03.18 sudecap escavaÇao mecanica de valas com …
Post on 04-Dec-2021
6 Views
Preview:
TRANSCRIPT
03.18 SUDECAP
03.18.03 SUDECAP M3 134,40
03.18.04 SUDECAP M3 7,73
03.22.01 SUDECAP M3 754,55
03.22.02 SUDECAP M3 1.359,52
03.23 SUDECAP
03.23.03 SUDECAP M2 1.884,45
04
05
05.01 SUDECAP
05.01.02 SUDECAP M3 1.100,50
05.03 SUDECAP
05.03.01 SUDECAP M3 22,20
05.04 SUDECAP
05.04.01 SUDECAP M2 712,89
05.05 SUDECAP
05.05.01 SUDECAP KG 1.671,39
05.07 SUDECAP
05.07.20 SUDECAP M3 1,58
05.07.25 SUDECAP M3 175,85
05.17 SUDECAP
05.17.04 SUDECAP UN 3,00
05.17.14 SUDECAP UN 5,00
05.20 SUDECAP
05.20.07 SUDECAP M3 2.152,92
19
19.32 SUDECAP
19.32.01 SUDECAP M2 370,87
19.32.02 SUDECAP M2 2.626,48
19.33 SUDECAP
19.33.01 SUDECAP M2 198,26
19.33.03 SUDECAP M2 511,43
TIPO B - MADEIRA ROLIÇA D= 11 A 15 CM
GABIAO
TIPO COLCHAO MALHA 6X8, FIO 2,2MM GALV.REVEST. PVC Espessura 0.30m
DRENAGEMDRENAGEM
ESCORAMENTO CONTINUO DE VALAS - PADRAO SUDECAP
TIPO A - MADEIRA ROLIÇA D= 11 A 15 CM
TIPO C-1, ESTACA PRANCHA BZ-300B
ESCORAMENTO DESCONTINUO DE VALAS - PADRAO SUDECAP
TIPO A - MADEIRA ROLIÇA D= 6 A 10 CM
CONCRETO ESTRUTURAL, FORN. APLICAÇAO E ADENSAMENTO
FCK >= 20,0 MPa
FCK >= 25,0 MPa
ALA DE GALERIA CELULAR
B= 1.50M
B= 2.50M
CONCRETO DE REGULARIZAÇAO
TRAÇO 1:3:6,FORNEC. E LANÇAMENTO SOBRE ENROCAMENTO
FORMA INCLUSIVE DESFORMA E LIMPEZA
FORMA DE COMPENSADO RESINADO
ARMAÇAO INCLUSIVE CORTE, DOBRA E COLOCAÇAO
AÇO CA-50 OU CA-60
GALERIA CELULAR E/OU CONTENÇOESGALERIA CELULAR E/OU CONTENÇOES
ENROCAMENTO COM PEDRA DE MAO
ARRUMADA
3.0 M < H <= 5.0 M
H > 5,0 M
FUNDAÇOES
MANUAL
COMPACTADO COM EQUIP. PLACA VIBRATORIA OU EQUIVALENTE
REGULARIZAÇAO E COMPACTAÇAO DE TERRENO
COM PLACA VIBRATORIA
ESCAVAÇAO MECANICA DE VALAS COM DESCARGA LATERAL
ITEM 8.1.3 = 1.359,62+754,55-7,73-134,40 = 1.971,94 m³
ITEM 8.1.7 = 1.971,94 m³ * 1,3 = 2.563,52 m³
ITEM 8.1.8 = 2.563,52 m³ * 16 km = 41.016,35 m³ x km
PROJETO:
OBRA:
TRECHO:
05.17.01 05.17.02 05.17.03 05.17.04 05.17.05 05.17.06 05.17.07 05.17.08 05.17.09 05.17.10 05.17.11 05.17.12 05.17.13 05.17.14 05.17.15 05.17.16 05.17.17 05.17.18 05.17.19
B=1.20m B=1.30m B=1.40m B=1.50m B=1.60m B=1.70m B=1.80m B=1.90m B=2.00m B=2.10m B=2.20m B=2.30m B=2.40m B=2.50m B=2.60m B=2.70m B=2.80m B=2.90m B=3.00m (m³) (m³) (m²) (kg) (m³)
Estaca 33+4.00 - PE 1 2,70 0,00 26,49 0,00 9,63
Estaca 57+5.00 - PD - Bacia 2 2 6,36 6,70 92,94 504,60 29,02
Estaca 76+0.00 - PD 2 5,40 0,00 52,98 0,00 19,26
Estaca 152+15.00 - PD - Bacia 3 2 6,04 6,20 79,62 450,20 25,64
Estaca 151+10.00 - PE - Bacia 4 1 3,02 3,10 39,81 225,10 12,82
Estaca 185+0.00 - PE - Bacia 5 2 6,04 6,20 79,62 450,20 25,64
TOTAL = 0 0 0 3 0 0 0 0 0 0 0 0 0 5 0 0 0 0 2 29,56 22,20 371,46 1630,10 122,01
Conc. Reg. Aço
QUANTITATIVOS - ALA DE GALERIA CELULAR
PR-147/14A
Localização
05.17.00 - Ala Galeria Celular (un)
