Diameter [mm] 800.1
Chemical Water (Liquid)
Length/Height [m] 6.3Thickness [mm] 8.700
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 1/1/1974
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
0.9Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
123.7Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
1.530E-04
3,262,458
2. MEDIUM
1
LoF[Events/Yr]
499
1
0
0
0
1
0.0
0.3
0.5
1.530E-04
2. MEDIUM
1
499
1
0
1
0.0
0.3
0.5
1.530E-04
2. MEDIUM
1
499
1
0
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-516 \ Grade: 55
Generalized
HIC/ SOHIC - H2S and/orSSC
11-Usually 1-Fairly
txtSCCCurrentInspections
None
None [Y]
None [Y]
None [Y]
0.030(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 209 Prob. Rem. Life [yrs] 211
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17C1 BOTTOM
Equipment Summary Sheet
Eqp. Type COLUMNBTMProduction Unit RU IV
Eqp. Name Column Sour Water Stripper
Print date: 26-Dec-11Page 1 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
2/33
Diameter [mm] 800.1
Chemical Water (Gas)
Length/Height [m] 6.3Thickness [mm] 8.700
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 1/1/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.9Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
124.8Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.1
0.5
1.530E-04
3,262,458
2. MEDIUM
1
LoF[Events/Yr]
499
1
0
0
0
1
0.0
2.2
2.2
6.732E-04
2. MEDIUM
1
2,196
2
0
2
0.0
2.3
2.3
7.038E-04
2. MEDIUM
1
2,296
2
0
2
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-516 \ Grade: 55
Generalized
HIC/ SOHIC - H2S and/orSSC
11-Usually 1-Fairly
txtSCCCurrentInspections
None
None [Y]
None [Y]
None [Y]
0.050(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 124 Prob. Rem. Life [yrs] 127
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17C1 TOP
Equipment Summary Sheet
Eqp. Type COLUMNTOPProduction Unit RU IV
Eqp. Name Column Sour Water Stripper
Print date: 26-Dec-11Page 2 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
3/33
Diameter [mm] 489.0
Chemical Water (Liquid)
Length/Height [m] 5.9Thickness [mm] 9.500
Insulated [y/n] Y PWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
4.5Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
123.7Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
7.800E-05
1,029,643
2. MEDIUM
1
LoF[Events/Yr]
80
1
0
0
0
1
0.0
0.0
0.5
7.800E-05
2. MEDIUM
1
80
1
0
1
0.0
0.0
0.5
7.800E-05
2. MEDIUM
1
80
1
0
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: E/B
Generalized
HIC/ SOHIC - H2S
12-Usually 2-Fairly
txtSCCCurrentInspections
None
None [Y]
None [Y]
None [Y]
0.048(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 64 Prob. Rem. Life [yrs] 66
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E1A SHELL
Equipment Summary Sheet
Eqp. Type EXCHANGER Production Unit RU IV
Eqp. Name Feed/Effluent Exchanger
Print date: 26-Dec-11Page 3 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
4/33
Diameter [mm] 21.2
Chemical Water (Liquid)
Length/Height [m] 566.6Thickness [mm] 2.100
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
93.3Op. Temp. [C]
NoneLining Type
Thinning
SCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.5
7.800E-05
2,131,993
2. MEDIUM
1
LoF[Events/Yr]
166
0
0
0
0
1
0.0
0.5
7.800E-05
2. MEDIUM
1
166
0
0
1
0.0
0.5
7.800E-05
2. MEDIUM
1
166
0
0
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
Thinning
SCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Nickel \ 42Ni - 21.5Cr - 3Mo - 2.3Cu (UNS: N08825) \ SB-163 Class: Annealed
Generalized
None
12-Fairly
None
None
None [Y]
None [Y]
None [Y]
0.000(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 467247
Prob. Rem. Life [yrs] 466943
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E1A TUBE
Equipment Summary Sheet
Eqp. Type EXCHANGER-TSProduction Unit RU IV
Eqp. Name Feed/Effluent Exchanger
Print date: 26-Dec-11Page 4 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
