Arkansas Statewide Transportation
Improvement Program (STIP)
Presented by the
Arkansas State Highway Commission
in compliance with
Title 23—United States Code—Section 135
April 12, 2010
Fisc
al Y
ears
201
0-20
13
(Apr
il 6
, 201
0 ~
Sep
tem
ber 3
0, 2
013
)
AHTD STIP
Arkansas State Highway and Transportation Department Statewide Transportation Improvement Program
For Federal Fiscal Years 2010 - 2013
www.arkansashighways.com
TABLE OF CONTENTS
Introduction........................................................................................................... i
Financial Summary Report Federal Highway Administration Funds ............................................ v
Federal Transit Administration Funds............................................... vi
Glossary of Terms / Abbreviations / Acronyms ............................ vii
Information on Grouped Categories ................................................... viii
Projects State Projects Sorted by Route............................................................ 1
Local Projects Areas > 200,000 Population
Central Arkansas Regional Transportation Study Area............................... 22
West Memphis-Marion Area Transportation Study .................................... 27
Areas < 200,000 Population..................................................................... 29
Statewide Generic Projects FFY 2010.................................................................................................. 33
FFY 2011.................................................................................................. 35
FFY 2012.................................................................................................. 37
FFY 2013.................................................................................................. 39
Transit Projects FFY 2010.................................................................................................. 41
FFY 2011.................................................................................................. 47
FFY 2012.................................................................................................. 53
FFY 2013.................................................................................................. 59
Eastern Federal Lands Highway Division ...................................... 65
State and Local Projects Sorted by Job Number.......................... 66
State and Local Projects Sorted by County.................................... 91
i
INTRODUCTION This Statewide Transportation Improvement Program (STIP) for federal fiscal years 2010 through 2013 has been prepared by the Arkansas State Highway Commission in response to 23 U.S.C. 135 - Statewide Planning, as amended by the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users. Authorization for the listed projects may be requested for any phase of development (i.e., preliminary engineering, right of way, utilities, or construction) during F.Y. 2010-2013. Authorization for pre-construction phases may be requested in advance of the year a project is scheduled for construction to assure the project can be advertised and let to contract as scheduled in this STIP. With respect to urban areas greater than 50,000 in population, projects listed in the Transportation Improvement Programs (TIPs) that have been developed by the various Metropolitan Planning Organizations (MPO) are hereby included as part of the overall Federal-aid highway construction program. For additional information on projects located within a TIP Area, consult the following TIPs or contact the appropriate MPO.
Bi-State - Bi-State Transportation Study (Crawford & Sebastian Counties) Bi-State MPO Mr. John Guthrie, Executive Director P. O. Box 2067 Fort Smith, AR 72901 Telephone: 479-785-2651
CARTS - Central Arkansas Regional Transportation Study
(Pulaski, Saline, Faulkner, & Lonoke Counties)
Metroplan Mr. Jim McKenzie, Executive Director 501 West Markham, Suite B Little Rock, AR 72201 Telephone: 501-372-3300
ii
HSA-MPO - Hot Springs Area Metropolitan Planning Organization (Garland & Hot Spring Counties)
Hot Springs Area Metropolitan Planning Organization Mr. Lance Hudnell, Hot Springs City Manager P. O. Box 700 Hot Springs, AR 71902-0083 Telephone: 501-321-4804
JATS - Jonesboro Area Transportation Study
(Craighead County)
Mayor of Jonesboro The Honorable Harold Perrin P. O. Box 1845 Jonesboro, AR 72403-1845 Telephone: 870-933-4635
NARTS - Northwest Arkansas Regional Transportation Study
(Washington & Benton Counties)
Northwest Arkansas Regional Planning Commission Mr. Jeff Hawkins, Executive Director 1311 A Clayton St. Springdale, AR 72762 Telephone: 479-751-7125
PBATS - Pine Bluff Area Transportation Study
(Jefferson County)
Southeast Arkansas Regional Planning Commission Ms. Jerre George, Director P. O. Box 8398 Pine Bluff, AR 71611 Telephone: 870-534-4247
iii
TUTS - Texarkana Urban Transportation Study
(Miller County)
CEO of Texarkana, Texas Dr. Larry Sullivan P. O. Box 1967 Texarkana, TX 75504-1967 Telephone: 903-798-3927
WMATS - West Memphis-Marion Area Transportation Study (Crittenden County)
Mayor of West Memphis The Honorable William Johnson 205 South Redding West Memphis, AR 72301 Telephone: 870-732-7500
Projects (including Federal Transit Administration Projects) utilizing funds set aside for rural areas were selected in consultation with the appropriate local officials. This program includes both the Federal-aid portion and the 100% State funded portion of the State's overall highway construction program and is financially constrained in accordance with federal regulations set forth in 23 CFR Part 450. The following financial summary demonstrates current and estimated revenues to fund the STIP, while the system as a whole is being adequately operated and maintained. Additional information regarding this program may be obtained by contacting: Scott Bennett Assistant Chief Engineer - Planning Arkansas State Highway and Transportation Department P. O. Box 2261 Little Rock, Arkansas 72203 Telephone: (501) 569-2241
iv
NOTICE OF NONDISCRIMINATION
The Arkansas State Highway and Transportation Department complies with all civil rights provisions of federal statutes and related authorities that prohibited discrimination in programs and activities receiving federal financial assistance. Therefore, the Department does not discriminate on the basis of race, sex, color, age, national origin, religion or disability, in the admission, access to and treatment in Department’s programs and activities, as well as the Department’s hiring or employment practices. Complaints of alleged discrimination and inquiries regarding the Department’s nondiscrimination policies may be directed to James B. Moore, Jr., Section Head - EEO/DBE (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: james.moore@arkansashighways.com.
April 6, 2010 (P&C)
REVENUES
EXPENDITURES (1)
STATE FUNDS REMAINING FOR
CONSTRUCTION
FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED
INTERSTATE MAINTENANCE 89.0 71.5 92.5 71.5 96.1 71.5 99.9 71.5 377.4 286.0
NATIONAL HIGHWAY SYSTEM 101.4 106.0 105.4 88.9 109.6 170.6 113.9 70.0 430.3 435.5
SURFACE TRANSPORTATION 247.3 203.1 158.4 157.1 164.7 138.4 171.1 197.0 741.5 695.6
CONGESTION MITIGATION AND AIR QUALITY 11.4 0.7 11.9 25.7 12.4 0.7 12.8 0.8 48.5 27.9
HIGHWAY SAFETY 21.4 35.7 22.3 14.0 23.1 13.6 24.0 21.5 90.8 84.8
RAIL-HWY CROSSING 3.9 3.7 4.1 3.8 4.3 4.0 4.4 4.1 16.7 15.5
SAFE ROUTES TO SCHOOL 1.7 1.4 1.8 1.4 1.8 1.5 1.9 1.5 7.2 5.8
BRIDGE REPLACEMENT 73.0 59.5 75.9 78.2 78.8 58.7 81.9 112.9 309.6 309.3
RECREATIONAL TRAILS 1.5 0.8 1.5 0.8 1.6 0.8 1.6 0.8 6.2 3.2
SUB-TOTAL 550.6 482.4 473.7 441.5 492.3 459.7 511.6 480.1 2,028.2 1,863.6
EARMARKED FUNDS 148.2 148.2 162.3 162.3 4.6 4.6 8.6 8.6 323.6 323.6
FEDERAL LANDS HIGHWAY PROGRAM 2.0 2.0 10.2 10.2 0.04 0.04 0.1 0.1 12.4 12.4
STATE MATCH 98.2 98.2 103.6 103.6 88.0 88.0 86.1 86.1 375.9 375.9
IRP DEBT SERVICE 17.0 17.0 18.5 18.5 18.5 18.5 19.0 19.0 73.0 73.0
OTHER MATCH(2) 76.6 76.6 70.7 70.7 52.5 52.5 26.8 26.8 226.6 226.6
TOTAL 892.6 824.4 839.0 806.8 655.9 623.3 652.2 620.7 3,039.7 2,875.1
FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED
402-SAFETY 21.3 18.5 10.0 5.0 10.4 9.1 10.8 9.8 52.6 42.4
100% STATE 57.3 33.8 29.4 52.5 19.0 14.0 21.0 23.0 126.8 123.3
TOTAL 78.6 52.3 39.5 57.5 29.4 23.1 31.9 32.8 179.3 165.7
GRAND TOTAL 971.2 876.7 878.5 864.2 685.3 646.4 684.0 653.5 3,219.0 3,040.8
NOTE: TOTAL MAY NOT BE ADDITIVE DUE TO ROUNDING
2013 TOTAL
2010 2011 2012 2013 TOTAL
(2) LOCAL, STATE AID, RAILROAD
2012
160.3 163.1 162.4 647.1
442.6
(266.7) (273.7) (1,081.3)
1,728.4429.8
OTHER AVAILABLE FUNDING ANALYSIS
436.1
161.4
FHWA FEDERAL FUNDING ANALYSIS
2010 2011
(259.7)
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
FINANCIAL SUMMARY REPORT FOR FEDERAL FISCAL YEARS 2010-2013(x $1 million)
(281.2)
2013
ESTIMATED STATE REVENUE ANALYSIS
2011
420.0
(1) INCLUDES FUNDS TO BE USED FOR MAINTENANCE AND OPERATIONS OF EXISTING SYSTEM
TOTAL2010 2012
v
February 25, 2010 (P&R)
FUNDING CATEGORIES: APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED APPORTIONED SCHEDULED
FTA 5307 - URBANIZED AREAS $9,779 $9,779 $10,017 $10,017 $10,357 $10,357 $10,711 $10,711 $40,864 $40,864
FTA 5309 - BUS & BUS FACILITIES $950 $950 $3,000 $3,000 $3,000 $3,000 $3,000 $3,000 $9,950 $9,950
FTA 5310 - ELDERLY & DISABLED $1,414 $1,414 $1,414 $1,414 $1,463 $1,463 $1,514 $1,514 $5,805 $5,805
FTA 5311 - NONURBANIZED AREAS $10,206 $10,206 $10,206 $10,206 $10,564 $10,564 $10,933 $10,933 $41,909 $41,909
FTA 5316 - JOB ACCESS & REVERSE COMMUTE $1,693 $1,693 $1,693 $1,693 $1,752 $1,752 $1,814 $1,814 $6,952 $6,952
FTA 5317 - NEW FREEDOM $855 $855 $855 $855 $885 $885 $917 $917 $3,512 $3,512
FTA 5337 - JOB ACCESS DISCRETIONARY $350 $350 $350 $350
EARMARKED FUNDS $570 $570 $570 $570
SUB-TOTAL $25,817 $25,817 $27,185 $27,185 $28,021 $28,021 $28,889 $28,889 $109,912 $109,912
LOCAL MATCH $11,328 $11,328 $11,377 $11,377 $11,816 $11,816 $12,197 $12,197 $46,718 $46,718
GRAND TOTAL $37,145 $37,145 $38,562 $38,562 $39,837 $39,837 $41,086 $41,086 $156,630 $156,630
vi
STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM (STIP)
FY 2010 FY 2011 FY 2012 FY 2013 TOTAL
FTA FEDERAL FUNDING ANALYSIS
(x $1 thousand)
FINANCIAL SUMMARY FOR FEDERAL FISCAL YEARS 2010-2013
GLOSSARY OF TERMS / ABBREVIATIONS / ACRONYMS
402-Safety Funds set aside for safety improvements due to the lack of a state open container law.
JETS Jonesboro Economical Transit System
4-R Resurfacing, Restoration, Rehabilitation and Reconstruction LUZA Local Urbanized Area
BI-STATE Bi-State Transportation Study MPO Metropolitan Planning Organization
BR Bridge Replacement Funds NARTS Northwest Arkansas Regional Transportation Study
Bs. & Surf. Base and Surfacing NHS National Highway System Funds
CARTS Central Arkansas Regional Transportation Study PBATS Pine Bluff Area Transportation Study
CATA Central Arkansas Transit Authority P.E. Preliminary Engineering
CMAQ AQ Congestion Mitigation and Air Quality Funds – Air Quality Use Rec Trails Recreational Trail Funds
CMAQ FLEX Congestion Mitigation and Air Quality Funds – Flexible Use RR Railroad
CR County Road RRP Railway-Highway Crossing Program Funds
CS City Street RUZA Regional Urbanized Area
Earmark Various Earmarked Funds in Previous Highway Acts SRTS Safe Routes to School Funds
EFLHD Eastern Federal Lands Highway Division of the Federal Highway Administration
STP Surface Transportation Program Funds
Eng. Engineering STP > 200,000 Surface Transportation Program funds for areas greater than 200,000 population
ENH Enhancement Funds STP < 200,000 Surface Transportation Program funds for areas less than 200,000 population
FTA Federal Transit Administration Funds Str. & Apprs. Structure and Approaches
Gr. & Strs. Grading and Structures TIP Transportation Improvement Program
HSA-MPO Hot Springs Area Metropolitan Planning Organization TDOT Tennessee Department of Transportation
HSIP Highway Safety Improvement Program Funds TUTS Texarkana Urban Transportation Study
IM Interstate Maintenance Funds U of A University of Arkansas
IRP Interstate Rehabilitation Program WMATS West Memphis-Marion Area Transportation Study
vii
JATS Jonesboro Area Transportation Study
viii
ARKANSAS’ STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM FEDERAL FISCAL YEARS 2010-2013
INFORMATION ON GROUPED CATEGORIES
INTERSTATE MAINTENANCE
VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of the Interstate System. The purpose of these improvements would be to improve the ride quality, to extend the life of pavements, or to improve traffic service on the Interstate System. Improvements could include interchange reconstruction and increasing lanes widths and/or shoulder widths to current standards, but do not include adding capacity.
RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
NATIONAL HIGHWAY SYSTEM
VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes on the National Highway System. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements on the National Highway System. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
SURFACE TRANSPORTATION PROGRAM
VARIOUS RESURFACING / RESTORATION / REHABILITATION / RECONSTRUCTION – Projects in this category include improvements to the existing pavement condition of routes functionally classified above rural minor collector. The purpose of these improvements would be to improve the ride quality or to extend the life of pavements. Although projects may increase lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
VARIOUS RESURFACING / RESTORATION / REHABITATION / RECONSTRUCTION / BRIDGE REPLACEMENT / BRIDGE REHABILITATION ON COUNTY ROADS– Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.
ix
SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS > 200,000
LUZA/RUZA NON-CAPACITY PROJECTS – Projects in this category include improvements to maintain the system of eligible routes in Transportation Management Areas. Eligible projects would include resurfacing, restoration, rehabilitation, reconstruction, signalization, increasing lanes widths and/or shoulder widths to current standards, intersection improvements such as the addition of turn lanes, pedestrian and bicycle improvements, bridge rehabilitation or replacement, and railroad crossing improvements. Projects to add capacity are not included in this category.
SURFACE TRANSPORTATION PROGRAM – URBAN PROJECTS IN AREAS < 200,000
SIGNALIZATION / INTERSECTION IMPROVEMENTS – Projects in this category include signalization, signal upgrades, signal coordination, and the addition of turn lanes to improve the flow of traffic through intersections.
SURFACE TRANSPORTATION PROGRAM – ENHANCEMENT
VARIOUS ENHANCEMENT TYPE PROJECTS – Projects in this category include those eligible under the Federal Transportation Enhancement Program as listed in 23 USC 101(a)(35). These include: Provision of facilities for pedestrians and bicycles. Provision of safety and educational activities for pedestrians and bicyclists. Acquisition of scenic easements and scenic or historic sites (including historic battlefields). Scenic or historic highway programs (including the provision of tourist and welcome center
facilities). Landscaping and other scenic beautification. Historic preservation. Rehabilitation and operation of historic transportation buildings, structures, or facilities
(including historic railroad facilities and canals). Preservation of abandoned railway corridors (including the conversion and use of the
corridors for pedestrian or bicycle trails). Inventory, control, and removal of outdoor advertising. Archaeological planning and research. Environmental mitigation--
(i) to address water pollution due to highway runoff; or (ii) reduce vehicle-caused wildlife mortality while maintaining habitat connectivity. Establishment of transportation museums.
RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
BRIDGE REPLACEMENT
VARIOUS BRIDGE REHABILITATION / REPLACEMENT – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities that include right-of-way acquisition, relocating utilities and providing construction engineering.
x
BRIDGE PAINTING / GUARD RAIL / SCOUR CONTROL / INSPECTION – Projects in this category include the routine inspection of bridges, painting structural steel, adding or replacing guard rail at bridge ends, and improvements to columns to control scour.
VARIOUS BRIDGE REHABILITATION / REPLACEMENT ON COUNTY ROADS – Projects in this category include the replacement or rehabilitation of eligible bridges. While improvements may include increasing lane widths and/or shoulder widths to current standards, projects to add capacity are not included in this category.
HIGHWAY SAFETY IMPROVEMENT PROGRAM
VARIOUS SAFETY TYPE IMPROVEMENTS – Highway safety improvement project means a project consistent with the State strategic highway safety plan (SHSP) that corrects or improves a hazardous road location or feature, or addresses a highway safety problem. Projects include, but are not limited to, the following: An intersection safety improvement. Pavement and shoulder widening (including addition of a passing lane to remedy an unsafe
condition). Installation of rumble strips or other warning devices, if the rumble strips or other warning
devices do not adversely affect the safety or mobility of bicyclists, pedestrians and persons with disabilities.
Installation of a skid-resistant surface at an intersection or other location with a high frequency of crashes.
An improvement for pedestrian or bicyclist safety or for the safety of persons with disabilities.
Construction of any project for the elimination of hazards at a railway-highway crossing that is eligible for funding under 23 U.S.C. 130, including the separation or protection of grades at railway-highway crossings.
Construction of a railway-highway crossing safety feature, including installation of highway-rail grade crossing protective devices.
The conduct of an effective traffic enforcement activity at a railway-highway crossing. Construction of a traffic calming feature. Elimination of a roadside obstacle or roadside hazard. Improvement of highway signage and pavement markings. Installation of a priority control system for emergency vehicles at signalized intersections. Installation of a traffic control or other warning device at a location with high crash potential. Transportation safety planning. Improvement in the collection and analysis of safety data. Planning integrated interoperable emergency communications equipment, operational
activities, or traffic enforcement activities (including law enforcement assistance) relating to work zone safety.
Installation of guardrails, barriers (including barriers between construction work zones and traffic lanes for the safety of road users and workers), and crash attenuators.
The addition or retrofitting of structures or other measures to eliminate or reduce crashes involving vehicles and wildlife.
Installation and maintenance of signs (including fluorescent yellow-green signs) at pedestrian-bicycle crossings and in school zones.
Construction and operational improvements on high risk rural roads. Conducting road safety audits.
xi
. RIGHT-OF-WAY / UTILITIES / CONSTRUCTION ENGINEERING – Funding for project activities
that include right-of-way acquisition, relocating utilities and providing construction engineering.
RAILWAY-HIGHWAY CROSSING
RAILROAD CROSSING PROTECTIVE DEVICES / SURFACING / HAZARD ELIMINATION – Projects in this category include adding or upgrading flashing lights and gates, crossbucks or surfaces at railroad crossings, and the construction of railroad overpasses.
CONGESTION MITIGATION AND AIR QUALITY
NON-ATTAINMENT PROJECT – Projects in this category have been selected by the Metropolitan Planning Organization in an area designated by the Environmental Protection Agency as a non-attainment area for the National Ambient Air Quality Standards and have been documented to decrease vehicular emissions.
RECREATIONAL TRAILS
VARIOUS TRAIL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include motorized and non-motorized trails and trail facilities.
SAFE ROUTES TO SCHOOL
VARIOUS SAFE ROUTES TO SCHOOL PROJECTS – Projects in this category will be approved through the solicitation of applications. Eligible projects include infrastructure and non-infrastructure projects, as well as administration of a Safe Routes to School Program that benefits elementary and middle school children in grades K-8. Infrastructure-related projects include the planning, design, and construction of projects within public right of way that will substantially improve the ability of students to walk and bicycle to school. These include: Sidewalk improvements, Traffic calming and speed reduction improvements, Pedestrian and bicycle crossing improvements, On-street bicycle facilities, Off-street bicycle and pedestrian facilities, Secure bicycle parking facilities, and Traffic diversion improvements in the vicinity of schools. Non-infrastructure-related activities include activities that will encourage walking and
bicycling to school, including: Public awareness campaigns and outreach, Traffic education and enforcement in the vicinity of schools, Student sessions on bicycle and pedestrian safety, health, and environment, and Funding for training, volunteers, and managers of SRTS Programs.
NATIONAL SCENIC BYWAYS
SCENIC BYWAYS PROJECTS – Eligible projects in this category include: An activity related to the planning, design, or development of a State or Indian tribe scenic
byway program;
xii
Development and implementation of a byway corridor management plan; Safety improvements to accommodate increased traffic; improvements that enhance
access; protection of resources adjacent to the byway; Development and implementation of a marketing program; Development and provision of tourist implementation; and construction of bicycle and
pedestrian facilities, interpretive facilities, overlooks and other enhancements for byway travelers.
