2020 entry point schedule effective date: 01/01/2020 ... · facility name: cortland willow...

Post on 07-Oct-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

BELLE ACRES MOBILE HOME PARKOH7800212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859116EP001

Facility Name: BELLE ACRES MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BELLE ACRES MOBILE HOME PARKOH7800212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLE ACRES MOBILE PARK DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLE ACRES MOBILE PARK DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BELLE ACRES MOBILE HOME PARKOH7800212

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BELLE ACRES MOBILE PARK DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BROOKFIELD ACRES MHC PWSOH7800312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859117EP001

Facility Name: BROOKFIELD ACRES MHC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BROOKFIELD ACRES MHC PWSOH7800312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BROOKFIELD ACRES MHC DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BROOKFIELD ACRES MHC DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BROOKFIELD ACRES MHC PWSOH7800312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BROOKFIELD ACRES MHC DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BROOKFIELD ACRES MHC DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CORTLAND CITY PWSOH7800512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859119EP001

Facility Name: CORTLAND WILLOW PARK/SOUTH WELLS - STU 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CORTLAND CITY PWSOH7800512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7860610EP002

Facility Name: CORTLAND ADMIN. BLDG./NORTH WELLS -STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP002

EP002

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CORTLAND CITY PWSOH7800512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7862495EP003

Facility Name: CORTLAND BRADLEE/BROWNLEE(NEW WELL)STU 3

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP003

EP003

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CORTLAND CITY PWSOH7800512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CORTLAND, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20208TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20208 2/1/2020 andSample(s) Required between 3/31/20208 3/1/2020 andSample(s) Required between 4/30/20208 4/1/2020 andSample(s) Required between 5/31/20208 5/1/2020 andSample(s) Required between 6/30/20208 6/1/2020 andSample(s) Required between 7/31/20208 7/1/2020 andSample(s) Required between 8/31/20208 8/1/2020 andSample(s) Required between 9/30/20208 9/1/2020 andSample(s) Required between 10/31/20208 10/1/2020 andSample(s) Required between 11/30/20208 11/1/2020 andSample(s) Required between 12/31/20208 12/1/2020 and

Sample(s) Required between 1/31/20208TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20208 2/1/2020 andSample(s) Required between 3/31/20208 3/1/2020 andSample(s) Required between 4/30/20208 4/1/2020 andSample(s) Required between 5/31/20208 5/1/2020 andSample(s) Required between 6/30/20208 6/1/2020 andSample(s) Required between 7/31/20208 7/1/2020 andSample(s) Required between 8/31/20208 8/1/2020 andSample(s) Required between 9/30/20208 9/1/2020 andSample(s) Required between 10/31/20208 10/1/2020 andSample(s) Required between 11/30/20208 11/1/2020 andSample(s) Required between 12/31/20208 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CORTLAND, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

CORTLAND CITY PWSOH7800512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CORTLAND, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CORTLAND, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CONCORD CARE CENTER OF CORTLANDOH7800712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859120EP001

Facility Name: CONCORD CARE CENTER - CORTLAND

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CONCORD CARE CENTER OF CORTLANDOH7800712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONCORD CARE CTR DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONCORD CARE CTR DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

CONCORD CARE CENTER OF CORTLANDOH7800712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONCORD CARE CTR DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CONCORD CARE CENTER - HARTFORDOH7800812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859121EP001

Facility Name: CONCORD CARE CTR-HARTFORD

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CONCORD CARE CENTER - HARTFORDOH7800812

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONCORD CARE CTR-HARTFORD- DISTRIBUTDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONCORD CARE CTR-HARTFORD- DISTRIBUTDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

CONCORD CARE CENTER - HARTFORDOH7800812

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CONCORD CARE CTR-HARTFORD- DISTRIBUTLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

FOWLER MOBILE HOME PARKOH7801012

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859122EP001

Facility Name: FOWLER MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

FOWLER MOBILE HOME PARKOH7801012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FOWLER MOBILE HOME PARK DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FOWLER MOBILE HOME PARK DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

FOWLER MOBILE HOME PARKOH7801012

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: FOWLER MOBILE HOME PARK DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

GIRARD CITY PWSOH7801103

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202015TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202015 2/1/2020 andSample(s) Required between 3/31/202015 3/1/2020 andSample(s) Required between 4/30/202015 4/1/2020 andSample(s) Required between 5/31/202015 5/1/2020 andSample(s) Required between 6/30/202015 6/1/2020 andSample(s) Required between 7/31/202015 7/1/2020 andSample(s) Required between 8/31/202015 8/1/2020 andSample(s) Required between 9/30/202015 9/1/2020 andSample(s) Required between 10/31/202015 10/1/2020 andSample(s) Required between 11/30/202015 11/1/2020 andSample(s) Required between 12/31/202015 12/1/2020 and

Sample(s) Required between 1/31/202015TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202015 2/1/2020 andSample(s) Required between 3/31/202015 3/1/2020 andSample(s) Required between 4/30/202015 4/1/2020 andSample(s) Required between 5/31/202015 5/1/2020 andSample(s) Required between 6/30/202015 6/1/2020 andSample(s) Required between 7/31/202015 7/1/2020 andSample(s) Required between 8/31/202015 8/1/2020 andSample(s) Required between 9/30/202015 9/1/2020 andSample(s) Required between 10/31/202015 10/1/2020 andSample(s) Required between 11/30/202015 11/1/2020 andSample(s) Required between 12/31/202015 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 1 PETRO PL.

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and

GIRARD CITY PWSOH7801103

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 1 PETRO PL.

Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 100 W. MAIN ST.

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS203 55 HARRY ST.

Dual Sample Required between 2/7/2020at: DS203DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2035/1/2020 andDual Sample Required between 8/7/2020at: DS2038/1/2020 andDual Sample Required between 11/7/2020at: DS20311/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 330 TRUMBULL

Dual Sample Required between 2/7/2020at: DS204DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2045/1/2020 andDual Sample Required between 8/7/2020at: DS2048/1/2020 and

GIRARD CITY PWSOH7801103

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 330 TRUMBULL

Dual Sample Required between 11/7/2020at: DS204DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: GIRARD,CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

WARREN WOODS ESTATES MHPOH7801312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859125EP001

Facility Name: WARREN WOODS ESTATES MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

WARREN WOODS ESTATES MHPOH7801312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN WOODS ESTATES MHP DISTRIBUTIODS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN WOODS ESTATES MHP DISTRIBUTIODS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

WARREN WOODS ESTATES MHPOH7801312

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN WOODS ESTATES MHP DISTRIBUTIOLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

HUBBARD CITY PWSOH7801415

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859126EP001

Facility Name: HUBBARD WTP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Source: Surface Water

EP001

EP001

Sample WEEKLYTOTAL MICROCYSTINS 1

HUBBARD CITY PWSOH7801415

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HUBBARD CITYPWS DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HUBBARD CITYPWS DISTRIBUTION Facility Class: CLASS 1DS201 204 WEST LIBERTY

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 andDual Sample Required between 11/7/2020at: DS20111/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

HUBBARD CITY PWSOH7801415

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HUBBARD CITYPWS DISTRIBUTION Facility Class: CLASS 1DS202 340 PARKVIEW

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HUBBARD CITYPWS DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LAKEVIEW MOBILE HOME PARKOH7801712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859127EP001

Facility Name: LAKEVIEW MOBILE HOME PARK STU 1

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LAKEVIEW MOBILE HOME PARKOH7801712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7860611EP002

Facility Name: LAKEVIEW MOBILE HOME PARK STU 2

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP002

EP002

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Sample(s) Required betweenRADIOLOGICALS 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Sample for all the analytes listed below:

GROSS ALPHA - 4002 RADIUM-228 - 4030

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

LAKEVIEW MOBILE HOME PARKOH7801712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKEVIEW MOBILE HOME PK DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKEVIEW MOBILE HOME PK DISTRIBUTIONDS201 2934 DURST ROAD

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

LAKEVIEW MOBILE HOME PARKOH7801712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LAKEVIEW MOBILE HOME PK DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MAHONING VALLEY SANITARY DISTRICTOH7801811

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859128EP001

Facility Name: MAHONING VALLEY SANI DIST MEANDER CREEK

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

MAHONING VALLEY SANITARY DISTRICTOH7801811

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859128EP001/LT2001

Facility Name: MAHONING VALLEY SANI DIST MEANDER CREEK

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

MAHONING VALLEY SANITARY DISTRICTOH7801811

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859128LT2001

Facility Name: MAHONING VALLEY SANI DIST MEANDER CREEK

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

MAHONING VALLEY SANITARY DISTRICTOH7801811

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAHONING VALLEY SAN DIST DISTRIBUTIONDS000

Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAHONING VALLEY SAN DIST DISTRIBUTIONDS201 1181 OHLTOWN-MCDONALD RD.