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Escavação FormaConcreto
Estrutural
3/30
PROJETO:
OBRA:
TRECHO:
19.10.02 19.10.03 19.10.05 19.10.07 19.10.09 19.10.11
Ø 500mm Ø 600mm Ø 800mm Ø 1000mm Ø 1200mm Ø 1500mm (m³) (m²) (m³)
Rua Che Guevara 1 0,47 13,31 02,00
Rua G (Tancredo Neves) 1 0,36 07,46 01,20
Estaca 5+0.00 - PD 1 0,36 07,46 01,20
Estaca 13+12.00 - PD 2 0,72 14,92 02,40
Estaca 17+0.00 - PD 2 0,72 14,92 02,40
Estaca 25+1.00 - PD 2 0,72 14,92 02,40
Estaca 32+0.00 - PD 1 0,36 07,46 01,20
Estaca 49+6.00 - PE 2 0,78 18,62 02,76
Estaca 70+0.00 - PE 2 0,78 18,62 02,76
Estaca 41+9.00 - PD 2 0,72 14,92 02,40
Estaca 68+16.00 - PD 2 0,78 18,62 02,76
Estaca 100+5.00 - PE 1 0,36 07,46 01,20
Estaca 82+8.00 - PD 1 0,39 09,31 01,38
Estaca 93+10.00 - PD 2 0,72 14,92 02,40
Estaca 96+10.00 - PD 2 0,72 14,92 02,40
Estaca 102+0.00 - PD 1 0,36 07,46 01,20
Estaca 106+0.00 - PD 1 0,36 07,46 01,20
Rua 5 1 0,39 09,31 01,38
Rua Sem Nome 4 1 0,36 07,46 01,20
Estaca 119+3.00 - PD 2 0,72 14,92 02,40
Rua Sem Nome 5 1 0,36 07,46 01,20
Estaca 198+0.00 - PD 2 0,72 14,92 02,40
Estaca 215+4.00 - PD 2 0,72 14,92 02,40
Estaca 206+10.00 - PE 1 0,36 07,46 01,20
Estaca 211+0.00 - PE 2 0,72 14,92 02,40
Estaca 5+15.00 - RamoA - Int MG 808 1 0,36 07,46 01,20
Estaca 2+10.00 - Ramo B - Int MG 808 2 0,72 14,92 02,40
Estaca 10+0.00 - Ramo B - Int MG 808 2 0,72 14,92 02,40
TOTAL = 0 0 34 8 1 0 15,83 341,43 53,84
Escavação FormaConcreto
Estrutural
QUANTITATIVOS - ALA DE REDE TUBULAR
PR-147/14A
Localização
19.10.00 - Ala Rede Tubular (un)
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
4/30
31/10/2018
PROJETO:
OBRA:
TRECHO:
Largura Esp. Extensão Volume Largura Esp. Extensão Volume
(m) (m) (m) (m³) (m) (m) (m) (m³)
CANAL ABERTO 9 + 0,000 11 + 0,000 20,80 0,30 40,00 249,60
25 + 18,000 26 + 18,000 23,00 0,30 20,00 138,00
35 + 0,000 36 + 10,000 20,80 0,30 30,00 187,20
65 + 0,000 67 + 0,000 20,80 0,30 40,00 249,60
79 + 17,000 81 + 10,000 20,80 0,30 33,00 205,92
81 + 10,000 82 + 5,000 30,00 0,30 15,00 135,00
86 + 7,000 87 + 0,000 23,00 0,30 13,00 89,70
105 + 10,000 106 + 10,000 20,80 0,30 20,00 124,80
109 + 15,000 111 + 0,000 23,00 0,30 25,00 172,50
124 + 10,000 125 + 5,000 20,80 0,30 15,00 93,60
132 + 15,000 134 + 0,000 20,80 0,30 25,00 156,00
147 + 0,000 149 + 5,000 26,00 0,30 45,00 351,00
TOTAL - - - 0,00 - - - 2.152,92- -
QUANTITATIVOS - BRITA E COLCHÃO RENO
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Localização
COLCHÃO RENO BRITA Nº 1
Estaca
5/30
PROJETO:
OBRA:
TRECHO:
Ø H média H escav. Extensão Enrocam. Tipo de Classe do
Est. Inicial Est. Final Total Escavação Tubo
(mm) (m) (m) (m) (m) (m) (m)
Canteiro Central 0 + 0,00 1,00 + 10,00 800 2,71 2,57 2,64 2,92 30,00 Desc.B Lateral PA-1
Canteiro Central 1 + 10,00 4,00 + 0,00 800 2,57 2,11 2,34 2,62 50,00 Desc.B Lateral PA-1