5/33
Diameter [mm] 489.0
Chemical Water (Liquid)
Length/Height [m] 5.9Thickness [mm] 9.500
Insulated [y/n] Y PWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
4.5Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
101.3Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.0
0.5
7.800E-05
1,029,653
2. MEDIUM
1
LoF[Events/Yr]
80
1
1
0
0
1
0.0
0.0
0.0
0.5
7.800E-05
2. MEDIUM
1
80
1
1
1
0.0
0.0
0.0
0.5
7.800E-05
2. MEDIUM
1
80
1
1
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: E/B
Generalized
HIC/ SOHIC - H2S
Extl. Corrosion
8-Usually 1-Fairly
None
7-Highly 2-Poorly
None [Y]
None [Y]
None [Y]
0.031(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 99 Prob. Rem. Life [yrs] 102
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E1B SHELL
Equipment Summary Sheet
Eqp. Type EXCHANGER Production Unit RU IV
Eqp. Name Feed/Effluent Exchanger
Print date: 26-Dec-11Page 5 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
6/33
Diameter [mm] 21.2
Chemical Water (Liquid)
Length/Height [m] 566.6Thickness [mm] 2.100
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
59.4Op. Temp. [C]
NoneLining Type
Thinning
SCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.5
7.800E-05
2,131,993
2. MEDIUM
1
LoF[Events/Yr]
166
0
0
0
0
1
0.0
0.5
7.800E-05
2. MEDIUM
1
166
0
0
1
0.0
0.5
7.800E-05
2. MEDIUM
1
166
0
0
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
Thinning
SCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Nickel \ 42Ni - 21.5Cr - 3Mo - 2.3Cu (UNS: N08825) \ SB-163 Class: Annealed
Generalized
None
7-Fairly
None
None
None [Y]
None [Y]
None [Y]
0.000(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 467247
Prob. Rem. Life [yrs] 463167
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E1B TUBE
Equipment Summary Sheet
Eqp. Type EXCHANGER-TSProduction Unit RU IV
Eqp. Name Feed/Effluent Exchanger
Print date: 26-Dec-11Page 6 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
7/33
Diameter [mm] 294.0
Chemical Water (Liquid)
Length/Height [m] 1797.1Thickness [mm] 38.100
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
72.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
176.4
0.0
0.0
176.4
4.057E-01
787,067
2. MEDIUM
4
LoF[Events/Yr]
319,338
1
1
0
0
4
641.0
0.0
0.0
641.0
1.474E+00
2. MEDIUM
4
1,160,408
1
1
4
0.2
0.0
0.0
0.5
1.150E-03
1. LOW
1
905
1
1
1
B
Potential Damage Mechanism(s)
26-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-283 \ Grade: C
Generalized
HIC/ SOHIC - H2S
Extl. Corrosion
None
None
None
Highly [Y]
None [Y]
None [Y]
0.230(Mea)Corr. Rate-Expert [mm/Yr]
Exceeded corrosion allowance Prob. Rem. Life [yrs] 0
ORBIT Sugg. User Pref.
None [N]
None [Y]
None [Y]
Trad. (Non-RBI)
None [N]
None [Y]
None [Y]
Final Appr.
Highly [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
Max. Insp. Interval
None
None
Target Driver
12/26/2011
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E2 INLET
Equipment Summary Sheet
Eqp. Type FINFANProduction Unit RU IV
Eqp. Name Stripper Water Effluent Cooler
Print date: 26-Dec-11Page 7 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
8/33
-
8/13/2019 17-Equipment Summary Sheet
9/33
Diameter [mm] 25.4
Chemical Water (Liquid)
Length/Height [m] 1210.3Thickness [mm] 2.800
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
53.9Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
3,205.1
0.0
0.0
3,205.1
7.372E+00
787,067
3. MEDIUM HIGH
5
LoF[Events/Yr]
5,802,220
1
1
0
0
5
3,205.1
0.0
0.0
3,205.1
7.372E+00
3. MEDIUM HIGH
5
5,802,220
1
1
5
3,205.1
0.0
0.0
3,205.1
7.372E+00
3. MEDIUM HIGH
5
5,802,220
1
1
5
B
Potential Damage Mechanism(s)
26-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-214
Generalized
HIC/ SOHIC - H2S
Extl. Corrosion
None
None
None
Highly [N]
None [Y]
None [Y]
0.270(Mea)Corr. Rate-Expert [mm/Yr]
Exceeded corrosion allowance Prob. Rem. Life [yrs] 0
ORBIT Sugg. User Pref.