Dual Sample Required between 2/14/2020at: DS201DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2015/8/2020 andDual Sample Required between 8/14/2020at: DS2018/8/2020 andDual Sample Required between 11/14/2020at: DS20111/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

MAHONING VALLEY SANITARY DISTRICTOH7801811

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAHONING VALLEY SAN DIST DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MCDONALD VILLAGE PWSOH7802003

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCDONALD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20206TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20206 2/1/2020 andSample(s) Required between 3/31/20206 3/1/2020 andSample(s) Required between 4/30/20206 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20206 10/1/2020 andSample(s) Required between 11/30/20206 11/1/2020 andSample(s) Required between 12/31/20206 12/1/2020 and

Sample(s) Required between 1/31/20206TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20206 2/1/2020 andSample(s) Required between 3/31/20206 3/1/2020 andSample(s) Required between 4/30/20206 4/1/2020 andSample(s) Required between 5/31/20206 5/1/2020 andSample(s) Required between 6/30/20206 6/1/2020 andSample(s) Required between 7/31/20206 7/1/2020 andSample(s) Required between 8/31/20206 8/1/2020 andSample(s) Required between 9/30/20206 9/1/2020 andSample(s) Required between 10/31/20206 10/1/2020 andSample(s) Required between 11/30/20206 11/1/2020 andSample(s) Required between 12/31/20206 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCDONALD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 451 OHIO AVE.

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and

MCDONALD VILLAGE PWSOH7802003

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCDONALD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 451 OHIO AVE.

Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCDONALD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 1 ROSSLER DRIVE

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MCDONALD, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

MIDWAY MOBILE HOMES LLCOH7802112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859130EP001

Facility Name: MIDWAY MOBILE HOMES LLC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MIDWAY MOBILE HOMES LLCOH7802112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MIDWAY MOBILE HOMES LLC DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MIDWAY MOBILE HOMES LLC DISTRIBUTIONDS201 21 BENNETT ST

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

MIDWAY MOBILE HOMES LLCOH7802112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MIDWAY MOBILE HOMES LLC DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NEWTON FALLS CITYOH7802311

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859131EP001

Facility Name: NEWTON FALLS PWS

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

EP001

EP001

Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

NEWTON FALLS CITYOH7802311

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859131EP001/LT2001

Facility Name: NEWTON FALLS PWS

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

NEWTON FALLS CITYOH7802311

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859131LT2001

Facility Name: NEWTON FALLS PWS

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenLT2 MONITORING 1 1/6/2020 and 1/10/2020Sample(s) Required between1 2/3/2020 and 2/7/2020Sample(s) Required between1 3/2/2020 and 3/6/2020Sample(s) Required between1 4/6/2020 and 4/10/2020Sample(s) Required between1 5/4/2020 and 5/8/2020Sample(s) Required between1 6/1/2020 and 6/5/2020Sample(s) Required between1 7/6/2020 and 7/10/2020Sample(s) Required between1 8/7/2020 and 8/11/2020Sample(s) Required between1 9/7/2020 and 9/11/2020Sample(s) Required between1 10/5/2020 and 10/9/2020Sample(s) Required between1 11/2/2020 and 11/6/2020Sample(s) Required between1 12/7/2020 and 12/11/2020

Sample(s) Required betweenLT2 MATRIX SPIKE SAMPLE 1 11/2/2020 and 11/6/2020

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020

NEWTON FALLS CITYOH7802311

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859131LT2001

Facility Name: NEWTON FALLS PWS

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 3Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/13/2020 and 12/19/2020

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

NEWTON FALLS CITYOH7802311

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NEWTON FALLS, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20207TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20207 2/1/2020 andSample(s) Required between 3/31/20207 3/1/2020 andSample(s) Required between 4/30/20207 4/1/2020 andSample(s) Required between 5/31/20207 5/1/2020 andSample(s) Required between 6/30/20207 6/1/2020 andSample(s) Required between 7/31/20207 7/1/2020 andSample(s) Required between 8/31/20207 8/1/2020 andSample(s) Required between 9/30/20207 9/1/2020 andSample(s) Required between 10/31/20207 10/1/2020 andSample(s) Required between 11/30/20207 11/1/2020 andSample(s) Required between 12/31/20207 12/1/2020 and

Sample(s) Required between 1/31/20207TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20207 2/1/2020 andSample(s) Required between 3/31/20207 3/1/2020 andSample(s) Required between 4/30/20207 4/1/2020 andSample(s) Required between 5/31/20207 5/1/2020 andSample(s) Required between 6/30/20207 6/1/2020 andSample(s) Required between 7/31/20207 7/1/2020 andSample(s) Required between 8/31/20207 8/1/2020 andSample(s) Required between 9/30/20207 9/1/2020 andSample(s) Required between 10/31/20207 10/1/2020 andSample(s) Required between 11/30/20207 11/1/2020 andSample(s) Required between 12/31/20207 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NEWTON FALLS, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 3260 CARSON SALT SPRING RD

Dual Sample Required between 3/7/2020at: DS201DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2016/1/2020 andDual Sample Required between 9/7/2020at: DS2019/1/2020 and

NEWTON FALLS CITYOH7802311

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NEWTON FALLS, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 3260 CARSON SALT SPRING RD

Dual Sample Required between 12/7/2020at: DS201DISINFECTION BYPRODUCTS 12/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NEWTON FALLS, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 340 RIDGE RD

Dual Sample Required between 3/7/2020at: DS202DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2026/1/2020 andDual Sample Required between 9/7/2020at: DS2029/1/2020 andDual Sample Required between 12/7/2020at: DS20212/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NEWTON FALLS, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

NILES CITY PWSOH7802403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NILES, CITY OF DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/202025TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and

Sample(s) Required between 1/31/202025TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202025 2/1/2020 andSample(s) Required between 3/31/202025 3/1/2020 andSample(s) Required between 4/30/202025 4/1/2020 andSample(s) Required between 5/31/202025 5/1/2020 andSample(s) Required between 6/30/202025 6/1/2020 andSample(s) Required between 7/31/202025 7/1/2020 andSample(s) Required between 8/31/202025 8/1/2020 andSample(s) Required between 9/30/202025 9/1/2020 andSample(s) Required between 10/31/202025 10/1/2020 andSample(s) Required between 11/30/202025 11/1/2020 andSample(s) Required between 12/31/202025 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NILES, CITY OF DISTRIBUTION Facility Class: CLASS 1DS201 2249 YOUNGSTOWN WARREN RD.

Dual Sample Required between 2/14/2020at: DS201DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2015/8/2020 andDual Sample Required between 8/14/2020at: DS2018/8/2020 andDual Sample Required between 11/14/2020at: DS20111/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

NILES CITY PWSOH7802403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NILES, CITY OF DISTRIBUTION Facility Class: CLASS 1DS202 3328 RIDGE RD.

Dual Sample Required between 2/14/2020at: DS202DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2025/8/2020 andDual Sample Required between 8/14/2020at: DS2028/8/2020 andDual Sample Required between 11/14/2020at: DS20211/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NILES, CITY OF DISTRIBUTION Facility Class: CLASS 1DS203 48 VIENNA

Dual Sample Required between 2/14/2020at: DS203DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2035/8/2020 andDual Sample Required between 8/14/2020at: DS2038/8/2020 andDual Sample Required between 11/14/2020at: DS20311/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NILES, CITY OF DISTRIBUTION Facility Class: CLASS 1DS204 999 SUMMIT ST.

Dual Sample Required between 2/14/2020at: DS204DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2045/8/2020 andDual Sample Required between 8/14/2020at: DS2048/8/2020 andDual Sample Required between 11/14/2020at: DS20411/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

NILES CITY PWSOH7802403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: NILES, CITY OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202030LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

PLEASANT PARK MOBILE COURTOH7802512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859133EP001

Facility Name: PLEASANT PARK MOBILE COURT

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

PLEASANT PARK MOBILE COURTOH7802512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLEASANT PARK MOBILE COU DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLEASANT PARK MOBILE COU DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

PLEASANT PARK MOBILE COURTOH7802512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLEASANT PARK MOBILE COU DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

AQUA OHIO - MASURYOH7802711

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859134EP001

Facility Name: AQUA OHIO, INC.- MASURY

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Source: Surface Water

EP001

EP001

Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Sample WEEKLYTOTAL MICROCYSTINS 1

Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 6/1/2020 and 10/31/2020

AQUA OHIO - MASURYOH7802711

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO, INC. - MASURY DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO, INC. - MASURY DISTRIBUTION Facility Class: CLASS 1DS201 908 BROADWAY AVENUE

Dual Sample Required between 2/14/2020at: DS201DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2015/8/2020 andDual Sample Required between 8/14/2020at: DS2018/8/2020 andDual Sample Required between 11/14/2020at: DS20111/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

AQUA OHIO - MASURYOH7802711

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO, INC. - MASURY DISTRIBUTION Facility Class: CLASS 1DS202 7835 ELM STREET