State Highway Projects Sorted by Route
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
110502 Lee 001 Cypress Corner-North (S) Widening 4.70 2012State State30,500
24,400 - NHS
6,100 - State Match
- TOTAL
110228 Lee 001 So. Marianna-South (S) Widening 1.80 2010State State9,500
7,600 - NHS
1,900 - State Match
- TOTAL
061259 Garland 005 Hwy. 7-Hot Springs Village (Safety Impvts) (S) Safety Improvements 1.08 2012State State HSA-MPO3,500
3,150 - HSIP
350 - State Match
- TOTAL
061228 Saline 005 Hwy. 5 Drainage Structure (Bryant) (S) Str. & Apprs. 2011State State CARTS1,000
800 - STP
200 - State Match
- TOTAL
061202 Pulaski 005 Saline Co Line-Otter Creek Rd. (L.R.) (S) Widening 1.26 2010State State CARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL
060352 Pulaski 005 McHenry Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State CARTS2,200
1,760 - BR
440 - State Match
- TOTAL
R50116 Stone 005 Little Raccoon Creek-Cove Prong Creek (S) Reconst/Climb Lanes 4.00 2011State State11,500
5,000 - STP
1,250 - State Match
- TOTAL
5,250 - 100% State
090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Str. & Apprs. 2011State State3,000
2,400 - BR
600 - State Match
- TOTAL
Page 1 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
080385 Yell 007 Little Rock & Western RR Str. & Apprs. (Ola) (S) Str. & Apprs. 2012State State1,250
1,000 - BR
250 - State Match
- TOTAL
080377 Yell 007 Centerville-Dardanelle (Passing Lanes) (S) Passing Lanes 1.00 2013State State2,000
1,600 - STP
400 - State Match
- TOTAL
080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2013State State6,250
5,000 - STP
1,250 - State Match
- TOTAL
080392 Pope 007 Newton Co. Line-South (Passing Lanes) (S) Passing Lanes 2.30 2012State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2010State State3,000
2,400 - STP
600 - State Match
- TOTAL
090213 Newton 007 Co. Rd. 46-Buffalo River (Safety Impvts.) (S) Reconstruction 0.60 2010State State8,600
7,740 - HSIP
860 - State Match
- TOTAL
009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Str. & Apprs. 2010State State2,600
2,080 - BR
520 - State Match
- TOTAL
090221 Newton 007 Mill Cr.-Hwy. 7S Safety Impvts. (Marble Falls) (S) Reconstruction 0.83 2010State State5,700
5,130 - HSIP
570 - State Match
- TOTAL
Page 2 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
080378 Montgomery 008 Lick Creek Str. & Apprs. (Norman) (S) Str. & Apprs. 2011State State1,200
960 - BR
240 - State Match
- TOTAL
050012 Izard 009 Fulton Co. Line-South Strs. & Apprs.(Oxford) (S) Str. & Apprs. 2011State State3,300
2,640 - BR
660 - State Match
- TOTAL
061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (Little Rock) (S) Safety Improvements 0.65 2013Local State CARTS9,000
8,100 - HSIP
900 - Local
- TOTAL
061218 Pulaski 010 Union Pacific R.R. Viaduct Safety Impvts. (L.R) (S) Safety Improvements 0.20 2012State State CARTS1,700
1,530 - HSIP
170 - State Match
- TOTAL
020506 Lincoln 011 Cane Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Capacity Imprvmnts 2.70 2012Local State NARTS20,400
10,400 - Local
- TOTAL
10,000 - 100% State
061215 Lonoke 013 I-40-South (Carlisle) (S) Rehabilitation 0.46 2012State State2,500
2,000 - STP
500 - State Match
- TOTAL
050189 White 013 Hwy. 13 Extension (Searcy) (Phase I) (S) New Location 4.60 2011State State10,000
8,000 - STP
2,000 - State Match
- TOTAL
Page 3 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
050212 White 013 Hwy. 13 Extension (Searcy) (Phase II) (S) New Location 4.60 2013State State14,000
11,200 - STP
2,800 - State Match
- TOTAL
070273 Union 015 Hwy 335-Hwy 82 Strs & Apprs (S) Str. & Apprs. 2011State State2,650
2,120 - BR
530 - State Match
- TOTAL
090282 Benton 016 Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS5,000
4,000 - BR
1,000 - State Match
- TOTAL
040486 Washington 016 College Ave.-Stone Bridge Rd. (Fayetteville) (S) Widening 2.68 2011Local State NARTS10,000
5,000 - STP
5,000 - Local
- TOTAL
040569 Washington 016 West & Middle Forks of White River Strs. & Apprs. (Fayetteville) (S)
Str. & Apprs. 2012State State NARTS11,500
9,200 - BR
2,300 - State Match
- TOTAL
100308 Craighead 018 St. Francis River-North of Black Oak (S) Widening 5.60 2010State State33,000
26,400 - STP
6,600 - State Match
- TOTAL
100567 Craighead 018 North of Black Oak-Monette Bypass (S) Widening 1.40 2013State State11,600
9,280 - STP
2,320 - State Match
- TOTAL
100653 Craig/Miss 018 Monette Bypass-Manila (S) Widening 6.00 2012State State41,700
33,360 - STP
8,340 - State Match
- TOTAL
Page 4 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
100307 Mississippi 018 Hwy. 181-West (S) Widening 2.74 2010State State17,000
12,400
1,200
- STP
- BR
3,400 - State Match
- TOTAL
100663 Mississippi 018 Hwy. 18 Improvements (Blytheville) (S) Safety Improvements 2011State State15,876
6,000
500
2,588
- STP
- Earmarks
- HSIP
1,788 - State Match
- TOTAL
5,000 - 402-Safety
090283 Carroll 021 Indian Creek Str. & Apprs. (S) Str. & Apprs. 2012State State1,000
800 - BR
200 - State Match
- TOTAL
040438 Franklin 023 Arkansas River Bridge Painting (Ozark) (S) Str. & Apprs. 2011State State870
696 - BR
174 - State Match
- TOTAL
080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,000
4,500 - STP
3,621 - Local
- STP > 200,000
- TOTAL
879
Also shown in the LOCAL PROJECTS AREAS > 200,000 POPULATION Section
050166 Cleburne 025 Faulkner Co. Line-Hwy. 107 (Passing Lanes) (S) Passing Lanes 2.20 2012State State6,500
5,200 - STP
1,300 - State Match
- TOTAL
080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Str. & Apprs. 2012State State2,500
2,000 - BR
500 - State Match
- TOTAL
Page 5 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
061256 Saline 030 Hwy. 70-Sevier St. Cable Median Barrier (S) Safety Improvements 5.21 2012State CARTS1,700 - TOTAL
1,700 - 402-Safety
061201 Pulaski 030 I-30: South Terminal Interchange-I-630 (L.R.) (P.E.) (F) Safety & Traffic Eng. 1.40 2010State State CARTS1,350
1,080 - Earmarks
270 - State Match
- TOTAL
030386 Nevada 032 Little Bodcaw Creek & Relief Strs. & Apprs.(S) Str. & Apprs. 2011State State2,800
2,240 - BR
560 - State Match
- TOTAL
100722 Greene 034 Lafe-Marmaduke Strs. & Apprs. (S) Str. & Apprs. 2011State State2,500
2,000 - BR
500 - State Match
- TOTAL
080339 Faulkner 036 Hwys. 36/107 Inters. Impvts. (S. of Enola) (S) Safety 2011State State900
720 - STP
180 - State Match
- TOTAL
061280 Prairie 038 White River Bridge Rehab. (Des Arc) (S) Str. & Apprs. 2010State State1,600
1,280 - BR
320 - State Match
- TOTAL
110541 Woodruff 038 Bayou Deview Str. & Apprs. (S) Str. & Apprs. 2011State State1,750
1,400 - BR
350 - State Match
- TOTAL
080388 Faulkner 040 Conway-Pulaski Co. Line (Widening) (Phase I) (F) Widening 2012State State CARTS36,000
28,800 - NHS
7,200 - State Match
- TOTAL
061190 Pulaski 040 I-40 Interchange (Maumelle) (F) Interchange 2010Local Local CARTS696
557 - Earmarks
139 - Local
- TOTAL
Page 6 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (Project Development) (F) Interchange 2010Local Local5,352
4,282 - Earmarks
1,070 - Local
- TOTAL
110473 Crittenden 040 I-40 Miss. River Bridge Seismic Retrofit (Phase VII) (S) Str. & Apprs. 2010State TDOT WMATS11,040
8,832 - BR
2,208 - State Match
- TOTAL
110542 Crittenden 040 I-40 Miss. Rv. Br. Seismic Retrofit (Phase VIII) (S) Str. & Apprs. 2011State TDOT WMATS26,000
20,800 - BR
5,200 - State Match
- TOTAL
040238 Sebastian 045 Hwy. 255-Phoenix Ave. (Widening) (Ft. Smith) (S) Widening 1.10 2010Local State BI-STATE9,400
4,700 - STP
4,700 - Local
- TOTAL
110478 Monroe 049 Hwy. 17-I-40 (Brinkley) (S) Widening 1.03 2010State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Str. & Apprs. 2012State State3,000
2,400 - BR
600 - State Match
- TOTAL
020451 Desha 054 Waterman St.-West (Dumas) (S) Reconstruction 0.81 2010State State3,300 - TOTAL
3,300 - 100% State
020508 Jefferson 054 Steep Bank Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS600
480 - BR
120 - State Match
- TOTAL
020507 Jefferson 054 Big Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS800
640 - BR
160 - State Match
- TOTAL
Page 7 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
040524 Washington 062 Hwy. 62 Bypass (Gr. & Strs.) (Prairie Grove) (S) New Location 4.20 2010State State NARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL
090065 Benton 062 Avoca-North Garfield (S) Widening 6.43 2012State State NARTS28,000
22,400 - NHS
5,600 - State Match
- TOTAL
009901 Carroll 062 Hwy. 143-Berryville (S) Widening 2.80 2010State State13,300
10,640 - STP
2,660 - State Match
- TOTAL
009702 Carroll 062 Hwy. 62 Improvements (Green Forest) (Phase I) (S) Widening 2.00 2013State State9,000
4,800 - STP
1,200 - State Match
- TOTAL
3,000 - 100% State
R90097 Marion 062 Flippin Bypass-Hwy. 62B (S) Widening 0.65 2010State State5,300 - TOTAL
5,300 - 100% State
050230 Fulton 063 Hwy. 9-Hwy. 342 Strs. & Apprs. (Mammoth Spring) (S) Str. & Apprs. 2012State State7,000
5,600 - BR
1,400 - State Match
- TOTAL
100686 Lawrence 063 Black Rock-Portia (Phase I) (F) Widening 3.50 2013State State15,900
12,720 - STP
3,180 - State Match
- TOTAL
100687 Lawrence 063 Black River & Relief Strs. & Apprs. (F) Str. & Apprs. 2013State State33,000
26,400 - BR
6,600 - State Match
- TOTAL
Page 8 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
100682 Poinsett 063 Future I-555 Access Roads (S) Project Development 2011State State2,946
2,357 - Earmarks
589 - State Match
- TOTAL
080380 Pope 064 Galla Creek Str. & Apprs. (Pottsville) (S) Str. & Apprs. 2011State State2,500
2,000 - BR
500 - State Match
- TOTAL
110504 Cross 064 Hwy. 1 North-West (Wynne) (S) Widening 0.65 2010State State6,400
5,120 - STP
1,280 - State Match
- TOTAL
090280 Searcy 065 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State2,000
1,600 - BR
400 - State Match
- TOTAL
080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Widening 1.41 2013State State15,000
12,000 - NHS
3,000 - State Match
- TOTAL
080391 Van Buren 065 Hwy. 336 West-Co. Rd. 28 (Phase I) (S) Widening 9.30 2012State State15,000
12,000 - NHS
3,000 - State Match
- TOTAL
080363 Van Buren 065 Hwys. 65/92 Signal & Inters. Impvts. (Bee Branch) (S) Inters Impvts 2011State State2,000
1,600 - STP
400 - State Match
- TOTAL
080273 Faulkner 065B Hwy 266-Hwy. 64 (Conway) (S) Widening 0.51 2010State State CARTS2,250
2,025 - HSIP
225 - State Match
- TOTAL
Page 9 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
050231 Stone 066 Mt. View-West (Passing Lanes) (S) Passing Lanes 3.00 2013State State9,500
7,600 - STP
1,900 - State Match
- TOTAL
070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Str. & Apprs. 2013State State5,000
4,000 - BR
1,000 - State Match
- TOTAL
061278 Pulaski 067 Redmond Rd. Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2012State State CARTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
061276 Pulaski 067 Main Street Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2013State State CARTS4,000
3,200 - BR
800 - State Match
- TOTAL
061219 Lonoke/Pul 067 Hwy. 67 Cable Median Barrier (Jacksonville-Cabot) (S) Safety Improvements 4.80 2012State State CARTS1,500
1,350 - HSIP
150 - State Match
- TOTAL
050207 Independence 069 Hwy. 69/Hwy. 122 Inters. Impvts. (S. of Newark) (S) Safety Improvements 2011State State130
117 - HSIP
13 - State Match
- TOTAL
020316 Desha 069 I-69 Corridor (Hwy. 65-Miss. Rt. 1) (GRB) (Ph I) (F) Phase I 2010State State10,346
8,666 - Earmarks
1,680 - State Match
- TOTAL
020462 Drew 069 Monticello Bypass (Phase I) (F) New Location 8.60 2010State State88,107
70,486 - Earmarks
17,621 - State Match
- TOTAL
Page 10 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Str. & Apprs. 2013State State CARTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Str. & Apprs. 2013State State CARTS45,000
36,000 - BR
9,000 - State Match
- TOTAL
110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Str. & Apprs. 2013State State4,000
3,200 - BR
800 - State Match
- TOTAL
030X01 Miller 071 LA Line-Doddridge (Phase III) (F) New Location 2.18 2012State State23,505
15,200
3,800
- NHS
- Earmarks
4,505 - State Match
- TOTAL
030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Str. & Apprs. 2012State State TUTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
030326 Miller 071 I-30-Hwy. 71 (Bs. & Surf.) (F) New Location 4.44 2010State State TUTS33,600
6,720 - NHS
1,680 - State Match
- TOTAL
25,200 - 100% State
030325 Miller 071 Arkansas Blvd.-I-30 (Bs. & Surf.) (F) New Location 2.43 2010State State TUTS14,800
11,840 - NHS
2,960 - State Match
- TOTAL
040373 Sebastian 071 Jenny Lind-I-40 (Phase II) (F) New Location 6.04 2011State State BI-STATE29,900
17,600
6,300
- NHS
- Earmarks
6,000 - State Match
- TOTAL
Page 11 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
090224 Benton 071 Bella Vista Bypass (Phase I) (F) New Location 14.60 2011State State NARTS33,584
12,000
15,032
- STP
- Earmarks
6,552 - State Match
- TOTAL
040024 Washington 074 White River Bridge Str. & Apprs. (Elkins) (S) Str. & Apprs. 2011State State NARTS2,500
2,000 - BR
500 - State Match
- TOTAL
070301 Columbia 079 Magnolia-Ouachita Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,200
5,580 - HSIP
620 - State Match
- TOTAL
020070 Jefferson 079 Hwy. 65B-North (S) Widening 1.60 2010State State PBATS8,900
4,240
2,880
- STP
- Earmarks
1,780 - State Match
- TOTAL
110394 Monroe 079 White River Str. & Apprs. (Clarendon) (Ph. II) (F) Str. & Apprs. 1.14 2010State State38,200
30,560 - BR
7,640 - State Match
- TOTAL
020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Str. & Apprs. 2012State State2,200
1,760 - BR
440 - State Match
- TOTAL
R20098 Chicot 082 Fairview-Mississippi River Br. (S) Widening 4.10 2011State State25,250
800
1,800
- STP
- Earmarks
650 - State Match
- TOTAL
22,000 - 100% State
Page 12 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
061113 Garland 088 Hwy. 270-Printers Place (Higdon Ferry Rd.) (Hot Springs) (S) Widening 0.46 2010State State HSA-MPO3,000
2,400 - STP
600 - State Match
- TOTAL
061214 Garland 088 Printers Place-Hwy 7 North (Higdon Ferry Rd)(Hot Sprs) (S) Widening 0.36 2013State/Local State HSA-MPO5,686
4,000
549
- STP
- Earmarks
1,000 - State Match
137 - Local
- TOTAL
080381 Van Buren 092 Scroggins Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Reconstruction 1.20 2012State State4,000
3,200 - STP
800 - State Match
- TOTAL
080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts (S)
Reconstruction 0.80 2012State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
090174 Benton 102 Hwy. 102B-Greenhouse Rd. (Centerton) (S) Widening 1.79 2010Local State NARTS12,000
10,000 - STP
2,000 - Local
- TOTAL
080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Capacity Imprvmnts 0.40 2013State State7,500
6,000 - STP
1,500 - State Match
- TOTAL
040489 Washington 112 Hwy. 112 Spur-North (Fayetteville) (S) Widening 0.75 2010Local State NARTS3,000
1,500 - STP
1,500 - Local
- TOTAL
Page 13 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
080383 Conway 124 Point Remove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500
1,200 - BR
300 - State Match
- TOTAL
080382 Conway 124 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500
1,200 - BR
300 - State Match
- TOTAL
100675 Greene 135 Cache River & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State6,120
4,896 - BR
1,224 - State Match
- TOTAL
100723 Mississippi 148 Clear Lake Str. & Apprs. (S) Str. & Apprs. 2011State State900
720 - BR
180 - State Match
- TOTAL
070289 Cleve/Dallas 167 Hwy. 273-Peters Rd. (CR 24) (Phase I) (S) Widening 5.30 2013State State38,364
29,600
1,364
- STP
- Earmarks
7,400 - State Match
- TOTAL
070290 Cleveland 167 Peters Rd. (CR 24)-North (S) Widening 5.10 2011State State32,500
26,000 - NHS
6,500 - State Match
- TOTAL
070291 Cleve/Dallas 167 Saline River-South (S) Widening 5.50 2012State State54,500
43,600 - NHS
10,900 - State Match
- TOTAL
020464 Grant 167 Hwy. 167 Bypass (Sheridan) (Bs. & Surf.) (S) New Location 8.63 2010State State43,000
34,400 - NHS
8,600 - State Match
- TOTAL
Page 14 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
050186 Independence 167 Hwy. 69-Hwy. 394 (Batesville) (S) Widening 2.70 2010State State12,400
9,920 - STP
2,480 - State Match
- TOTAL
050213 Independence 167 Hwy. 394-North (S) Widening 5.11 2013State State18,000
14,400 - STP
3,600 - State Match
- TOTAL
050187 Sharp 167 Hwy. 354-Hwy. 62/412 (Ash Flat) (S) Widening 1.00 2010State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS750
600 - BR
150 - State Match
- TOTAL
090223 Baxter 177 Hwy. 5-Izard Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,400
5,760 - HSIP
640 - State Match
- TOTAL
050228 Cleburne 225 Midway Branch Str. & Apprs. (S) Str. & Apprs. 2011State State3,500
2,800 - BR
700 - State Match
- TOTAL
100412 Craighead 226 Hwy. 67-Hwy. 49 (Phase II) (F) Widening 12.45 2011State State JATS49,717
22,160
19,092
- STP
- Earmarks
8,465 - State Match
- TOTAL
080345 Pope 247 I-40 South (Russellville Bypass) (Bs. & Surf.) (S) New Location 2.43 2012State State16,600
13,280 - STP
3,320 - State Match
- TOTAL
Page 15 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
040443 Sebastian 252 Branch of Washburn Creek Str. & Apprs. (So. of Hwy. 10) (S) Str. & Apprs. 2011State State500
400 - BR
100 - State Match
- TOTAL
110543 St. Francis 261 Hwys. 261, 38 & 149 Strs. & Apprs. (S) Str. & Apprs. 2012State State4,800
3,840 - BR
960 - State Match
- TOTAL
090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Widening 1.40 2013State State NARTS11,000
8,800 - STP
2,200 - State Match
- TOTAL
040517 Washington 265 Hwy. 45-E. Joyce Blvd. (Fayetteville) (S) Widening 2.19 2010Local State NARTS15,400
7,700 - STP
7,700 - Local
- TOTAL
040518 Washington 265 E. Joyce Blvd.-City Limits (Fayetteville) (S) Widening 2.04 2012State State NARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL
040490 Washington 265 South City Limits-Hwy. 412 (Springdale) (S) Widening 1.25 2010Local State NARTS4,700
2,350 - STP
2,350 - Local
- TOTAL
012007 Benton/Wash 265 Randall Wobbe Lane-Hwy. 264 (Springdale) (S) Widening 1.55 2011Local State NARTS5,000
2,500 - STP
2,500 - Local
- TOTAL
080310 Montgomery 270 Hwy. 270 Realignment (Blowout Mountain) (S) Reconstruction 1.35 2010State State4,360
3,924 - HSIP
436 - State Match
- TOTAL
061059 Garland 270 Hot Springs-West (Passing Lanes) (S) Passing Lanes 4.55 2010State HSA-MPO12,800 - TOTAL