None [N]
None [Y]
None [Y]
Trad. (Non-RBI)
None [N]
None [Y]
None [Y]
Final Appr.
Highly [N]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
Risk (Total Cost)
None
None
Target Driver
12/26/2011
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E2 TUBE
Equipment Summary Sheet
Eqp. Type FINFANProduction Unit RU IV
Eqp. Name Stripper Water Effluent Cooler
Print date: 26-Dec-11Page 9 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
10/33
Diameter [mm] 294.0
Chemical Water (Liquid)
Length/Height [m] 1797.1Thickness [mm] 38.100
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
72.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
176.4
0.0
0.0
176.4
4.057E-01
787,067
2. MEDIUM
4
LoF[Events/Yr]
319,338
1
1
0
0
4
641.0
0.0
0.0
641.0
1.474E+00
2. MEDIUM
4
1,160,408
1
1
4
0.2
0.0
0.0
0.5
1.150E-03
1. LOW
1
905
1
1
1
B
Potential Damage Mechanism(s)
26-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-283 \ Grade: C
Generalized
HIC/ SOHIC - H2S
Extl. Corrosion
None
None
None
Highly [Y]
None [Y]
None [Y]
0.230(Mea)Corr. Rate-Expert [mm/Yr]
Exceeded corrosion allowance Prob. Rem. Life [yrs] 0
ORBIT Sugg. User Pref.
None [N]
None [Y]
None [Y]
Trad. (Non-RBI)
None [N]
None [Y]
None [Y]
Final Appr.
Highly [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
Max. Insp. Interval
None
None
Target Driver
12/26/2011
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E2K INLET
Equipment Summary Sheet
Eqp. Type FINFANProduction Unit RU IV
Eqp. Name Stripper Water Effluent Cooler
Print date: 26-Dec-11Page 10 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
11/33
Diameter [mm] 294.0
Chemical Water (Liquid)
Length/Height [m] 1797.1Thickness [mm] 38.100
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
53.9Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
641.0
0.0
0.0
641.0
1.474E+00
787,067
2. MEDIUM
4
LoF[Events/Yr]
1,160,408
1
1
0
0
4
641.1
0.0
0.0
641.1
1.475E+00
2. MEDIUM
4
1,160,589
1
1
4
0.2
0.0
0.0
0.5
1.150E-03
1. LOW
1
905
1
1
1
B
Potential Damage Mechanism(s)
26-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-283 \ Grade: C
Generalized
HIC/ SOHIC - H2S
Extl. Corrosion
None
None
None
Highly [Y]
None [Y]
None [Y]
0.270(Mea)Corr. Rate-Expert [mm/Yr]
Exceeded corrosion allowance Prob. Rem. Life [yrs] 0
ORBIT Sugg. User Pref.
None [N]
None [Y]
None [Y]
Trad. (Non-RBI)
None [N]
None [Y]
None [Y]
Final Appr.