Dual Sample Required between 2/14/2020at: DS202DISINFECTION BYPRODUCTS 2/8/2020 andDual Sample Required between 5/14/2020at: DS2025/8/2020 andDual Sample Required between 8/14/2020at: DS2028/8/2020 andDual Sample Required between 11/14/2020at: DS20211/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: AQUA OHIO, INC. - MASURY DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

STONEYBROOKE VILLAGE MHPOH7802912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859136EP001

Facility Name: STONEYBROOKE VILLAGE MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

STONEYBROOKE VILLAGE MHPOH7802912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STONEYBROOKE VILLAGE MHP DISTRIBUTIO Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STONEYBROOKE VILLAGE MHP DISTRIBUTIO Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

STONEYBROOKE VILLAGE MHPOH7802912

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: STONEYBROOKE VILLAGE MHP DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

TRUMBULL CO.-SOUTHEAST PWSOH7803203

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-SOUTHEAST DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202010TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

Sample(s) Required between 1/31/202010TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202010 2/1/2020 andSample(s) Required between 3/31/202010 3/1/2020 andSample(s) Required between 4/30/202010 4/1/2020 andSample(s) Required between 5/31/202010 5/1/2020 andSample(s) Required between 6/30/202010 6/1/2020 andSample(s) Required between 7/31/202010 7/1/2020 andSample(s) Required between 8/31/202010 8/1/2020 andSample(s) Required between 9/30/202010 9/1/2020 andSample(s) Required between 10/31/202010 10/1/2020 andSample(s) Required between 11/30/202010 11/1/2020 andSample(s) Required between 12/31/202010 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-SOUTHEAST DISTRIBUTION Facility Class: CLASS 1DS201 1122 SR 193

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and

TRUMBULL CO.-SOUTHEAST PWSOH7803203

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-SOUTHEAST DISTRIBUTION Facility Class: CLASS 1DS201 1122 SR 193

Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-SOUTHEAST DISTRIBUTION Facility Class: CLASS 1DS202 7860 CONNELLY

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-SOUTHEAST DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

TRUMBULL CO.-MINERAL RIDGE PWSOH7803503

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MINERAL RID DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20203TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20203 2/1/2020 andSample(s) Required between 3/31/20203 3/1/2020 andSample(s) Required between 4/30/20203 4/1/2020 andSample(s) Required between 5/31/20203 5/1/2020 andSample(s) Required between 6/30/20203 6/1/2020 andSample(s) Required between 7/31/20203 7/1/2020 andSample(s) Required between 8/31/20203 8/1/2020 andSample(s) Required between 9/30/20203 9/1/2020 andSample(s) Required between 10/31/20203 10/1/2020 andSample(s) Required between 11/30/20203 11/1/2020 andSample(s) Required between 12/31/20203 12/1/2020 and

Sample(s) Required between 1/31/20203TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20203 2/1/2020 andSample(s) Required between 3/31/20203 3/1/2020 andSample(s) Required between 4/30/20203 4/1/2020 andSample(s) Required between 5/31/20203 5/1/2020 andSample(s) Required between 6/30/20203 6/1/2020 andSample(s) Required between 7/31/20203 7/1/2020 andSample(s) Required between 8/31/20203 8/1/2020 andSample(s) Required between 9/30/20203 9/1/2020 andSample(s) Required between 10/31/20203 10/1/2020 andSample(s) Required between 11/30/20203 11/1/2020 andSample(s) Required between 12/31/20203 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MINERAL RID DISTRIBUTION Facility Class: CLASS 1DS201 3816 EDWARDS ST.

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and

TRUMBULL CO.-MINERAL RIDGE PWSOH7803503

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MINERAL RID DISTRIBUTION Facility Class: CLASS 1DS201 3816 EDWARDS ST.

Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MINERAL RID DISTRIBUTION Facility Class: CLASS 1DS202 1330 SEABORN ST.

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MINERAL RID DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

VALLEY MOBILE HOMESOH7803712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859140EP001

Facility Name: VALLEY MHP

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

VALLEY MOBILE HOMESOH7803712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: VALLEY MOBILE HOMES DISTRIBUTIONDS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: VALLEY MOBILE HOMES DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

VALLEY MOBILE HOMESOH7803712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: VALLEY MOBILE HOMES DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

WARREN CITY PWSOH7803811

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859141EP001

Facility Name: WARREN WTP

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

EP001

Sample(s) Required betweenINORGANICS 1 6/1/2020 and 10/31/2020 Sample for all the analytes listed below:

ANTIMONY, TOTAL - 1074 ARSENIC - 1005 BARIUM - 1010 BERYLLIUM, TOTAL - 1075 CADMIUM - 1015 CHROMIUM - 1020

CYANIDE - 1024 FLUORIDE - 1025 MERCURY - 1035 NICKEL - 1036 SELENIUM - 1045 THALLIUM, TOTAL - 1085

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 1/1/2020 and 1/31/2020Sample(s) Required between1 2/1/2020 and 2/29/2020Sample(s) Required between1 3/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 4/30/2020Sample(s) Required between1 5/1/2020 and 5/31/2020Sample(s) Required between1 6/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 7/31/2020Sample(s) Required between1 8/1/2020 and 8/31/2020Sample(s) Required between1 9/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 10/31/2020Sample(s) Required between1 11/1/2020 and 11/30/2020Sample(s) Required between1 12/1/2020 and 12/31/2020

Not RequiredRADIOLOGICALS

Sample(s) Required betweenSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1 1 4/1/2020 and 6/30/2020 Sample for all the analytes listed below:

ALACHLOR (LASSO) - 2051 ATRAZINE - 2050 SIMAZINE - 2037

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020

Paired Sample Set Required betweenTOTAL ORGANIC CARBON (TOC) 1 1/1/2020 and 1/31/2020Paired Sample Set Required between1 2/1/2020 and 2/29/2020Paired Sample Set Required between1 3/1/2020 and 3/31/2020Paired Sample Set Required between1 4/1/2020 and 4/30/2020Paired Sample Set Required between1 5/1/2020 and 5/31/2020Paired Sample Set Required between1 6/1/2020 and 6/30/2020Paired Sample Set Required between1 7/1/2020 and 7/31/2020Paired Sample Set Required between1 8/1/2020 and 8/31/2020Paired Sample Set Required between1 9/1/2020 and 9/30/2020Paired Sample Set Required between1 10/1/2020 and 10/31/2020Paired Sample Set Required between1 11/1/2020 and 11/30/2020Paired Sample Set Required between1 12/1/2020 and 12/31/2020

A paired sample set refers to one source water and one treated water sample. A source water alkalinity is also required at the same time theTOC sample is taken.

WARREN CITY PWSOH7803811

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859141EP001/LT2001

Facility Name: WARREN WTP

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

EP001

LT2001

Sample Set Required WEEKLY*TOTAL MICROCYSTINS 1

Total microcystins sample set refers to one raw source water sample at LT2001 and one finished water sample at EP001. A week is definedas Sunday through Saturday.

*Weekly sampling unless requirements for reduced monitoring are met. Current reduced monitoring schedules can be found athttp://epa.ohio.gov/ddagw/HAB.aspx. Reduced monitoring is contingent on a public water system continuing to experience NO raw orfinished water total microcystins detections. Any total microcystins detections during routine (weekly) or reduced sampling will triggeradditional sampling. Please refer to the website above for specifics on follow-up sampling requirements.

WARREN CITY PWSOH7803811

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859141LT2001

Facility Name: WARREN WTP

Effective Date: 04/17/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 4Facility Source: Surface Water

LT200

LT2001

Sample(s) Required betweenCYANOBACTERIA SCREENING 1 12/29/2019 and 1/4/2020Sample(s) Required between1 1/12/2020 and 1/18/2020Sample(s) Required between1 1/26/2020 and 2/1/2020Sample(s) Required between1 2/9/2020 and 2/15/2020Sample(s) Required between1 2/23/2020 and 2/29/2020Sample(s) Required between1 3/8/2020 and 3/14/2020Sample(s) Required between1 3/22/2020 and 3/28/2020Sample(s) Required between1 4/5/2020 and 4/11/2020Sample(s) Required between1 4/19/2020 and 4/25/2020Sample(s) Required between1 5/3/2020 and 5/9/2020Sample(s) Required between1 5/17/2020 and 5/23/2020Sample(s) Required between1 5/31/2020 and 6/6/2020Sample(s) Required between1 6/14/2020 and 6/20/2020Sample(s) Required between1 6/28/2020 and 7/4/2020Sample(s) Required between1 7/12/2020 and 7/18/2020Sample(s) Required between1 7/26/2020 and 8/1/2020Sample(s) Required between1 8/9/2020 and 8/15/2020Sample(s) Required between1 8/23/2020 and 8/29/2020Sample(s) Required between1 9/6/2020 and 9/12/2020Sample(s) Required between1 9/20/2020 and 9/26/2020Sample(s) Required between1 10/4/2020 and 10/10/2020Sample(s) Required between1 10/18/2020 and 10/24/2020Sample(s) Required between1 11/1/2020 and 11/7/2020Sample(s) Required between1 11/15/2020 and 11/21/2020Sample(s) Required between1 11/29/2020 and 12/5/2020Sample(s) Required between1 12/13/2020 and 12/19/2020

Cyanobacteria screening sample is to be collected biweekly from raw source water at sample point LT2001 unless requirements for reducedmonitoring are met. Current reduced monitoring schedules can be found at http://epa.ohio.gov/ddagw/HAB.aspx. As of 12/31/17, all publicwater systems are responsible for contracting with a lab certified to perform cyanobacteria screening (qPCR). Please review the website forfurther information pertaining to follow-up sampling requirements for cyanobacteria screening gene detections, and certified labs that canperform analysis.

