13.
and provide roof flashing re: . . . . . .
previous location of garage
SECTIONSCALE: 1/4" = 1'-0"
SCALE: 1/2" = 1'-0"SCALE: 1/2" = 1'-0"
FRONT ELEVATION
SCALE: 1/2" = 1'-0"
PLAN
SIDE ELEVATION
14. 1/2" galvanized metal plate3/4" threaded galvanized rod15.2" high galvanized grate16.2x3.5 galvanized metal angle17.galvanized turn buckle18.galvanized plate to be anchored into existing19.brick parapet wallsee: structural dwg for parapet wall bracinggrate - angle attacment20.
DETAILSCALE: 1 1/2" = 1'-0"
3/4" welded eye bolt to angle below21.
(alucobond or similar)i.e. galvalum)
color by architect
provide different coat surfaces for architect approval
owner to discuss w/ SLC corp.
hose bib to remain22.1.5" x 4'-8" 3/8" thick metal strip (galvanized) 23.light fixtures support
FLOOR PLANSCALE 1/8"-1'-0"
Build-outCONSTRUCTION DOCUMENT Circa BuildingSalt Lake City, UtahBNA
FLOOR PLAN
A2.0
REFERENCE NOTES:
1. +/- 3/8" granite floor tile lay in mastic
VCT floor tile - manufacturer : Amstrong2.
new window to match existing windows3.at rear see: rear elevation
north and south interior brick wallA.
GENERAL NOTES
and steel to be sandblasted
glue down carpet unless noted otherwiseC.(existing floor will receive concrete toping coat)
concrete floor4.
LEGEND
FULL HEIGHT PARTITION
8'-0" HEIGH PARTITION
4'-0" HEIGH PARTITION
FE
FEFIRE EXTINGUISHER CABINETWITH FIRE EXTINGUISHER INSIDEsemirecessed
FE
ceramic tile floor see: A4.05.
pour leveling concrete toping overB.existing concrete floor (+/- 1" - 3" thick)
and dicuss w/owner any areas verify exposed wood structure conditionD.
required to be cleaned / sandblasted
existing roof drain pipe to be repainted6.
replace damaged roof drain pipe andsurounding damaged structure -decking
E.
mat at entrance floor7.
carpet - manufacturer :8.
exterior of building where damagedrepair brick masonry at interior andF.
or missing (match existing)
existing room below (shown dashed)9.to remain and not to be used
existing 4" waste line see: plumbing10.vending N.I.C.11.refrigerator N.I.C.12.water cooler N.I.C.13.damaged brick masonry re: general note14.
roof access hatch w/ permanent ladder15.
new skylight see: reflected ceiling plan16.not used17.
Cambridge Commercial CarpetModel: St. AndrewsColor: 26707 Mid Iron
Stone Tex, Color 52155 (Forest Moss)
Miliken P/4043 - C/123 (Gray) orUS Rubber shure slep
Verde Fountain Tile or similarselect by Architect based on submittal
apply 4" concrete topping slabover entire floor area
G.
1 REVISION No 1 date: August, 2000
1
1
see: reflected ceiling plan
18. provide header 7 feet above finish floor30 inches highprovide 3'-8" (3'-0") wide by 7'-0" high 19."knock out panel" for future wall opening
Circa BuildingCONSTRUCTION DOCUMENT Build-out A6.0
INTERIOR ELEVATION
all new partition walls to have 4" rubber base
REFERENCE NOTES:
1.
INTERIOR ELEVATIONSCALE 1/8"-1'-0"
BNASalt Lake City, Utah
NORTH HALLWAY LOOKING NORTHELEVATION 1
NORTH HALLWAY LOOKING SOUTHELEVATION 2
SCALE 1/8"-1'-0"
INTERIOR ELEVATION
SOUTH HALLWAY LOOKING SOUTHELEVATION 1
ELEVATION 2 SOUTH HALLWAY LOOKING NORTH
INTERIOR ELEVATIONSCALE 1/8"-1'-0"
ELEVATION 1 LOOKING NORTH LOOKING EASTELEVATION 2
LOOKING SOUTHELEVATION 3 LOOKING WESTELEVATION 4
SCALE 1/8"-1'-0"
INTERIOR ELEVATIONINTERIOR ELEVATIONSCALE 1/8"-1'-0"
ELEVATION 2 LOOKING EAST ELEVATION 4 LOOKING WEST
at bottom, except inside of toilet rooms
conference and meeting rooms to have 4" solid maple base clear-coated
LEGEND
painted gypsum board
1/4 clear glazed surface
existing brick at background
aluminum panel
INTERIOR ELEVATIONSCALE 1/8"-1'-0"
INTERIOR ELEVATIONSCALE 1/8"-1'-0"
LOOKING NORTHELEVATION 1LOOKING SOUTHELEVATION 3
INTERIOR ELEVATIONSCALE 1/8"-1'-0"
ELEVATION 1 LOOKING NORTH ELEVATION 3 LOOKING SOUTH
indicates clear plate1/4" tempered glass
TTTT
T
T T T T T T T
TTTTTTTTT
T TT T
where wall ceramic tile are installed.
T galvalum sheating
Rubber Base - Johnsonite , color : 63 Burnt Umber
T
T T TT
T T
top related