12,800 - 402-Safety
Page 16 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
020445 Jefferson 270 Grant Co. Line-White Hall (Passing Lanes) (S) Passing Lanes 2.20 2010State PBATS5,700 - TOTAL
5,700 - 402-Safety
070345 Calhoun 274 Ditch at L.M. 1.8 Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
080384 Faulkner 287 Branch of Cadron Creek Str. & Apprs. (Holland) (S) Str. & Apprs. 2011State State600
480 - BR
120 - State Match
- TOTAL
050229 White 305 Brier Creek Str. & Apprs. (S) Str. & Apprs. 2011State State700
560 - BR
140 - State Match
- TOTAL
100724 Mississippi 312 Ditch No. 6 Str. & Apprs. (Blytheville) (S) Str. & Apprs. 2011State State800
640 - BR
160 - State Match
- TOTAL
080389 Pope 326 Hob Nob Rd.-Hwy. 124 (S) Widening 0.45 2013Local State6,000
3,000 - STP
3,000 - Local
- TOTAL
060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Str. & Apprs. 2012State State CARTS6,200
4,960 - BR
1,240 - State Match
- TOTAL
005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Str. & Apprs. 2013State State20,000
16,000 - BR
4,000 - State Match
- TOTAL
030387 Hempstead 371 Ozan Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State2,000
1,600 - BR
400 - State Match
- TOTAL
Page 17 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
001966 Benton/Wash 412 Springdale Northern Bypass (Phase I) (F) New Location 20.60 2011State State NARTS11,521
8,000
1,217
- NHS
- Earmarks
2,304 - State Match
- TOTAL
090272 Madison 412 Hwy. 412/Hwy. 45 Inters. Impvts. (N. of Hindsville) (S) Safety Improvements 2011State State650
585 - HSIP
65 - State Match
- TOTAL
009951 Madison 412 Hindsville-Huntsville Bypass (F) Widening 4.92 2010State State18,000
14,400 - NHS
3,600 - State Match
- TOTAL
090235 Carroll 412 Dryfork-Hwy. 103 (Passing Lane) (S) Passing Lanes 1.30 2012State State4,000 - TOTAL
4,000 - 100% State
100445 Greene 412 Hwy. 412 Improvements (Paragould) (Phase I) (F) New Location 9.90 2011State State28,625
3,400 - Earmarks
- TOTAL
25,225 - 100% State
100X01 Greene 412 Hwy. 412 Improvements (Paragould) (Phase II) (F) New Location 10.43 2013State State14,800
11,840 - NHS
2,960 - State Match
- TOTAL
061244 Pulaski 430 I-430/I-630 Interchange Modifications (Phase III) (F) Interchange 2011State State CARTS80,069
30,600
9,825
- STP
- Earmarks
14,644 - State Match
25,000 - CMAQ FLEX
- TOTAL
020354 Jefferson 530 I-530-Co. Rd. 35 (Bs. & Surf.) (F) New Location 4.60 2011State State PBATS26,900
21,520 - Earmarks
5,380 - State Match
- TOTAL
Page 18 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
012060 Clev/Jeff/Linc 530 Co. Rd. 35-Hwy. 212 (Bs. & Surf.) (F) New Location 11.14 2011State State39,300
31,440 - Earmarks
7,860 - State Match
- TOTAL
020356 Lincoln 530 Hwy. 212-Hwys. 11/425 Connector (Bs. & Surf) (Phase I) (F) New Location 7.40 2013State State7,131
5,855 - Earmarks
1,276 - State Match
- TOTAL
040561 Washington 540 Bobby Hopper Tunnel-Winslow (S) Safety Improvements 3.50 2012State NARTS900 - TOTAL
900 - 402-Safety
012X01 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2011State State NARTS15,890
8,000
5,335
- NHS
- Earmarks
2,555 - State Match
- TOTAL
012X02 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2013State State NARTS20,000
16,000 - NHS
4,000 - State Match
- TOTAL
012111 Benton/Wash 540 Hwy. 112/265-Hwy. 62/102 Cable Median Barrier (F) Safety Improvements 24.45 2012State NARTS6,500 - TOTAL
6,500 - 402-Safety
040485 Washington 540 I-540/Hwy. 62/180 Interchg Interim Impvts. (Fayetteville) (F) Interchange 2010State State NARTS5,000
4,000 - NHS
1,000 - State Match
- TOTAL
090236 Benton 540 I-540/Hwy. 62/102 Interch Interim Impvts. (Bentonvl) (F) Interchange 2010State/Local State NARTS6,598
4,000
1,278
- NHS
- Earmarks
320 - State Match
1,000 - Local
- TOTAL
Page 19 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
050198 White NEW North Searcy Connector (Phase I) (S) New Location 2013Local State12,000
6,000 - STP
6,000 - Local
- TOTAL
R60016 Garland NEW East-West Arterial (Hot Springs) (P.E.) Project Development 2011State State HSA-MPO7,234
5,787 - Earmarks
1,447 - State Match
- TOTAL
Note: Contingent upon approval from National Parks Service
080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,000
5,589
1,836
- NHS
- Earmarks
41 - State Match
4,534 - Local
- TOTAL
Also shown in the LOCAL PROJECTS AREAS > 200,000 POPULATION Section
080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,000
5,500 - NHS
4,329 - Local
- STP > 200,000
- TOTAL
1,171
Also shown in the LOCAL PROJECTS AREAS > 200,000 POPULATION Section
110547 Crittenden VAR District 1 Bridge Painting (S) Str. & Apprs. 2010State State WMATS2,040
1,632 - BR
408 - State Match
- TOTAL
030236A Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2011State State TUTS995
797 - BR
198 - State Match
- TOTAL
030236B Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2012State State TUTS980
784 - BR
196 - State Match
- TOTAL
Page 20 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
050X04 Various VAR Districts 5 & 8 Highway Improvements Various 2013State State CARTS20,000 - TOTAL
20,000 - 100% State
090X03 Benton VAR District 9 Improvements TBD 2013State State NARTS5,000
4,000 - STP
1,000 - State Match
- TOTAL
323.53 1,840,632TOTAL
Page 21 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATE PROJECTS SORTED BY ROUTE
Local Projects in Areas > 200,000 Population
Sorted by MPO Area and Job Number
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
060907 Pulaski CS Geyer Springs R.R. Grade Separation (L.R.) (PE) (S) RR Xing 2010Local Local CARTS734
587 - Earmarks
147 - Local
- TOTAL
061026A Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Utilities 2010Local State/Local CARTS2,026
405 - Local
- STP > 200,000
- TOTAL
1,621
061026B Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Widening 2011Local State/Local CARTS7,996
1,599 - Local
- STP > 200,000
- TOTAL
6,397
061080 Pulaski CS South Loop Bypass (Mabelvale Rd-Alexander Rd) (LR) (S) New Location 1.00 2010Local Local CARTS5,365
3,060 - Earmarks
1,073 - Local
- STP > 200,000
- TOTAL
1,232
061094A Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) ROW/Utilities 1.00 2010Local State/Local CARTS470
94 - Local
- STP > 200,000
- TOTAL
376
061094B Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) Widening 0.50 2010Local Local CARTS2,521
504 - Local
- STP > 200,000
- TOTAL
2,017
061229 Lonoke 067 Hwy 67/Hwy 5 Interchange Ramp Modifications (Cabot) (S) Interchange 2010Local State CARTS860
172 - Local
- STP > 200,000
- TOTAL
688
061232 Saline CS Benton Downtown Streetscape (S) Enhancement 2010Local State/Local CARTS619
160 - Local
- STP > 200,000
- TOTAL
459
Page 22 of 115
An (S) or (F) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
061257 Saline CS Congo Rd.-I-30 (Military Rd.) (Benton) (S) Widening 2010Local State/Local CARTS8,250
1,650 - Local
- STP > 200,000
- TOTAL
6,600
061260 Pulaski 630 I-630 Corridor Fixed Guideway Alignment Study Planning 2010Local Metroplan CARTS188
38 - Local
- STP > 200,000
- TOTAL
150
061267A Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)
PE 2010Local State/Local CARTS138
28 - Local
- STP > 200,000
- TOTAL
110
061267B Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)
Safety & Traffic Eng. 2011Local State/Local CARTS439
88 - Local
- STP > 200,000
- TOTAL
351
061268 Lonoke 038 Hwy 367/Locust Signal (Cabot) (S) Safety & Traffic Eng. 2010Local State/Local CARTS130
26 - Local
- STP > 200,000
- TOTAL
104
061X01 Lonoke CS Cabot High School Roundabout (S) Reconstruction 2010Local State/Local CARTS211
43 - Local
- STP > 200,000
- TOTAL
168
061269 Lonoke CS Cabot Jr. High School North Sidewalks (Cabot) (S) Enhancement 2010Local State/Local CARTS60
12 - Local
- STP > 200,000
- TOTAL
48
061X03A Pulaski CS McCain Rail Grade Separation PE 2011Local State/Local CARTS1,338
268 - Local
- STP > 200,000
- TOTAL
1,070
Page 23 of 115
An (S) or (F) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
061X03B Pulaski CS McCain Rail Grade Separation ROW/Utilities 2012Local State/Local CARTS4,294
859 - Local
- STP > 200,000
- TOTAL
3,435
061X03C Pulaski CS McCain Rail Grade Separation Str. & Apprs. 2013Local State/Local CARTS11,185
2,227 - Local
- STP > 200,000
- TOTAL
8,958
061X04A Pulaski CS Maryland Road Extension (Sherwood) PE 2011Local State/Local CARTS106
21 - Local
- STP > 200,000
- TOTAL
85
061X04B Pulaski CS Maryland Road Extension (Sherwood) New Location 2012Local State/Local CARTS960
192 - Local
- STP > 200,000
- TOTAL
768
061X05 Pulaski Levy UPRR Spur Bikeway (North Little Rock) ROW 2012Local State/Local CARTS1,803
361 - Local
- STP > 200,000
- TOTAL
1,442
061X06A Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) PE 2010Local State CARTS900
180 - Local
- STP > 200,000
- TOTAL
720
061X06B Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) Widening 2011Local State/Local CARTS1,047
209 - Local
- STP > 200,000
- TOTAL
838
061X07 Pulaski Maumelle Pedestrian/Bicycle Facilities (Phase II) Enhancement 2010Local State/Local CARTS536
107 - Local
- STP > 200,000
- TOTAL
429
Page 24 of 115
An (S) or (F) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
080329 Faulkner Vilonia Middle SRTS I (2007) (Supplemental Funds) Enhancement 2010Local State/Local CARTS106
21 - Local
- STP > 200,000
- TOTAL
85
080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,000
4,500 - STP
3,621 - Local
- STP > 200,000
- TOTAL
879
Also shown in the STATE PROJECTS SORTED BY ROUTE Section
080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,000
5,589
1,836
- NHS
- Earmarks
41 - State Match
4,534 - Local
- TOTAL
Also shown in the STATE PROJECTS SORTED BY ROUTE Section
080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,000
5,500 - NHS
4,329 - Local
- STP > 200,000
- TOTAL
1,171
Also shown in the STATE PROJECTS SORTED BY ROUTE Section
080X12 Faulkner NEW Hwy. 365-Sturgis Road (Phase I) (S) New Location 2012Local State CARTS5,437
5,437 - Local
- TOTAL
XX2010-19 Various CARTS Planning Planning 2010Local Metroplan CARTS215
43 - Local
- STP > 200,000
- TOTAL
172
XX2010-20 Various LUZA Non-Capacity Projects TBD 2010Local State/Local CARTS919
184 - Local
- STP > 200,000
- TOTAL
735
Page 25 of 115
An (S) or (F) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2010-21 Various RUZA Non-Capacity Projects TBD 2010Local State/Local CARTS795
159 - Local
- STP > 200,000
- TOTAL
636
XX2011-19 Various CARTS Planning Planning 2011Local Metroplan CARTS225
45 - Local
- STP > 200,000
- TOTAL
180
XX2011-20 Various LUZA Non-Capacity Projects TBD 2011Local State/Local CARTS225
46 - Local
- STP > 200,000
- TOTAL
179
XX2012-19 Various CARTS Planning Planning 2012Local Metroplan CARTS225
45 - Local
- STP > 200,000
- TOTAL
180
XX2012-20 Various LUZA Non-Capacity Projects TBD 2012Local State/Local CARTS303
61 - Local
- STP > 200,000
- TOTAL
242
XX2012-21 Various RUZA Non-Capacity Projects TBD 2012Local State/Local CARTS2,424
485 - Local
- STP > 200,000
- TOTAL
1,939
XX2013-19 Various CARTS Planning Planning 2013Local Metroplan CARTS225
45 - Local
- STP > 200,000
- TOTAL
180
4.20 95,275TOTAL
Page 26 of 115
An (S) or (F) following the termini indicates federal or state oversight.
CENTRAL ARKANSAS REGIONAL TRANSPORTATION STUDY AREA
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2010Local Local WMATS6,061
5,206 - Earmarks
855 - Local
- TOTAL
110530 Crittenden CS Southland Dr.-MLK, Jr. Dr.-West (S) Rehabilitation 0.42 2010Local Local WMATS1,300
260 - Local
- STP > 200,000
- TOTAL
1,040
110X01 Crittenden CS Southland Dr., Ingram Blvd.-East (S) Miscellaneous 0.83 2013Local Local WMATS2,695
539 - Local
- STP > 200,000
- TOTAL
2,156
XX2010-15 Crittenden VAR MPO Planning Planning 2010Local Local WMATS272
55 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
79
XX2011-15 Crittenden VAR MPO Planning Planning 2011Local Local WMATS272
55 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
79
XX2012-15 Crittenden VAR MPO Planning Planning 2012Local Local WMATS272
55 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
79
XX2013-15 Crittenden VAR MPO Planning Planning 2013Local Local WMATS272
55 - Local
- STP > 200,000
138 - CMAQ FLEX
- TOTAL
79
Page 27 of 115
An (S) or (F) following the termini indicates federal or state oversight.
WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2010-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2010Local Local WMATS721
144 - Local
577 - CMAQ - AQ
- TOTAL
XX2011-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2011Local Local WMATS738
148 - Local
590 - CMAQ - AQ
- TOTAL
XX2012-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2012Local Local WMATS756
151 - Local
605 - CMAQ - AQ
- TOTAL
XX2013-16 Crittenden VAR CMAQ Non-Attainment Project Improve Air Quality 2013Local Local WMATS774
155 - Local
619 - CMAQ - AQ
- TOTAL
1.25 14,133TOTAL
Page 28 of 115
An (S) or (F) following the termini indicates federal or state oversight.
WEST MEMPHIS-MARION AREA TRANSPORTATION STUDY
Local Projects in Areas < 200,000 Population
Sorted by Job Number
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
020480 Drew Southeast Arkansas Intermodal Facility (Wilmar) (S) Roadside Appurt 2010Local Local1,752
1,401 - Earmarks
351 - Local
- TOTAL
020505 Jefferson CS Nevins Creek Str. & Apprs. (Nevins Rd.) (Pine Bluff) (S) Str. & Apprs. 2012Local State PBATS350
280 - BR
70 - Local
- TOTAL
030100 Miller CS Jefferson Ave-Mount Olive Dr(McDonald Ln)(Texarkana)(S) New Location 0.25 2010Local Local TUTS1,913
913 - Local
- STP < 200,000
- TOTAL
1,000
040272 Washington CS Johnson Road Reconst. (Springdale) P.E. Widening 2.20 2010Local Local NARTS14,586
10,669 - Earmarks
2,917 - Local
- STP < 200,000
- TOTAL
1,000
040345 Crawford CS Hwy. 59-West (Rena Road) (Van Buren) (S) Widening 1.10 2010Local State BI-STATE5,400
3,240
80
- Earmarks
- BR
1,080 - Local
- STP < 200,000
- TOTAL
1,000
040418 Washington 112 Hwy. 180-Garland Ave. (Hwy. 112) (Fayetteville) (S) Widening 1.17 2012Local State NARTS1,250
250 - Local
- STP < 200,000
- TOTAL
1,000
040464 Crawford CS West of Ham Town Rd.-East (Wire Rd.) (Mulberry) (S) Reconstruction 0.94 2012Local State2,350
1,350 - Local
- STP < 200,000
- TOTAL
1,000
040471 Sebastian CS Jenny Lind Rd. & Ingersoll Rd. Widening (Fort Smith) (S) Widening 3.00 2010Local Local BI-STATE8,980
7,360 - Earmarks
1,620 - Local
- TOTAL
Page 29 of 115
An (S) or (F) following the termini indicates federal or state oversight.
LOCAL PROJECTS AREAS < 200,000 POPULATION
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2011Local State1,935
935 - Local
- STP < 200,000
- TOTAL
1,000
040496 Washington CS Hwy. 112-Hwy. 71B (Cato Springs Rd.) (Fayetteville) (S) Reconstruction 1.00 2010Local Local NARTS3,596
2,877 - Earmarks
719 - Local
- TOTAL
040506 Franklin CS Gar Creek Str. & Apprs. (2nd Street) (Ozark) (S) Str. & Apprs. 2010Local State425
340 - BR
85 - Local
- TOTAL
040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2012Local Local NARTS26,951
26,951 - Local
- TOTAL
040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Str. & Apprs. 2011Local Local NARTS6,452
5,162 - Earmarks
1,290 - Local
- TOTAL
040536 Washington CS Fulbright Expwy./Futrall Dr. Roundabout (Fayetteville) (S) Inters Impvts 2010Local Local NARTS2,966
2,373 - Earmarks
593 - Local
- TOTAL
040545 Sebastian CS 9th St.-13th St. (Garrison Ave.) (Ft. Smith) (S) Enhancement 2010Local Local BI-STATE2,438
950 - Earmarks
488 - Local
- STP < 200,000
- TOTAL
1,000
070304 Columbia CS Frederick St.-Hwy. 82 (E. North St.) (Magnolia) (S) Widening 0.70 2011Local State2,840
1,840 - Local
- STP < 200,000
- TOTAL
1,000
Page 30 of 115
An (S) or (F) following the termini indicates federal or state oversight.
LOCAL PROJECTS AREAS < 200,000 POPULATION
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
080157 Pope Intermodal Complex (Russellville) (F) Miscellaneous 2010Local Local3,488
2,790 - Earmarks
698 - Local
- TOTAL
080295 Pope CS W Main Pl-Honeysuckle Ln (Inglewood St) (Russellville)(S) Reconstruction 0.80 2010Local State2,850
1,850 - Local
- STP < 200,000
- TOTAL
1,000
080314 Johnson CS Hwy. 123-Hwy. 21 (Clarksville) (S) Project Development 0.50 2011Local Local1,100
100 - Local
- STP < 200,000
- TOTAL
1,000
090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2010Local Local NARTS35,000
10,651 - Earmarks
24,349 - Local
- TOTAL
090218 Benton CS 8th Street Improvements (Bentonville) (S) Widening 2011Local Local NARTS38,586
30,869 - Earmarks
7,717 - Local
- TOTAL
090228 Benton CR War Eagle Bridge Rehab. (Benton Co.) (S) New Location 2010Local State NARTS494
395 - Earmarks
99 - Local
- TOTAL
090232 Benton CS East Monroe Ave. Extension (Sel. Secs.) (Lowell) (S) New Location 0.32 2010Local State NARTS2,100
1,100 - Local
- STP < 200,000
- TOTAL
1,000
090254 Benton CS Shell Road Str. & Apprs. (Bentonville) (S) Str. & Apprs. 2010Local State NARTS1,404
1,000 - BR
404 - Local
- TOTAL
090260 Benton 071 Hwy. 71/NE J St. Intchng. (Bentonville) (F) Interchange 2011Local Local NARTS37,676
37,676 - Local
- TOTAL
Page 31 of 115
An (S) or (F) following the termini indicates federal or state oversight.
LOCAL PROJECTS AREAS < 200,000 POPULATION
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
100639 Craighead CS Mt. Carmel Rd-S Culberhouse Rd (Lawson Rd)(Jonesboro)(S) Widening 1.20 2010Local State JATS4,900
3,900 - Local
- STP < 200,000
- TOTAL
1,000
100662 Craighead CS Caraway Rd. Safety Enhancement (Jonesboro) (Ph. II) (S) New Location 2010Local Local JATS9,185
5,848 - Earmarks
1,837 - Local
1,500 - RRP
- TOTAL
XX2010-17 Various VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2010State/Local State All MPOs except WMATS
2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
XX2011-17 Various VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2011State/Local State All MPOs except WMATS
2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
XX2012-17 Various VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2012State/Local State All MPOs except WMATS
2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
XX2013-17 Statewide VAR Various Signals and Intersection Improvements Safety & Traffic Eng. 2013State/Local State All MPOs except WMATS
2,500
500 - State or Local
- STP < 200,000
- TOTAL
2,000
14.08 230,967TOTAL
Page 32 of 115
An (S) or (F) following the termini indicates federal or state oversight.