Canteiro Central 4 + 0,00 7,00 + 0,00 800 2,11 2,34 2,23 2,51 60,00 Desc.B Lateral PA-1
Canteiro Central 7 + 0,00 9,00 + 10,00 800 2,34 2,04 2,19 2,47 50,00 Desc.B Lateral PA-1
Canteiro Central 9 + 10,00 13,00 + 15,00 800 2,04 2,00 2,02 2,30 85,00 Desc.B Lateral PA-1
Canteiro Central 13 + 15,00 16,00 + 10,00 800 2,00 1,85 1,93 2,21 55,00 Desc.B Lateral PA-1
Canteiro Central 16 + 10,00 19,00 + 0,00 1000 2,05 2,31 2,18 2,53 50,00 Desc.B Lateral PA-1
Canteiro Central 19 + 0,00 21,00 + 5,00 1000 1,67 1,77 1,72 2,07 45,00 Desc.B Lateral PA-1
Canteiro Central 21 + 5,00 23,00 + 5,00 1200 1,97 2,05 2,01 2,43 40,00 Desc.B Lateral PA-1
Canteiro Central 23 + 5,00 25,00 + 10,00 1200 2,05 2,15 2,10 2,52 45,00 Desc.B Lateral PA-1
Canteiro Central 25 + 10,00 29,00 + 0,00 1200 2,15 2,30 2,23 2,65 70,00 Desc.B Lateral PA-1
Canteiro Central 29 + 0,00 31,00 + 10,00 1200 2,30 2,41 2,35 2,77 50,00 Desc.B Lateral PA-1
Canteiro Central 31 + 10,00 34,00 + 0,00 1200 2,41 2,39 2,40 2,82 50,00 Desc.B Lateral PA-1
Canteiro Central 34 + 0,00 36,00 + 10,00 1200 2,39 2,38 2,38 2,80 50,00 Desc.B Lateral PA-1
Canteiro Central 36 + 10,00 39,00 + 0,00 1200 2,38 2,37 2,38 2,80 50,00 Desc.B Lateral PA-1
Canteiro Central 39 + 0,00 42,00 + 0,00 1200 2,37 2,36 2,37 2,79 60,00 Desc.B Lateral PA-1
LANÇAMENTO 42 + 0,00 43,00 + 11,50 1200 2,36 0,89 1,63 2,05 31,50 Desc.B Lateral PA-1
Av. Albert Scwwartzer - LE 2 + 10,00 0 + 15,00 1200 2,15 1,68 1,91 2,33 35,00 Desc.B Lateral PA-1
Av. Albert Scwwartzer - LE 0 + 15,00 0 + 3,30 1.200 2,16 2,15 2,15 2,57 11,70 Desc.B Lateral PA-1
Av. Albert Scwwartzer - LD 2 + 10,00 1 + 0,00 800 1,51 1,51 1,51 1,79 30,00 Desc.A Lateral PA-1
Av. Albert Scwwartzer -LD 1 + 0,00 0 + 3,30 800 1,51 2,03 1,77 2,05 16,70 Desc.B Lateral PA-1
Rua Che Guevara 0 + 0,00 2 + 0,00 1200 2,00 1,90 1,95 2,37 40,00 Desc.B Lateral PA-1
Rua G (Tancredo Neves) 0 + 0,00 2 + 0,00 800 1,33 1,99 1,66 1,94 40,00 Desc.A Lateral PA-1
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,00 1 + 4,00 800 1,66 2,06 1,86 2,14 24,00 Desc.B Lateral PA-1
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,00 1 + 13,00 800 2,51 2,69 2,60 2,88 9,00 Desc.B Lateral PA-1
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,00 1 + 10,00 800 2,08 2,41 2,25 2,53 30,00 Desc.B Lateral PA-1
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,00 1 + 6,00 800 1,80 1,96 1,88 2,16 26,00 Desc.B Lateral PA-1
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,00 1 + 3,80 800 1,93 2,03 1,98 2,26 23,80 Desc.B Lateral PA-1
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,00 1 + 0,00 800 1,95 2,15 2,05 2,33 20,00 Desc.B Lateral PA-1
Talvegue Natural - 49+6.00 - PE 0 + 0,00 1 + 5,00 1000 1,70 1,43 1,57 1,92 25,00 Desc.A Lateral PA-1
Talvegue Natural - 70+0.00 - PE 0 + 0,00 1 + 5,00 800 1,47 1,45 1,46 1,74 25,00 Desc.A Lateral PA-1