Highly [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
Max. Insp. Interval
None
None
Target Driver
12/26/2011
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E2K OUTLET
Equipment Summary Sheet
Eqp. Type FINFANProduction Unit RU IV
Eqp. Name Stripper Water Effluent Cooler
Print date: 26-Dec-11Page 11 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
12/33
Diameter [mm] 25.4
Chemical Water (Liquid)
Length/Height [m] 1210.3Thickness [mm] 2.800
Insulated [y/n] NPWHT [y/n] Y
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
6.8Op. Pres. [kgf/sqcm (a)]95244.4(Calc)
53.9Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
3,205.1
0.0
0.0
3,205.1
7.372E+00
787,067
3. MEDIUM HIGH
5
LoF[Events/Yr]
5,802,220
1
1
0
0
5
3,205.1
0.0
0.0
3,205.1
7.372E+00
3. MEDIUM HIGH
5
5,802,220
1
1
5
3,205.1
0.0
0.0
3,205.1
7.372E+00
3. MEDIUM HIGH
5
5,802,220
1
1
5
B
Potential Damage Mechanism(s)
26-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-214
Generalized
HIC/ SOHIC - H2S
Extl. Corrosion
None
None
None
Highly [N]
None [Y]
None [Y]
0.270(Mea)Corr. Rate-Expert [mm/Yr]
Exceeded corrosion allowance Prob. Rem. Life [yrs] 0
ORBIT Sugg. User Pref.
None [N]
None [Y]
None [Y]
Trad. (Non-RBI)
None [N]
None [Y]
None [Y]
Final Appr.
Highly [N]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
Risk (Total Cost)
None
None
Target Driver
12/26/2011
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID 17E2K TUBE
Equipment Summary Sheet
Eqp. Type FINFANProduction Unit RU IV
Eqp. Name Stripper Water Effluent Cooler
Print date: 26-Dec-11Page 12 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
13/33
Diameter [mm] 914.4
Chemical n-Eicosane_Crude Typical_Lubricating Oil (Liquid)
Length/Height [m] 5.3Thickness [mm] 9.500
Insulated [y/n] NPWHT [y/n] N
Service Start Date 1/1/1975
Material
Toxic Chemical None (0%)Inventory Group[Kg]
0.9Op. Pres. [kgf/sqcm (a)]2669.7(Calc)
59.4Op. Temp. [C]
Weld Overlay []Lining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
641.1
641.1
1.000E-01
3,169,339
3. MEDIUM HIGH
1
LoF[Events/Yr]
316,971
1
4
0
0
4
0.0
0.2
642.0
642.2
1.002E-01
3. MEDIUM HIGH
1
317,515
1
4
4
0.0
0.2
0.2
0.5
7.800E-05
2. MEDIUM
1
247
1
1
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-516 \ Grade: 55
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.127(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 34 Prob. Rem. Life [yrs] 26
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner Damage Factor 12/25/2011 Highly [N] None [N] None [N] Highly [N]
Asset IDEqp. ID 17V1 BOTTOM
Equipment Summary Sheet
Eqp. Type DRUMProduction Unit RU IV
Eqp. Name Sour Water Collecting Vessel
Print date: 26-Dec-11Page 13 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
14/33
Diameter [mm] 914.4
Chemical Water (Liquid)
Length/Height [m] 5.3Thickness [mm] 9.500
Insulated [y/n] NPWHT [y/n] N
Service Start Date 1/1/1975
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.9Op. Pres. [kgf/sqcm (a)]2669.7(Calc)
59.4Op. Temp. [C]
Weld Overlay []Lining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
641.1
641.1
1.000E-01
2,386,566
3. MEDIUM HIGH
1
LoF[Events/Yr]
238,684
0
4
0
0
4
0.0
642.0
642.0
1.002E-01
3. MEDIUM HIGH
1
239,019
0
4
4
0.0
0.2
0.5
7.800E-05
2. MEDIUM
1
186
0
1
1
C
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-516 \ Grade: 55
Generalized
None
Extl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.083(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 93 Prob. Rem. Life [yrs] 40
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [N] None [Y]
Asset IDEqp. ID 17V1 TOP
Equipment Summary Sheet
Eqp. Type DRUMProduction Unit RU IV
Eqp. Name Sour Water Collecting Vessel
Print date: 26-Dec-11Page 14 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
15/33
Diameter [mm] 33.4
Chemical n-Eicosane_Crude Typical_Lubricating Oil (Liquid)
Length/Height [m] 7.0Thickness [mm] 6.400
Insulated [y/n] NPWHT [y/n] N
Service Start Date 10/26/1974
Material
Toxic Chemical None (0%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]2669.7(Calc)
59.4Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.6
10.0
10.6
1.458E-03
223,562
1. LOW
1
LoF[Events/Yr]
326
0
1
0
3
3
0.0
2.0
12.0
1.650E-03
1. LOW
1
369
0
2
3
0.0
2.0
12.0
1.650E-03
1. LOW
1
369
0
2
3
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
None
Extl. Corrosion
3-Fairly
None
3-Highly
None [Y]
None [Y]
None [Y]
0.014(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 446 Prob. Rem. Life [yrs] 416
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
Fatigue The fatigue factor exceeds the set damage factor limit.
