2013.06.26 scott street_community workshop_presentation

Post on 02-Apr-2018

219 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 1/109

June 26, 201326 Juin, 2013

Scott Street Community Design Plan

Plan de conception communautaire pour le secteur de la rue Scott

Delcan

Community Workshop

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 2/109

Welcome!

Agenda6:30 Presentation

7:15 Roundtable Discussions

8:30 Report Back

9:00 Wrap-up

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 3/109

Where we are in the processPhases and Timeline

Phase 1: Goals,Objectives andPotential- mapping,

modeling &analysis

- stakeholder interviews

- visioningworkshops

Phase 2: Vision andUrban DesignFramework- preliminary directions- conceptual

framework- PAC meeting- community meeting

(June 26)- confirm framework

Phase 3: Draft CDP- draft document- implementation

session- PAC meeting- stakeholder

roundtables

Phase 4: Final CDP- refine document- open house- finalize CDP- presentation to

P&E Committee

Technical Advisory Committee and Public Advisory Committee

March – May May – July July – Oct Oct – Jan 2014

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 4/109

What we want to talk about

• planning context

• what we’ve seen and heard

• proposed principles

• 4 focus areas: preliminary design directions

• next steps

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 5/109

Mechanicsville

North Hintonburg

West Wellington

Tunney’s Pasture

ChamplainPark

Study Boundary

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 6/109

planning context

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 7/109

Beyond the study area, significant change is planned or ongoing.

600 m

600 m

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 8/109

Most of the study area is designated Mixed-Use Centre in the Official Plan,i.e., a strategic area for growth that supports rapid transit.

Mixed Use Centre

600 m

600 m

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 9/109

Within the study area, recent developments have been approved in theabsence of a plan for the area. The CDP needs to acknowledge these.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 10/109

More important, the CDP needs to anticipate and guide potentialdevelopments “in the pipeline” and on other “soft sites”.

Carling-BayviewCorridor CDP

Wellington StreetWest CDP

Richmond Road /

Westboro CDP

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 11/109

The area already has the densest Mixed-Use Centre outside of Ottawa’sCentral Area.

Selected MUCs Jobs(2006)

Pop.(2006)

Density(P&J/ha)

Tunney’s 15,873 2,057 207

Lees 54 2,545 167

Bayview-Preston 8,916 2,738 142

Billings Bridge 5,519 0 130Blair-Hwy. 174 6,411 0 106

• The City’s density target for the Tunney’s MUC is250 P&J/ha.

• 200 P&J/ha minimum is considered “LRT supportive”. • Recent development built or approved on Parkdale will likely increase

the density to about220 P&J/ha.• Another 2,500 people would increase the density to about 250 P&J/ha.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 12/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 13/109

Gradual intensification of the area should beencouraged, but increased density should notbe the primary driver of change.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 14/109

what we’ve seen and heard

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 15/109

Existing Land Uses – The area generally meets the definition of acomplete, transit-supportive community.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 16/109

The established surrounding neighbourhoods are generally healthy and havehighly valued character.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 17/109

Champlain Park and West Wellington are particularly stable,even at their edges.

Champlain Park

West Wellington

Maintain thecharacter of theneighbourhoods

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 18/109

The core of North Hintonburg, mostly outside of the study, is experiencingreinvestment in keeping with the established character. Its edges on Parkdaleand Scott, which are captured in the study area, are less strongly defined.

North Hintonburg

North Hintonburg

Higher densitydevelopment shouldrespect the scale of the neighbourhoods

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 19/109

Mechanicsville, entirely within the study area, is the most eclecticneighbourhood and the one experiencing the most change.

Mechanicsvilleneeds morebasic commercial

amenities

Laroche Park needsimprovements tohandle the heavyuse it gets

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 20/109

The stable edges of Wellington West and North Hintonburg are not areasrequiring significant change.

Study area boundary

Proposed CDP boundary

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 21/109

Study area boundary

Proposed CDP boundary

The stable edges of Wellington West and North Hintonburg are not areasrequiring significant change.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 22/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 23/109

What else we heard

It should be easy andpleasant to walk to the

LRT station

Traffic isterrible onParkdale andit should be abetter street

Scott Streetis scary for pedestriansand cyclistsand not easyto cross

Connections to theriverfront should beimproved

More parkland isneeded to supportpopulation growth

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 24/109

proposed principles

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 25/109

Draft principles for the CDP

1. Reinforce and respect the character of existingneighbourhoods

2. Establish a vibrant, diverse and attractive mixed-use centre

3. Integrate higher density development strategically andsensitively

4. Enhance and interconnect the open space network

5. Create complete and inviting streets

6. Promote design excellence

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 26/109

4 focus areas:preliminary design directions

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 27/109

Tunney’s Pasture holds the greatest potential for intensification—employment and residential—and this is a PWGSC objective.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 28/109

Tunney’s Pasture today

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 29/109

A master plan for the site is in progress. The CDP can inform the processby articulating broad community objectives, particularly regarding the“public realm” and the site’s interface with existing neighbourhoods.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 30/109