Talvegue Natural - 41+9.00 - PD 0 + 0,00 1 + 4,00 800 1,93 2,00 1,97 2,25 24,00 Desc.B Lateral PA-1
Talvegue Natural - 68+16.00 - PD 0 + 0,00 1 + 3,00 1000 2,10 2,10 2,10 2,45 23,00 Desc.B Lateral PA-1
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,00 2 + 10,00 1000 1,93 2,44 2,18 2,53 50,00 Desc.B Lateral PA-1
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,00 3 + 10,00 1000 2,44 2,49 2,46 2,81 20,00 Desc.B Lateral PA-1
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,00 4 + 14,30 1000 3,40 1,12 2,26 2,61 24,30 Desc.B Lateral PA-1
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,00 1 + 13,00 1000 1,70 1,90 1,80 2,15 33,00 Desc.B Lateral PA-1
QUANTITATIVOS - 03.00.00 - TRABALHOS EM TERRA
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
LocalizaçãoTipo de
Escoramento
Alturas
Estaca
Inicial Final
PROJETO:
OBRA:
TRECHO:
Ø H média H escav. Extensão Enrocam. Tipo de Classe do
Est. Inicial Est. Final Total Escavação Tubo
(mm) (m) (m) (m) (m) (m) (m)
QUANTITATIVOS - 03.00.00 - TRABALHOS EM TERRA
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
LocalizaçãoTipo de
Escoramento
Alturas
Estaca
Inicial Final
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,00 2 + 10,00 1000 1,90 2,22 2,06 2,41 17,00 Desc.B Lateral PA-1
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,00 3 + 1,50 1000 2,22 1,91 2,06 2,41 11,50 Desc.B Lateral PA-1
Rua Manoel Jacinto Jr. - Pista Direita 3 + 1,50 3 + 14,40 1000 2,36 2,11 2,24 2,59 12,90 Desc.B Lateral PA-1
Talvegue Natural - 82+8.00 - PD 0 + 0,00 1 + 4,00 1000 2,33 2,19 2,26 2,61 24,00 Desc.B Lateral PA-1
Talvegue Natural - 93+10.00 - PD 0 + 0,00 1 + 3,00 800 1,71 1,97 1,84 2,12 23,00 Desc.B Lateral PA-1
Talvegue Natural - 96+10.00 - PD 0 + 0,00 1 + 8,00 800 2,03 2,55 2,29 2,57 28,00 Desc.B Lateral PA-1
Talvegue Natural - 100+0.00 - PE 0 + 0,00 1 + 16,00 800 1,71 1,07 1,39 1,67 36,00 Desc.A Lateral PA-1
Talvegue Natural - 102+0.00 - PD 0 + 0,00 2 + 2,00 800 5,46 3,21 4,33 4,61 42,00 Cont.B Lateral PA-1
Talvegue Natural - 106+0.00 - PD 0 + 0,00 1 + 10,00 800 3,38 3,33 3,36 3,64 30,00 Cont.A Lateral PA-1
Rua 1 - Est. 105+7.00 - PE 0 + 0,00 1 + 0,00 800 1,68 1,66 1,67 1,95 20,00 Desc.A Lateral PA-1
Rua 1 - Est. 105+7.00 - PE 1 + 0,00 2 + 14,00 800 1,66 1,48 1,57 1,85 34,00 Desc.A Lateral PA-1
Rua Sem Nome 1 - Est 114+0.00 - PE 1 + 0,00 2 + 10,00 800 1,77 1,51 1,64 1,92 30,00 Desc.A Lateral PA-1
Rua Sem Nome 4 - Est 113+10.00 - PD 0 + 0,00 1 + 5,00 800 1,59 2,08 1,84 2,12 25,00 Desc.B Lateral PA-1
Rua 5 - Est 118+15.00 - PE 0 0,00 1 12,00 1000 1,68 1,83 1,76 2,11 32,00 Desc.B Lateral PA-1
Rua 5 - Est 118+15.00 - PE 1 12,00 3 0,00 1000 1,83 1,98 1,91 2,26 28,00 Desc.B Lateral PA-1
Talvegue Natural - 119+3.00 - PD 0 0,00 1 13,00 800 3,32 3,16 3,24 3,52 33,00 Cont.A Lateral PA-1
Rua 3 - Est 127+15.00 - PE 0 0,00 1 12,00 800 1,84 1,62 1,73 2,01 32,00 Desc.B Lateral PA-1
