445 baltic street retrofit model: wet floodproofing

Post on 20-Jan-2016

229 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

445 BALTIC STREETRETROFIT MODEL: WET FLOODPROOFING

BUILDING SUMMARYLandlord Fi f th Avenue Commit tee

Zone R6

Evacuat ion Zone 2

Resident ial Uni ts 5

Stories 4

Basement Yes

Structure Type Br ick

Elevator? Walk Up

Year Bui l t 1900

Year Al tered 1997

Subsidy LIHTC

Subsidy Start Year 1998

KEY LONG-TERM RESILIENCE CHALLENGES

1. Basement flooding

2. Flooding from attached building

3. Equipment is located below BFE

4. Basement is accessed through an exterior hatch

5. Others?

PROPOSED SOLUTIONWET FLOODPROOFING

WET FLOODPROOFINGDETAILS

WET FLOODPROOFINGIMPLEMENTATION PLAN

WET FLOODPROOFINGREGULATORY BARRIERS

WET FLOODPROOFINGOTHER CHALLENGES

MOST COST-EFFECTIVE SOLUTION(NOTE: If you find a solution that will be more cost effective in the long run that wet floodproofing, please use the following supporting slides to illustrate the idea and its challenges.)

COST-EFFECTIVE SOLUTIONDETAILS

COST-EFFECTIVE SOLUTIONIMPLEMENTATION PLAN

COST-EFFECTIVE SOLUTIONREGULATORY BARRIERS

COST-EFFECTIVE SOLUTIONOTHER CHALLENGES

BEST SOLUTION(NOTE: If you find a solution that team agrees is better for this building than what you’ve already addressed, please use the following supporting slides to illustrate the idea and its challenges.)

BEST SOLUTIONDETAILS

BEST SOLUTIONIMPLEMENTATION PLAN

BEST SOLUTIONREGULATORY BARRIERS

BEST SOLUTIONOTHER CHALLENGES

Are any or all of these solutions models for retrofitting other, similar buildings?

DISCUSSION QUESTIONS

top related