LOCAL PROJECTS AREAS < 200,000 POPULATION
Statewide Generic Projects
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2010-01 Statewide VAR IRP Debt Service Various 2010State State58,000
58,000 - IM
- TOTAL
XX2010-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconst 4-R 2010State State All MPOs16,000
1,600
1,600
10,800
- NHS
- STP
- IM
2,000 - State Match
- TOTAL
XX2010-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2010State/Local State/Local All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2010-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2010State/Local State All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2010-05 Statewide VAR Various Safety Type Improvements Safety 2010State State All MPOs1,000
900 - HSIP
100 - State Match
- TOTAL
XX2010-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2010State/RR State/RR All MPOs2,400
240 - State Match
2,160 - RRP
- TOTAL
XX2010-07 Statewide VAR Various Enhancement Type Projects Enhancement 2010State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2010-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2010N/A State/Local All MPOs1,400 - TOTAL
1,400 - SRTS
Page 33 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2010-09 Statewide VAR Scenic Byways Projects Miscellaneous 2010State/Local State/Local WMATS / JATS / HSA-MPO
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2010-10 Statewide VAR Various Trail Projects Enhancement 2010Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
XX2010-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2010State/Local State All MPOs7,459
5,967 - STP
1,492 - State or Local
- TOTAL
XX2010-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2010Local State All MPOs5,525
720
3,700
- Earmarks
- BR
1,105 - Local
- TOTAL
XX2010-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2010State/Local State All MPOs80,600
21,440
28,880
2,700
5,600
4,680
- NHS
- STP
- IM
- BR
- HSIP
14,800 - State Match
500 - State or Local
- TOTAL
2,000 - ENH
188,384TOTAL
Page 34 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2011-01 Statewide VAR IRP Debt Service Various 2011State State58,000
58,000 - IM
- TOTAL
XX2011-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconstruction 4-R 2011State State All MPOs16,000
1,600
1,600
10,800
- NHS
- STP
- IM
2,000 - State Match
- TOTAL
XX2011-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2011State/Local State/Local All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2011-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2011State/Local State All MPOs2,000
1,600 - BR
400 - State or Local
- TOTAL
XX2011-05 Statewide VAR Various Safety Type Improvements Safety 2011State State All MPOs6,556
5,900 - HSIP
656 - State Match
- TOTAL
XX2011-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2011State/RR State/RR All MPOs4,222
422 - State Match
3,800 - RRP
- TOTAL
XX2011-07 Statewide VAR Various Enhancement Type Projects Enhancement 2011State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2011-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2011N/A State/Local All MPOs1,400 - TOTAL
1,400 - SRTS
Page 35 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2011-09 Statewide VAR Scenic Byways Projects Miscellaneous 2011State/Local State/Local WMATS / JATS / HSA-MPO
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2011-10 Statewide VAR Various Trail Projects Enhancement 2011Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
XX2011-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2011State/Local State All MPOs7,459
5,967 - STP
1,492 - State or Local
- TOTAL
XX2011-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2011Local State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2011-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2011State/Local State All MPOs83,400
22,160
29,920
2,700
6,000
4,770
- NHS
- STP
- IM
- BR
- HSIP
15,350 - State Match
500 - State or Local
- TOTAL
2,000 - ENH
XX2011-18 Statewide NA Motor Fuel Tracking System Miscellaneous 2011N/A State300
300 - STP
- TOTAL
197,962TOTAL
Page 36 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2012-01 Statewide VAR IRP Debt Service Various 2012State State58,000
58,000 - IM
- TOTAL
XX2012-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconstruction 4-R 2012State State All MPOs16,000
1,600
1,600
10,800
- NHS
- STP
- IM
2,000 - State Match
- TOTAL
XX2012-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2012State/Local State/Local All MPOs2,000
1,600 - BR
400 - State Match
- TOTAL
XX2012-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2012State/Local State All MPOs2,000
1,600 - BR
400 - State Match
- TOTAL
XX2012-05 Statewide VAR Various Safety Type Improvements Safety 2012State State All MPOs3,000
2,700 - HSIP
300 - State Match
- TOTAL
XX2012-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2012State/RR State/RR All MPOs4,389
439 - State Match
3,950 - RRP
- TOTAL
XX2012-07 Statewide VAR Various Enhancement Type Projects Enhancement 2012State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2012-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2012N/A State/Local All MPOs1,500 - TOTAL
1,500 - SRTS
Page 37 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2012-09 Statewide VAR Scenic Byways Projects Miscellaneous 2012State/Local State/Local WMATS / JATS / HSA-MPO
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2012-10 Statewide VAR Various Trail Projects Enhancement 2012Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
XX2012-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2012State/Local State All MPOs7,459
5,967 - STP
1,492 - State or Local
- TOTAL
XX2012-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2012Local State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2012-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2012State/Local State All MPOs87,300
22,560
30,560
2,700
8,000
4,860
- NHS
- STP
- IM
- BR
- HSIP
16,120 - State Match
500 - State or Local
- TOTAL
2,000 - ENH
XX2012-18 Statewide NA Motor Fuel Tracking System Miscellaneous 2012N/A State300
300 - STP
- TOTAL
198,573TOTAL
Page 38 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:18 AM
XX2013-01 Statewide VAR IRP Debt Service Various 2013State State58,000
58,000 - IM
- TOTAL
XX2013-02 Statewide VAR Various Resurf / Restoration / Rehab / Reconstruction 4-R 2013State/Local State All MPOs16,050
1,600
1,600
10,800
- NHS
- STP
- IM
2,000 - State Match
10 - Local
- STP < 200,000
- TOTAL
40
XX2013-03 Statewide VAR Various Bridge Rehab / Replacement Str. & Apprs. 2013State/Local State/Local All MPOs2,000
1,600 - BR
400 - State Match
- TOTAL
XX2013-04 Statewide VAR Bridge Painting / Guard Rail / Scour Control / Inspection Miscellaneous 2013State/Local State All MPOs2,000
1,600 - BR
400 - State Match
- TOTAL
XX2013-05 Statewide VAR Various Safety Type Improvements Safety 2013State State All MPOs19,120
8,388 - HSIP
932 - State Match
- TOTAL
9,800 - 402-Safety
XX2013-06 Statewide VAR RR Xing Protect Devices / Surfacing / Hazard Elim Safety 2013State/RR State/RR All MPOs4,567
457 - State Match
4,110 - RRP
- TOTAL
XX2013-07 Statewide VAR Various Enhancement Type Projects Enhancement 2013State/Local State/Local All MPOs10,000
2,000 - State or Local
- TOTAL
8,000 - ENH
XX2013-08 Statewide VAR Various Safe Routes to School Projects Enhancement 2013N/A State/Local All MPOs1,500 - TOTAL
1,500 - SRTS
Page 39 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
XX2013-09 Statewide VAR Scenic Byways Projects Miscellaneous 2013State/Local State/Local WMATS / JATS / HSA-MPO
1,000
800 - Earmarks
200 - State or Local
- TOTAL
XX2013-10 Statewide VAR Various Trail Projects Enhancement 2013Local Local All MPOs1,000
200 - Local
800 - Rec Trails
- TOTAL
XX2013-11 Statewide CR Var Resurf / Restore / Rehab / Reconst / BR Repl / BR Rehab on County Roads
4-R / Strs. & Apprs. 2013State/Local State All MPOs7,459
5,967 - STP
1,492 - State or Local
- TOTAL
XX2013-12 Statewide CR Various Bridge Rehab / Replacement on County Roads Str. & Apprs. 2013Local State All MPOs4,625
3,700 - BR
925 - Local
- TOTAL
XX2013-13 Statewide VAR Right-of-Way / Utilities / CENG Various 2013State/Local State All MPOs93,900
23,040
31,200
2,700
12,000
5,040
- NHS
- STP
- IM
- BR
- HSIP
17,420 - State Match
500 - State or Local
- TOTAL
2,000 - ENH
XX2013-18 Statewide NA Motor Fuel Tracking System Miscellaneous 2013N/A State300
300 - STP
- TOTAL
221,521TOTAL
Page 40 of 115
An (S) or (F) following the termini indicates federal or state oversight.
STATEWIDE GENERIC PROJECTS FFY 2013
Transit Projects
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
031FTA Miller Operating Assistance Transit 2010Local Local TUTS394
197 - Local
197 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2010Local Local TUTS106
21 - Local
85 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
040FTA Wash/Benton Environmental, Security & Bus Upgrades Transit 2010Local - UofA Local - UofA NARTS713
143 - Local
570 - FTA-5309
FFY Transit Appropriation: 2009
E2009-BUSP-043FTA Earmark ID:
- TOTAL
116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2010Var Agencies
Var Agencies
CARTS / WMATS
466
233 - Local
233 - FTA-5316
FFY Transit Appropriation: 2009
- TOTAL
117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2010Var Agencies
Var Agencies
CARTS / WMATS
248
124 - Local
124 - FTA-5317
FFY Transit Appropriation: 2009
- TOTAL
216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2010Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
1,186
593 - Local
593 - FTA-5316
FFY Transit Appropriation: 2009
- TOTAL
Page 41 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2010Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
606
303 - Local
303 - FTA-5317
FFY Transit Appropriation: 2009
- TOTAL
309FTA Statewide Bus and Bus Facilities Transit 2010Var Agencies
Var Agencies
All MPOs1,188
238 - Local
950 - FTA-5309
FFY Transit Appropriation: 2009
E2009-BUSP-046FTA Earmark ID:
- TOTAL
310FTA Statewide Elderly and Disabled Persons Transit 2010Var Agencies
Var Agencies
All MPOs1,768
354 - Local
1,414 - FTA-5310
FFY Transit Appropriation: 2009
- TOTAL
311FTA Statewide Non-Urbanized Transit 2010Local Local All MPOs12,758
2,552 - Local
10,206 - FTA-5311
FFY Transit Appropriation: 2009
- TOTAL
316CRI Crittenden Job Access Reverse Commute - Discretionary Transit 2010Local Local WMATS700
350 - Local
350 - FTA-5316
FFY Transit Appropriation: 2009
- TOTAL
316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2010Var Agencies
Var Agencies
All MPOs1,734
867 - Local
867 - FTA-5316
FFY Transit Appropriation: 2009
- TOTAL
Page 42 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
317FTA Statewide New Freedom Non Urbanized Areas Transit 2010Var Agencies
Var Agencies
All MPOs856
428 - Local
428 - FTA-5317
FFY Transit Appropriation: 2009
- TOTAL
CATA01 Pulaski Bus Support Equipment/Facilities Transit 2010Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
CATA02 Pulaski Transit Enhancements (Bus) Transit 2010Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
CATA03 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2010Local Local CARTS2,039
408 - Local
1,631 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
CATA04 Pulaski Metropolitan Planning Transit 2010Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
CATA05 Pulaski Training Transit 2010Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
CATA06 Pulaski Signal & Communication (Bus) Transit 2010Local Local CARTS2,098
420 - Local
1,678 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
Page 43 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
FST001 Sebastian Operating Assistance Transit 2010Local Local BI-STATE1,704
852 - Local
852 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2010Local Local BI-STATE514
103 - Local
411 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
FST003 Sebastian Rolling Stock Transit 2010Local Local BI-STATE186
37 - Local
149 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
HSIT01 Garland Operating Assistance Transit 2010Local Local HSA-MPO658
329 - Local
329 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2010Local Local HSA-MPO286
57 - Local
229 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
JETS01 Craighead Operating Assistance Transit 2010Local Local JATS990
495 - Local
495 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
JETS02 Craighead Capital - Paratransit Service Transit 2010Local Local JATS280
56 - Local
224 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
Page 44 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
JETS03 Craighead Tires Transit 2010Local Local JATS28
6 - Local
22 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
NART01 Wash/Benton Operating Assistance Transit 2010Local - ORT Local - ORT NARTS1,506
753 - Local
753 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
NART02 Wash/Benton Capital - Preventive Maintenance Transit 2010Local - ORT Local - ORT NARTS511
102 - Local
409 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
NART03 Wash/Benton Operating Assistance Transit 2010Local - UofA Local - UofA NARTS1,302
651 - Local
651 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
NART04 Wash/Benton Capital - Preventive Maintenance Transit 2010Local - UofA Local - UofA NARTS375
75 - Local
300 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2010Local Local PBATS640
320 - Local
320 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2010Local Local PBATS390
78 - Local
312 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
Page 45 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
PBT003 Jefferson Capital - Paratransit Service Transit 2010Local Local PBATS91
18 - Local
73 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
PBT004 Jefferson Capital - Planning Transit 2010Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit Appropriation: 2009
- TOTAL
37,145TOTAL
Page 46 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2010
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
031FTA Miller Operating Assistance Transit 2011Local Local TUTS394
197 - Local
197 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2011Local Local TUTS106
21 - Local
85 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2011Var Agencies
Var Agencies
CARTS / WMATS
466
233 - Local
233 - FTA-5316
FFY Transit Appropriation: 2010
- TOTAL
117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2011Var Agencies
Var Agencies
CARTS / WMATS
248
124 - Local
124 - FTA-5317
FFY Transit Appropriation: 2010
- TOTAL
216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2011Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
1,186
593 - Local
593 - FTA-5316
FFY Transit Appropriation: 2010
- TOTAL
217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2011Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
606
303 - Local
303 - FTA-5317
FFY Transit Appropriation: 2010
- TOTAL
Page 47 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
309FTA Statewide Bus and Bus Facilities Transit 2011Local Local All MPOs3,750
750 - Local
3,000 - FTA-5309
FFY Transit Appropriation: 2010
- TOTAL
310FTA Statewide Elderly and Disabled Persons Transit 2011Var Agencies
Var Agencies
All MPOs1,768
354 - Local
1,414 - FTA-5310
FFY Transit Appropriation: 2010
- TOTAL
311FTA Statewide Non-Urbanized Transit 2011Local Local All MPOs12,758
2,552 - Local
10,206 - FTA-5311
FFY Transit Appropriation: 2010
- TOTAL
316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2011Var Agencies
Var Agencies
All MPOs1,734
867 - Local
867 - FTA-5316
FFY Transit Appropriation: 2010
- TOTAL
317FTA Statewide New Freedom Non Urbanized Areas Transit 2011Var Agencies
Var Agencies
All MPOs856
428 - Local
428 - FTA-5317
FFY Transit Appropriation: 2010
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2011Local Local CARTS2,170
370 - Local
1,800 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
Page 48 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2011Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
CATA03 Pulaski Transit Enhancements (Bus) Transit 2011Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
CATA04 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2011Local Local CARTS2,039
408 - Local
1,631 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
CATA05 Pulaski Metropolitan Planning Transit 2011Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
CATA06 Pulaski Training Transit 2011Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
CATA07 Pulaski Signal & Communication (Bus) Transit 2011Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
FST001 Sebastian Operating Assistance Transit 2011Local Local BI-STATE1,704
852 - Local
852 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
Page 49 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2011Local Local BI-STATE514
103 - Local
411 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
FST003 Sebastian Rolling Stock Transit 2011Local Local BI-STATE186
37 - Local
149 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
HSIT01 Garland Operating Assistance Transit 2011Local Local HSA-MPO682
341 - Local
341 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2011Local Local HSA-MPO296
59 - Local
237 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
JETS01 Craighead Operating Assistance Transit 2011Local Local JATS1,000
500 - Local
500 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
JETS02 Craighead Capital - Paratransit Service Transit 2011Local Local JATS280
56 - Local
224 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
JETS03 Craighead Tires Transit 2011Local Local JATS28
6 - Local
22 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
Page 50 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
JETS04 Craighead Computers (3) Transit 2011Local Local JATS3
1 - Local
2 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
NART01 Wash/Benton Operating Assistance Transit 2011Local - ORT Local - ORT NARTS1,558
779 - Local
779 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
NART02 Wash/Benton Capital - Preventive Maintenance Transit 2011Local - ORT Local - ORT NARTS529
106 - Local
423 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
NART03 Wash/Benton Operating Assistance Transit 2011Local - UofA Local - UofA NARTS1,348
674 - Local
674 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
NART04 Wash/Benton Capital - Preventive Maintenance Transit 2011Local - UofA Local - UofA NARTS388
78 - Local
310 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2011Local Local PBATS640
320 - Local
320 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2011Local Local PBATS390
78 - Local
312 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
Page 51 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
PBT003 Jefferson Capital - Paratransit Service Transit 2011Local Local PBATS91
18 - Local
73 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
PBT004 Jefferson Capital - Planning Transit 2011Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit Appropriation: 2010
- TOTAL
38,562TOTAL
Page 52 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2011
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
031FTA Miller Operating Assistance Transit 2012Local Local TUTS408
204 - Local
204 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2012Local Local TUTS109
22 - Local
87 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2012Var Agencies
Var Agencies
CARTS / WMATS
482
241 - Local
241 - FTA-5316
FFY Transit Appropriation: 2011
- TOTAL
117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2012Var Agencies
Var Agencies
CARTS / WMATS
256
128 - Local
128 - FTA-5317
FFY Transit Appropriation: 2011
- TOTAL
216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2012Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
1,228
614 - Local
614 - FTA-5316
FFY Transit Appropriation: 2011
- TOTAL
217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2012Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
628
314 - Local
314 - FTA-5317
FFY Transit Appropriation: 2011
- TOTAL
Page 53 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
309FTA Statewide Bus and Bus Facilities Transit 2012Local Local All MPOs3,750
750 - Local
3,000 - FTA-5309
FFY Transit Appropriation: 2011
- TOTAL
310FTA Statewide Elderly and Disabled Persons Transit 2012Var Agencies
Var Agencies
All MPOs1,829
366 - Local
1,463 - FTA-5310
FFY Transit Appropriation: 2011
- TOTAL
311FTA Statewide Non-Urbanized Transit 2012Local Local All MPOs13,205
2,641 - Local
10,564 - FTA-5311
FFY Transit Appropriation: 2011
- TOTAL
316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2012Var Agencies
Var Agencies
All MPOs1,794
897 - Local
897 - FTA-5316
FFY Transit Appropriation: 2011
- TOTAL
317FTA Statewide New Freedom Non Urbanized Areas Transit 2012Var Agencies
Var Agencies
All MPOs886
443 - Local
443 - FTA-5317
FFY Transit Appropriation: 2011
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2012Local Local CARTS2,428
486 - Local
1,942 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
Page 54 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2012Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
CATA03 Pulaski Transit Enhancements (Bus) Transit 2012Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
CATA04 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2012Local Local CARTS2,039
408 - Local
1,631 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
CATA05 Pulaski Metropolitan Planning Transit 2012Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
CATA06 Pulaski Training Transit 2012Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
CATA07 Pulaski Signal & Communication (Bus) Transit 2012Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
FST001 Sebastian Operating Assistance Transit 2012Local Local BI-STATE1,762
881 - Local
881 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
Page 55 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2012Local Local BI-STATE533
107 - Local
426 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
FST003 Sebastian Rolling Stock Transit 2012Local Local BI-STATE200
40 - Local
160 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
HSIT01 Garland Operating Assistance Transit 2012Local Local HSA-MPO706
353 - Local
353 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2012Local Local HSA-MPO306
61 - Local
245 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
JETS01 Craighead Operating Assistance Transit 2012Local Local JATS1,000
500 - Local
500 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
JETS02 Craighead Capital - Paratransit Service Transit 2012Local Local JATS290
58 - Local
232 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
JETS03 Craighead Tires Transit 2012Local Local JATS30
6 - Local
24 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
Page 56 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
JETS04 Craighead Computers (3) Transit 2012Local Local JATS3
1 - Local
2 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
NART01 Wash/Benton Operating Assistance Transit 2012Local - ORT Local - ORT NARTS1,614
807 - Local
807 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
NART02 Wash/Benton Capital - Preventive Maintenance Transit 2012Local - ORT Local - ORT NARTS548
110 - Local
438 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
NART03 Wash/Benton Operating Assistance Transit 2012Local - UofA Local - UofA NARTS1,394
697 - Local
697 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
NART04 Wash/Benton Capital - Preventive Maintenance Transit 2012Local - UofA Local - UofA NARTS402
80 - Local
322 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2012Local Local PBATS664
332 - Local
332 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2012Local Local PBATS405
81 - Local
324 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
Page 57 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
PBT003 Jefferson Capital - Paratransit Service Transit 2012Local Local PBATS94
19 - Local
75 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
PBT004 Jefferson Capital - Planning Transit 2012Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit Appropriation: 2011
- TOTAL
39,837TOTAL
Page 58 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2012
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
031FTA Miller Operating Assistance Transit 2013Local Local TUTS422
211 - Local
211 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
032FTA Miller Capital - Preventive Maintenance Transit 2013Local Local TUTS113
23 - Local
90 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
116FTA Statewide Job Access Reverse Commute Urbanized Areas > 200,000 Transit 2013Var Agencies
Var Agencies
CARTS / WMATS
500
250 - Local
250 - FTA-5316
FFY Transit Appropriation: 2012
- TOTAL
117FTA Statewide New Freedom Urbanized Areas >200,000 Transit 2013Var Agencies
Var Agencies
CARTS / WMATS
266
133 - Local
133 - FTA-5317
FFY Transit Appropriation: 2012
- TOTAL
216FTA Statewide Job Access Reverse Commute Urbanized Areas < 200,000 Transit 2013Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
1,272
636 - Local
636 - FTA-5316
FFY Transit Appropriation: 2012
- TOTAL
217FTA Statewide New Freedom Urbanized Areas <200,000 Transit 2013Var Agencies
Var Agencies
BI-STATE / HSA / JATS / NARTS / PBATS / TUTS
650
325 - Local
325 - FTA-5317
FFY Transit Appropriation: 2012
- TOTAL
Page 59 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
309FTA Statewide Bus and Bus Facilities Transit 2013Local Local All MPOs3,750
750 - Local
3,000 - FTA-5309
FFY Transit Appropriation: 2012
- TOTAL
310FTA Statewide Elderly and Disabled Persons Transit 2013Var Agencies
Var Agencies
All MPOs1,893
379 - Local
1,514 - FTA-5310
FFY Transit Appropriation: 2012
- TOTAL
311FTA Statewide Non-Urbanized Transit 2013Local Local All MPOs13,666
2,733 - Local
10,933 - FTA-5311
FFY Transit Appropriation: 2012
- TOTAL
316FTA Statewide Job Access Reverse Commute Non-Urbanized Areas Transit 2013Var Agencies
Var Agencies
All MPOs1,856
928 - Local
928 - FTA-5316
FFY Transit Appropriation: 2012
- TOTAL
317FTA Statewide New Freedom Non Urbanized Areas Transit 2013Var Agencies
Var Agencies
All MPOs918
459 - Local
459 - FTA-5317
FFY Transit Appropriation: 2012
- TOTAL
CATA01 Pulaski Rolling Stock Transit 2013Local Local CARTS2,613
523 - Local
2,090 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
Page 60 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
CATA02 Pulaski Bus Support Equipment/Facilities Transit 2013Local Local CARTS368
74 - Local
294 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
CATA03 Pulaski Transit Enhancements (Bus) Transit 2013Local Local CARTS75
15 - Local
60 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
CATA04 Pulaski Other Capital Items (Bus) - Prev Maint / Para Serv Transit 2013Local Local CARTS2,039
408 - Local
1,631 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
CATA05 Pulaski Metropolitan Planning Transit 2013Local Local CARTS333
67 - Local
266 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
CATA06 Pulaski Training Transit 2013Local Local CARTS19
4 - Local
15 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
CATA07 Pulaski Signal & Communication (Bus) Transit 2013Local Local CARTS20
4 - Local
16 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
FST001 Sebastian Operating Assistance Transit 2013Local Local BI-STATE1,824
912 - Local
912 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
Page 61 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
FST002 Sebastian Capital - Preventive Maintenance / Paratransit Service Transit 2013Local Local BI-STATE551
110 - Local
441 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
FST003 Sebastian Rolling Stock Transit 2013Local Local BI-STATE206
41 - Local
165 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
HSIT01 Garland Operating Assistance Transit 2013Local Local HSA-MPO730
365 - Local
365 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
HSIT02 Garland Capital - Preventive Maintenance Transit 2013Local Local HSA-MPO317
63 - Local
254 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
JETS01 Craighead Operating Assistance Transit 2013Local Local JATS1,020
510 - Local
510 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
JETS02 Craighead Capital - Paratransit Service Transit 2013Local Local JATS300
60 - Local
240 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
JETS03 Craighead Tires Transit 2013Local Local JATS30
6 - Local
24 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
Page 62 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
JETS04 Craighead Computers (3) Transit 2013Local Local JATS3
1 - Local
2 - FTA-5307
FFY Transit Appropriation: 2013
- TOTAL
NART01 Wash/Benton Operating Assistance Transit 2013Local - ORT Local - ORT NARTS1,670
835 - Local
835 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
NART02 Wash/Benton Capital - Preventive Maintenance Transit 2013Local - ORT Local - ORT NARTS567
113 - Local
454 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
NART03 Wash/Benton Operating Assistance Transit 2013Local - UofA Local - UofA NARTS1,444
722 - Local
722 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
NART04 Wash/Benton Capital - Preventive Maintenance Transit 2013Local - UofA Local - UofA NARTS416
83 - Local
333 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
PBT001 Jefferson Operating Assistance Transit 2013Local Local PBATS688
344 - Local
344 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
PBT002 Jefferson Capital - Preventive Maintenance Transit 2013Local Local PBATS419
84 - Local
335 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
Page 63 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
PBT003 Jefferson Capital - Paratransit Service Transit 2013Local Local PBATS98
20 - Local
78 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
PBT004 Jefferson Capital - Planning Transit 2013Local Local PBATS30
6 - Local
24 - FTA-5307
FFY Transit Appropriation: 2012
- TOTAL
41,086TOTAL
Page 64 of 115
An (S) or (F) following the termini indicates federal or state oversight.