Rua 3 - Est 127+15.00 - PE 1 12,00 3 5,00 800 2,12 0,85 1,49 1,77 33,00 Desc.A Lateral PA-1
Rua Sem Nome 5 - Est 128+0.00 - PD 0 0,00 1 0,00 800 1,47 1,69 1,58 1,86 20,00 Desc.A Lateral PA-1
Rua Dulce Geralda Diniz - LD 0 0,00 2 4,00 1000 2,11 1,85 1,98 2,33 44,00 Desc.B Lateral PA-1
Rua Dulce Geralda Diniz - LD 2 4,00 3 10,00 1000 2,36 2,15 2,26 2,61 26,00 Desc.B Lateral PA-1
Rua Dulce Geralda Diniz - LD 3 10,00 5 17,00 1000 2,15 2,39 2,27 2,62 47,00 Desc.B Lateral PA-1
Rua Dulce Geralda Diniz - LD 5 17,00 6 7,00 1000 2,39 1,64 2,01 2,36 10,00 Desc.B Lateral PA-1
Rua Dulce Geralda Diniz - LD 6 7,00 6 9,50 1000 2,64 1,08 1,86 2,21 2,50 Desc.B Lateral PA-1
Rua Felisbino Pinto Monteiro 0 5,00 1 10,00 1200 2,20 2,26 2,23 2,65 25,00 Desc.B Lateral PA-1
Rua Felisbino Pinto Monteiro 1 10,00 3 10,00 1200 2,26 2,44 2,35 2,77 40,00 Desc.B Lateral PA-1
Rua Felisbino Pinto Monteiro 3 10,00 4 5,00 1200 2,44 3,15 2,80 3,22 15,00 Cont.A Lateral PA-1
Rua Francisco Almeida Melo 7 15,00 6 15,00 1000 2,00 1,97 1,98 2,33 20,00 Desc.B Lateral PA-1
Rua Francisco Almeida Melo 6 15,00 5 10,00 1000 1,97 2,55 2,26 2,61 25,00 Desc.B Lateral PA-1
Rua Francisco Almeida Melo 5 10,00 4 15,00 1000 3,39 3,51 3,45 3,80 15,00 Cont.A Lateral PA-1
Drenagem Natural - PD - Est 198+0.00 0 0,00 4 12,00 800 7,35 2,34 4,85 5,13 92,00 Cont.C Lateral PA-1
Drenagem Natural - PD - Est 215+10.00 0 0,00 1 3,00 800 1,93 1,17 1,55 1,83 23,00 Desc.A Lateral PA-1
Drenagem Natural - PE - Est 206+10.00 0 0,00 1 2,00 800 1,80 1,12 1,46 1,74 22,00 Desc.A Lateral PA-1
Drenagem Natural - PE - Est 211+0.00 0 0,00 2 0,00 800 3,81 6,01 4,91 5,19 40,00 Cont.C Lateral PA-1
Drenagem Natural - Ramo B - Est 2+10.00 0 0,00 0 16,00 800 1,94 2,35 2,14 2,42 16,00 Desc.B Lateral PA-1
Drenagem Natural - Ramo B - Est 10+0.00 0 0,00 1 9,00 800 3,40 7,99 5,69 5,97 29,00 Cont.C Lateral PA-2
TOTAL =
PROJETO:
OBRA:
TRECHO:
Total03.18.01
Lateral
03.19.01
Caminhão
03.17.01
ManualTotal
03.18.02
Lateral
03.19.02
Caminhão
03.17.02
Manual
(mm) (m) (m³) (m) (m³) (m³) (m³) (m³) (m³) (m³) (m³) (m³)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 140,16 1,60 72,00 72,00 68,16 68,16
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 209,60 1,60 120,00 120,00 89,60 89,60
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 240,48 1,60 144,00 144,00 96,48 96,48
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 197,60 1,60 120,00 120,00 77,60 77,60
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 312,80 1,60 204,00 204,00 108,80 108,80
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 194,04 1,60 132,00 132,00 62,04 62,04
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 240,35 1,90 142,50 142,50 97,85 97,85
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 176,98 1,90 128,25 128,25 48,73 48,73