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-10 AW 1
Equipment Summary Sheet
Eqp. Type PIPE-1Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 15 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
16/33
Diameter [mm] 33.4
Chemical n-Eicosane_Crude Typical_Lubricating Oil (Liquid)
Length/Height [m] 29.0Thickness [mm] 6.400
Insulated [y/n] NPWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical None (0%)Inventory Group[Kg]
3.0Op. Pres. [kgf/sqcm (a)]19.4(Calc)
59.4Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.6
2.0
2.6
1.361E-03
393,996
1. LOW
1
LoF[Events/Yr]
536
0
1
0
2
2
0.0
2.0
4.0
2.093E-03
1. LOW
1
825
0
2
2
0.0
2.0
4.0
2.093E-03
1. LOW
1
825
0
2
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
None
Extl. Corrosion
3-Fairly
None
3-Highly
None [Y]
None [Y]
None [Y]
0.006(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 1002 Prob. Rem. Life [yrs] 932
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-11 AW 1
Equipment Summary Sheet
Eqp. Type PIPE-1Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 16 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
17/33
Diameter [mm] 60.3
Chemical Water (Gas)
Length/Height [m] 20.0Thickness [mm] 8.700
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 4/12/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
115.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.0
0.5
1.181E-04
156,816
1. LOW
1
LoF[Events/Yr]
19
1
1
0
0
1
0.0
0.6
0.0
0.6
1.417E-04
1. LOW
1
22
1
1
1
0.0
0.6
0.0
0.6
1.417E-04
1. LOW
1
22
1
1
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
3-Fairly
None
3-Poorly
None [Y]
None [Y]
None [Y]
0.039(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 219 Prob. Rem. Life [yrs] 205
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-12 AW 2
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 17 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
18/33
Diameter [mm] 60.3
Chemical Water (Liquid)
Length/Height [m] 18.3Thickness [mm] 5.540
Insulated [y/n] NPWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
1.0Op. Pres. [kgf/sqcm (a)]240.6(Calc)
30.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.2
862.5
862.7
1.863E-01
156,816
2. MEDIUM
1
LoF[Events/Yr]
29,222
1
4
0
0
4
0.0
4.2
1,602.6
1,606.8
3.471E-01
3. MEDIUM HIGH
1
54,426
2
5
5
0.0
4.2
2.0
6.2
1.339E-03
1. LOW
1
210
2
2
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.040(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 132 Prob. Rem. Life [yrs] 94
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-15 A 2
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 18 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
19/33
Diameter [mm] 114.3
Chemical Water (Liquid)
Length/Height [m] 18.3Thickness [mm] 6.020
Insulated [y/n] NPWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
1.0Op. Pres. [kgf/sqcm (a)]240.6(Calc)
30.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.2
682.6
682.8
1.072E-01
464,717
2. MEDIUM
1
LoF[Events/Yr]
49,818
1
4
0
0
4
0.0
4.2
1,162.8
1,167.0
1.832E-01
3. MEDIUM HIGH
1
85,145
2
5
5
0.0
4.2
1.1
5.3
8.321E-04
1. LOW
1
387
2
2
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.040(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 142 Prob. Rem. Life [yrs] 101
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-15 A 4
Equipment Summary Sheet
Eqp. Type PIPE-4Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 19 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
20/33
Diameter [mm] 168.3
Chemical Water (Liquid)
Length/Height [m] 27.0Thickness [mm] 7.100
Insulated [y/n] NPWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
1.0Op. Pres. [kgf/sqcm (a)]240.6(Calc)
30.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.2
0.0
0.5
6.600E-05
574,047
1. LOW
1
LoF[Events/Yr]
38
1
1
0
0
1
0.0
4.2
0.1
4.3
5.676E-04
1. LOW
1
326
2
1
2
0.0
4.2
0.1
4.3
5.676E-04
1. LOW
1
326
2
1
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
3-Fairly
None
3-Highly
None [Y]
None [Y]
None [Y]
0.040(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 168 Prob. Rem. Life [yrs] 158
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-15 A 6
Equipment Summary Sheet