TRANSIT PROJECTS FFY 2013
Eastern Federal Lands Highway Division
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:19 AM
EFLHD1 Johnson 215 Rt 215 from Sta. 11+590 to Sta. 14+000 (Schedule B only) 2010EFLHD EFLHD1,075 - TOTAL
Project - AR PFH 65-3(7) Funding Source - ARRA - Public Lands Highway-Forest Highway / Forest Highway
EFLHD2 Searcy Permanent Repairs for Slide at Falling Water Road 2010EFLHD EFLHD670 - TOTAL
Project - AR FSR 400(1) Funding Source - Emergency Repair for Federally Owned Lands
EFLHD3 Ashley / Bradley / Union
Rehabilitate Boar Shoat Road 2010EFLHD EFLHD35 - TOTAL
Project - Felsenthal Funding Source - Refuge Roads
EFLHD4 Arkansas Construct Visitor Center Turn Lanes off Highway 1 and Rehabilitate Belknap Lake Road
2010EFLHD EFLHD250 - TOTAL
Project - White River Funding Source - Refuge Roads
EFLHD5 Howard / Polk CR 25/64 1.2 mi Realignment 2011EFLHD EFLHD4,380 - TOTAL
Project - AR PFH 159-1(2) Funding Source - Public Lands Highway-Forest Highway
EFLHD6 Garland Repair/Rehabilitate West Mountain Drive and West Mountain Summit Drive
2011EFLHD EFLHD1,400 - TOTAL
Project - HOSP 11(2), 101(2) Funding Source - Park Roads and Parkways
EFLHD7 Johnson 215 Rt 215 from Sta. 11+590 to Sta. 14+000 (Remaining Schedules)
2011EFLHD EFLHD4,450 - TOTAL
Project - AR PFH 65-3(7) Funding Source - Public Lands Highway-Forest Highway / Forest Highway
EFLHD8 Various Rehabilitate Howell Unit Access Road 2012EFLHD EFLHD38 - TOTAL
Project - Cache River Funding Source - Refuge Roads
EFLHD9 Crittenden Rehabilitate Nature Drive, Route 011 2013EFLHD EFLHD70 - TOTAL
Project - Wapanocca Funding Source - Refuge Roads
12,368TOTAL
Page 65 of 115
An (S) or (F) following the termini indicates federal or state oversight.
EASTERN FEDERAL LANDS HIGHWAY DIVISION
State and Local Projects Sorted by Job Number
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
110228 Lee 001 So. Marianna-South (S) Widening 1.80 2010State State9,500
7,600 - NHS
1,900 - State Match
- TOTAL
110394 Monroe 079 White River Str. & Apprs. (Clarendon) (Ph. II) (F) Str. & Apprs. 1.14 2010State State38,200
30,560 - BR
7,640 - State Match
- TOTAL
110473 Crittenden 040 I-40 Miss. River Bridge Seismic Retrofit (Phase VII) (S) Str. & Apprs. 2010State TDOT WMATS11,040
8,832 - BR
2,208 - State Match
- TOTAL
110478 Monroe 049 Hwy. 17-I-40 (Brinkley) (S) Widening 1.03 2010State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
110502 Lee 001 Cypress Corner-North (S) Widening 4.70 2012State State30,500
24,400 - NHS
6,100 - State Match
- TOTAL
110504 Cross 064 Hwy. 1 North-West (Wynne) (S) Widening 0.65 2010State State6,400
5,120 - STP
1,280 - State Match
- TOTAL
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2010Local Local WMATS6,061
5,206 - Earmarks
855 - Local
- TOTAL
110530 Crittenden CS Southland Dr.-MLK, Jr. Dr.-West (S) Rehabilitation 0.42 2010Local Local WMATS1,300
260 - Local
- STP > 200,000
- TOTAL
1,040
110541 Woodruff 038 Bayou Deview Str. & Apprs. (S) Str. & Apprs. 2011State State1,750
1,400 - BR
350 - State Match
- TOTAL
Page 66 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
110542 Crittenden 040 I-40 Miss. Rv. Br. Seismic Retrofit (Phase VIII) (S) Str. & Apprs. 2011State TDOT WMATS26,000
20,800 - BR
5,200 - State Match
- TOTAL
110543 St. Francis 261 Hwys. 261, 38 & 149 Strs. & Apprs. (S) Str. & Apprs. 2012State State4,800
3,840 - BR
960 - State Match
- TOTAL
110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Str. & Apprs. 2013State State4,000
3,200 - BR
800 - State Match
- TOTAL
110547 Crittenden VAR District 1 Bridge Painting (S) Str. & Apprs. 2010State State WMATS2,040
1,632 - BR
408 - State Match
- TOTAL
110X01 Crittenden CS Southland Dr., Ingram Blvd.-East (S) Miscellaneous 0.83 2013Local Local WMATS2,695
539 - Local
- STP > 200,000
- TOTAL
2,156
020070 Jefferson 079 Hwy. 65B-North (S) Widening 1.60 2010State State PBATS8,900
4,240
2,880
- STP
- Earmarks
1,780 - State Match
- TOTAL
020316 Desha 069 I-69 Corridor (Hwy. 65-Miss. Rt. 1) (GRB) (Ph I) (F) Phase I 2010State State10,346
8,666 - Earmarks
1,680 - State Match
- TOTAL
020354 Jefferson 530 I-530-Co. Rd. 35 (Bs. & Surf.) (F) New Location 4.60 2011State State PBATS26,900
21,520 - Earmarks
5,380 - State Match
- TOTAL
020356 Lincoln 530 Hwy. 212-Hwys. 11/425 Connector (Bs. & Surf) (Phase I) (F) New Location 7.40 2013State State7,131
5,855 - Earmarks
1,276 - State Match
- TOTAL
Page 67 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
020445 Jefferson 270 Grant Co. Line-White Hall (Passing Lanes) (S) Passing Lanes 2.20 2010State PBATS5,700 - TOTAL
5,700 - 402-Safety
020451 Desha 054 Waterman St.-West (Dumas) (S) Reconstruction 0.81 2010State State3,300 - TOTAL
3,300 - 100% State
020462 Drew 069 Monticello Bypass (Phase I) (F) New Location 8.60 2010State State88,107
70,486 - Earmarks
17,621 - State Match
- TOTAL
020464 Grant 167 Hwy. 167 Bypass (Sheridan) (Bs. & Surf.) (S) New Location 8.63 2010State State43,000
34,400 - NHS
8,600 - State Match
- TOTAL
020480 Drew Southeast Arkansas Intermodal Facility (Wilmar) (S) Roadside Appurt 2010Local Local1,752
1,401 - Earmarks
351 - Local
- TOTAL
020505 Jefferson CS Nevins Creek Str. & Apprs. (Nevins Rd.) (Pine Bluff) (S) Str. & Apprs. 2012Local State PBATS350
280 - BR
70 - Local
- TOTAL
020506 Lincoln 011 Cane Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
020507 Jefferson 054 Big Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS800
640 - BR
160 - State Match
- TOTAL
020508 Jefferson 054 Steep Bank Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS600
480 - BR
120 - State Match
- TOTAL
020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Str. & Apprs. 2012State State2,200
1,760 - BR
440 - State Match
- TOTAL
Page 68 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
R20098 Chicot 082 Fairview-Mississippi River Br. (S) Widening 4.10 2011State State25,250
800
1,800
- STP
- Earmarks
650 - State Match
- TOTAL
22,000 - 100% State
030100 Miller CS Jefferson Ave-Mount Olive Dr(McDonald Ln)(Texarkana)(S) New Location 0.25 2010Local Local TUTS1,913
913 - Local
- STP < 200,000
- TOTAL
1,000
030236A Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2011State State TUTS995
797 - BR
198 - State Match
- TOTAL
030236B Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2012State State TUTS980
784 - BR
196 - State Match
- TOTAL
030325 Miller 071 Arkansas Blvd.-I-30 (Bs. & Surf.) (F) New Location 2.43 2010State State TUTS14,800
11,840 - NHS
2,960 - State Match
- TOTAL
030326 Miller 071 I-30-Hwy. 71 (Bs. & Surf.) (F) New Location 4.44 2010State State TUTS33,600
6,720 - NHS
1,680 - State Match
- TOTAL
25,200 - 100% State
030386 Nevada 032 Little Bodcaw Creek & Relief Strs. & Apprs.(S) Str. & Apprs. 2011State State2,800
2,240 - BR
560 - State Match
- TOTAL
030387 Hempstead 371 Ozan Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State2,000
1,600 - BR
400 - State Match
- TOTAL
030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Str. & Apprs. 2012State State TUTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
Page 69 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
030X01 Miller 071 LA Line-Doddridge (Phase III) (F) New Location 2.18 2012State State23,505
15,200
3,800
- NHS
- Earmarks
4,505 - State Match
- TOTAL
040024 Washington 074 White River Bridge Str. & Apprs. (Elkins) (S) Str. & Apprs. 2011State State NARTS2,500
2,000 - BR
500 - State Match
- TOTAL
040238 Sebastian 045 Hwy. 255-Phoenix Ave. (Widening) (Ft. Smith) (S) Widening 1.10 2010Local State BI-STATE9,400
4,700 - STP
4,700 - Local
- TOTAL
040272 Washington CS Johnson Road Reconst. (Springdale) P.E. Widening 2.20 2010Local Local NARTS14,586
10,669 - Earmarks
2,917 - Local
- STP < 200,000
- TOTAL
1,000
040345 Crawford CS Hwy. 59-West (Rena Road) (Van Buren) (S) Widening 1.10 2010Local State BI-STATE5,400
3,240
80
- Earmarks
- BR
1,080 - Local
- STP < 200,000
- TOTAL
1,000
040373 Sebastian 071 Jenny Lind-I-40 (Phase II) (F) New Location 6.04 2011State State BI-STATE29,900
17,600
6,300
- NHS
- Earmarks
6,000 - State Match
- TOTAL
040418 Washington 112 Hwy. 180-Garland Ave. (Hwy. 112) (Fayetteville) (S) Widening 1.17 2012Local State NARTS1,250
250 - Local
- STP < 200,000
- TOTAL
1,000
040438 Franklin 023 Arkansas River Bridge Painting (Ozark) (S) Str. & Apprs. 2011State State870
696 - BR
174 - State Match
- TOTAL
Page 70 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
040443 Sebastian 252 Branch of Washburn Creek Str. & Apprs. (So. of Hwy. 10) (S) Str. & Apprs. 2011State State500
400 - BR
100 - State Match
- TOTAL
040464 Crawford CS West of Ham Town Rd.-East (Wire Rd.) (Mulberry) (S) Reconstruction 0.94 2012Local State2,350
1,350 - Local
- STP < 200,000
- TOTAL
1,000
040471 Sebastian CS Jenny Lind Rd. & Ingersoll Rd. Widening (Fort Smith) (S) Widening 3.00 2010Local Local BI-STATE8,980
7,360 - Earmarks
1,620 - Local
- TOTAL
040485 Washington 540 I-540/Hwy. 62/180 Interchg Interim Impvts. (Fayetteville) (F) Interchange 2010State State NARTS5,000
4,000 - NHS
1,000 - State Match
- TOTAL
040486 Washington 016 College Ave.-Stone Bridge Rd. (Fayetteville) (S) Widening 2.68 2011Local State NARTS10,000
5,000 - STP
5,000 - Local
- TOTAL
040489 Washington 112 Hwy. 112 Spur-North (Fayetteville) (S) Widening 0.75 2010Local State NARTS3,000
1,500 - STP
1,500 - Local
- TOTAL
040490 Washington 265 South City Limits-Hwy. 412 (Springdale) (S) Widening 1.25 2010Local State NARTS4,700
2,350 - STP
2,350 - Local
- TOTAL
040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2011Local State1,935
935 - Local
- STP < 200,000
- TOTAL
1,000
040496 Washington CS Hwy. 112-Hwy. 71B (Cato Springs Rd.) (Fayetteville) (S) Reconstruction 1.00 2010Local Local NARTS3,596
2,877 - Earmarks
719 - Local
- TOTAL
Page 71 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
040506 Franklin CS Gar Creek Str. & Apprs. (2nd Street) (Ozark) (S) Str. & Apprs. 2010Local State425
340 - BR
85 - Local
- TOTAL
040517 Washington 265 Hwy. 45-E. Joyce Blvd. (Fayetteville) (S) Widening 2.19 2010Local State NARTS15,400
7,700 - STP
7,700 - Local
- TOTAL
040518 Washington 265 E. Joyce Blvd.-City Limits (Fayetteville) (S) Widening 2.04 2012State State NARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL
040524 Washington 062 Hwy. 62 Bypass (Gr. & Strs.) (Prairie Grove) (S) New Location 4.20 2010State State NARTS15,000
12,000 - STP
3,000 - State Match
- TOTAL
040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2012Local Local NARTS26,951
26,951 - Local
- TOTAL
040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Str. & Apprs. 2011Local Local NARTS6,452
5,162 - Earmarks
1,290 - Local
- TOTAL
040536 Washington CS Fulbright Expwy./Futrall Dr. Roundabout (Fayetteville) (S) Inters Impvts 2010Local Local NARTS2,966
2,373 - Earmarks
593 - Local
- TOTAL
040545 Sebastian CS 9th St.-13th St. (Garrison Ave.) (Ft. Smith) (S) Enhancement 2010Local Local BI-STATE2,438
950 - Earmarks
488 - Local
- STP < 200,000
- TOTAL
1,000
040561 Washington 540 Bobby Hopper Tunnel-Winslow (S) Safety Improvements 3.50 2012State NARTS900 - TOTAL
900 - 402-Safety
Page 72 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
040569 Washington 016 West & Middle Forks of White River Strs. & Apprs. (Fayetteville) (S)
Str. & Apprs. 2012State State NARTS11,500
9,200 - BR
2,300 - State Match
- TOTAL
040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS750
600 - BR
150 - State Match
- TOTAL
005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Str. & Apprs. 2013State State20,000
16,000 - BR
4,000 - State Match
- TOTAL
050012 Izard 009 Fulton Co. Line-South Strs. & Apprs.(Oxford) (S) Str. & Apprs. 2011State State3,300
2,640 - BR
660 - State Match
- TOTAL
050166 Cleburne 025 Faulkner Co. Line-Hwy. 107 (Passing Lanes) (S) Passing Lanes 2.20 2012State State6,500
5,200 - STP
1,300 - State Match
- TOTAL
050186 Independence 167 Hwy. 69-Hwy. 394 (Batesville) (S) Widening 2.70 2010State State12,400
9,920 - STP
2,480 - State Match
- TOTAL
050187 Sharp 167 Hwy. 354-Hwy. 62/412 (Ash Flat) (S) Widening 1.00 2010State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
050189 White 013 Hwy. 13 Extension (Searcy) (Phase I) (S) New Location 4.60 2011State State10,000
8,000 - STP
2,000 - State Match
- TOTAL
050198 White NEW North Searcy Connector (Phase I) (S) New Location 2013Local State12,000
6,000 - STP
6,000 - Local
- TOTAL
Page 73 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
050207 Independence 069 Hwy. 69/Hwy. 122 Inters. Impvts. (S. of Newark) (S) Safety Improvements 2011State State130
117 - HSIP
13 - State Match
- TOTAL
050212 White 013 Hwy. 13 Extension (Searcy) (Phase II) (S) New Location 4.60 2013State State14,000
11,200 - STP
2,800 - State Match
- TOTAL
050213 Independence 167 Hwy. 394-North (S) Widening 5.11 2013State State18,000
14,400 - STP
3,600 - State Match
- TOTAL
050228 Cleburne 225 Midway Branch Str. & Apprs. (S) Str. & Apprs. 2011State State3,500
2,800 - BR
700 - State Match
- TOTAL
050229 White 305 Brier Creek Str. & Apprs. (S) Str. & Apprs. 2011State State700
560 - BR
140 - State Match
- TOTAL
050230 Fulton 063 Hwy. 9-Hwy. 342 Strs. & Apprs. (Mammoth Spring) (S) Str. & Apprs. 2012State State7,000
5,600 - BR
1,400 - State Match
- TOTAL
050231 Stone 066 Mt. View-West (Passing Lanes) (S) Passing Lanes 3.00 2013State State9,500
7,600 - STP
1,900 - State Match
- TOTAL
050X04 Various VAR Districts 5 & 8 Highway Improvements Various 2013State State CARTS20,000 - TOTAL
20,000 - 100% State
R50116 Stone 005 Little Raccoon Creek-Cove Prong Creek (S) Reconst/Climb Lanes 4.00 2011State State11,500
5,000 - STP
1,250 - State Match
- TOTAL
5,250 - 100% State
Page 74 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
060352 Pulaski 005 McHenry Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State CARTS2,200
1,760 - BR
440 - State Match
- TOTAL
060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Str. & Apprs. 2012State State CARTS6,200
4,960 - BR
1,240 - State Match
- TOTAL
060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (Project Development) (F) Interchange 2010Local Local5,352
4,282 - Earmarks
1,070 - Local
- TOTAL
060907 Pulaski CS Geyer Springs R.R. Grade Separation (L.R.) (PE) (S) RR Xing 2010Local Local CARTS734
587 - Earmarks
147 - Local
- TOTAL
061026A Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Utilities 2010Local State/Local CARTS2,026
405 - Local
- STP > 200,000
- TOTAL
1,621
061026B Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Widening 2011Local State/Local CARTS7,996
1,599 - Local
- STP > 200,000
- TOTAL
6,397
061059 Garland 270 Hot Springs-West (Passing Lanes) (S) Passing Lanes 4.55 2010State HSA-MPO12,800 - TOTAL
12,800 - 402-Safety
061080 Pulaski CS South Loop Bypass (Mabelvale Rd-Alexander Rd) (LR) (S) New Location 1.00 2010Local Local CARTS5,365
3,060 - Earmarks
1,073 - Local
- STP > 200,000
- TOTAL
1,232
061094A Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) ROW/Utilities 1.00 2010Local State/Local CARTS470
94 - Local
- STP > 200,000
- TOTAL
376
Page 75 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
061094B Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) Widening 0.50 2010Local Local CARTS2,521
504 - Local
- STP > 200,000
- TOTAL
2,017
061113 Garland 088 Hwy. 270-Printers Place (Higdon Ferry Rd.) (Hot Springs) (S) Widening 0.46 2010State State HSA-MPO3,000
2,400 - STP
600 - State Match
- TOTAL
061190 Pulaski 040 I-40 Interchange (Maumelle) (F) Interchange 2010Local Local CARTS696
557 - Earmarks
139 - Local
- TOTAL
061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (Little Rock) (S) Safety Improvements 0.65 2013Local State CARTS9,000
8,100 - HSIP
900 - Local
- TOTAL
061201 Pulaski 030 I-30: South Terminal Interchange-I-630 (L.R.) (P.E.) (F) Safety & Traffic Eng. 1.40 2010State State CARTS1,350
1,080 - Earmarks
270 - State Match
- TOTAL
061202 Pulaski 005 Saline Co Line-Otter Creek Rd. (L.R.) (S) Widening 1.26 2010State State CARTS12,000
9,600 - STP
2,400 - State Match
- TOTAL
061214 Garland 088 Printers Place-Hwy 7 North (Higdon Ferry Rd)(Hot Sprs) (S) Widening 0.36 2013State/Local State HSA-MPO5,686
4,000
549
- STP
- Earmarks
1,000 - State Match
137 - Local
- TOTAL
061215 Lonoke 013 I-40-South (Carlisle) (S) Rehabilitation 0.46 2012State State2,500
2,000 - STP
500 - State Match
- TOTAL
061218 Pulaski 010 Union Pacific R.R. Viaduct Safety Impvts. (L.R) (S) Safety Improvements 0.20 2012State State CARTS1,700
1,530 - HSIP
170 - State Match
- TOTAL
Page 76 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
061219 Lonoke/Pul 067 Hwy. 67 Cable Median Barrier (Jacksonville-Cabot) (S) Safety Improvements 4.80 2012State State CARTS1,500
1,350 - HSIP
150 - State Match
- TOTAL
061228 Saline 005 Hwy. 5 Drainage Structure (Bryant) (S) Str. & Apprs. 2011State State CARTS1,000