Parkdale today is narrow and congested, with little space or amenities for pedestrians and cyclists

Opportunities and directions

A l P kd l ld t li t t S tt St t d th

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 31/109

A greenway along Parkdale would connect cyclists to Scott Street and theriver trails, and provide more comfort for pedestrians.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 32/109

A new transit plaza and new parks would provide a more urban gathering andrecreation spaces for Tunney’s Pasture and the surrounding neighbourhoods

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 33/109

A new transit plaza and new parks would provide a more urban gathering andrecreation spaces for Tunney’s Pasture and the surrounding neighbourhoods

l k f h d l k ld

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 34/109

A complementary network of pathways and cycling network would improveconnectivity within and outside the area

Opportunities and Directions for Tunney’s Pasture

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 35/109

Opportunities and Directions for Tunney s Pasture

Opportunities for newpark spaces withinTunney’s Pasture

A new connection toRemic Rapids park

and the river ImprovingParkdale as apedestrian andcycling route andgreen edge

A new transitplaza

Improved network of streets and paths

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 36/109

These are conceptual ideas and PWGSC isin the process of refining its Master Plan.The CDP process will continue to provideinput and PWGSC expect to present itsrefined Master Plan sometime in the fall.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 37/109

Are there other public objectives for Tunney’s Pasture?

M h i ill i i d id ti l ith l i l

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 38/109

Mechanicsvilleis a mixed residential area with a low-rise core, a largepublic park and connections to the river and bike trails.

M h i ill i i d id ti l ith t bl l i

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 39/109

Mechanicsvilleis a mixed residential area with a stable low-rise core, alarge public park, and good connections to the river and bike trails.

Sig ifi t i t ifi ti i th ighb h d i t d ld

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 40/109

Significant intensification in the neighbourhood is not necessary and wouldthreaten its character. The MUC designation should be replaced.

MUC

Central Area

Major Open Space

Significant intensification in the neighbo rhood is not necessar and o ld

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 41/109

Significant intensification in the neighbourhood is not necessary and wouldthreaten its character. The MUC designation should be replaced.

MUC

Central Area

Major Open Space

Improvements to Laroche Park could include new pathways, a dog area,

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 42/109

Improvements to Laroche Park could include new pathways, a dog area,community gardens and a new splash pad.

Improvements to Laroche Park could include new pathways, a dog area,

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 43/109

Improvements to Laroche Park could include new pathways, a dog area,community gardens and a new splash pad.

The NCC lands today are difficult to access but are an asset to the

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 44/109

The NCC lands today are difficult to access but are an asset to thecommunity for casual recreation

A new park on NCC lands would better connect Laroche Park to riverfront

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 45/109

pparks and provide more community space

Burnside should have a better pedestrian realm.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 46/109

p

A green street along Burnside would connect new and existing open

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 47/109

g g g pspaces through the neighbourhood and beyond.

The pedestrian connection north of the Transitway is well used but not

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 48/109

p ywell designed.

Improvements could include a well-designed path, new landscaping or a

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 49/109

p g p , p gcommunity garden, and smaller parks and plazas

Improvements could include a well-designed path, new landscaping or a

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 50/109

p g p p gcommunity garden, and smaller parks and plazas

Improvements could include a well-designed path, new landscaping or a

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 51/109

p g p p gcommunity garden, and smaller parks and plazas

Smaller infill development should stay within the as-of-right height limit.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 52/109

Redevelopment of larger lots could accommodate higher density without

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 53/109

taller buildings.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 54/109

Burnside today has a mix of low-rise and taller buildings, as well as some

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 55/109

parking lots.

4 storey walk-up

Infill on Burnside could be taller to face the park, from the 4 storeys

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 56/109

allowed now up to 6 or 7 storeys.

4 storey walk-up

Existing on Burnside

Infill on Burnside could be taller to face the park, from the 4 storeys

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 57/109

allowed now up to 6 or 7 storeys.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 58/109

Certain small-scale neighbourhood commercial uses, such as

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 59/109

convenience stores, personal services and cafes, could be permittedthroughout the neighbourhood.

Certain small-scale neighbourhood commercial uses, such as

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 60/109

convenience stores, personal services and cafes, could be permittedthroughout the neighbourhood.

Ensuring laneway connections remain clear will allow building fronts and

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 61/109

sidewalks to be free of service functions like garbage storage.

Emerging Design Framework for Mechanicsville

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 62/109

Re-export map • Connections to the River Path

• Potential a new park on NCC Lands• Laroche Park improvements

• Commercial and institutional uses throughoutthe neighbourhood

• Enhancing Burnside as a green street

• Redevelopment along Burnside

• Mixed use path on Parkdale

• Smaller infill

• Preserve laneway connections

• Transforming the pedestrian connection northof the Transitway

• Supporting the pedestrian connection withnew small squares and parks

• Better pedestrian connections across ScottStreet

• Neighbourhood retail across Scott Street

• Connections to the River Path

• Redevelopment of larger parking lots

• Connections to Bayview mainstreet

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 63/109

Did we capture all of the opportunities for Mechanicsville?