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 213,84 2,20 132,00 132,00 81,84 81,84
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 249,48 2,20 148,50 148,50 100,98 100,98
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 407,33 2,20 231,00 231,00 176,33 176,33
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 305,25 2,20 165,00 165,00 140,25 140,25
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 310,20 2,20 165,00 165,00 145,20 145,20
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 308,55 2,20 165,00 165,00 143,55 143,55
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 307,45 2,20 165,00 165,00 142,45 142,45
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 367,62 2,20 198,00 198,00 169,62 169,62
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 141,72 2,20 103,95 103,95 37,77 37,77
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 179,79 2,20 115,50 115,50 64,29 64,29
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 66,28 2,20 38,61 38,61 27,67 27,67
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 85,92 1,60 72,00 72,00 13,92 13,92
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 54,78 1,60 40,08 40,08 14,70 14,70
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 208,56 2,20 132,00 132,00 76,56 76,56
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 124,16 1,60 96,00 96,00 28,16 28,16
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 82,18 1,60 57,60 57,60 24,58 24,58
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 41,47 1,60 21,60 21,60 19,87 19,87
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 121,20 1,60 72,00 72,00 49,20 49,20
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 89,86 1,60 62,40 62,40 27,46 27,46
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 86,06 1,60 57,12 57,12 28,94 28,94
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 74,56 1,60 48,00 48,00 26,56 26,56
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 90,96 1,90 71,25 71,25 19,71 19,71
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 69,60 1,60 60,00 60,00 9,60 9,60
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 86,21 1,60 57,60 57,60 28,61 28,61
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 107,07 1,90 65,55 65,55 41,52 41,52
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 240,82 1,90 142,50 142,50 98,32 98,32
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 106,97 1,90 57,00 57,00 49,97 49,97
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 120,50 1,90 69,26 69,26 51,25 51,25
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 134,81 1,90 94,05 94,05 40,76 40,76
Final
LEscavação
TotalLarg. Vala
ESCAV.CAIXÃO H<= 1,50m ESCAV. CAIXÃO 1,50m < H <=3,00m
PISTAS ESQUERDA E DIREITA
QUANTITATIVOS - 03.00.00 - TRABALHOS EM TERRA
PR-147/14A
AVENIDA MARACANÃ