800 - STP
200 - State Match
- TOTAL
061229 Lonoke 067 Hwy 67/Hwy 5 Interchange Ramp Modifications (Cabot) (S) Interchange 2010Local State CARTS860
172 - Local
- STP > 200,000
- TOTAL
688
061232 Saline CS Benton Downtown Streetscape (S) Enhancement 2010Local State/Local CARTS619
160 - Local
- STP > 200,000
- TOTAL
459
061244 Pulaski 430 I-430/I-630 Interchange Modifications (Phase III) (F) Interchange 2011State State CARTS80,069
30,600
9,825
- STP
- Earmarks
14,644 - State Match
25,000 - CMAQ FLEX
- TOTAL
061256 Saline 030 Hwy. 70-Sevier St. Cable Median Barrier (S) Safety Improvements 5.21 2012State CARTS1,700 - TOTAL
1,700 - 402-Safety
061257 Saline CS Congo Rd.-I-30 (Military Rd.) (Benton) (S) Widening 2010Local State/Local CARTS8,250
1,650 - Local
- STP > 200,000
- TOTAL
6,600
061259 Garland 005 Hwy. 7-Hot Springs Village (Safety Impvts) (S) Safety Improvements 1.08 2012State State HSA-MPO3,500
3,150 - HSIP
350 - State Match
- TOTAL
061260 Pulaski 630 I-630 Corridor Fixed Guideway Alignment Study Planning 2010Local Metroplan CARTS188
38 - Local
- STP > 200,000
- TOTAL
150
Page 77 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
061267A Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)
PE 2010Local State/Local CARTS138
28 - Local
- STP > 200,000
- TOTAL
110
061267B Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)
Safety & Traffic Eng. 2011Local State/Local CARTS439
88 - Local
- STP > 200,000
- TOTAL
351
061268 Lonoke 038 Hwy 367/Locust Signal (Cabot) (S) Safety & Traffic Eng. 2010Local State/Local CARTS130
26 - Local
- STP > 200,000
- TOTAL
104
061269 Lonoke CS Cabot Jr. High School North Sidewalks (Cabot) (S) Enhancement 2010Local State/Local CARTS60
12 - Local
- STP > 200,000
- TOTAL
48
061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Str. & Apprs. 2013State State CARTS45,000
36,000 - BR
9,000 - State Match
- TOTAL
061276 Pulaski 067 Main Street Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2013State State CARTS4,000
3,200 - BR
800 - State Match
- TOTAL
061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Str. & Apprs. 2013State State CARTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
061278 Pulaski 067 Redmond Rd. Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2012State State CARTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
061280 Prairie 038 White River Bridge Rehab. (Des Arc) (S) Str. & Apprs. 2010State State1,600
1,280 - BR
320 - State Match
- TOTAL
Page 78 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
061X01 Lonoke CS Cabot High School Roundabout (S) Reconstruction 2010Local State/Local CARTS211
43 - Local
- STP > 200,000
- TOTAL
168
061X03A Pulaski CS McCain Rail Grade Separation PE 2011Local State/Local CARTS1,338
268 - Local
- STP > 200,000
- TOTAL
1,070
061X03B Pulaski CS McCain Rail Grade Separation ROW/Utilities 2012Local State/Local CARTS4,294
859 - Local
- STP > 200,000
- TOTAL
3,435
061X03C Pulaski CS McCain Rail Grade Separation Str. & Apprs. 2013Local State/Local CARTS11,185
2,227 - Local
- STP > 200,000
- TOTAL
8,958
061X04A Pulaski CS Maryland Road Extension (Sherwood) PE 2011Local State/Local CARTS106
21 - Local
- STP > 200,000
- TOTAL
85
061X04B Pulaski CS Maryland Road Extension (Sherwood) New Location 2012Local State/Local CARTS960
192 - Local
- STP > 200,000
- TOTAL
768
061X05 Pulaski Levy UPRR Spur Bikeway (North Little Rock) ROW 2012Local State/Local CARTS1,803
361 - Local
- STP > 200,000
- TOTAL
1,442
061X06A Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) PE 2010Local State CARTS900
180 - Local
- STP > 200,000
- TOTAL
720
061X06B Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) Widening 2011Local State/Local CARTS1,047
209 - Local
- STP > 200,000
- TOTAL
838
Page 79 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
061X07 Pulaski Maumelle Pedestrian/Bicycle Facilities (Phase II) Enhancement 2010Local State/Local CARTS536
107 - Local
- STP > 200,000
- TOTAL
429
R60016 Garland NEW East-West Arterial (Hot Springs) (P.E.) Project Development 2011State State HSA-MPO7,234
5,787 - Earmarks
1,447 - State Match
- TOTAL
Note: Contingent upon approval from National Parks Service
070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Str. & Apprs. 2012State State3,000
2,400 - BR
600 - State Match
- TOTAL
070273 Union 015 Hwy 335-Hwy 82 Strs & Apprs (S) Str. & Apprs. 2011State State2,650
2,120 - BR
530 - State Match
- TOTAL
070289 Cleve/Dallas 167 Hwy. 273-Peters Rd. (CR 24) (Phase I) (S) Widening 5.30 2013State State38,364
29,600
1,364
- STP
- Earmarks
7,400 - State Match
- TOTAL
070290 Cleveland 167 Peters Rd. (CR 24)-North (S) Widening 5.10 2011State State32,500
26,000 - NHS
6,500 - State Match
- TOTAL
070291 Cleve/Dallas 167 Saline River-South (S) Widening 5.50 2012State State54,500
43,600 - NHS
10,900 - State Match
- TOTAL
070301 Columbia 079 Magnolia-Ouachita Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,200
5,580 - HSIP
620 - State Match
- TOTAL
070304 Columbia CS Frederick St.-Hwy. 82 (E. North St.) (Magnolia) (S) Widening 0.70 2011Local State2,840
1,840 - Local
- STP < 200,000
- TOTAL
1,000
Page 80 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Str. & Apprs. 2013State State5,000
4,000 - BR
1,000 - State Match
- TOTAL
070345 Calhoun 274 Ditch at L.M. 1.8 Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
080157 Pope Intermodal Complex (Russellville) (F) Miscellaneous 2010Local Local3,488
2,790 - Earmarks
698 - Local
- TOTAL
080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2013State State6,250
5,000 - STP
1,250 - State Match
- TOTAL
080273 Faulkner 065B Hwy 266-Hwy. 64 (Conway) (S) Widening 0.51 2010State State CARTS2,250
2,025 - HSIP
225 - State Match
- TOTAL
080295 Pope CS W Main Pl-Honeysuckle Ln (Inglewood St) (Russellville)(S) Reconstruction 0.80 2010Local State2,850
1,850 - Local
- STP < 200,000
- TOTAL
1,000
080310 Montgomery 270 Hwy. 270 Realignment (Blowout Mountain) (S) Reconstruction 1.35 2010State State4,360
3,924 - HSIP
436 - State Match
- TOTAL
080314 Johnson CS Hwy. 123-Hwy. 21 (Clarksville) (S) Project Development 0.50 2011Local Local1,100
100 - Local
- STP < 200,000
- TOTAL
1,000
080329 Faulkner Vilonia Middle SRTS I (2007) (Supplemental Funds) Enhancement 2010Local State/Local CARTS106
21 - Local
- STP > 200,000
- TOTAL
85
Page 81 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
080339 Faulkner 036 Hwys. 36/107 Inters. Impvts. (S. of Enola) (S) Safety 2011State State900
720 - STP
180 - State Match
- TOTAL
080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Capacity Imprvmnts 0.40 2013State State7,500
6,000 - STP
1,500 - State Match
- TOTAL
080345 Pope 247 I-40 South (Russellville Bypass) (Bs. & Surf.) (S) New Location 2.43 2012State State16,600
13,280 - STP
3,320 - State Match
- TOTAL
080363 Van Buren 065 Hwys. 65/92 Signal & Inters. Impvts. (Bee Branch) (S) Inters Impvts 2011State State2,000
1,600 - STP
400 - State Match
- TOTAL
080377 Yell 007 Centerville-Dardanelle (Passing Lanes) (S) Passing Lanes 1.00 2013State State2,000
1,600 - STP
400 - State Match
- TOTAL
080378 Montgomery 008 Lick Creek Str. & Apprs. (Norman) (S) Str. & Apprs. 2011State State1,200
960 - BR
240 - State Match
- TOTAL
080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Str. & Apprs. 2012State State2,500
2,000 - BR
500 - State Match
- TOTAL
080380 Pope 064 Galla Creek Str. & Apprs. (Pottsville) (S) Str. & Apprs. 2011State State2,500
2,000 - BR
500 - State Match
- TOTAL
080381 Van Buren 092 Scroggins Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
Page 82 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
080382 Conway 124 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500
1,200 - BR
300 - State Match
- TOTAL
080383 Conway 124 Point Remove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500
1,200 - BR
300 - State Match
- TOTAL
080384 Faulkner 287 Branch of Cadron Creek Str. & Apprs. (Holland) (S) Str. & Apprs. 2011State State600
480 - BR
120 - State Match
- TOTAL
080385 Yell 007 Little Rock & Western RR Str. & Apprs. (Ola) (S) Str. & Apprs. 2012State State1,250
1,000 - BR
250 - State Match
- TOTAL
080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts (S)
Reconstruction 0.80 2012State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Reconstruction 1.20 2012State State4,000
3,200 - STP
800 - State Match
- TOTAL
080388 Faulkner 040 Conway-Pulaski Co. Line (Widening) (Phase I) (F) Widening 2012State State CARTS36,000
28,800 - NHS
7,200 - State Match
- TOTAL
080389 Pope 326 Hob Nob Rd.-Hwy. 124 (S) Widening 0.45 2013Local State6,000
3,000 - STP
3,000 - Local
- TOTAL
080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Widening 1.41 2013State State15,000
12,000 - NHS
3,000 - State Match
- TOTAL
Page 83 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
080391 Van Buren 065 Hwy. 336 West-Co. Rd. 28 (Phase I) (S) Widening 9.30 2012State State15,000
12,000 - NHS
3,000 - State Match
- TOTAL
080392 Pope 007 Newton Co. Line-South (Passing Lanes) (S) Passing Lanes 2.30 2012State State5,000
4,000 - STP
1,000 - State Match
- TOTAL
080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,000
4,500 - STP
3,621 - Local
- STP > 200,000
- TOTAL
879
080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,000
5,589
1,836
- NHS
- Earmarks
41 - State Match
4,534 - Local
- TOTAL
080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,000
5,500 - NHS
4,329 - Local
- STP > 200,000
- TOTAL
1,171
080X12 Faulkner NEW Hwy. 365-Sturgis Road (Phase I) (S) New Location 2012Local State CARTS5,437
5,437 - Local
- TOTAL
009702 Carroll 062 Hwy. 62 Improvements (Green Forest) (Phase I) (S) Widening 2.00 2013State State9,000
4,800 - STP
1,200 - State Match
- TOTAL
3,000 - 100% State
009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Str. & Apprs. 2010State State2,600
2,080 - BR
520 - State Match
- TOTAL
Page 84 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
009901 Carroll 062 Hwy. 143-Berryville (S) Widening 2.80 2010State State13,300
10,640 - STP
2,660 - State Match
- TOTAL
009951 Madison 412 Hindsville-Huntsville Bypass (F) Widening 4.92 2010State State18,000
14,400 - NHS
3,600 - State Match
- TOTAL
090065 Benton 062 Avoca-North Garfield (S) Widening 6.43 2012State State NARTS28,000
22,400 - NHS
5,600 - State Match
- TOTAL
090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2010Local Local NARTS35,000
10,651 - Earmarks
24,349 - Local
- TOTAL
090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2010State State3,000
2,400 - STP
600 - State Match
- TOTAL
090174 Benton 102 Hwy. 102B-Greenhouse Rd. (Centerton) (S) Widening 1.79 2010Local State NARTS12,000
10,000 - STP
2,000 - Local
- TOTAL
090213 Newton 007 Co. Rd. 46-Buffalo River (Safety Impvts.) (S) Reconstruction 0.60 2010State State8,600
7,740 - HSIP
860 - State Match
- TOTAL
090218 Benton CS 8th Street Improvements (Bentonville) (S) Widening 2011Local Local NARTS38,586
30,869 - Earmarks
7,717 - Local
- TOTAL
090221 Newton 007 Mill Cr.-Hwy. 7S Safety Impvts. (Marble Falls) (S) Reconstruction 0.83 2010State State5,700
5,130 - HSIP
570 - State Match
- TOTAL
Page 85 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
090223 Baxter 177 Hwy. 5-Izard Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,400
5,760 - HSIP
640 - State Match
- TOTAL
090224 Benton 071 Bella Vista Bypass (Phase I) (F) New Location 14.60 2011State State NARTS33,584
12,000
15,032
- STP
- Earmarks
6,552 - State Match
- TOTAL
090228 Benton CR War Eagle Bridge Rehab. (Benton Co.) (S) New Location 2010Local State NARTS494
395 - Earmarks
99 - Local
- TOTAL
090232 Benton CS East Monroe Ave. Extension (Sel. Secs.) (Lowell) (S) New Location 0.32 2010Local State NARTS2,100
1,100 - Local
- STP < 200,000
- TOTAL
1,000
090235 Carroll 412 Dryfork-Hwy. 103 (Passing Lane) (S) Passing Lanes 1.30 2012State State4,000 - TOTAL
4,000 - 100% State
090236 Benton 540 I-540/Hwy. 62/102 Interch Interim Impvts. (Bentonvl) (F) Interchange 2010State/Local State NARTS6,598
4,000
1,278
- NHS
- Earmarks
320 - State Match
1,000 - Local
- TOTAL
090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Capacity Imprvmnts 2.70 2012Local State NARTS20,400
10,400 - Local
- TOTAL
10,000 - 100% State
090254 Benton CS Shell Road Str. & Apprs. (Bentonville) (S) Str. & Apprs. 2010Local State NARTS1,404
1,000 - BR
404 - Local
- TOTAL
090260 Benton 071 Hwy. 71/NE J St. Intchng. (Bentonville) (F) Interchange 2011Local Local NARTS37,676
37,676 - Local
- TOTAL
Page 86 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
090272 Madison 412 Hwy. 412/Hwy. 45 Inters. Impvts. (N. of Hindsville) (S) Safety Improvements 2011State State650
585 - HSIP
65 - State Match
- TOTAL
090280 Searcy 065 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State2,000
1,600 - BR
400 - State Match
- TOTAL
090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Str. & Apprs. 2011State State3,000
2,400 - BR
600 - State Match
- TOTAL
090282 Benton 016 Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS5,000
4,000 - BR
1,000 - State Match
- TOTAL
090283 Carroll 021 Indian Creek Str. & Apprs. (S) Str. & Apprs. 2012State State1,000
800 - BR
200 - State Match
- TOTAL
090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Widening 1.40 2013State State NARTS11,000
8,800 - STP
2,200 - State Match
- TOTAL
090X03 Benton VAR District 9 Improvements TBD 2013State State NARTS5,000
4,000 - STP
1,000 - State Match
- TOTAL
R90097 Marion 062 Flippin Bypass-Hwy. 62B (S) Widening 0.65 2010State State5,300 - TOTAL
5,300 - 100% State
100307 Mississippi 018 Hwy. 181-West (S) Widening 2.74 2010State State17,000
12,400
1,200
- STP
- BR
3,400 - State Match
- TOTAL
Page 87 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
100308 Craighead 018 St. Francis River-North of Black Oak (S) Widening 5.60 2010State State33,000
26,400 - STP
6,600 - State Match
- TOTAL
100412 Craighead 226 Hwy. 67-Hwy. 49 (Phase II) (F) Widening 12.45 2011State State JATS49,717
22,160
19,092
- STP
- Earmarks
8,465 - State Match
- TOTAL
100445 Greene 412 Hwy. 412 Improvements (Paragould) (Phase I) (F) New Location 9.90 2011State State28,625
3,400 - Earmarks
- TOTAL
25,225 - 100% State
100567 Craighead 018 North of Black Oak-Monette Bypass (S) Widening 1.40 2013State State11,600
9,280 - STP
2,320 - State Match
- TOTAL
100639 Craighead CS Mt. Carmel Rd-S Culberhouse Rd (Lawson Rd)(Jonesboro)(S) Widening 1.20 2010Local State JATS4,900
3,900 - Local
- STP < 200,000
- TOTAL
1,000
100653 Craig/Miss 018 Monette Bypass-Manila (S) Widening 6.00 2012State State41,700
33,360 - STP
8,340 - State Match
- TOTAL
100662 Craighead CS Caraway Rd. Safety Enhancement (Jonesboro) (Ph. II) (S) New Location 2010Local Local JATS9,185
5,848 - Earmarks
1,837 - Local
1,500 - RRP
- TOTAL
100663 Mississippi 018 Hwy. 18 Improvements (Blytheville) (S) Safety Improvements 2011State State15,876
6,000
500
2,588
- STP
- Earmarks
- HSIP
1,788 - State Match
- TOTAL
5,000 - 402-Safety
Page 88 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
100675 Greene 135 Cache River & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State6,120
4,896 - BR
1,224 - State Match
- TOTAL
100682 Poinsett 063 Future I-555 Access Roads (S) Project Development 2011State State2,946
2,357 - Earmarks
589 - State Match
- TOTAL
100686 Lawrence 063 Black Rock-Portia (Phase I) (F) Widening 3.50 2013State State15,900
12,720 - STP
3,180 - State Match
- TOTAL
100687 Lawrence 063 Black River & Relief Strs. & Apprs. (F) Str. & Apprs. 2013State State33,000
26,400 - BR
6,600 - State Match
- TOTAL
100722 Greene 034 Lafe-Marmaduke Strs. & Apprs. (S) Str. & Apprs. 2011State State2,500
2,000 - BR
500 - State Match
- TOTAL
100723 Mississippi 148 Clear Lake Str. & Apprs. (S) Str. & Apprs. 2011State State900
720 - BR
180 - State Match
- TOTAL
100724 Mississippi 312 Ditch No. 6 Str. & Apprs. (Blytheville) (S) Str. & Apprs. 2011State State800
640 - BR
160 - State Match
- TOTAL
100X01 Greene 412 Hwy. 412 Improvements (Paragould) (Phase II) (F) New Location 10.43 2013State State14,800
11,840 - NHS
2,960 - State Match
- TOTAL
001966 Benton/Wash 412 Springdale Northern Bypass (Phase I) (F) New Location 20.60 2011State State NARTS11,521
8,000
1,217
- NHS
- Earmarks
2,304 - State Match
- TOTAL
Page 89 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:42 AM
012007 Benton/Wash 265 Randall Wobbe Lane-Hwy. 264 (Springdale) (S) Widening 1.55 2011Local State NARTS5,000
2,500 - STP
2,500 - Local
- TOTAL
012060 Clev/Jeff/Linc 530 Co. Rd. 35-Hwy. 212 (Bs. & Surf.) (F) New Location 11.14 2011State State39,300
31,440 - Earmarks
7,860 - State Match
- TOTAL
012111 Benton/Wash 540 Hwy. 112/265-Hwy. 62/102 Cable Median Barrier (F) Safety Improvements 24.45 2012State NARTS6,500 - TOTAL
6,500 - 402-Safety