WARREN CITY PWSOH7803811

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/202060TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/202060 2/1/2020 andSample(s) Required between 3/31/202060 3/1/2020 andSample(s) Required between 4/30/202060 4/1/2020 andSample(s) Required between 5/31/202060 5/1/2020 andSample(s) Required between 6/30/202060 6/1/2020 andSample(s) Required between 7/31/202060 7/1/2020 andSample(s) Required between 8/31/202060 8/1/2020 andSample(s) Required between 9/30/202060 9/1/2020 andSample(s) Required between 10/31/202060 10/1/2020 andSample(s) Required between 11/30/202060 11/1/2020 andSample(s) Required between 12/31/202060 12/1/2020 and

Sample(s) Required between 1/31/202060TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/202060 2/1/2020 andSample(s) Required between 3/31/202060 3/1/2020 andSample(s) Required between 4/30/202060 4/1/2020 andSample(s) Required between 5/31/202060 5/1/2020 andSample(s) Required between 6/30/202060 6/1/2020 andSample(s) Required between 7/31/202060 7/1/2020 andSample(s) Required between 8/31/202060 8/1/2020 andSample(s) Required between 9/30/202060 9/1/2020 andSample(s) Required between 10/31/202060 10/1/2020 andSample(s) Required between 11/30/202060 11/1/2020 andSample(s) Required between 12/31/202060 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 3825 WEST MARKET ST.

Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 and

WARREN CITY PWSOH7803811

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS201 3825 WEST MARKET ST.

Dual Sample Required between 10/14/2020at: DS201DISINFECTION BYPRODUCTS 10/8/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS202 2847 PARKMAN RD.

Dual Sample Required between 1/14/2020at: DS202DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2024/8/2020 andDual Sample Required between 7/14/2020at: DS2027/8/2020 andDual Sample Required between 10/14/2020at: DS20210/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS203 2436 NILES ROAD

Dual Sample Required between 1/14/2020at: DS203DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2034/8/2020 andDual Sample Required between 7/14/2020at: DS2037/8/2020 andDual Sample Required between 10/14/2020at: DS20310/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS204 210 HIGH STREET

Dual Sample Required between 1/14/2020at: DS204DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2044/8/2020 andDual Sample Required between 7/14/2020at: DS2047/8/2020 and

WARREN CITY PWSOH7803811

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2DS204 210 HIGH STREET

Dual Sample Required between 10/14/2020at: DS204DISINFECTION BYPRODUCTS 10/8/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WARREN, CITY OF DISTRIBUTION Facility Class: CLASS 2LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

WEST FARMINGTON VILLAGE PWSOH7803911

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST FARMINGTON, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 4/30/20201TOTAL COLIFORM (TCR) - 3100 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 4/30/20201TOTAL CHLORINE - 1000 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST FARMINGTON, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS201 6006 STATE ROUTE 534

Dual Sample Required between 6/7/2020at: DS201DISINFECTION BYPRODUCTS 6/1/2020 andDual Sample Required between 9/7/2020at: DS2019/1/2020 andDual Sample Required between 12/7/2020at: DS20112/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST FARMINGTON, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 6973 N. GIRDLE ROAD

Dual Sample Required between 6/7/2020at: DS202DISINFECTION BYPRODUCTS 6/1/2020 andDual Sample Required between 9/7/2020at: DS2029/1/2020 and

WEST FARMINGTON VILLAGE PWSOH7803911

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

05/15/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST FARMINGTON, VILLAGE DISTRIBUTION Facility Class: CLASS 1DS202 6973 N. GIRDLE ROAD

Dual Sample Required between 12/7/2020at: DS202DISINFECTION BYPRODUCTS 12/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: WEST FARMINGTON, VILLAGE DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/202020LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202020 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

TRUMBULL CO. - BAZETTA/CHAMPIONOH7804303

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO-BAZETTA/CHAM DISTRIBUTIO Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20209TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20209 2/1/2020 andSample(s) Required between 3/31/20209 3/1/2020 andSample(s) Required between 4/30/20209 4/1/2020 andSample(s) Required between 5/31/20209 5/1/2020 andSample(s) Required between 6/30/20209 6/1/2020 andSample(s) Required between 7/31/20209 7/1/2020 andSample(s) Required between 8/31/20209 8/1/2020 andSample(s) Required between 9/30/20209 9/1/2020 andSample(s) Required between 10/31/20209 10/1/2020 andSample(s) Required between 11/30/20209 11/1/2020 andSample(s) Required between 12/31/20209 12/1/2020 and

Sample(s) Required between 1/31/20209TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20209 2/1/2020 andSample(s) Required between 3/31/20209 3/1/2020 andSample(s) Required between 4/30/20209 4/1/2020 andSample(s) Required between 5/31/20209 5/1/2020 andSample(s) Required between 6/30/20209 6/1/2020 andSample(s) Required between 7/31/20209 7/1/2020 andSample(s) Required between 8/31/20209 8/1/2020 andSample(s) Required between 9/30/20209 9/1/2020 andSample(s) Required between 10/31/20209 10/1/2020 andSample(s) Required between 11/30/20209 11/1/2020 andSample(s) Required between 12/31/20209 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO-BAZETTA/CHAM DISTRIBUTIO Facility Class: CLASS 1DS201 4131 HOAGLAND BLACKSTUB

Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 and

TRUMBULL CO. - BAZETTA/CHAMPIONOH7804303

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO-BAZETTA/CHAM DISTRIBUTIO Facility Class: CLASS 1DS201 4131 HOAGLAND BLACKSTUB

Dual Sample Required between 10/14/2020at: DS201DISINFECTION BYPRODUCTS 10/8/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO-BAZETTA/CHAM DISTRIBUTIO Facility Class: CLASS 1DS202 4576 LEAVITT ROAD

Dual Sample Required between 1/14/2020at: DS202DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2024/8/2020 andDual Sample Required between 7/14/2020at: DS2027/8/2020 andDual Sample Required between 10/14/2020at: DS20210/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO-BAZETTA/CHAM DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

LORDSTOWN VILLAGE PWSOH7804403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LORDSTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20204TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Sample(s) Required between 1/31/20204TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20204 2/1/2020 andSample(s) Required between 3/31/20204 3/1/2020 andSample(s) Required between 4/30/20204 4/1/2020 andSample(s) Required between 5/31/20204 5/1/2020 andSample(s) Required between 6/30/20204 6/1/2020 andSample(s) Required between 7/31/20204 7/1/2020 andSample(s) Required between 8/31/20204 8/1/2020 andSample(s) Required between 9/30/20204 9/1/2020 andSample(s) Required between 10/31/20204 10/1/2020 andSample(s) Required between 11/30/20204 11/1/2020 andSample(s) Required between 12/31/20204 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LORDSTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 8521 YERKE YOUNG RD.

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and

LORDSTOWN VILLAGE PWSOH7804403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LORDSTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS201 8521 YERKE YOUNG RD.

Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LORDSTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1DS202 2996 HEWITT-GIFFORD RD.