Eqp. Type PIPE-6Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 20 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
21/33
-
8/13/2019 17-Equipment Summary Sheet
22/33
Diameter [mm] 25.4
Chemical Water (Liquid)
Length/Height [m] 2.0Thickness [mm] 4.550
Insulated [y/n] NPWHT [y/n] N
Service Start Date 10/16/1974
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]2669.7(Calc)
59.4Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
1,602.8
1,602.8
2.204E-01
223,562
3. MEDIUM HIGH
1
LoF[Events/Yr]
49,270
1
5
0
0
5
17.3
0.0
1,607.6
1,624.9
2.234E-01
3. MEDIUM HIGH
3
49,949
1
5
5
9.1
0.0
203.4
212.5
2.922E-02
2. MEDIUM
2
6,532
1
4
4
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
None
None
None
Fairly [Y]
None [Y]
Highly [N]
0.125(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 33 Prob. Rem. Life [yrs] 25
ORBIT Sugg. User Pref.
None [N]
None [Y]
None [N]
Trad. (Non-RBI)
None [N]
None [Y]
None [N]
Final Appr.
Fairly [Y]
None [Y]
Highly [N]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
Max. Insp. Interval
None
Damage Factor
Target Driver
12/25/2011
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-17 AW 1
Equipment Summary Sheet
Eqp. Type PIPE-1Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 22 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
23/33
Diameter [mm] 48.3
Chemical Water (Liquid)
Length/Height [m] 2.0Thickness [mm] 5.080
Insulated [y/n] NPWHT [y/n] N
Service Start Date 10/16/1974
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]2669.7(Calc)
59.4Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
1,602.6
1,602.6
2.885E-01
156,816
3. MEDIUM HIGH
1
LoF[Events/Yr]
45,236
1
5
0
0
5
1.9
0.0
1,603.0
1,604.9
2.889E-01
3. MEDIUM HIGH
2
45,301
1
5
5
1.9
0.0
2.9
4.8
8.640E-04
1. LOW
2
135
1
2
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.125(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 37 Prob. Rem. Life [yrs] 28
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-17 AW 1.5
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 23 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
24/33
Diameter [mm] 60.3
Chemical Water (Liquid)
Length/Height [m] 2.0Thickness [mm] 8.700
Insulated [y/n] NPWHT [y/n] N
Service Start Date 10/16/1974
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]2669.7(Calc)
59.4Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
641.4
641.4
1.155E-01
156,816
2. MEDIUM
1
LoF[Events/Yr]
18,105
1
4
0
0
4
0.0
0.0
649.7
649.7
1.169E-01
2. MEDIUM
1
18,339
1
4
4
0.0
0.0
0.3
0.5
9.000E-05
1. LOW
1
14
1
1
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSCExtl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.125(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 66 Prob. Rem. Life [yrs] 48
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-17 AW 2
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 24 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
25/33
Diameter [mm] 48.3
Chemical Water (Liquid)
Length/Height [m] 2.0Thickness [mm] 5.080
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
124.8Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
9.000E-05
156,816
1. LOW
1
LoF[Events/Yr]
14
1
0
0
0
1
1.9
0.7
2.6
4.680E-04
1. LOW
2
73
1
0
2
1.9
0.7
2.6
4.680E-04
1. LOW
2
73
1
0
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSC
None
None
None
None [Y]
None [Y]
None [Y]
0.125(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 37 Prob. Rem. Life [yrs] 28
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-18 AW 1.5
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 25 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
26/33
Diameter [mm] 60.3
Chemical Water (Liquid)
Length/Height [m] 5.0Thickness [mm] 8.700
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
124.8Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
9.000E-05
156,816
1. LOW
1
LoF[Events/Yr]
14
1
0
0
0
1
0.0
0.7
0.7
1.260E-04
1. LOW
1
20
1
0
1
0.0
0.7
0.7
1.260E-04
1. LOW
1
20
1
0
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSC
None
None
None
None [Y]
None [Y]
None [Y]
0.125(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 66 Prob. Rem. Life [yrs] 48
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-18 AW 2