The Holland-Parkdale Nodeis a fragmented area in transition, with

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 64/109

update

strategic sites for redevelopment.

The area today is a mix of building types and sizes, with an active

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 65/109

development application on Spencer Street.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 66/109

Holland might be able to accommodate bike lanes, and cyclists can divert

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 67/109

to Hamilton from Parkdale.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 68/109

The walkway south of Holland Cross is an important mid-block connection.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 69/109

A north-south link between Scott and Hamilton would also improve connectiv

The walkway south of Holland Cross is an important mid-block connection.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 70/109

A north-south link between Scott and Hamilton would also improve connectiv

The area today is a mix of building types and sizes. There is currently an

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 71/109

active development application on Spencer Street

Buildings of 4 storeys are appropriate on the east side of Parkdale and

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 72/109

west side of Holland.

Buildings of 4 storeys are appropriate on the east side of Parkdale and

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 73/109

west side of Holland.

Buildings of 4 storeys are appropriate on the east side of Parkdale and

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 74/109

west side of Holland.

There are a number of parcels in the node that are likely to be redeveloped

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 75/109

in the near future.

The east half of the node has the most potential for redevelopment.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 76/109

Mid-rise buildings with setbacks at 4 or 5 storeys

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 77/109

Mid-rise buildings with setbacks at 4 or 5 storeys

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 78/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 79/109

Larger and deeper sites provides opportunities for tower elements set backf P kd l

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 80/109

from Parkdale.

750 m 2

25m minimum

12m minimumsetback

25m minimum

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 81/109

Larger and deeper sites provides opportunities for tower elements set backf P kd l

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 82/109

12m minimumsetback

from Parkdale.

Towers could be staggered. A variety of built form should be encouragedd d it h ld i th l g t t th t ti

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 83/109

and density should increase the closer you get to the station.

Design Framework for the Holland-Parkdale Node

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 84/109

Connections tothe mixed use

path on Parkdale

Scott Streetgreen corridor

Built-formtransition to the

neighbourhoods

Primarydevelopmentopportunity area

New bikeconnectionsthrough the area

The edge of Hintonburg onScott Street is varied.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 85/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 86/109

• There are small, medium and larger sites for

redevelopment along Scott Street, but mostly shallow• Infill along Scott Street will be site specific to ensure the

best fit on the site and an appropriate transition to theneighbourhood

• An angular plane applied at the rear of the property couldguide built form transitions

An angular plane applied at the rear of the property could guide builtform transitions

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 87/109

form transitions.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 88/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 89/109

Development opportunities on Scott Street

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 90/109

Infill of various sizesalong Scott Street

Built form transitions downto the neighbourhood

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 91/109

Did we capture all of the opportunities for Hintonburg?

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 92/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 93/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 94/109

Scott Street during LRT construction

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 95/109

Scott Street during LRT construction

Scott Street

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 96/109

Scott Street

In the long term, Scott Street opportunities include:• Bicycle lanes that are separated from traffic – a bike track, multi-

use/casual path, or bi-directional bike lanes• Power poles to be relocated in the nearer term to a long-term location

• A significant greening/landscaping program

The re-design and rebuild of Scott Street should be a priority capitalproject linked if possible to the LRT project.

Scott Street longer term with on-street cycle tracks

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 97/109

Scott Street longer term with on street cycle tracks

M u

l t i - u s e

P a

t h

L a n

d s c a p e

Z o n e

C y c

l e T r a c

k

L a n

d s c a p e

Z o n e

Churchill Street, Ottawa

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 98/109

Scott Street longer-term with separated cycle tracks

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 99/109

Scott St eet o ge te w t sepa ated cyc e t ac s

M u

l t i - u s e

P a

t h

L a n

d s c a p e

Z o n e

C y c

l e T r a c

k

L a n

d s c a p e

Z o n e

L a n

d s c a p e

Z o n e

Scott Street longer-term with separated cycle tracks

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 100/109

g p y

M u

l t i - u s e

P a

t h

L a n

d s c a p e

Z o n e

C y c

l e T r a c

k

L a n

d s c a p e

Z o n e

L a n

d s c a p e

Z o n e

Scott Street longer-term with a bi-directional bike lane

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 101/109

g

M u

l t i - u s e

P a

t h

L a n

d s c a p e

Z o n e

B i - d i r e c

t i o n a

l

B i k e

L a n e

L a n

d s c a p e

Z o n e

L a n

d s c a p e

Z o n e

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 102/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 103/109

Connections across Scott Street could be improved with new paving,painted crosswalks or curb extensions.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 104/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 105/109

Did we capture all of the opportunities for Scott Street?

The emergingDesign Frameworkfor the CDP integrates the key moves tocreate a strategic vision for the entire CDP area.

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 106/109

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 107/109

Roundtable Discussions

Next steps

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 108/109

Next steps

• Confirm principles and design framework• Prepare draft CDP

• Community Open House in October

7/27/2019 2013.06.26 Scott Street_Community Workshop_Presentation

http://slidepdf.com/reader/full/20130626-scott-streetcommunity-workshoppresentation 109/109

top related