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: LORDSTOWN, VILLAGE OF DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

PLALAN LAKE WATER ASSOC.OH7804512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859145EP001

Facility Name: PLALAN LAKE WATER ASSOCIATION

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

PLALAN LAKE WATER ASSOC.OH7804512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLALAN LAKE WATER ASSOC. DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLALAN LAKE WATER ASSOC. DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

PLALAN LAKE WATER ASSOC.OH7804512

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLALAN LAKE WATER ASSOC. DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

BOYDS KINSMAN HOME PWSOH7804712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859147EP001

Facility Name: BOYDS KINSMAN HOME

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020

Not RequiredRADIOLOGICALS

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BOYDS KINSMAN HOME PWSOH7804712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOYDS KINSMAN HOME DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOYDS KINSMAN HOME DISTRIBUTION Facility Class: CLASS 1DS201 7929 STATE ROUTE 5

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BOYDS KINSMAN HOME PWSOH7804712

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BOYDS KINSMAN HOME DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

TRUMBULL CO.-WARREN TWP PWSOH7806112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-WARREN TWP DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-WARREN TWP DISTRIBUTION Facility Class: CLASS 1DS201 6500 WOODVIEW CIRCLE

Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 and

TRUMBULL CO.-WARREN TWP PWSOH7806112

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-WARREN TWP DISTRIBUTION Facility Class: CLASS 1DS201 6500 WOODVIEW CIRCLE

Dual Sample Required between 10/14/2020at: DS201DISINFECTION BYPRODUCTS 10/8/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-WARREN TWP DISTRIBUTION Facility Class: CLASS 1DS202 4632 PENDLETON RD

Dual Sample Required between 1/14/2020at: DS202DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2024/8/2020 andDual Sample Required between 7/14/2020at: DS2027/8/2020 andDual Sample Required between 10/14/2020at: DS20210/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-WARREN TWP DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

TRUMBULL CO.-HOWLAND TWP PWSOH7806303

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-HOWLAND TWP DISTRIBUTIO Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20207TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20207 2/1/2020 andSample(s) Required between 3/31/20207 3/1/2020 andSample(s) Required between 4/30/20207 4/1/2020 andSample(s) Required between 5/31/20207 5/1/2020 andSample(s) Required between 6/30/20207 6/1/2020 andSample(s) Required between 7/31/20207 7/1/2020 andSample(s) Required between 8/31/20207 8/1/2020 andSample(s) Required between 9/30/20207 9/1/2020 andSample(s) Required between 10/31/20207 10/1/2020 andSample(s) Required between 11/30/20207 11/1/2020 andSample(s) Required between 12/31/20207 12/1/2020 and

Sample(s) Required between 1/31/20207TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20207 2/1/2020 andSample(s) Required between 3/31/20207 3/1/2020 andSample(s) Required between 4/30/20207 4/1/2020 andSample(s) Required between 5/31/20207 5/1/2020 andSample(s) Required between 6/30/20207 6/1/2020 andSample(s) Required between 7/31/20207 7/1/2020 andSample(s) Required between 8/31/20207 8/1/2020 andSample(s) Required between 9/30/20207 9/1/2020 andSample(s) Required between 10/31/20207 10/1/2020 andSample(s) Required between 11/30/20207 11/1/2020 andSample(s) Required between 12/31/20207 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-HOWLAND TWP DISTRIBUTIO Facility Class: CLASS 1DS201 9658 CAIN DR.

Dual Sample Required between 2/7/2020at: DS201DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2015/1/2020 andDual Sample Required between 8/7/2020at: DS2018/1/2020 and

TRUMBULL CO.-HOWLAND TWP PWSOH7806303

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-HOWLAND TWP DISTRIBUTIO Facility Class: CLASS 1DS201 9658 CAIN DR.

Dual Sample Required between 11/7/2020at: DS201DISINFECTION BYPRODUCTS 11/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-HOWLAND TWP DISTRIBUTIO Facility Class: CLASS 1DS202 2150 SILVER FOX

Dual Sample Required between 2/7/2020at: DS202DISINFECTION BYPRODUCTS 2/1/2020 andDual Sample Required between 5/7/2020at: DS2025/1/2020 andDual Sample Required between 8/7/2020at: DS2028/1/2020 andDual Sample Required between 11/7/2020at: DS20211/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-HOWLAND TWP DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202020LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

TRUMBULL CO.-MOSQUITO CREEK PWSOH7806403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MOSQUITO CR DISTRIBUTION Facility Class: CLASS 1DS000

Not RequiredASBESTOS - 1094

Sample(s) Required between 1/31/20202TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Sample(s) Required between 1/31/20202TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20202 2/1/2020 andSample(s) Required between 3/31/20202 3/1/2020 andSample(s) Required between 4/30/20202 4/1/2020 andSample(s) Required between 5/31/20202 5/1/2020 andSample(s) Required between 6/30/20202 6/1/2020 andSample(s) Required between 7/31/20202 7/1/2020 andSample(s) Required between 8/31/20202 8/1/2020 andSample(s) Required between 9/30/20202 9/1/2020 andSample(s) Required between 10/31/20202 10/1/2020 andSample(s) Required between 11/30/20202 11/1/2020 andSample(s) Required between 12/31/20202 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MOSQUITO CR DISTRIBUTION Facility Class: CLASS 1DS201 1939 SR 46

Dual Sample Required between 1/14/2020at: DS201DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2014/8/2020 andDual Sample Required between 7/14/2020at: DS2017/8/2020 and

TRUMBULL CO.-MOSQUITO CREEK PWSOH7806403

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MOSQUITO CR DISTRIBUTION Facility Class: CLASS 1DS201 1939 SR 46

Dual Sample Required between 10/14/2020at: DS201DISINFECTION BYPRODUCTS 10/8/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MOSQUITO CR DISTRIBUTION Facility Class: CLASS 1DS202 7767 CASTLE ROCK

Dual Sample Required between 1/14/2020at: DS202DISINFECTION BYPRODUCTS 1/8/2020 andDual Sample Required between 4/14/2020at: DS2024/8/2020 andDual Sample Required between 7/14/2020at: DS2027/8/2020 andDual Sample Required between 10/14/2020at: DS20210/8/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO.-MOSQUITO CR DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

TRUMBULL CO. - BRACEVILLE TWP PWSOH7806503

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO BRACEVILLE TWP DISTRIBUTI Facility Class: CLASS 1DS000

Sample(s) Required between 1/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Sample(s) Required between 1/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 2/29/20201 2/1/2020 andSample(s) Required between 3/31/20201 3/1/2020 andSample(s) Required between 4/30/20201 4/1/2020 andSample(s) Required between 5/31/20201 5/1/2020 andSample(s) Required between 6/30/20201 6/1/2020 andSample(s) Required between 7/31/20201 7/1/2020 andSample(s) Required between 8/31/20201 8/1/2020 andSample(s) Required between 9/30/20201 9/1/2020 andSample(s) Required between 10/31/20201 10/1/2020 andSample(s) Required between 11/30/20201 11/1/2020 andSample(s) Required between 12/31/20201 12/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO BRACEVILLE TWP DISTRIBUTI Facility Class: CLASS 1DS201 BRACEVILLE ROBINSON RD S OF CHERRY ST

Dual Sample Required between 3/7/2020at: DS201DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2016/1/2020 andDual Sample Required between 9/7/2020at: DS2019/1/2020 andDual Sample Required between 12/7/2020at: DS20112/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

TRUMBULL CO. - BRACEVILLE TWP PWSOH7806503

2020 DISTRIBUTION SCHEDULE

CommunitySystem Type: Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

** REMINDER: ** Consumer Confidence Report (CCR) is due July 1, 2020

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO BRACEVILLE TWP DISTRIBUTI Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 3/7/2020at: DS202DISINFECTION BYPRODUCTS 3/1/2020 andDual Sample Required between 6/7/2020at: DS2026/1/2020 andDual Sample Required between 9/7/2020at: DS2029/1/2020 andDual Sample Required between 12/7/2020at: DS20212/1/2020 and

Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: TRUMBULL CO BRACEVILLE TWP DISTRIBUTI Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/202010LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202010 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

BELL WICK BOWL

2020 MONITORING SCHEDULE

OH7830212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BELL WICK BOWL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BELL WICK BOWL

2020 MONITORING SCHEDULE

OH7830212 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BELLWICK BOWLING LANESGround Water

7859151

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MILLERS BLOOMFIELD INN

2020 MONITORING SCHEDULE

OH7830412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MILLERS BLOOMFIELD INN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MILLERS BLOOMFIELD INN

2020 MONITORING SCHEDULE

OH7830412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MILLERS BLOOMFIELD INNGround Water

7859152

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP SUGARBUSH LODGE

2020 MONITORING SCHEDULE

OH7830912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CAMP SUGARBUSH LODGE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CAMP SUGARBUSH LODGE

2020 MONITORING SCHEDULE

OH7830912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CAMP SUGARBUSH LODGEGround Water

7859154

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HOLE IN THE WALL

2020 MONITORING SCHEDULE

OH7833012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HOLE IN THE WALL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HOLE IN THE WALL

2020 MONITORING SCHEDULE

OH7833012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HOLE IN THE WALL INCGround Water

7859160

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NANCYS COZY CAFE

2020 MONITORING SCHEDULE

OH7834512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: NANCYS COZY CAFE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

NANCYS COZY CAFE

2020 MONITORING SCHEDULE

OH7834512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: NANCYS COZY CAFEGround Water

7859162

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BLOOMFIELD HIGH SCHOOLOH7835212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859166EP001

Facility Name: BLOOMFIELD HIGH SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BLOOMFIELD HIGH SCHOOLOH7835212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BLOOMFIELD HIGH SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BLOOMFIELD HIGH SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BLOOMFIELD HIGH SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

BRISTOL LOCAL SCHOOLOH7835312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859167EP001

