2x250mw, tpp cseb, korba (e)

Post on 17-Jan-2016

84 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

2x250MW, TPP CSEB, KORBA (E). WELCOMES. HON'BLE CHIEF MINISTER OF CHHATTISGARH STATE. ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1. DEVELOPED BY:- B. ADHIKARY, EE (IE). BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA (E). OIL TANK. OIL LINE. BOILER. - PowerPoint PPT Presentation

TRANSCRIPT

WELCOMESWELCOMES

ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1ON THE OCCASION OF BOILER LIGHT UP OF UNIT #1

DEVELOPED BY:- DEVELOPED BY:- B. ADHIKARY, B. ADHIKARY, EE (IE)EE (IE)

Flue Gas Duct

ID FanID Fan

CHIMNEY

ELECTROSTATIC

PRECIPITATOR

BOILEBOILERR

FD Fan

OIL TAN

K

WATER TANK

OIL LINEOIL LINE

WATER WATER LINELINE

AIR LINEAIR LINE

BOILER LIGHT UP UNIT #1 BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA 2X250 MW, TPP, CSEB, KORBA

(E)(E)

BOILER LIGHT UP UNIT #1 BOILER LIGHT UP UNIT #1 2X250 MW, TPP, CSEB, KORBA 2X250 MW, TPP, CSEB, KORBA

(E)(E)

DM DM PUMPPUMP

OIL OIL PUMPPUMPCOMPRESSCOMPRESS

OROR

WIND BOX

WINDBOX

SA SA

Coal/Oil Burner

Coal/A

ir M

ixtu

reA

tom

ized

O

il

Internal Combustion BoilerCorner Fired (Tangential)

Fuel Firing System

water walls

water walls

wate

r walls

FURNACEFIRE BALL

wate

r walls

Drum

From HPT To IPT

W/W Platen

To Boiler Drum

Drum

To HPT

From HPT To IPT

To Boiler Drum

ECO

RH

RH

Pre

pare

d b

y:-

B. A

dh

ikary

, EE (IE

), K

E

LTSH

Inte

rnal

Com

bu

stio

n

Boile

r

APH-A

BFP

Oil Guns

Coal Burner

ESP

To atmosphere through chimney

FD Fan Flue gas exit

ID Fan

Wind Box

FSH

FSH

Hot SA

Cold SA

PLTSH

PLTSH

APH

PlSH

PlSH

RH

RHR

H

RH

FSH

FSH

Eco

PSH

147Kg/cm2

5400

C

Generator Transforme

r

Generator

Turbine

Boiler

Coal Bunkers

Primary Air Fans

Coal Mills

Raw Coal Fdr

Ch

imn

ey

Flue Gas Duct

Induced Draft Fan

Coal Conveyer

Coal Bunker

CSEB Crusher House

400/220 KV

Switch Yard

400/220 KV15.75

KV

Condenser

Boiler Feed Pump

2x250MW, Thermal Power Project CSEB, Korba (E) Prepared by:

B Adhikary (I.E.)

2x250MW, Thermal Power Project CSEB, Korba (E) Prepared by:

B Adhikary (I.E.)

Coal Handling Plant

Forced Draft Fan

BoilerDrum

3000 rpm

210MW

Plant LayoutPlant LayoutPlant LayoutPlant Layout

ESPESP

AH

Cold PA Hot PA