012X01 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2011State State NARTS15,890
8,000
5,335
- NHS
- Earmarks
2,555 - State Match
- TOTAL
012X02 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2013State State NARTS20,000
16,000 - NHS
4,000 - State Match
- TOTAL
Page 90 of 115
STATE AND LOCAL PROJECTS SORTED BY JOB NUMBER
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
State and Local Projects Sorted by County
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
020509 Ashley 082 Hwy. 165 Str. & Apprs. (Montrose) (S) Str. & Apprs. 2012State State2,200
1,760 - BR
440 - State Match
- TOTAL
090223 Baxter 177 Hwy. 5-Izard Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,400
640 - State Match
- TOTAL
5,760 - HSIP
090281 Baxter 005 North Fork River Str. & Apprs. (Norfork) (S) Str. & Apprs. 2011State State3,000
2,400 - BR
600 - State Match
- TOTAL
090065 Benton 062 Avoca-North Garfield (S) Widening 6.43 2012State State NARTS28,00022,400 - NHS
5,600 - State Match
- TOTAL
090069 Benton NEW Northwest Arkansas Regional Airport Access (F) New Location 2010Local Local NARTS35,00010,651 - Earmarks
24,349 - Local
- TOTAL
090174 Benton 102 Hwy. 102B-Greenhouse Rd. (Centerton) (S) Widening 1.79 2010Local State NARTS12,00010,000 - STP
2,000 - Local
- TOTAL
090218 Benton CS 8th Street Improvements (Bentonville) (S) Widening 2011Local Local NARTS38,586
30,869 - Earmarks
7,717 - Local
- TOTAL
090224 Benton 071 Bella Vista Bypass (Phase I) (F) New Location 14.60 2011State State NARTS33,58412,000
15,032
- STP
- Earmarks
6,552 - State Match
- TOTAL
090228 Benton CR War Eagle Bridge Rehab. (Benton Co.) (S) New Location 2010Local State NARTS494
395 - Earmarks
99 - Local
- TOTAL
Page 91 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
090232 Benton CS East Monroe Ave. Extension (Sel. Secs.) (Lowell) (S) New Location 0.32 2010Local State NARTS2,100
1,100 - Local
- STP < 200,000
- TOTAL
1,000
090236 Benton 540 I-540/Hwy. 62/102 Interch Interim Impvts. (Bentonvl) (F) Interchange 2010State/Local State NARTS6,5984,000
1,278
- NHS
- Earmarks
320 - State Match
1,000 - Local
- TOTAL
090251 Benton 012 Hwy. 71B-Shell Rd. (Hwy. 12) (Bentonville) (S) Capacity Imprvmnts 2.70 2012Local State NARTS20,400
10,400 - Local
- TOTAL
10,000 - 100% State
090254 Benton CS Shell Road Str. & Apprs. (Bentonville) (S) Str. & Apprs. 2010Local State NARTS1,404
1,000 - BR
404 - Local
- TOTAL
090260 Benton 071 Hwy. 71/NE J St. Intchng. (Bentonville) (F) Interchange 2011Local Local NARTS37,676
37,676 - Local
- TOTAL
090282 Benton 016 Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS5,000
4,000 - BR
1,000 - State Match
- TOTAL
090284 Benton 264 Hwy. 71B-Hwy. 265 (Springdale) (S) Widening 1.40 2013State State NARTS11,0008,800 - STP
2,200 - State Match
- TOTAL
090X03 Benton VAR District 9 Improvements TBD 2013State State NARTS5,0004,000 - STP
1,000 - State Match
- TOTAL
001966 Benton/Wash 412 Springdale Northern Bypass (Phase I) (F) New Location 20.60 2011State State NARTS11,5218,000
1,217
- NHS
- Earmarks
2,304 - State Match
- TOTAL
Page 92 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
012007 Benton/Wash 265 Randall Wobbe Lane-Hwy. 264 (Springdale) (S) Widening 1.55 2011Local State NARTS5,0002,500 - STP
2,500 - Local
- TOTAL
012111 Benton/Wash 540 Hwy. 112/265-Hwy. 62/102 Cable Median Barrier (F) Safety Improvements 24.45 2012State NARTS6,500
6,500 - 402-Safety
- TOTAL
012X01 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2011State State NARTS15,8908,000
5,335
- NHS
- Earmarks
2,555 - State Match
- TOTAL
012X02 Benton/Wash 540 Major Widening and/or Interchange Improvements (F) Capacity Imprvmnts 2013State State NARTS20,00016,000 - NHS
4,000 - State Match
- TOTAL
070345 Calhoun 274 Ditch at L.M. 1.8 Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
009702 Carroll 062 Hwy. 62 Improvements (Green Forest) (Phase I) (S) Widening 2.00 2013State State9,0004,800 - STP
1,200 - State Match
- TOTAL
3,000 - 100% State
009901 Carroll 062 Hwy. 143-Berryville (S) Widening 2.80 2010State State13,30010,640 - STP
2,660 - State Match
- TOTAL
090235 Carroll 412 Dryfork-Hwy. 103 (Passing Lane) (S) Passing Lanes 1.30 2012State State4,000 - TOTAL
4,000 - 100% State
090283 Carroll 021 Indian Creek Str. & Apprs. (S) Str. & Apprs. 2012State State1,000
800 - BR
200 - State Match
- TOTAL
Page 93 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
R20098 Chicot 082 Fairview-Mississippi River Br. (S) Widening 4.10 2011State State25,250800
1,800
- STP
- Earmarks
650 - State Match
- TOTAL
22,000 - 100% State
070240 Clark 051 Ouachita River Str. & Apprs. (Arkadelphia) (S) Str. & Apprs. 2012State State3,000
2,400 - BR
600 - State Match
- TOTAL
070344 Clark 067 Gurdon-Oak Grove Strs. & Apprs. (S) Str. & Apprs. 2013State State5,000
4,000 - BR
1,000 - State Match
- TOTAL
050166 Cleburne 025 Faulkner Co. Line-Hwy. 107 (Passing Lanes) (S) Passing Lanes 2.20 2012State State6,5005,200 - STP
1,300 - State Match
- TOTAL
050228 Cleburne 225 Midway Branch Str. & Apprs. (S) Str. & Apprs. 2011State State3,500
2,800 - BR
700 - State Match
- TOTAL
012060 Clev/Jeff/Linc 530 Co. Rd. 35-Hwy. 212 (Bs. & Surf.) (F) New Location 11.14 2011State State39,300
31,440 - Earmarks
7,860 - State Match
- TOTAL
070289 Cleve/Dallas 167 Hwy. 273-Peters Rd. (CR 24) (Phase I) (S) Widening 5.30 2013State State38,36429,600
1,364
- STP
- Earmarks
7,400 - State Match
- TOTAL
070291 Cleve/Dallas 167 Saline River-South (S) Widening 5.50 2012State State54,50043,600 - NHS
10,900 - State Match
- TOTAL
070290 Cleveland 167 Peters Rd. (CR 24)-North (S) Widening 5.10 2011State State32,50026,000 - NHS
6,500 - State Match
- TOTAL
Page 94 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
070301 Columbia 079 Magnolia-Ouachita Co. Line (Passing Lanes) (S) Passing Lanes 2.50 2010State State6,200
620 - State Match
- TOTAL
5,580 - HSIP
070304 Columbia CS Frederick St.-Hwy. 82 (E. North St.) (Magnolia) (S) Widening 0.70 2011Local State2,840
1,840 - Local
- STP < 200,000
- TOTAL
1,000
080382 Conway 124 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500
1,200 - BR
300 - State Match
- TOTAL
080383 Conway 124 Point Remove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,500
1,200 - BR
300 - State Match
- TOTAL
080386 Conway 095 East Fork Point Remove Creek-North & South Grade Impvts (S)
Reconstruction 0.80 2012State State6,000
4,800 - STP
1,200 - State Match
- TOTAL
080387 Conway 095 Overcup Creek-North & South Grade Impvts. (S) Reconstruction 1.20 2012State State4,0003,200 - STP
800 - State Match
- TOTAL
100653 Craig/Miss 018 Monette Bypass-Manila (S) Widening 6.00 2012State State41,70033,360 - STP
8,340 - State Match
- TOTAL
100308 Craighead 018 St. Francis River-North of Black Oak (S) Widening 5.60 2010State State33,00026,400 - STP
6,600 - State Match
- TOTAL
100412 Craighead 226 Hwy. 67-Hwy. 49 (Phase II) (F) Widening 12.45 2011State State JATS49,71722,160
19,092
- STP
- Earmarks
8,465 - State Match
- TOTAL
Page 95 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
100567 Craighead 018 North of Black Oak-Monette Bypass (S) Widening 1.40 2013State State11,6009,280 - STP
2,320 - State Match
- TOTAL
100639 Craighead CS Mt. Carmel Rd-S Culberhouse Rd (Lawson Rd)(Jonesboro)(S) Widening 1.20 2010Local State JATS4,900
3,900 - Local
- STP < 200,000
- TOTAL
1,000
100662 Craighead CS Caraway Rd. Safety Enhancement (Jonesboro) (Ph. II) (S) New Location 2010Local Local JATS9,185
5,848 - Earmarks
1,837 - Local
1,500 - RRP
- TOTAL
040345 Crawford CS Hwy. 59-West (Rena Road) (Van Buren) (S) Widening 1.10 2010Local State BI-STATE5,4003,240
80
- Earmarks
- BR
1,080 - Local
- STP < 200,000
- TOTAL
1,000
040464 Crawford CS West of Ham Town Rd.-East (Wire Rd.) (Mulberry) (S) Reconstruction 0.94 2012Local State2,350
1,350 - Local
- STP < 200,000
- TOTAL
1,000
110473 Crittenden 040 I-40 Miss. River Bridge Seismic Retrofit (Phase VII) (S) Str. & Apprs. 2010State TDOT WMATS11,040
8,832 - BR
2,208 - State Match
- TOTAL
110509 Crittenden CS BNSF Railroad Overpass (Marion) (S) Str. & Apprs. 2010Local Local WMATS6,061
5,206 - Earmarks
855 - Local
- TOTAL
110530 Crittenden CS Southland Dr.-MLK, Jr. Dr.-West (S) Rehabilitation 0.42 2010Local Local WMATS1,300
260 - Local
- STP > 200,000
- TOTAL
1,040
110542 Crittenden 040 I-40 Miss. Rv. Br. Seismic Retrofit (Phase VIII) (S) Str. & Apprs. 2011State TDOT WMATS26,000
20,800 - BR
5,200 - State Match
- TOTAL
Page 96 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
110547 Crittenden VAR District 1 Bridge Painting (S) Str. & Apprs. 2010State State WMATS2,040
1,632 - BR
408 - State Match
- TOTAL
110X01 Crittenden CS Southland Dr., Ingram Blvd.-East (S) Miscellaneous 0.83 2013Local Local WMATS2,695
539 - Local
- STP > 200,000
- TOTAL
2,156
110504 Cross 064 Hwy. 1 North-West (Wynne) (S) Widening 0.65 2010State State6,4005,120 - STP
1,280 - State Match
- TOTAL
020316 Desha 069 I-69 Corridor (Hwy. 65-Miss. Rt. 1) (GRB) (Ph I) (F) Phase I 2010State State10,346
8,666 - Earmarks
1,680 - State Match
- TOTAL
020451 Desha 054 Waterman St.-West (Dumas) (S) Reconstruction 0.81 2010State State3,300 - TOTAL
3,300 - 100% State
020462 Drew 069 Monticello Bypass (Phase I) (F) New Location 8.60 2010State State88,10770,486 - Earmarks
17,621 - State Match
- TOTAL
020480 Drew Southeast Arkansas Intermodal Facility (Wilmar) (S) Roadside Appurt 2010Local Local1,752
1,401 - Earmarks
351 - Local
- TOTAL
080273 Faulkner 065B Hwy 266-Hwy. 64 (Conway) (S) Widening 0.51 2010State State CARTS2,250
225 - State Match
- TOTAL
2,025 - HSIP
080329 Faulkner Vilonia Middle SRTS I (2007) (Supplemental Funds) Enhancement 2010Local State/Local CARTS106
21 - Local
- STP > 200,000
- TOTAL
85
080339 Faulkner 036 Hwys. 36/107 Inters. Impvts. (S. of Enola) (S) Safety 2011State State900720 - STP
180 - State Match
- TOTAL
Page 97 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
080384 Faulkner 287 Branch of Cadron Creek Str. & Apprs. (Holland) (S) Str. & Apprs. 2011State State600
480 - BR
120 - State Match
- TOTAL
080388 Faulkner 040 Conway-Pulaski Co. Line (Widening) (Phase I) (F) Widening 2012State State CARTS36,00028,800 - NHS
7,200 - State Match
- TOTAL
080X01 Faulkner 025 Hwy. 25 Relocation (S) New Location 1.70 2013Local State CARTS9,0004,500 - STP
3,621 - Local
- STP > 200,000
- TOTAL
879
080X03 Faulkner NEW Conway South Interchange-Hwy. 365 (Gr. & Strs.) (F) New Location 2011Local State CARTS12,0005,589
1,836
- NHS
- Earmarks
41 - State Match
4,534 - Local
- TOTAL
080X04 Faulkner NEW Conway South Interchange-Hwy. 365 (Bs. & Surf.) (F) New Location 2013Local State CARTS11,0005,500 - NHS
4,329 - Local
- STP > 200,000
- TOTAL
1,171
080X12 Faulkner NEW Hwy. 365-Sturgis Road (Phase I) (S) New Location 2012Local State CARTS5,437
5,437 - Local
- TOTAL
040438 Franklin 023 Arkansas River Bridge Painting (Ozark) (S) Str. & Apprs. 2011State State870
696 - BR
174 - State Match
- TOTAL
040493 Franklin CS Hillbilly Lane-Hwy. 23 (Ozark) (S) New Location 0.90 2011Local State1,935
935 - Local
- STP < 200,000
- TOTAL
1,000
040506 Franklin CS Gar Creek Str. & Apprs. (2nd Street) (Ozark) (S) Str. & Apprs. 2010Local State425
340 - BR
85 - Local
- TOTAL
Page 98 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
050230 Fulton 063 Hwy. 9-Hwy. 342 Strs. & Apprs. (Mammoth Spring) (S) Str. & Apprs. 2012State State7,000
5,600 - BR
1,400 - State Match
- TOTAL
061059 Garland 270 Hot Springs-West (Passing Lanes) (S) Passing Lanes 4.55 2010State HSA-MPO12,800
12,800 - 402-Safety
- TOTAL
061113 Garland 088 Hwy. 270-Printers Place (Higdon Ferry Rd.) (Hot Springs) (S) Widening 0.46 2010State State HSA-MPO3,0002,400 - STP
600 - State Match
- TOTAL
061214 Garland 088 Printers Place-Hwy 7 North (Higdon Ferry Rd)(Hot Sprs) (S) Widening 0.36 2013State/Local State HSA-MPO5,6864,000
549
- STP
- Earmarks
1,000 - State Match
137 - Local
- TOTAL
061259 Garland 005 Hwy. 7-Hot Springs Village (Safety Impvts) (S) Safety Improvements 1.08 2012State State HSA-MPO3,500
350 - State Match
- TOTAL
3,150 - HSIP
R60016 Garland NEW East-West Arterial (Hot Springs) (P.E.) Project Development 2011State State HSA-MPO7,234
5,787 - Earmarks
1,447 - State Match
- TOTAL
Note: Contingent upon approval from National Parks Service
020464 Grant 167 Hwy. 167 Bypass (Sheridan) (Bs. & Surf.) (S) New Location 8.63 2010State State43,00034,400 - NHS
8,600 - State Match
- TOTAL
100445 Greene 412 Hwy. 412 Improvements (Paragould) (Phase I) (F) New Location 9.90 2011State State28,625
3,400 - Earmarks
- TOTAL
25,225 - 100% State
100675 Greene 135 Cache River & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State6,120
4,896 - BR
1,224 - State Match
- TOTAL
Page 99 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
100722 Greene 034 Lafe-Marmaduke Strs. & Apprs. (S) Str. & Apprs. 2011State State2,500
2,000 - BR
500 - State Match
- TOTAL
100X01 Greene 412 Hwy. 412 Improvements (Paragould) (Phase II) (F) New Location 10.43 2013State State14,80011,840 - NHS
2,960 - State Match
- TOTAL
030387 Hempstead 371 Ozan Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State2,000
1,600 - BR
400 - State Match
- TOTAL
050186 Independence 167 Hwy. 69-Hwy. 394 (Batesville) (S) Widening 2.70 2010State State12,4009,920 - STP
2,480 - State Match
- TOTAL
050207 Independence 069 Hwy. 69/Hwy. 122 Inters. Impvts. (S. of Newark) (S) Safety Improvements 2011State State130
13 - State Match
- TOTAL
117 - HSIP
050213 Independence 167 Hwy. 394-North (S) Widening 5.11 2013State State18,00014,400 - STP
3,600 - State Match
- TOTAL
050012 Izard 009 Fulton Co. Line-South Strs. & Apprs.(Oxford) (S) Str. & Apprs. 2011State State3,300
2,640 - BR
660 - State Match
- TOTAL
005836 Jackson 367 White River Str. & Apprs. (Newport) (S) Str. & Apprs. 2013State State20,000
16,000 - BR
4,000 - State Match
- TOTAL
020070 Jefferson 079 Hwy. 65B-North (S) Widening 1.60 2010State State PBATS8,9004,240
2,880
- STP
- Earmarks
1,780 - State Match
- TOTAL
Page 100 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
020354 Jefferson 530 I-530-Co. Rd. 35 (Bs. & Surf.) (F) New Location 4.60 2011State State PBATS26,900
21,520 - Earmarks
5,380 - State Match
- TOTAL
020445 Jefferson 270 Grant Co. Line-White Hall (Passing Lanes) (S) Passing Lanes 2.20 2010State PBATS5,700
5,700 - 402-Safety
- TOTAL
020505 Jefferson CS Nevins Creek Str. & Apprs. (Nevins Rd.) (Pine Bluff) (S) Str. & Apprs. 2012Local State PBATS350
280 - BR
70 - Local
- TOTAL
020507 Jefferson 054 Big Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS800
640 - BR
160 - State Match
- TOTAL
020508 Jefferson 054 Steep Bank Creek Str. & Apprs. (S) Str. & Apprs. 2011State State PBATS600
480 - BR
120 - State Match
- TOTAL
080314 Johnson CS Hwy. 123-Hwy. 21 (Clarksville) (S) Project Development 0.50 2011Local Local1,100
100 - Local
- STP < 200,000
- TOTAL
1,000
080340 Johnson 103 Market St.-I-40 WB Ramps (Clarksville) (S) Capacity Imprvmnts 0.40 2013State State7,5006,000 - STP
1,500 - State Match
- TOTAL
100686 Lawrence 063 Black Rock-Portia (Phase I) (F) Widening 3.50 2013State State15,90012,720 - STP
3,180 - State Match
- TOTAL
100687 Lawrence 063 Black River & Relief Strs. & Apprs. (F) Str. & Apprs. 2013State State33,000
26,400 - BR
6,600 - State Match
- TOTAL
110228 Lee 001 So. Marianna-South (S) Widening 1.80 2010State State9,5007,600 - NHS
1,900 - State Match
- TOTAL
Page 101 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
110502 Lee 001 Cypress Corner-North (S) Widening 4.70 2012State State30,50024,400 - NHS
6,100 - State Match
- TOTAL
020356 Lincoln 530 Hwy. 212-Hwys. 11/425 Connector (Bs. & Surf) (Phase I) (F) New Location 7.40 2013State State7,131
5,855 - Earmarks
1,276 - State Match
- TOTAL
020506 Lincoln 011 Cane Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
060897 Lonoke 040 I-40/Hwy. 89 Intchg. (Lonoke) (Project Development) (F) Interchange 2010Local Local5,352
4,282 - Earmarks
1,070 - Local
- TOTAL
061215 Lonoke 013 I-40-South (Carlisle) (S) Rehabilitation 0.46 2012State State2,5002,000 - STP
500 - State Match
- TOTAL
061229 Lonoke 067 Hwy 67/Hwy 5 Interchange Ramp Modifications (Cabot) (S) Interchange 2010Local State CARTS860
172 - Local
- STP > 200,000
- TOTAL
688
061268 Lonoke 038 Hwy 367/Locust Signal (Cabot) (S) Safety & Traffic Eng. 2010Local State/Local CARTS130
26 - Local
- STP > 200,000
- TOTAL
104
061269 Lonoke CS Cabot Jr. High School North Sidewalks (Cabot) (S) Enhancement 2010Local State/Local CARTS60
12 - Local
- STP > 200,000
- TOTAL
48
061X01 Lonoke CS Cabot High School Roundabout (S) Reconstruction 2010Local State/Local CARTS211
43 - Local
- STP > 200,000
- TOTAL
168
Page 102 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
061219 Lonoke/Pul 067 Hwy. 67 Cable Median Barrier (Jacksonville-Cabot) (S) Safety Improvements 4.80 2012State State CARTS1,500