Facility Name: BRISTOL LOCAL SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BRISTOL LOCAL SCHOOLOH7835312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BRISTOL LOCAL SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BRISTOL LOCAL SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BRISTOL LOCAL SCHOOL DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

BRISTOL LOCAL SCHOOLOH7835312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BRISTOL LOCAL SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

PARADISE LAKES

2020 MONITORING SCHEDULE

OH7835412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: PARADISE LAKES DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PARADISE LAKES

2020 MONITORING SCHEDULE

OH7835412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PARADISE LAKES DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PARADISE LAKES

2020 MONITORING SCHEDULE

OH7835412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PARADISE LAKESGround Water

7859168

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRISTOLWOOD GOLF COURSE

2020 MONITORING SCHEDULE

OH7835512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BRISTOLWOOD GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRISTOLWOOD GOLF COURSE

2020 MONITORING SCHEDULE

OH7835512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BRISTOLWOOD GOLF COURSEGround Water

7859169

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRONZWOOD GOLF COURSE

2020 MONITORING SCHEDULE

OH7835612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BRONZWOOD GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BRONZWOOD GOLF COURSE

2020 MONITORING SCHEDULE

OH7835612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BRONZWOOD GOLF COURSEGround Water

7859170

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CANDYWOOD

2020 MONITORING SCHEDULE

OH7835912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CANDYWOOD DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CANDYWOOD

2020 MONITORING SCHEDULE

OH7835912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CANDYWOOD DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CANDYWOOD

2020 MONITORING SCHEDULE

OH7835912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CANDYWOODGround Water

7859173

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROCK OF GRACE CHURCH

2020 MONITORING SCHEDULE

OH7836512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ROCK OF GRACE CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROCK OF GRACE CHURCH

2020 MONITORING SCHEDULE

OH7836512 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ROCK OF GRACE CHURCHGround Water

7859176

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CURRIE ELEMENTARY SCHOOLOH7836712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859178EP001

Facility Name: CURRIE ELEMENTARY SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

CURRIE ELEMENTARY SCHOOLOH7836712

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CURRIE ELEMENTARY SCHOOL DISTRIBUTIONFacility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: CURRIE ELEMENTARY SCHOOL DISTRIBUTIONFacility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

DAIRY OASIS

2020 MONITORING SCHEDULE

OH7836812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DAIRY OASIS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DAIRY OASIS

2020 MONITORING SCHEDULE

OH7836812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DAIRY OASISGround Water

7859179

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROBINSON LAKESIDE RETREAT PWS

2020 MONITORING SCHEDULE

OH7836912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: ROBINSON LAKESIDE RETREAT DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROBINSON LAKESIDE RETREAT PWS

2020 MONITORING SCHEDULE

OH7836912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ROBINSON LAKESIDE RETREAT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ROBINSON LAKESIDE RETREAT PWS

2020 MONITORING SCHEDULE

OH7836912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ROBINSON LAKESIDE RETREATGround Water

7859180

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TOBEYS PUB AND GRILLE

2020 MONITORING SCHEDULE

OH7837012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TOBEYS PUB DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TOBEYS PUB AND GRILLE

2020 MONITORING SCHEDULE

OH7837012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TOBEYS PUB & GRILLGround Water

7859181

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DEER CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7837112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: DEER CREEK GOLF COURSE DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DEER CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7837112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

06/19/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DEER CREEK GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DEER CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7837112 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DEER CREEK GOLF COURSEGround Water

7859182

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HIDDEN OAKS GOLF COURSE

2020 MONITORING SCHEDULE

OH7837412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HIDDEN OAKS GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HIDDEN OAKS GOLF COURSE

2020 MONITORING SCHEDULE

OH7837412 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HIDDEN OAKS GOLF COURSEGround Water

7859183

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CROSSROADS BAR AND GRILL

2020 MONITORING SCHEDULE

OH7838112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CROSROADS BAR & GRILL DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CROSSROADS BAR AND GRILL

2020 MONITORING SCHEDULE

OH7838112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CROSSROADS BAR AND GRILLGround Water

7859187

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HALF-WAY RESTAURANT

2020 MONITORING SCHEDULE

OH7838312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: HALF-WAY RESTAURANT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HALF-WAY RESTAURANT

2020 MONITORING SCHEDULE

OH7838312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HALFWAY RESTAURANTGround Water

7859189

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JOSEPH BADGER MEADOWS-CAMP

2020 MONITORING SCHEDULE

OH7838812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JOSEPH BADGER MEADOWS-CA DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JOSEPH BADGER MEADOWS-CAMP

2020 MONITORING SCHEDULE

OH7838812 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JOSEPH BADGER MEADOWS CAMPGround Water

7859190

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAPLEWOOD HIGH SCHOOLOH7839512

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859194EP001

Facility Name: MAPLEWOOD HS

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Sample(s) Required betweenVOLATILE ORGANIC CHEMICALS (VOC) 1 7/1/2020 and 9/30/2020

MAPLEWOOD HIGH SCHOOLOH7839512

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLEWOOD HIGH SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLEWOOD HIGH SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLEWOOD HIGH SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

MESOPOTAMIA ELEMENTARY SCHOOLOH7839912

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859196EP001

Facility Name: MESOPOTAMIA ELEMENTARY SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MESOPOTAMIA ELEMENTARY SCHOOLOH7839912

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MESOPOTAMIA ELEMENTARY S DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MESOPOTAMIA ELEMENTARY S DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

CHRISSY'S LAKE TAVERN

2020 MONITORING SCHEDULE

OH7840012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHRISSY'S LAKE TAVERN DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHRISSY'S LAKE TAVERN

2020 MONITORING SCHEDULE

OH7840012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHRISSY'S LAKE TAVERNGround Water

7859197

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PIKIE BAY CAMPGROUND

2020 MONITORING SCHEDULE

OH7840712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PIKIE BAY CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PIKIE BAY CAMPGROUND

2020 MONITORING SCHEDULE

OH7840712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PIKIE BAY CAMPGROUNDGround Water

7859200

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP

2020 MONITORING SCHEDULE

OH7841312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: RIDGE RANCH CAMP DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP

2020 MONITORING SCHEDULE

OH7841312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RIDGE RANCH CAMP DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP

2020 MONITORING SCHEDULE

OH7841312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP003 Facility Source:

Facility Name: RIDGE RANCH CAMP STU 3Ground Water

7861909

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP

2020 MONITORING SCHEDULE

OH7841312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: RIDGE RANCH CAMP STU 2Ground Water

7861799

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP

2020 MONITORING SCHEDULE

OH7841312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIDGE RANCH CAMP STU 1Ground Water

7859204

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP-A LINE

2020 MONITORING SCHEDULE

OH7841412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: RIDGE RANCH CAMP-A LINE DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP-A LINE

2020 MONITORING SCHEDULE

OH7841412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RIDGE RANCH CAMP-A LINE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIDGE RANCH CAMP-A LINE

2020 MONITORING SCHEDULE

OH7841412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIDGE RANCH CAMP A LINEGround Water

7859205

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PEBBLES HIDDEN HILL

2020 MONITORING SCHEDULE

OH7842312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PEBBLES HIDDEN HILLGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PEBBLES HIDDEN HILL

2020 MONITORING SCHEDULE

OH7842312 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PEBBLES HIDDEN HILLGround Water

7859210

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TAMER WIN GOLF COURSE

2020 MONITORING SCHEDULE

OH7842612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TAMER WIN GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TAMER WIN GOLF COURSE

2020 MONITORING SCHEDULE

OH7842612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TAMER WIN GOLF COURSEGround Water

7859212

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TIMES SQUARE RESTAURANT, LLC

2020 MONITORING SCHEDULE

OH7842712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: TIMES SQUARE RESTAURANT DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

TIMES SQUARE RESTAURANT, LLC

2020 MONITORING SCHEDULE

OH7842712 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: TIMES SQUARE RESTAURANTGround Water

7859213

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

VILLA MARIA TERESA PRESCHOOLOH7843212

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859215EP001

Facility Name: VILLA MARIA TERESA PRESCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

VILLA MARIA TERESA PRESCHOOLOH7843212

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: VILLA MARIA TERESA PRESC DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: VILLA MARIA TERESA PRESC DISTRIBUTIONDS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: VILLA MARIA TERESA PRESC DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

WILLOW LAKE PARK

2020 MONITORING SCHEDULE

OH7843312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: WILLOW LAKE PARK DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILLOW LAKE PARK

2020 MONITORING SCHEDULE

OH7843312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: WILLOW LAKE PARK DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILLOW LAKE PARK

2020 MONITORING SCHEDULE

OH7843312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: WILLOW LAKE PARK STU 2Ground Water

7860612

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

WILLOW LAKE PARK

2020 MONITORING SCHEDULE

OH7843312 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: WILLOW LAKE WELL 1 STU 1Ground Water