Localização
ØEstaca
Inicial
PROJETO:
OBRA:
TRECHO:
Total03.18.01
Lateral
03.19.01
Caminhão
03.17.01
ManualTotal
03.18.02
Lateral
03.19.02
Caminhão
03.17.02
Manual
(mm) (m) (m³) (m) (m³) (m³) (m³) (m³) (m³) (m³) (m³) (m³)Final
LEscavação
TotalLarg. Vala
ESCAV.CAIXÃO H<= 1,50m ESCAV. CAIXÃO 1,50m < H <=3,00m
PISTAS ESQUERDA E DIREITA
QUANTITATIVOS - 03.00.00 - TRABALHOS EM TERRA
PR-147/14A
AVENIDA MARACANÃ
Localização
ØEstaca
Inicial
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 77,84 1,90 48,45 48,45 29,39 29,39
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 52,77 1,90 32,78 32,78 19,99 19,99
Rua Manoel Jacinto Jr. - Pista Direita 3 + 1,500 3 + 14,400 1000 12,90 63,36 1,90 36,77 36,77 26,59 26,59
Talvegue Natural - 82+8.00 - PD 0 + 0,000 1 + 4,000 1000 24,00 119,02 1,90 68,40 68,40 50,62 50,62
Talvegue Natural - 93+10.00 - PD 0 + 0,000 1 + 3,000 800 23,00 78,02 1,60 55,20 55,20 22,82 22,82
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 115,14 1,60 67,20 67,20 47,94 47,94
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 96,19 1,60 86,40 86,40 9,79 9,79
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 310,13 1,60 100,80 100,80 100,80 100,80
Talvegue Natural - 106+0.00 - PD 0 + 0,000 1 + 10,000 800 30,00 174,48 1,60 72,00 72,00 72,00 72,00
Rua 1 - Est. 105+7.00 - PE 0 + 0,000 1 + 0,000 800 20,00 62,40 1,60 48,00 48,00 14,40 14,40
Rua 1 - Est. 105+7.00 - PE 1 + 0,000 2 + 14,000 800 34,00 100,64 1,60 81,60 81,60 19,04 19,04
Rua Sem Nome 1 - Est 114+0.00 - PE 1 + 0,000 2 + 10,000 800 30,00 92,16 1,60 72,00 72,00 20,16 20,16
Rua Sem Nome 4 - Est 113+10.00 - PD 0 + 0,000 1 + 5,000 800 25,00 84,60 1,60 60,00 60,00 24,60 24,60
Rua 5 - Est 118+15.00 - PE 0 0,000 1 12,000 1000 32,00 127,98 1,90 91,20 91,20 36,78 36,78
Rua 5 - Est 118+15.00 - PE 1 12,000 3 0,000 1000 28,00 119,97 1,90 79,80 79,80 40,17 40,17
Talvegue Natural - 119+3.00 - PD 0 0,000 1 13,000 800 33,00 185,86 1,60 79,20 79,20 79,20 79,20
Rua 3 - Est 127+15.00 - PE 0 0,000 1 12,000 800 32,00 102,91 1,60 76,80 76,80 26,11 26,11
Rua 3 - Est 127+15.00 - PE 1 12,000 3 5,000 800 33,00 93,19 1,60 79,20 79,20 13,99 13,99
Rua Sem Nome 5 - Est 128+0.00 - PD 0 0,000 1 0,000 800 20,00 59,52 1,60 48,00 48,00 11,52 11,52
Rua Dulce Geralda Diniz - LD 0 0,000 2 4,000 1000 44,00 194,79 1,90 125,40 125,40 69,39 69,39
Rua Dulce Geralda Diniz - LD 2 4,000 3 10,000 1000 26,00 128,69 1,90 74,10 74,10 54,59 54,59
Rua Dulce Geralda Diniz - LD 3 10,000 5 17,000 1000 47,00 233,97 1,90 133,95 133,95 100,02 100,02
Rua Dulce Geralda Diniz - LD 5 17,000 6 7,000 1000 10,00 44,93 1,90 28,50 28,50 16,43 16,43
Rua Dulce Geralda Diniz - LD 6 7,000 6 9,500 1000 2,50 10,50 1,90 7,13 7,13 3,37 3,37
Rua Felisbino Pinto Monteiro 0 5,000 1 10,000 1200 25,00 145,75 2,20 82,50 82,50 63,25 63,25
