1 NSE AGM ABUJA 2013

“EFFECTIVE FLOOD PLAIN MANAGEMENT IN NIGERIA: ISSUES, BENEFITS AND

CHALLENGES”

Presenter – Engr. Ikenna Okonkwo – MNSE, COREN

Environment Advisor, NNPC CHQ, Abuja

PRESENTATION ON

2NSE AGM ABUJA 2013

THE TOPIC FOR PRESENTATION WILL BE DISCUSSED UNDER THE FOLLOWING ASPECTS.

• INTRODUCTION • STATEMENT OF PROBLEM • A FOOD FOR THOUGHT

• FLOOD PLAIN AND FLOODING PICTURES IN NIGERIA • FACTORS DETERMINING THE EFFECTS OF FLOODING

• CONTROL OF FLOODS • THE BENEFITS OF EFFECTIVE FLOOD PLAIN MANAGEMENT

• THE CHALLENGES • CONCLUSION AND RECOMMENDATIONS • END OF PRESENTATION

PRESENTATION OUTLINE

3 NSE AGM ABUJA 2013

WHAT IS A FLOOD PLAIN? • Is an area of low lying ground adjacent to a stream or river that stretches from the banks of its channel to the base of the enclosing valley walls and experiences flooding during periods of high discharge

• WHERE ARE THEY FOUND?

• Are they HABITABLE?

INTRODUCTION

4 NSE AGM ABUJA 2013

STATEMENT OF PROBLEM

“The people living along the flood plains of both the major and minor rivers of Nigeria even though illegally are constantly being ravaged by the menace of flooding and this keeps recurring without any end in sight posing a problem of undue stress to the agencies of Government saddled with Emergency Management responsibilities when these disasters occur. Their habitation along the flood plains also creates extended flood Damage as the saying that water must find its level.”

5 NSE AGM ABUJA 2013

A FOOD FOR THOUGHT

• A total of N17.6 Billion was released by the Federal Government as a palliative measure in 2012 Flooding as was distributed as follows:

STATES – N13.3 BILLIONFEDERAL AGENCIES (NERMA, FMOW,FMENV, Refugee) – N4.3 BILLION • CATEGORY “A” STATES – OYO, KOGI, BENUE, PLATEAU, ADAMAWA, DELTA,

BAYELSA, ANAMBRA – N500M

CATEGORY “B” STATES JIGAWA,KANO,BAUCHI,KADUNA,NIGER,NASARAWA,TARABA,CROSS-

RIVER,EDO, LAGOS, IMO – N400M

6 NSE AGM ABUJA 2013

A FOOD FOR THOUGHT CONT’D

CATEGORY “C” STATES – KWARA, KATSINA, GOMBE, OGUN, ONDO, EBONYI,

ABIA, RIVERS – N300M

CATEGORY “D” STATES - SOKOTO, KEBBI, ZAMFARA, YOBE, ENUGU, EKITI,

OSUN, AKWA-IBOM, BORNO, FCT – N250M

RELIEF MATERIALS ALSO CAME FROM: How much was WATER RESOURCES (39 BILLION ) BUDGET for 2012?????????

DANGOTE GROUP OIL COMPANIESFAITH BASED ORGANISATIONS

7 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

8 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

9 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

10 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

11 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

12 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

13 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

14 NSE AGM ABUJA 2013

FLOOD PLAIN AND FLOOD PICTURES IN NIGERIA

15NSE AGM ABUJA 2013

FACTORS DETERMINING THE EFFECTS OF FLOODING

(1) THE LEVEL OF PREDICTABILITY: This affects the timing, accuracy and communication of warnings given before a flood

(2) THE RATE OF ONSET OF THE FLOOD: How quickly the water arrives and the speed at which it rises will govern the opportunity for people to prepare and respond effectively for a flood

(3) THE SPEED AND DEPTH OF THE WATER: This dictates the level of exposure

of people and property to a flood

(4) THE DURATION OF FLOOD: This takes care of the time that the volume of water lasted in a given area.

16NSE AGM ABUJA 2013

CONTROL OF FLOODS

(1) PLANTING TO RETAIN EXTRA WATERS

(2) TERRACING HILLSIDES TO SLOW FLOW DOWN THE HILLS

(3) CONSTRUCTION OF FLOOD WAYS, DREDGING AND MAINTAINING

FLOOD PLAIN

(4) CONTRUCTION OF LEVEES, DIKES, DAMS, RESERVOIR AND RETENTION PONDS

17NSE AGM ABUJA 2013

THE BENEFITS OF EFFECTIVE FLOOD PLAIN MANAGEMENT

(1) THE COLOSSAL DAMAGE AND DEATHS REDUCED

(2) GOVERNMENT SPENDINGS ON EMERGENCY MANAGEMENT WILL BE REDUCED

(3) PRESSURE ON NEMA TO ATTEND TO DISASTER IS REDUCED

18NSE AGM ABUJA 2013

THE CHALLENGES

(1) DIFFICULT TERRAIN AND POOR TOWN PLANNING APPROACH

(2) LACK OF MANPOWER AND EQUIPMENT FOR MONITORING AND INSPECTION

(3) LACK OF ENFORCEMENT OF EXISTING LEGISLATION

(4) LACK OF GOVERNMENT INTERVENTION THROUGH MASS HOUSING

(5) INDISCRIMATE DUMPING OF REFUSE IN THE RIVER

19 NSE AGM ABUJA 2013

CONCLUSION AND RECOMMENDATIONS

(1) DEVELOPMENT CONTROLS TO ENFORCE EXISTING LEGISLATION

(2) REGULAR MONITORING AND INSPECTION OF FLOOD PLAINS AND ROBUST DREDGING CAMPAIGNS

(3) RE-ENACT REALISTIC LOW COST HOUSING ESTATES AT BOTH

FEDERAL AND STATE LEVEL

(4) MINISTRIES OF ENVIRONMENT AT BOTH FEDERAL AND STATE TO CONTINUE ADVOCACY ON PROPER DUMPING OF REFUSE AND MANAGEMENT

(5) GOVERNMENT TO PROVIDE THE ENABLING ENVIRONMENT THROUGH PROPER TOWN PLANNING METHODS

(6) NIMET TO CONTINUE TO GIVE WEATHER UPDATES FOR EARLY WARNING SIGNALS

20

END OF PRESENTATION

THANK YOU FOR LISTENING!