7859216

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JANS CAMPGROUND

2020 MONITORING SCHEDULE

OH7843512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: JAN'S CAMPGROUND DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JANS CAMPGROUND

2020 MONITORING SCHEDULE

OH7843512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

04/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JAN'S CAMPGROUND DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JANS CAMPGROUND

2020 MONITORING SCHEDULE

OH7843512 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to6/1 10/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JAN'S CAMPGROUNDGround Water

7859217

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVERVIEW GOLF-CLUBHOUSE

2020 MONITORING SCHEDULE

OH7845112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: RIVERVIEW GOLF-CLUBHOUSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

RIVERVIEW GOLF-CLUBHOUSE

2020 MONITORING SCHEDULE

OH7845112 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: RIVERVIEW GOLF CLUBHOUSEGround Water

7859222

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAPLEWOOD ELEMENTARY K-6OH7848812

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859228EP001

Facility Name: MAPLEWOOD ELEMENTARY K-6

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

MAPLEWOOD ELEMENTARY K-6OH7848812

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLEWOOD ELEMENTARY K-6 DISTRIBUTIO Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLEWOOD ELEMENTARY K-6 DISTRIBUTIO Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: MAPLEWOOD ELEMENTARY K-6 DISTRIBUTIO Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 6/30/202010LEAD - 1030 AND COPPER - 1022 1/1/2020 andSample(s) Required between 12/31/202010 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

ELMVIEW PROFESSIONAL PARK 1 PWS

2020 MONITORING SCHEDULE

OH7849712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ELMVIEW PROF. PK. WELL 1 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ELMVIEW PROFESSIONAL PARK 1 PWS

2020 MONITORING SCHEDULE

OH7849712 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ELMVIEW PROF PK WELL 1Ground Water

7859233

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JAKS FINE FOODS

2020 MONITORING SCHEDULE

OH7850012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: JAKS FINE FOODS DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JAKS FINE FOODS

2020 MONITORING SCHEDULE

OH7850012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: JAKS FINE FOODSGround Water Facility Class: CLASS A

7859234

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BAYLOFF STAMPED PRODUCTS-KINSMANOH7850312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7859237EP001

Facility Name: BAYLOFF STAMPED PRODUCTS-KINSMAN

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

BAYLOFF STAMPED PRODUCTS-KINSMANOH7850312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BAYLOFF STAMPED PRODUCTS-K DISTRIBUTDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: BAYLOFF STAMPED PRODUCTS-K DISTRIBUTLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CORTLAND MOOSE LODGE

2020 MONITORING SCHEDULE

OH7850412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: CORTLAND MOOSE LODGE DISTRIBUTIONGround Water

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CORTLAND MOOSE LODGE

2020 MONITORING SCHEDULE

OH7850412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CORTLAND MOOSE LODGE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CORTLAND MOOSE LODGE

2020 MONITORING SCHEDULE

OH7850412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CORTLAND MOOSE LODGE 1012Ground Water

7859238

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ELMVIEW PROFESSIONAL PARK 2 PWS

2020 MONITORING SCHEDULE

OH7851812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: ELMVIEW PROF. PK. WELL 2 DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

ELMVIEW PROFESSIONAL PARK 2 PWS

2020 MONITORING SCHEDULE

OH7851812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: ELMVIEW PROF PK WELL 2Ground Water

7859248

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

YANKEE LAKE-BALLROOM

2020 MONITORING SCHEDULE

OH7851912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: YANKEE LAKE-BALLROOM DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

YANKEE LAKE-BALLROOM

2020 MONITORING SCHEDULE

OH7851912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP002 Facility Source:

Facility Name: YANKEE LAKE BALLROOM STU 2Ground Water

7860617

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

YANKEE LAKE-BALLROOM

2020 MONITORING SCHEDULE

OH7851912 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: YANKEE LAKE BALLROOM STU 1Ground Water

7859249

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEACON OF HOPE BAPTIST CHURCH

2020 MONITORING SCHEDULE

OH7852912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: BEACON OF HOPE BAPTIST C DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

BEACON OF HOPE BAPTIST CHURCH

2020 MONITORING SCHEDULE

OH7852912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: BEACON OF HOPE BAPTIST CHURCHGround Water

7859259

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DUCK CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7853012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DUCK CREEK GOLF COURSE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DUCK CREEK GOLF COURSE

2020 MONITORING SCHEDULE

OH7853012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DUCK CREEK GOLF COURSEGround Water

7859260

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PARKMAN ROAD CHURCH OF CHRIST

2020 MONITORING SCHEDULE

OH7853212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: PARKMAN ROAD CHURCH OF CHRISTGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PARKMAN ROAD CHURCH OF CHRIST

2020 MONITORING SCHEDULE

OH7853212 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: PARKMAN ROAD CHURCH OF CHRISTGround Water

7859262

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PLEASANT VALLEY CHURCH AND SCHOOLOH7854312

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7861237EP001

Facility Name: PLEASANT VALLEY CHURCH AND SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenPHTHALATE - 2039 1 4/1/2020 and 6/30/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 7/1/2020 and 9/30/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

PLEASANT VALLEY CHURCH AND SCHOOLOH7854312

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

08/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLEASANT VALLEY CH AND SCH DISTRIBUTIOFacility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLEASANT VALLEY CH AND SCH DISTRIBUTIOFacility Class: CLASS 1DS201 CHURCH KITCHEN HAND SINK

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: PLEASANT VALLEY CH AND SCH DISTRIBUTIOFacility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 12/31/202010LEAD - 1030 AND COPPER - 1022 7/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

SLN TEMPLE PWS

2020 MONITORING SCHEDULE

OH7854612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: SLN TEMPLE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

SLN TEMPLE PWS

2020 MONITORING SCHEDULE

OH7854612 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: SLN TEMPLEGround Water

7861625

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

JOSEPH BADGER LOCAL SCHOOL PWSOH7854712

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7861644EP001

Facility Name: JOSEPH BADGER LOCAL SCHOOL

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Sample(s) Required betweenARSENIC - 1005 1 1/1/2020 and 3/31/2020Sample(s) Required between1 4/1/2020 and 6/30/2020Sample(s) Required between1 7/1/2020 and 9/30/2020Sample(s) Required between1 10/1/2020 and 12/31/2020

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

JOSEPH BADGER LOCAL SCHOOL PWSOH7854712

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JOSEPH BADGER SCHOOL DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Sample(s) Required between 3/31/20201TOTAL CHLORINE - 1000 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Samples should be collected at the same time and place as the Total Coliform samples.

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JOSEPH BADGER SCHOOL DISTRIBUTION Facility Class: CLASS 1DS201 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS201DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JOSEPH BADGER SCHOOL DISTRIBUTION Facility Class: CLASS 1DS202 ADDRESS NOT KNOWN

Dual Sample Required between 9/30/2020at: DS202DISINFECTION BYPRODUCTS 7/1/2020 and Sample for all the analytes listed below:

1) TOTAL HALOACETIC ACIDS (HAA5) – 24562) TTHM - 2950

JOSEPH BADGER LOCAL SCHOOL PWSOH7854712

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: JOSEPH BADGER SCHOOL DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/202010LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

MAIN STREET CONVENIENCE LLC.

2020 MONITORING SCHEDULE

OH7854812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: MAIN STREET CONVENIENCE DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

MAIN STREET CONVENIENCE LLC.

2020 MONITORING SCHEDULE

OH7854812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: MAIN STREET CONVENIENCE LLCGround Water

7861709

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

APOSTOLAKIS HONDA PWS

2020 MONITORING SCHEDULE

OH7855012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: APOSTOLAKIS HONDA DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

APOSTOLAKIS HONDA PWS

2020 MONITORING SCHEDULE

OH7855012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: APOSTOLAKIS HONDAGround Water

7862065

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HOPEWELL INN PWSOH7855112

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7862067EP001

Facility Name: HOPEWELL INN

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS 1Facility Source: Ground Water

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

HOPEWELL INN PWSOH7855112

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HOPEWELL INN DISTRIBUTION Facility Class: CLASS 1DS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: HOPEWELL INN DISTRIBUTION Facility Class: CLASS 1LC### Refer to your Lead and Copper plan for SMP IDs

Not RequiredLEAD - 1030 AND COPPER - 1022

KATIES KORNER INC

2020 MONITORING SCHEDULE

OH7855412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: KATIES KORNERS INC DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

KATIES KORNER INC

2020 MONITORING SCHEDULE

OH7855412 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: KATIES KORNERS INCGround Water

7862153

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GREENE EAGLE WINERY PWS

2020 MONITORING SCHEDULE

OH7855612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: GREENE EAGLE WINERY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

GREENE EAGLE WINERY PWS

2020 MONITORING SCHEDULE

OH7855612 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: GREENE EAGLE WINERYGround Water

7862259

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

COUNTRY PORCH WINERY PWS

2020 MONITORING SCHEDULE

OH7855812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: COUNTRY PORCH WINERY DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

