19/09/2016

1

The Safe Route to

Construction

Lorraine YarrAIQA, AInstAM(Dip), Tech IOSH

19/09/2016

2

Background

• Working within the area of Health & Safety Management since

2003.

• Gaining well over ten years experience:

Manufacturing

Quarrying

Civil engineering

Construction

• Working with both Principal and Sub-Contractors

Construction Planning &

Management of Site Wide

ArrangementsGenerally, much construction work is transient and therefore the needs

of the site can change daily.

Many accidents that occur on site, can often be attributed to poor

planning, design and installation of temporary works.Source: CITB GE700C

In order to get things “right” the Principal Contractor must be provided

with relevant site information and suitable space.

19/09/2016

3

Important Areas for

ConsiderationTemporary Works

Site features & facilities

Site Security

Pedestrian & traffic routes

Materials storage and lay-down areas

Utility services

Location of the Site Office

Welfare facilities

First Aid

Emergency response plans

Signs & notices

Waste storage & disposal

Site Set Up & Establishment

VISIT SITE

Check Pre-Construction Information Pack

Local environment – Neighbouring properties

Use google maps

Plan for car parking

Plan for material deliveries

PRODUCE SITE MAP

Parking

Waste & Recycling

Welfare

Fire Assembly & First Aid

19/09/2016

4

Site Induction

Site location

Project Details

Project Team

Emergency Procedures

Site Rules

Site Specific Risks

Daily Hot Spots

Site Fencing Classified as Temporary Works

Suitable to prevent unauthorised access, especially children

Inspected & Maintained throughout the duration of construction

Create a good impression

Ideally have separate access point for pedestrians & vehicles

19/09/2016

5

Traffic Management &

SegregationCan change daily

Aim to keep Pedestrians & Vehicles apart

Organised parking areas

Material deliveries

Storage areas

Use of one way systems

Emergency access

Site HousekeepingJust in Time Deliveries

Designated storage & lay-down areas

19/09/2016

6

Site Housekeeping

Waste Materials, space to segregate & hold until disposal

Site Housekeeping

Cleaning regime, clear work areas & site walkways

19/09/2016

7

Welfare Arrangements

Changing / Drying Room - with somewhere to store belongings

Toilets – Portable for initial set up only

Washing Facilities

Canteen – hot water & somewhere to heat food

Rest area

Emergency ProceduresSite Specific

Clearly displayed

Communicated at Induction

Tested - regularly

19/09/2016

8

Case Study – No.1Costa Coffee – Spires Centre, Armagh City

Case Study – No.1Costa Coffee – Spires Centre, Armagh City

Challenges:

Busy shopping centre.

Construction site location within car

parking & road area.

Segregation of traffic & pedestrians.

Space constraints for site set-up – site

office, welfare, materials storage, waste

segregation.

Facilitating HGV delivery lorries to existing

premises.

19/09/2016

9

Case Study – No.1Costa Coffee – Spires Centre, Armagh City

Planned Approach:

Construction Phase Plan – taking into account stipulated restrictions on car parking

Traffic Management Plan – high level of control required, Car park works completed in 3 phases

Risk Assessment for Site Set Up

Site Specific Induction

Communication Plan – liaison with existing premises

Case Study – No.1Costa Coffee – Spires Centre, Armagh City

19/09/2016

10

Case Study – No.2Mark Royal House, Student Accommodation – Royal Avenue, Belfast City Centre

Case Study – No.2Mark Royal House, Student Accommodation – Royal Avenue, Belfast City Centre

Challenges:

Busy city centre location.

Two elevations – Royal Ave & Donegall St.

with operational offices between.

Only access to rear courtyard was via a low

roofed vehicle ramp. Wouldn’t

accommodate anything bigger than a car /

small box van.

Space constraints for site set-up – site

office, welfare, materials storage, waste

segregation.

Traffic & Parking restrictions on both

elevations.

19/09/2016

11

Case Study – No.2Mark Royal House, Student Accommodation – Royal Avenue, Belfast City Centre

Planned Approach:

Construction Phase Plan – taking into account the huge level of site restrictions

Traffic Management Plan – high level of control required, to accommodate deliveries and co-ordination of

skips for waste removal.

Risk Assessment for Site Set Up

Site Specific Induction

Communication Plan – liaison with existing premises

Case Study – No.2Mark Royal House, Student Accommodation – Royal Avenue, Belfast City Centre

Access ramp to rear set down

area.

All scaffolding and construction

materials had to be carried to

this area.

19/09/2016

12

Case Study – No.2Mark Royal House, Student Accommodation – Royal Avenue, Belfast City Centre

Case Study – No.3Omniplex Cinema– Highfield Rd, Craigavon

19/09/2016

13

Case Study – No.3Omniplex Cinema– Highfield Rd, Craigavon

Challenges:

Very few!

Choosing a suitable location for the site

compound – to minimise moving as the

site ground works progressed.

Case Study – No.3Omniplex Cinema– Highfield Rd, Craigavon

Planned Approach:

Construction Phase Plan

Traffic Management Plan – still required a high level of control, due to the vast open areas of the site.

Risk Assessment for Site Set Up

Site Specific Site Induction

19/09/2016

14

Case Study – No.3Omniplex Cinema– Highfield Rd, Craigavon

Summary

Planning is key to having a successful site

Work as a Team

Set your expectations early

Monitor

Improve

19/09/2016

15

WYG Additional Services

We offer our clients a broad range of high value services to ensure they are provided with the best

support necessary to comply with current H&S Legislation. These skills are at the heart of the decision

making process and are essential to the effective control at all stages of a project Life Cycle.

These services include;

• CDM Coordination & CDM advisory support

• Due diligence review and auditing

• Site Inspections and site auditing

• Logistical and Buildability planning

• Safety programming

• Reality Checks and Soft Landings

If you would like any more information, or see how we can help you succeed in your corporate and project ambitions please visit: www.wyg.com