2015 annual report - rohnert park · annual report . rohnert park department public safety fire...

Post on 01-Aug-2020

7 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

2015 Annual Report

Rohnert Park Department Public Safety FIRE DIVISION

Fire Suppression 1- Fire Commander 3- Sergeant Fire Captains 6- PSO Driver Operators/Engineers 6- PSO Firefighters (2- Academy Attendees/1 Vacant)

Fire Prevention

1- Fire Marshal 1- Secretary 1- Part-time Fire Inspector Total assigned personnel: 18.5

FIRE DIVISION STAFFING

Annual Business Fire Inspections 1390 New & Permit Construction Inspections 381 Public Education Events 55

FIRE PREVENTION

2014-15 Budgeted $250,000 Actual $315,552

2015-16 Budgeted $250,000 Mid-Year $205,544

Fees based on the Adopted Fire Division Fee Schedule Annual Fire Inspection and Permit Fees range from $40.00 to $1,014.00

(based upon business type and associated required permits)

FIRE DIVISION REVENUE

Year 2015 2014 2013 2012 Total CFS 3971 3734 3579 3324

INCREASE IN CALLS FOR SERVICE

3000

3200

3400

3600

3800

4000

2012 2013 2014 2015

3324

3579

3734

3971

Calls

for S

ervi

ces

Total Calls for Services - Fire Division 2012 - 2015

INCIDENTS BY HOUR OF THE DAY

INCIDENT TYPES

Fire 94 Rescue / Medical 2466 Hazard 69 Service Call 386 Good Intent Call 694 False Alarm Call 252 Special Incident 10

ESTIMATED FIRE LOSES

2015* 2014 2013 2012 2011 $932,128 $393,001 $1,203,523 $277,419 $1,293,452

*Estimated dollar value saved $10,824,839

Buildings, Vehicles, Vegetation

NOTABLE FIRE INCIDENTS IN 2015

Building Fire, 100 Avram Ave. ($500,000) Building Fire, 414 Alta Ave. ($110,000) Building Fire, 921 Kirsten Ct. ($60,000)

Passenger Vehicle Fire, 6088 Dawn Ct. ($78,000) Building Fire, 1540 Maria Place ($100,000)

Building Fire, 7272 Camino Colegio ($18,000)

MAJOR ACCOMPLISHMENTS IN 2015

Improved ISO Rating (Class 3) Installed Over 500 Smoke Alarms In Residences At Rancho Grande Mobile Home

Park Provided Hazardous Materials First Responder Operations Course & Firefighter

Safety and Survival Course For All Sworn Personnel Hosted Chief Officer Courses (Command 2A and 2B)

Deployed Fire Personnel to Geysers Area For Fire Protection As a Result of the Valley Fire

2016 GOALS & OBJECTIVES

GOAL 1: Planning for Westside Fire Station GOAL 2: Order Aerial Apparatus GOAL 3: Switch Fire Dispatching to REDCOM GOAL 4: Continue Increased Fire Training GOAL 5: Implement PSO Lieutenant Position at Station 4

top related