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 26 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
27/33
Diameter [mm] 88.9
Chemical Water (Gas)
Length/Height [m] 18.3Thickness [mm] 5.490
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 6/12/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
124.8Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
7.850E-05
464,717
1. LOW
1
LoF[Events/Yr]
36
1
0
0
0
1
0.0
0.6
0.6
9.420E-05
1. LOW
1
44
1
0
1
0.0
0.6
0.6
9.420E-05
1. LOW
1
44
1
0
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSC
None
None
None
None [Y]
None [Y]
None [Y]
0.030(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 175 Prob. Rem. Life [yrs] 124
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-5 AW 3
Equipment Summary Sheet
Eqp. Type PIPE-4Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 27 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
28/33
Diameter [mm] 114.3
Chemical Water (Gas)
Length/Height [m] 59.0Thickness [mm] 6.000
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 6/12/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
124.8Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
1.520E-04
464,717
1. LOW
1
LoF[Events/Yr]
71
1
0
0
0
1
0.0
0.6
0.6
1.823E-04
1. LOW
1
85
1
0
1
0.0
0.7
0.7
2.127E-04
1. LOW
1
99
1
0
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSC
5-Fairly
None
None
None [Y]
None [Y]
None [Y]
0.030(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 193 Prob. Rem. Life [yrs] 190
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-5 AW 4
Equipment Summary Sheet
Eqp. Type PIPE-4Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 28 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
29/33
Diameter [mm] 168.3
Chemical Water (Gas)
Length/Height [m] 67.0Thickness [mm] 7.100
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 6/12/1974
Material
Toxic Chemical Hydrogen Sulfide (1%)Inventory Group[Kg]
0.8Op. Pres. [kgf/sqcm (a)]3473.7(Calc)
124.8Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.0
0.5
9.672E-05
574,047
1. LOW
1
LoF[Events/Yr]
56
1
0
0
0
1
0.0
0.6
0.6
1.161E-04
1. LOW
1
67
1
0
1
0.0
0.7
0.7
1.354E-04
1. LOW
1
78
1
0
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
HIC/ SOHIC - H2S and/orSSC
2-Fairly
None
None
None [Y]
None [Y]
None [Y]
0.030(Mea)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 225 Prob. Rem. Life [yrs] 200
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-5 AW 6
Equipment Summary Sheet
Eqp. Type PIPE-6Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 29 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
30/33
Diameter [mm] 60.3
Chemical Water (Gas)
Length/Height [m] 18.3Thickness [mm] 5.540
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical None (0%)Inventory Group[Kg]
3.0Op. Pres. [kgf/sqcm (a)]3.3(Calc)
210.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.5
1.080E-04
156,816
1. LOW
1
LoF[Events/Yr]
17
0
0
0
0
1
0.0
0.5
1.080E-04
1. LOW
1
17
0
0
1
0.0
0.5
1.080E-04
1. LOW
1
17
0
0
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
None
None
None
None
None [Y]
None [Y]
None [Y]
0.001(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 4317 Prob. Rem. Life [yrs] 3024
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-823 N 2
Equipment Summary Sheet
Eqp. Type PIPE-2Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 30 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
31/33
Diameter [mm] 88.9
Chemical Water (Gas)
Length/Height [m] 18.3Thickness [mm] 5.490
Insulated [y/n] Y PWHT [y/n] N
Service Start Date 12/18/1974
Material
Toxic Chemical None (0%)Inventory Group[Kg]
3.0Op. Pres. [kgf/sqcm (a)]3.3(Calc)
210.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
0.5
7.850E-05
464,717
1. LOW
1
LoF[Events/Yr]
36
0
0
0
0
1
0.0
0.5
7.850E-05
1. LOW
1
36
0
0
1
0.0
0.5
7.850E-05
1. LOW
1
36
0
0
1
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
ThinningSCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: E/B
Generalized
None
None
None
None
None [Y]
None [Y]
None [Y]
0.001(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 4237 Prob. Rem. Life [yrs] 2968
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [Y]
Trad. (Non-RBI)
None [Y]
None [Y]
None [Y]
Final Appr.
