1 globalink/vhf digital link mode 2 icao seminar on implementation of data link and satcom...

Post on 27-Mar-2015

218 Views

Category:

Documents

3 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

GLOBALink/VHF Digital Link Mode 2

ICAO Seminar on Implementation of Data Link and ICAO Seminar on Implementation of Data Link and SATCOM Communications SATCOM Communications

Bangkok, Thailand17-19 November 2003

Copyright © 2003 ARINC Incorporated, 2551 Riva Road, Annapolis, Maryland, 21401. All rights reserved. No part of this publication may be reproduced without written permission of the publisher.

22

GLOBALink Services Overview

AirlineHost System

AirlineHost System

FAA/CAATower Systems

FAA/CAATower Systems

ARINC Ground Network(AviNet®)

ARINC CentralProcessing

System (CPS)

ARINC CentralProcessing

System (CPS)

SatcomSatcom

HFDLHFDL

ACARS/AOA

ATNATN Air/Ground Router

Air/Ground Router

Air Traffic Service Provider

Air Traffic Service Provider

Aviation Communication

Services

Aviation Communication

Services

VHFVHF

33

ARINC Status of VDLM2 Services

Two VDLM2 Services Offered

AOA: ACARS Over AVLC (Aviation VHF Link Control)• Operational November 2000

ATN: Aeronautical Telecommunication Network • Supports Controller Pilot Data Link Communications (CPDLC)• Operational September 2002

ARINC Providing VDLM2 Products/Service Globally

North America• AOA • ATN-FAA CPDLC Build 1 Program

Europe • AOA • ATN-EUROCONTROL Link 2000+

Asia• AOA -AVICOM (Japan)

44

ACARS Technology Limitations

ACARS has 2.4 kbps air-to-ground data link Current traffic reaching capacity of available frequencies at

busiest airports Limits data link speed and volume

Data link growth continues regardless of economy

Cannot continue to meet airlines demand New applications are data intensive New aircraft are data intensive

55

VDLM2

VDLM2 has 31.5 kbps air-to-ground data link >10X the throughput and speed of ACARS Enables data intensive applications Complies with ICAO SARPS for worldwide harmonization Eliminates radio frequency congestion

Designed to meet demanding requirements of Air Traffic Services (ATS) communications

Scalable system Expandable with demand Easily integrated with existing data link systems

66

ARINC VDLM2 Coverage for CPDLC Build 1

• AOA & ATN Service• 13 Stations; fully redundant system; 24/7 ops

• AOA & ATN Service• 13 Stations; fully redundant system; 24/7 ops

77

Airlines / Operators Will Benefit from ARINC’s Operational VDLM2/ATN Service

American Airlines

Continental Airlines

Delta Air Lines

Federal Express

US Air Force

88

ARINC’s VDLM2/ATN Service Today

ARINC won EUROCONTROL’s competition to be their LINK 2000+ ATN/CPDLC Service Provider

LINK 2000+

Where:

• Maastricht UAC

When:

• Fall 2003 through 2007

99

ARINC VDLM2 in Europe

Planned Coverage for: • AOA Service

2003 Coverage for:• Link 2000+ CPDLC • AOA & ATN Service

1010

Airlines/Operators to Benefit from ARINC’s Operational VDLM2/ATN Service

SAS

Lufthansa

ATI

American Airlines

Others expected to announce their participation shortly

1111

ARINC Provides TurnkeyAOA / VDLM2 System to AVICOM

Narita (NRT) - 1

Haneda (HND) - 3

Kansai (KIX) - 2Kagoshima

(KOJ) - 8

Fukuoka (FUK) - 9

Nigata (KIJ) - 7

Chitose (CTS) - 4

Kushiro (KUH) - 5

Sendai (SDJ) - 6

Naha/Okinawa (OKA) - 10

AVICOM serviceoperational Sept 2003

1212

VDLM2 Available and Planned Coverage

1313

Performance of VDLM2

AOA AOA 50 aircraft regularly using service

Expect 100 aircraft by end of year

147 VDLM2 stations operational 160+ VDLM2 stations planned by EOY 2003 >100,000 messages monthly >99% Uplink success rate Response time (round trip)

Average 1.35 seconds

ATNATN 30+ Aircraft using service 13 stations operational ~10,000 CPDLC messages monthly ARINC service availability

99.999% - Domestic 99.86% - Caribbean

1414

REPORTS/ACARS/ACARSPER.XLS:TRAFFICAOA/08-11-03/DMS

ACARS AOA VHF TRAFFIC-ADNS MESSAGES DATA FROM BILLING

0

20,000

40,000

60,000

80,000

100,000

120,000

JA

N0

3

FE

B

MA

R

AP

R

MA

Y

JU

N

JU

L

AU

G

SE

P

OC

T

NO

V

DE

C

Nu

mb

er

of

Me

ss

ag

es

0

10

20

30

40

50

60

Nu

mb

er

of

Billa

ble

Air

cra

ft

UPLINKS

DOWNLINKS

NUMBER BILLABLEAIRCRAFT

REPORTS/ACARS/ACARSPER.XLS:TRAFFICAOA/08-11-03/DMS

# COMMUNICATING AIRCRAFT

AOA VHF Traffic

Nu

mb

er

of

Air

cra

ft

AOA VHF Traffic

1515

VDLM 2 Summary

VDLM2 AOA and ATN networks are operational

VDLM2 avionics for AOA and ATN are available

ATN service is operational for CPDLC in Miami ARTCC over ARINC VDLM2

ATN European service for CPDLC operational by EOY 2003

VDLM2 is achieving promised performance

1616

Summary (cont.)

For questions or additional informationplease contact:Dan PendergastDirector, GLOBALink Servicesdpenderg@arinc.com410 266-2267

top related