150 - State Match
- TOTAL
1,350 - HSIP
009951 Madison 412 Hindsville-Huntsville Bypass (F) Widening 4.92 2010State State18,00014,400 - NHS
3,600 - State Match
- TOTAL
090272 Madison 412 Hwy. 412/Hwy. 45 Inters. Impvts. (N. of Hindsville) (S) Safety Improvements 2011State State650
65 - State Match
- TOTAL
585 - HSIP
R90097 Marion 062 Flippin Bypass-Hwy. 62B (S) Widening 0.65 2010State State5,300 - TOTAL
5,300 - 100% State
030100 Miller CS Jefferson Ave-Mount Olive Dr(McDonald Ln)(Texarkana)(S) New Location 0.25 2010Local Local TUTS1,913
913 - Local
- STP < 200,000
- TOTAL
1,000
030325 Miller 071 Arkansas Blvd.-I-30 (Bs. & Surf.) (F) New Location 2.43 2010State State TUTS14,80011,840 - NHS
2,960 - State Match
- TOTAL
030326 Miller 071 I-30-Hwy. 71 (Bs. & Surf.) (F) New Location 4.44 2010State State TUTS33,6006,720 - NHS
1,680 - State Match
- TOTAL
25,200 - 100% State
030388 Miller 071 Broad St. Str. & Apprs. (Texarkana) (S) Str. & Apprs. 2012State State TUTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
030X01 Miller 071 LA Line-Doddridge (Phase III) (F) New Location 2.18 2012State State23,50515,200
3,800
- NHS
- Earmarks
4,505 - State Match
- TOTAL
Page 103 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
100307 Mississippi 018 Hwy. 181-West (S) Widening 2.74 2010State State17,00012,400
1,200
- STP
- BR
3,400 - State Match
- TOTAL
100663 Mississippi 018 Hwy. 18 Improvements (Blytheville) (S) Safety Improvements 2011State State15,8766,000
500
5,000
- STP
- Earmarks
- 402-Safety
1,788 - State Match
- TOTAL
2,588 - HSIP
100723 Mississippi 148 Clear Lake Str. & Apprs. (S) Str. & Apprs. 2011State State900
720 - BR
180 - State Match
- TOTAL
100724 Mississippi 312 Ditch No. 6 Str. & Apprs. (Blytheville) (S) Str. & Apprs. 2011State State800
640 - BR
160 - State Match
- TOTAL
110394 Monroe 079 White River Str. & Apprs. (Clarendon) (Ph. II) (F) Str. & Apprs. 1.14 2010State State38,200
30,560 - BR
7,640 - State Match
- TOTAL
110478 Monroe 049 Hwy. 17-I-40 (Brinkley) (S) Widening 1.03 2010State State5,0004,000 - STP
1,000 - State Match
- TOTAL
110544 Monroe 070 Hwy. 17-St. Francis Co. Line Strs. & Apprs. (S) Str. & Apprs. 2013State State4,000
3,200 - BR
800 - State Match
- TOTAL
080310 Montgomery 270 Hwy. 270 Realignment (Blowout Mountain) (S) Reconstruction 1.35 2010State State4,360
436 - State Match
- TOTAL
3,924 - HSIP
Page 104 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
080378 Montgomery 008 Lick Creek Str. & Apprs. (Norman) (S) Str. & Apprs. 2011State State1,200
960 - BR
240 - State Match
- TOTAL
080379 Montgomery 027 Ouachita River Str. & Apprs. (S) Str. & Apprs. 2012State State2,500
2,000 - BR
500 - State Match
- TOTAL
030386 Nevada 032 Little Bodcaw Creek & Relief Strs. & Apprs.(S) Str. & Apprs. 2011State State2,800
2,240 - BR
560 - State Match
- TOTAL
009784 Newton 007 Buffalo River Br. & Apprs. (Pruitt) (S) Str. & Apprs. 2010State State2,600
2,080 - BR
520 - State Match
- TOTAL
090169 Newton 007 Jasper-Co. Rd. 46 (Passing Lanes) (S) Passing Lanes 1.00 2010State State3,0002,400 - STP
600 - State Match
- TOTAL
090213 Newton 007 Co. Rd. 46-Buffalo River (Safety Impvts.) (S) Reconstruction 0.60 2010State State8,600
860 - State Match
- TOTAL
7,740 - HSIP
090221 Newton 007 Mill Cr.-Hwy. 7S Safety Impvts. (Marble Falls) (S) Reconstruction 0.83 2010State State5,700
570 - State Match
- TOTAL
5,130 - HSIP
100682 Poinsett 063 Future I-555 Access Roads (S) Project Development 2011State State2,946
2,357 - Earmarks
589 - State Match
- TOTAL
080157 Pope Intermodal Complex (Russellville) (F) Miscellaneous 2010Local Local3,488
2,790 - Earmarks
698 - Local
- TOTAL
Page 105 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
080164 Pope 007 Hwy. 7 Improvements (Dover) (S) New Location 1.30 2013State State6,2505,000 - STP
1,250 - State Match
- TOTAL
080295 Pope CS W Main Pl-Honeysuckle Ln (Inglewood St) (Russellville)(S) Reconstruction 0.80 2010Local State2,850
1,850 - Local
- STP < 200,000
- TOTAL
1,000
080345 Pope 247 I-40 South (Russellville Bypass) (Bs. & Surf.) (S) New Location 2.43 2012State State16,60013,280 - STP
3,320 - State Match
- TOTAL
080380 Pope 064 Galla Creek Str. & Apprs. (Pottsville) (S) Str. & Apprs. 2011State State2,500
2,000 - BR
500 - State Match
- TOTAL
080389 Pope 326 Hob Nob Rd.-Hwy. 124 (S) Widening 0.45 2013Local State6,0003,000 - STP
3,000 - Local
- TOTAL
080392 Pope 007 Newton Co. Line-South (Passing Lanes) (S) Passing Lanes 2.30 2012State State5,0004,000 - STP
1,000 - State Match
- TOTAL
061280 Prairie 038 White River Bridge Rehab. (Des Arc) (S) Str. & Apprs. 2010State State1,600
1,280 - BR
320 - State Match
- TOTAL
060352 Pulaski 005 McHenry Creek & Relief Strs. & Apprs. (S) Str. & Apprs. 2011State State CARTS2,200
1,760 - BR
440 - State Match
- TOTAL
060395 Pulaski 367 Union Pacific RR Overpass (Arch St.) (LR) (S) Str. & Apprs. 2012State State CARTS6,200
4,960 - BR
1,240 - State Match
- TOTAL
Page 106 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
060907 Pulaski CS Geyer Springs R.R. Grade Separation (L.R.) (PE) (S) RR Xing 2010Local Local CARTS734
587 - Earmarks
147 - Local
- TOTAL
061026A Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Utilities 2010Local State/Local CARTS2,026
405 - Local
- STP > 200,000
- TOTAL
1,621
061026B Pulaski CS Oak St.-Loop Rd. (Graham Rd.) (Jacksonville) (S) Widening 2011Local State/Local CARTS7,996
1,599 - Local
- STP > 200,000
- TOTAL
6,397
061080 Pulaski CS South Loop Bypass (Mabelvale Rd-Alexander Rd) (LR) (S) New Location 1.00 2010Local Local CARTS5,365
3,060 - Earmarks
1,073 - Local
- STP > 200,000
- TOTAL
1,232
061094A Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) ROW/Utilities 1.00 2010Local State/Local CARTS470
94 - Local
- STP > 200,000
- TOTAL
376
061094B Pulaski CS Baseline Rd.-J.E. Davis Dr. (Scott Hamilton Dr.) (L.R.) (S) Widening 0.50 2010Local Local CARTS2,521
504 - Local
- STP > 200,000
- TOTAL
2,017
061190 Pulaski 040 I-40 Interchange (Maumelle) (F) Interchange 2010Local Local CARTS696
557 - Earmarks
139 - Local
- TOTAL
061194 Pulaski 010 Mississippi Ave.-Perryville Rd. (Hwy. 10) (Little Rock) (S) Safety Improvements 0.65 2013Local State CARTS9,000
900 - Local
- TOTAL
8,100 - HSIP
061201 Pulaski 030 I-30: South Terminal Interchange-I-630 (L.R.) (P.E.) (F) Safety & Traffic Eng. 1.40 2010State State CARTS1,350
1,080 - Earmarks
270 - State Match
- TOTAL
Page 107 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
061202 Pulaski 005 Saline Co Line-Otter Creek Rd. (L.R.) (S) Widening 1.26 2010State State CARTS12,0009,600 - STP
2,400 - State Match
- TOTAL
061218 Pulaski 010 Union Pacific R.R. Viaduct Safety Impvts. (L.R) (S) Safety Improvements 0.20 2012State State CARTS1,700
170 - State Match
- TOTAL
1,530 - HSIP
061244 Pulaski 430 I-430/I-630 Interchange Modifications (Phase III) (F) Interchange 2011State State CARTS80,06930,600
9,825
- STP
- Earmarks
14,644 - State Match
25,000 - CMAQ FLEX
- TOTAL
061260 Pulaski 630 I-630 Corridor Fixed Guideway Alignment Study Planning 2010Local Metroplan CARTS188
38 - Local
- STP > 200,000
- TOTAL
150
061267A Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)
PE 2010Local State/Local CARTS138
28 - Local
- STP > 200,000
- TOTAL
110
061267B Pulaski CS W Main St/Harris Rd/Jacksonville Cutoff Inters Impvts (Jacksonville) (S)
Safety & Traffic Eng. 2011Local State/Local CARTS439
88 - Local
- STP > 200,000
- TOTAL
351
061275 Pulaski 070 Arkansas River Str. & Apprs. (Broadway) (LR/NLR) (F) Str. & Apprs. 2013State State CARTS45,000
36,000 - BR
9,000 - State Match
- TOTAL
061276 Pulaski 067 Main Street Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2013State State CARTS4,000
3,200 - BR
800 - State Match
- TOTAL
Page 108 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
061277 Pulaski 070 Union Pacific RR Str. & Apprs. (Roosevelt Rd.) (LR) (S) Str. & Apprs. 2013State State CARTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
061278 Pulaski 067 Redmond Rd. Strs. & Apprs. (Jacksonville) (F) Str. & Apprs. 2012State State CARTS6,500
5,200 - BR
1,300 - State Match
- TOTAL
061X03A Pulaski CS McCain Rail Grade Separation PE 2011Local State/Local CARTS1,338
268 - Local
- STP > 200,000
- TOTAL
1,070
061X03B Pulaski CS McCain Rail Grade Separation ROW/Utilities 2012Local State/Local CARTS4,294
859 - Local
- STP > 200,000
- TOTAL
3,435
061X03C Pulaski CS McCain Rail Grade Separation Str. & Apprs. 2013Local State/Local CARTS11,185
2,227 - Local
- STP > 200,000
- TOTAL
8,958
061X04A Pulaski CS Maryland Road Extension (Sherwood) PE 2011Local State/Local CARTS106
21 - Local
- STP > 200,000
- TOTAL
85
061X04B Pulaski CS Maryland Road Extension (Sherwood) New Location 2012Local State/Local CARTS960
192 - Local
- STP > 200,000
- TOTAL
768
061X05 Pulaski Levy UPRR Spur Bikeway (North Little Rock) ROW 2012Local State/Local CARTS1,803
361 - Local
- STP > 200,000
- TOTAL
1,442
061X07 Pulaski Maumelle Pedestrian/Bicycle Facilities (Phase II) Enhancement 2010Local State/Local CARTS536
107 - Local
- STP > 200,000
- TOTAL
429
Page 109 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
061228 Saline 005 Hwy. 5 Drainage Structure (Bryant) (S) Str. & Apprs. 2011State State CARTS1,000800 - STP
200 - State Match
- TOTAL
061232 Saline CS Benton Downtown Streetscape (S) Enhancement 2010Local State/Local CARTS619
160 - Local
- STP > 200,000
- TOTAL
459
061256 Saline 030 Hwy. 70-Sevier St. Cable Median Barrier (S) Safety Improvements 5.21 2012State CARTS1,700
1,700 - 402-Safety
- TOTAL
061257 Saline CS Congo Rd.-I-30 (Military Rd.) (Benton) (S) Widening 2010Local State/Local CARTS8,250
1,650 - Local
- STP > 200,000
- TOTAL
6,600
061X06A Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) PE 2010Local State CARTS900
180 - Local
- STP > 200,000
- TOTAL
720
061X06B Saline CS Alcoa Road: I-30 to Sidell Road (Saline County) Widening 2011Local State/Local CARTS1,047
209 - Local
- STP > 200,000
- TOTAL
838
090280 Searcy 065 Cove Creek Str. & Apprs. (S) Str. & Apprs. 2011State State2,000
1,600 - BR
400 - State Match
- TOTAL
040238 Sebastian 045 Hwy. 255-Phoenix Ave. (Widening) (Ft. Smith) (S) Widening 1.10 2010Local State BI-STATE9,4004,700 - STP
4,700 - Local
- TOTAL
040373 Sebastian 071 Jenny Lind-I-40 (Phase II) (F) New Location 6.04 2011State State BI-STATE29,90017,600
6,300
- NHS
- Earmarks
6,000 - State Match
- TOTAL
Page 110 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
040443 Sebastian 252 Branch of Washburn Creek Str. & Apprs. (So. of Hwy. 10) (S) Str. & Apprs. 2011State State500
400 - BR
100 - State Match
- TOTAL
040471 Sebastian CS Jenny Lind Rd. & Ingersoll Rd. Widening (Fort Smith) (S) Widening 3.00 2010Local Local BI-STATE8,980
7,360 - Earmarks
1,620 - Local
- TOTAL
040545 Sebastian CS 9th St.-13th St. (Garrison Ave.) (Ft. Smith) (S) Enhancement 2010Local Local BI-STATE2,438
950 - Earmarks
488 - Local
- STP < 200,000
- TOTAL
1,000
050187 Sharp 167 Hwy. 354-Hwy. 62/412 (Ash Flat) (S) Widening 1.00 2010State State6,0004,800 - STP
1,200 - State Match
- TOTAL
110543 St. Francis 261 Hwys. 261, 38 & 149 Strs. & Apprs. (S) Str. & Apprs. 2012State State4,800
3,840 - BR
960 - State Match
- TOTAL
050231 Stone 066 Mt. View-West (Passing Lanes) (S) Passing Lanes 3.00 2013State State9,5007,600 - STP
1,900 - State Match
- TOTAL
R50116 Stone 005 Little Raccoon Creek-Cove Prong Creek (S) Reconst/Climb Lanes 4.00 2011State State11,5005,000 - STP
1,250 - State Match
- TOTAL
5,250 - 100% State
070273 Union 015 Hwy 335-Hwy 82 Strs & Apprs (S) Str. & Apprs. 2011State State2,650
2,120 - BR
530 - State Match
- TOTAL
080363 Van Buren 065 Hwys. 65/92 Signal & Inters. Impvts. (Bee Branch) (S) Inters Impvts 2011State State2,0001,600 - STP
400 - State Match
- TOTAL
Page 111 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
080381 Van Buren 092 Scroggins Creek Str. & Apprs. (S) Str. & Apprs. 2011State State1,000
800 - BR
200 - State Match
- TOTAL
080390 Van Buren 065 Hwy. 16 East-Hwy. 65B South (Clinton) (S) Widening 1.41 2013State State15,00012,000 - NHS
3,000 - State Match
- TOTAL
080391 Van Buren 065 Hwy. 336 West-Co. Rd. 28 (Phase I) (S) Widening 9.30 2012State State15,00012,000 - NHS
3,000 - State Match
- TOTAL
030236A Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2011State State TUTS995
797 - BR
198 - State Match
- TOTAL
030236B Various VAR District 3 Bridge Painting (Phase II) (S) Str. & Apprs. 2012State State TUTS980
784 - BR
196 - State Match
- TOTAL
050X04 Various VAR Districts 5 & 8 Highway Improvements Various 2013State State CARTS20,000 - TOTAL
20,000 - 100% State
040024 Washington 074 White River Bridge Str. & Apprs. (Elkins) (S) Str. & Apprs. 2011State State NARTS2,500
2,000 - BR
500 - State Match
- TOTAL
040272 Washington CS Johnson Road Reconst. (Springdale) P.E. Widening 2.20 2010Local Local NARTS14,586
10,669 - Earmarks
2,917 - Local
- STP < 200,000
- TOTAL
1,000
040418 Washington 112 Hwy. 180-Garland Ave. (Hwy. 112) (Fayetteville) (S) Widening 1.17 2012Local State NARTS1,250
250 - Local
- STP < 200,000
- TOTAL
1,000
Page 112 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
040485 Washington 540 I-540/Hwy. 62/180 Interchg Interim Impvts. (Fayetteville) (F) Interchange 2010State State NARTS5,0004,000 - NHS
1,000 - State Match
- TOTAL
040486 Washington 016 College Ave.-Stone Bridge Rd. (Fayetteville) (S) Widening 2.68 2011Local State NARTS10,0005,000 - STP
5,000 - Local
- TOTAL
040489 Washington 112 Hwy. 112 Spur-North (Fayetteville) (S) Widening 0.75 2010Local State NARTS3,0001,500 - STP
1,500 - Local
- TOTAL
040490 Washington 265 South City Limits-Hwy. 412 (Springdale) (S) Widening 1.25 2010Local State NARTS4,7002,350 - STP
2,350 - Local
- TOTAL
040496 Washington CS Hwy. 112-Hwy. 71B (Cato Springs Rd.) (Fayetteville) (S) Reconstruction 1.00 2010Local Local NARTS3,5962,877 - Earmarks
719 - Local
- TOTAL
040517 Washington 265 Hwy. 45-E. Joyce Blvd. (Fayetteville) (S) Widening 2.19 2010Local State NARTS15,4007,700 - STP
7,700 - Local
- TOTAL
040518 Washington 265 E. Joyce Blvd.-City Limits (Fayetteville) (S) Widening 2.04 2012State State NARTS15,00012,000 - STP
3,000 - State Match
- TOTAL
040524 Washington 062 Hwy. 62 Bypass (Gr. & Strs.) (Prairie Grove) (S) New Location 4.20 2010State State NARTS15,00012,000 - STP
3,000 - State Match
- TOTAL
040527 Washington 540 I-540/Don Tyson Pkwy. Intchng. (Springdale) (F) Interchange 2012Local Local NARTS26,951
26,951 - Local
- TOTAL
040535 Washington CS Fulbright Expwy./Hwy. 71B Flyover (Fayetteville) (S) Str. & Apprs. 2011Local Local NARTS6,452
5,162 - Earmarks
1,290 - Local
- TOTAL
Page 113 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
040536 Washington CS Fulbright Expwy./Futrall Dr. Roundabout (Fayetteville) (S) Inters Impvts 2010Local Local NARTS2,966
2,373 - Earmarks
593 - Local
- TOTAL
040561 Washington 540 Bobby Hopper Tunnel-Winslow (S) Safety Improvements 3.50 2012State NARTS900
900 - 402-Safety
- TOTAL
040569 Washington 016 West & Middle Forks of White River Strs. & Apprs. (Fayetteville) (S)
Str. & Apprs. 2012State State NARTS11,500
9,200 - BR
2,300 - State Match
- TOTAL
040570 Washington 170 Branch of Illinois River Str. & Apprs. (S) Str. & Apprs. 2012State State NARTS750
600 - BR
150 - State Match
- TOTAL
050189 White 013 Hwy. 13 Extension (Searcy) (Phase I) (S) New Location 4.60 2011State State10,0008,000 - STP
2,000 - State Match
- TOTAL
050198 White NEW North Searcy Connector (Phase I) (S) New Location 2013Local State12,0006,000 - STP
6,000 - Local
- TOTAL
050212 White 013 Hwy. 13 Extension (Searcy) (Phase II) (S) New Location 4.60 2013State State14,00011,200 - STP
2,800 - State Match
- TOTAL
050229 White 305 Brier Creek Str. & Apprs. (S) Str. & Apprs. 2011State State700
560 - BR
140 - State Match
- TOTAL
110541 Woodruff 038 Bayou Deview Str. & Apprs. (S) Str. & Apprs. 2011State State1,750
1,400 - BR
350 - State Match
- TOTAL
Page 114 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.
JOB / ITEM
NUMBER COUNTY RTE TERMINI TYPE WORK LENGTH
ESTIMATED COSTLET
YEAR
PROVIDING MATCHING
FUNDS
CARRYINGOUT THE PROJECT TIP AREA
AGENCY RESPONSIBLE FOR:
Funding Breakdown
(x $1,000)
4/14/2010 9:46:31 AM
080377 Yell 007 Centerville-Dardanelle (Passing Lanes) (S) Passing Lanes 1.00 2013State State2,0001,600 - STP
400 - State Match
- TOTAL
080385 Yell 007 Little Rock & Western RR Str. & Apprs. (Ola) (S) Str. & Apprs. 2012State State1,250
1,000 - BR
250 - State Match
- TOTAL
Page 115 of 115
STATE AND LOCAL PROJECTS SORTED BY COUNTY
An (S) or (F) following the termini indicates federal or state oversight.For those projects located in a Transportation Improvement Plan (TIP) Area, additional information is available. See the Introduction for further details.