None [Y]
None [Y]
None [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
None
Target Driver
No inspection
No inspection
No inspection
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-823 N 3
Equipment Summary Sheet
Eqp. Type PIPE-4Production Unit RU IV
Eqp. Name Piping
Print date: 26-Dec-11Page 31 of 33
RBI Pertamina RU IV CilacapUNIT17~1.ORD
-
8/13/2019 17-Equipment Summary Sheet
32/33
-
8/13/2019 17-Equipment Summary Sheet
33/33
Diameter [mm] 33.4
Chemical Hydrogen (Gas)
Length/Height [m] 63.0Thickness [mm] 4.600
Insulated [y/n] NPWHT [y/n] N
Service Start Date 11/28/1974
Material
Toxic Chemical Hydrogen Sulfide (0%)Inventory Group[Kg]
1.4Op. Pres. [kgf/sqcm (a)]1.1(Calc)
38.0Op. Temp. [C]
NoneLining Type
ThinningSCC
External Damage
Brittle Fracture
Fatigue
Likelihood
Current Status Future StatusBefore Inspection
Future Status AfterInspection
(Final Appr.)
CoF (Total Cost) [USD]
Risk Rank (Overall)
Risk (Total Cost) [USD/Yr]
Factor Category Factor Category Factor Category
0.0
655.1
655.1
7.447E-01
707,519
2. MEDIUM
1
LoF[Events/Yr]
526,907
0
4
0
0
4
0.0
901.3
901.3
1.025E+00
2. MEDIUM
1
724,929
0
4
4
0.0
5.3
5.3
6.025E-03
1. LOW
1
4,263
0
2
2
B
Potential Damage Mechanism(s)
25-Dec-11 18-Oct-16 18-Oct-16
Current Inspection(s)
Inspection Plans
Thinning
SCCExternal Damage
Recommendations
ThinningSCC
External Damage
Thinning
SCC
External Damage
Carbon Steel \ SA-53 \ Grade: S/B
Generalized
None
Extl. Corrosion
None
None
None
None [Y]
None [Y]
Highly [Y]
0.000(Exp)Corr. Rate-Expert [mm/Yr]
Nom. Rem. Life [yrs] 445097
Prob. Rem. Life [yrs] 311570
ORBIT Sugg. User Pref.
None [Y]
None [Y]
None [N]
Trad. (Non-RBI)
None [Y]
None [Y]
None [N]
Final Appr.
None [Y]
None [Y]
Highly [Y]
Analysis LevelConsequence-Lookup
Likelihood-Detailed Dmg. Mech.
None
None
Max. Insp. Interval
Target Driver
No inspection
No inspection
12/25/2011
Inspection Date
HTHA 0 0 0
HTHA
HTHA None
HTHA None [Y] None [Y] None [Y] None [Y]None No inspection
Liner None
Liner None No inspection None [Y] None [Y] None [Y] None [Y]
Asset IDEqp. ID LN 17-824 A 1
Equipment Summary Sheet
Eqp. Type PIPE-1Production Unit RU IV
Eqp. Name Piping
top related