1333 Gum StreetMDA – NRRP Project
DCD Construction – Owner
2 Bedrooms / 1 and a half Baths
Approximately 1100 sq ft
1333 Gum StreetDCD Construction
MDA – NRRP Project
• Repair interior and prep for painting
• Paint interior “wheat” and base “white”
• Install grinder pump and repair/check all plumbing
• Check and upgrade electrical. Install “arc fault breakers” for bedrooms
• Install flooring: tile/carpet (approx 1100 sq ft)
• Install new ceiling fans, lighting fixtures, vanities
• Repair/Re-Install kitchen cabinets and counters
• Purchase new appliances (stove, microwave, refrig)
• Check ac unit and service system
• Install closets & shelving throughout property
• Clean interior/exterior of unit and prepare for Section #8 inspection
1333 Gum StreetMDA – NRRP Project
Livingroom and hallway of completed rental
Front picture of exterior upon completion of project
1333 Gum StreetMDA – NRRP Project
Completed full bathroomCompleted Livingroom
1333 Gum StreetMDA – NRRP Project
Completed kitchenCompleted kitchen and utility room
1333 Gum StreetMDA – NRRP Project
Completed master bedroom Completed bedroom #1
1333 Gum StreetMDA – NRRP Project
Livingroom and hallway before repairs
Front of property before repairs
1333 Gum StreetMDA – NRRP Project
Full bath before repairsHalf bath before repairs
1333 Gum StreetMDA – NRRP Project
Kitchen before repairs Utility room and kitchen before repairs
1333 Gum StreetMDA – NRRP Project
Master bedroom before repairsBedroom #1 before repairs