8 9 side 2 install hard drives/carriers - intel · p/s aux cpu power connector id led nic2 usb2...

Post on 07-Feb-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Side

2

Front Panel Controls and Indicators(shown with bezel removed)

A. USB 2.0 ConnectorsB. System ID ButtonC. NMI ButtonD. LAN1 LEDE. LAN3 LEDF. Reset Button

G. Status/Fault LEDH. Power ButtonI. HDD LEDJ. LAN4 LEDK. LAN2 LED

A B C D E F G H

IJK

13 Install the Top Cover

B Tighten the four screws.

A Place cover onto chassis and slide forward to engage recessed edge at front of cover. Make sure the latch is locked.

A

A

BRecessedEdge

14 Install RackHandles

12 Install Processor Air DuctInstall processor air duct as shown.

NOTE: Use care to avoid pinching system cables.

Intel® Server Board S1200BTL Component Layout

3

2Default

RecoverJ1F3

BIOSRecovery

3

2Default

ClearJ1E2

CMOSClear

3

2Default

EnabledJ4A2

BMCForce

Update

3

2Default

J1F1

PasswordClear

PasswordClear

3

2Default

J1F2Enabled

MEForce

Update

DIM

M_A

2DI

MM

_A1

DIM

M_B

2DI

MM

_B1

Serial B

InternalUSB

SATA 5

SATA 2SATA 1

SATA 0

Internal USBFloppy Connector

InternalUSB

Front PanelConnector

SATA 4

SATA 3

IPMBSAS ModuleConnector

InternalUSB SSD

SATA_SGPIOSYS FAN_3SYS FAN_ 1 SYS FAN_2

Processor Socket

CPU FanConnector

RMM4 NIC

CMOS batteryHDD LED

TPM

RMM4 LiteSATA Key

Chassis Intrusion

Main PowerConnector

P/SAUX

CPU PowerConnector

ID LEDNIC2USB2USB3

NIC1USB0USB1

SerialPort A

Video

Diagnostic LED

SYS FAN_4

Note: Refer to the Technical Product Specificationfor Diagnostic LED decoder list.

HSBP

Slot

1 (

PCI )

Slot

3 (

PCIe

x 4

)

Slot

4 (

PCIe

x 4

)

Slot

5 (

PCIe

x 4

)

Slot

6 (

PCIe

x 8

) LP

Rise

r

2

Reset Button

NIC 2Link/Act

NIC 1Link/ActPower Button

HDD LED

Power LED

Front Panel Header (J1C1)

Status LED

16 Software • BIOS, Drivers, and Operating System Installation

D. Install Operating System Drivers: With the operating system running, insert the Intel® Server Deployment Toolkit CD. If using a Microsoft Windows* operating system, the Intel® Deployment Assistant will autorun and allow you to select the appropriate drivers to install. On other operating systems, browse the CD folders to locate and install the driver files.

C. Install your Operating System: Use the instructions provided with the RAID controller and with the operating system.

B. Configure your RAID Controller: Use the instructions provided with the RAID controller.

A. Confirm BIOS Version: Look on the Server/System Management screen in the BIOS Setup Utility to determine the installed BIOS version. Compare this to the versions at:http://www.intel.com/support/motherboards/serverIf new versions are available, update the BIOS on your server. See the Techinical Product Specification on the Intel® Server Deployment Toolkit CD for update instructions.

11 Install PCIe Add-inCard RiserAssembly

A Align the riser assemblywith the server boardriser socket.

B Press the riserassembly intoplace and securewith the screw.

PCI Riser Socket

B

ARiser CardConnector

10 Install PCIe Add-in CardA

B

C

CAUTION:Observe normal ESD precautions when installing add-in cards.

Remove filler panel from the add-in card slot.Insert add-in card until it seats in the riser connector.Secure add-in card with screw as shown.

Riser Connector

REMOVE Filler Panel

A

B

Add-in Card

C

15 Finishing Up

Before installing your operating system, you must finish your systeminstallation and connect back panel I/O connectors and AC power. CAUTION: This unit must

be operated with the TOP COVER installed to ensure proper cooling.

2. Connect your keyboard, mouse, video and other I/O cables/devices as shown. Then connect the AC power cord.

1. Make sure you have replaced the system cover.

Network

NIC1

Network

NIC2

USB0, 1

USB2, 3

SerialPort A

Video

AC Power

PCI-E Card

Platform Cabling Diagram

Server Board SATAConnector Legend 5

4

3

2

1

0

Server Board

Power Supply

Front Panel Board

ABCD Backplane

ABCDEF Front Panel USB

Power to Server Board (Main)

Power to Backplane

Power to Server Board (CPU)

Optical Device to Power Supply

PSU Management Bus to AUX

GHIJKLMNOP

Front Panel

HDD 0 to Server Board SATA 0

HDD 1 to Server Board SATA 1

HDD 2 to Server Board SATA 2

HDD 3 to Server Board SATA 3

Link to Backplane SGPIO

Blower Fan #1 Power

Blower Fan #2Power

Blower Fan #3 Power

Optical Device SATA Data Cable

DIM

M A

2DI

MM

A1

DIM

M B

2DI

MM

B1

CPU

HDD 0 HDD 1 HDD 2 HDD 3

Optical Device

A B

C

DE

F

K

C

B

A

GDL

H I J

MN O P

Available DocumentsTechnical Product Specification Quick Reference LabelQuick Start User Guide/System Configuration Guide

Additional Reference documents available at:http://www.intel.com/support/motherboards/server

A complete list of accessories and spares can be found at: http://www.intel.com/support/motherboards/server

Optional Accessories/Spares and Order CodesValue Rail kit AXXVRAILSATA Slim-line DVD AXXSATADVDROMIntel® Remote Management Module 4Intel® Remote Management Module 4 LiteIntel® SAS Entry RAID Module

AXXRMM4

Intel® Trusted Platform Module

AXXRMM4Lite

AXXTPME3AXX4SASMOD

9 Install and Cable Optical Device (optional)

FCRemove the security screws.

Remove the Filler Panel.

DAB

CAUTION: To maintain proper system cooling,a filler blank must be installed if you donot install a deviceat this location.

Pull the power and data cables through the front of the chassis opening.

E Connect the cables as shown.

Rear View

of Optical

Drive C

Insert optical device assembly into front panel opening and push all the way untilit stops .

Install the plastic latch on the rear side of the drive and fix it with two screws.

IMPORTANT NOTE: Refer to the Cabling Diagram below for connection locations and cable routing.

D

Data

Power

Optical

Drive E

FOptical

Device TrayAssembly

B

A

8 Install Hard Drives/Carriers

B Slide the carrier away from the chassis.

A

Attach the hard drive to thecarrier with four screws as shown.

C

D

E

F

Note: Hard drive 3 location is shown above.

Remove the drive carrier by pressing thegreen button and opening the lever.

Remove the air baffle and save forfuture use.

TOPBREAK OFF TAB

BEFORE MOUTING

2.5´´ HARD DRIVE

C

D

3.5´´ HDD

FE

With the lever open, insert the hard disk drive assembly into the chassis opening and push until the locking lever engages.Push in the lever to lock it into place.

CAUTION: If you install less than three drives or devices, empty drive bays must beoccupied by carriers with baffles to maintainproper system cooling.

A

B

top related