COUNTRY PORCH WINERY PWS

2020 MONITORING SCHEDULE

OH7855812 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: COUNTRY PORCH WINERYGround Water

7862315

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHAMPION BAPTIST CHURCH PWS

2020 MONITORING SCHEDULE

OH7855912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: CHAMPION BAPTIST CHURCH DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHAMPION BAPTIST CHURCH PWS

2020 MONITORING SCHEDULE

OH7855912 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHAMPION BAPTIST CHURCHGround Water

7862445

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

END OF COMMONS PWS

2020 MONITORING SCHEDULE

OH7856012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: END OF COMMONS DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

END OF COMMONS PWS

2020 MONITORING SCHEDULE

OH7856012 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: END OF COMMONSGround Water

7862446

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

PRIMETALS TECHNOLOGIES, LLCOH7856314

ENTRY POINT MONITORING SCHEDULE

2020 ENTRY POINT SCHEDULE

Nontransient NoncommunitySystem Type: Operating Period: to1/1 12/31

SamplingLocation

Facility ID: SMP ID:

7862497EP001

Facility Name: PRIMETALS TECHNOLOGIES, LLC

Effective Date: 01/01/2020

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

Facility Class: CLASS AFacility Source:

EP001

EP001

Not RequiredINORGANICS

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Not RequiredSYNTHETIC ORGANIC CHEMICALS (SOC) GROUP 1

Not RequiredVOLATILE ORGANIC CHEMICALS (VOC)

PRIMETALS TECHNOLOGIES, LLCOH7856314

2020 DISTRIBUTION SCHEDULE

Nontransient NoncommunitySystem Type: Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

DISTRIBUTION MONITORING SCHEDULE

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONDS000

Sample(s) Required between 3/31/20201TOTAL COLIFORM (TCR) - 3100 1/1/2020 andSample(s) Required between 6/30/20201 4/1/2020 andSample(s) Required between 9/30/20201 7/1/2020 andSample(s) Required between 12/31/20201 10/1/2020 and

Chemicals Monitoring Requirements

SamplingLocationSamplingLocation SMP ID:

Facility ID: DS1 Facility Name: DISTRIBUTIONLC### Refer to your Lead and Copper plan for SMP IDs

Sample(s) Required between 9/30/20205LEAD - 1030 AND COPPER - 1022 6/1/2020 and

Lead consumer notice must be completed no later than two business days after receipt of the sample results. The verification form forconsumer notice must be submitted to Ohio EPA no later than five business days after receipt of the sample results. Lead and copper samplemonitoring point (SMP) IDs (LC###) must be current and reflect properly tiered sites according to OAC Rule 3745-81-86. Submit lead andcopper SMP ID revisions to your Ohio EPA District Office. Forms and templates are available online athttp://epa.ohio.gov/ddagw/pws/leadandcopper.aspx. For questions contact your Ohio EPA District Office representative.

CHURCH OF LDS - CHAMPION TWP PWS

2020 MONITORING SCHEDULE

OH7856315 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHURCH OF LDS - CHAMPION TWP PWS

2020 MONITORING SCHEDULE

OH7856315 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHURCH OF LDS - CHAMPION TWPGround Water

7862498

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHURCH OF LDS - LIBERTY TWP PWS

2020 MONITORING SCHEDULE

OH7856316 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

CHURCH OF LDS - LIBERTY TWP PWS

2020 MONITORING SCHEDULE

OH7856316 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: CHURCH OF LDS - LIBERTY TWPGround Water

7862499

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTFORD HILL WINERY PWS

2020 MONITORING SCHEDULE

OH7856317 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

HARTFORD HILL WINERY PWS

2020 MONITORING SCHEDULE

OH7856317 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: HARTFORD HILL WINERYGround Water

7862500

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #15988 - BRISTOLVILLE

2020 MONITORING SCHEDULE

OH7856318 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #15988 - BRISTOLVILLE

2020 MONITORING SCHEDULE

OH7856318 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL #15988 - BRISTOLVILLEGround Water

7862501

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #17594 - MESOPOTAMIA

2020 MONITORING SCHEDULE

OH7856320 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #17594 - MESOPOTAMIA

2020 MONITORING SCHEDULE

OH7856320 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL #17594 - MESOPOTAMIAGround Water

7862503

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LIBERTY BIBLE CHURCH PWS

2020 MONITORING SCHEDULE

OH7856321 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

02/14/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTIONGround Water

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

LIBERTY BIBLE CHURCH PWS

2020 MONITORING SCHEDULE

OH7856321 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: LIBERTY BIBLE CHURCHGround Water

7862504

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #19491 - CORTLAND

2020 MONITORING SCHEDULE

OH7856324 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #19491 - CORTLAND

2020 MONITORING SCHEDULE

OH7856324 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL #19491 - CORTLAND PLANTGround Water

7862507

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE CAMP

2020 MONITORING SCHEDULE

OH7856325 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: SUP01 Facility Source:

Facility Name: DISTRIBUTION

DS1

At least 1 negative Total ColiformBacteria sample prior to servingwater to the public

TOTAL COLIFORM - SEASONAL STARTUP

*** Seasonal start-up sample does not count for routine compliance requirements. Collect at least one special purpose (SP) sample for totalcoliform (TC) analysis at the service connection considered to be most susceptible to contamination. The sample must be TC negative before thesystem may serve water to the public. If the sample is positive, contact your Ohio EPA District Representative for additional requirements. Ifyour start date is different from last year, please contact your Ohio EPA District Representative.***

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE CAMP

2020 MONITORING SCHEDULE

OH7856325 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

THE CAMP

2020 MONITORING SCHEDULE

OH7856325 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to5/1 9/30

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: THE CAMP PLANTGround Water

7862508

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #20066 - HARTFORD

2020 MONITORING SCHEDULE

OH7856326 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 1/31/2020

Sample(s) Required between1 2/1/2020 and 2/29/2020

Sample(s) Required between1 3/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 4/30/2020

Sample(s) Required between1 5/1/2020 and 5/31/2020

Sample(s) Required between1 6/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 7/31/2020

Sample(s) Required between1 8/1/2020 and 8/31/2020

Sample(s) Required between1 9/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 10/31/2020

Sample(s) Required between1 11/1/2020 and 11/30/2020

Sample(s) Required between1 12/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

DOLLAR GENERAL #20066 - HARTFORD

2020 MONITORING SCHEDULE

OH7856326 Transient NoncommunitySystem Type:

Ground Water Rule Minimal Treatment System

Operating Period: to1/1 12/31

01/01/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: DOLLAR GENERAL #20066 - HARTFORD PLANTGround Water

7862509

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

FOWLER LAND CENTER CO

2020 MONITORING SCHEDULE

OH7856328 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

04/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

DISTRIBUTION MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: DS000 Facility Source:

Facility Name: DISTRIBUTION

DS1

Sample(s) Required betweenTOTAL COLIFORM (TCR) - 3100 1 1/1/2020 and 3/31/2020

Sample(s) Required between1 4/1/2020 and 6/30/2020

Sample(s) Required between1 7/1/2020 and 9/30/2020

Sample(s) Required between1 10/1/2020 and 12/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

FOWLER LAND CENTER CO

2020 MONITORING SCHEDULE

OH7856328 Transient NoncommunitySystem Type:

Ground Water Rule Substantial System

Operating Period: to1/1 12/31

04/17/2020Effective Date:

THIS SCHEDULE MAY NOT INCLUDE ALL MONITORING REQUIREMENTS FOR YOUR SYSTEM.Contact your district office to review additional monitoring for operating parameters, and/or other monitoring requirements not included on this schedule.

Also, monitoring schedules may be revised during the year based on sampling results.

For water emergencies that occur after hours, please call 800-282-9378

Chemicals Monitoring Requirements

ENTRY POINT MONITORING SCHEDULE

SamplingLocation SMP ID:

Facility ID: EP001 Facility Source:

Facility Name: FOWLER LAND CENTER CO PLANT

7856328

Not RequiredNITRITE - 1041

Sample(s) Required betweenNITRATE - 1040 1 6/1/2020 and 10/31/2020

Well

DistributionSystem

Where to Collect Samples For a Small Public Water System

EP00# = First available tap after treatment*. Use for NITRATE and NITRITE samples

* If system does not have treatment, EP00# is the first tap after the well.

Save a dime. Sample on time!

Failing to sample for total coliform or nitrate will cost you $150 or more in penalties for each monitoring violation. A list of drinking water sample collection services that can assist you with collecting water samples is located at: http://epa.ohio.gov/portals/28/documents/PWS/DWSample.pdf.

PressureTank

Treatment*

Raw Tap

RS00#

orLT200#

GWR00#

DS000

DS000 = Taps in Distribution System. Use for TOTAL COLIFORM (TCR) samples

SUP01 = Seasonal Startup Sample. Collected before serving water to the public.

EP00#

SUP01or

top related