Rua Felisbino Pinto Monteiro 1 10,000 3 10,000 1200 40,00 243,76 2,20 132,00 132,00 111,76 111,76
Rua Felisbino Pinto Monteiro 3 10,000 4 5,000 1200 15,00 106,10 2,20 49,50 49,50 49,50 49,50
Rua Francisco Almeida Melo 7 15,000 6 15,000 1000 20,00 88,73 1,90 57,00 57,00 31,73 31,73
Rua Francisco Almeida Melo 6 15,000 5 10,000 1000 25,00 123,98 1,90 71,25 71,25 52,72 52,72
Rua Francisco Almeida Melo 5 10,000 4 15,000 1000 15,00 108,30 1,90 42,75 42,75 42,75 42,75
Drenagem Natural - PD - Est 198+0.00 0 0,000 4 12,000 800 92,00 754,40 1,60 220,80 220,80 220,80 220,80
Drenagem Natural - PD - Est 215+10.00 0 0,000 1 3,000 800 23,00 67,34 1,60 55,20 55,20 12,14 12,14
Drenagem Natural - PE - Est 206+10.00 0 0,000 1 2,000 800 22,00 61,25 1,60 52,80 52,80 8,45 8,45
Drenagem Natural - PE - Est 211+0.00 0 0,000 2 0,000 800 40,00 332,16 1,60 96,00 96,00 96,00 96,00
Drenagem Natural - Ramo B - Est 2+10.00 0 0,000 0 16,000 800 16,00 62,08 1,60 38,40 38,40 23,68 23,68
Drenagem Natural - Ramo B - Est 10+0.00 0 0,000 1 9,000 800 29,00 277,24 1,60 69,60 69,60 69,60 69,60
TOTAL = - - - - - - - - 11.595,33 - 6.586,98 6.586,98 0,00 0,00 4.220,99 4.220,99 0,00 0,00
PROJETO:
OBRA:
TRECHO:
(mm) (m) (m³) (m) Total Lateral Caminhão Manual Total Lateral Caminhão Manual
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 140,16 1,60
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 209,60 1,60
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 240,48 1,60
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 197,60 1,60
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 312,80 1,60
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 194,04 1,60
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 240,35 1,90
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 176,98 1,90
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 213,84 2,20
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 249,48 2,20
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 407,33 2,20
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 305,25 2,20
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 310,20 2,20
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 308,55 2,20
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 307,45 2,20
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 367,62 2,20
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 141,72 2,20
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 179,79 2,20
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 66,28 2,20
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 85,92 1,60
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 54,78 1,60
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 208,56 2,20
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 124,16 1,60
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 82,18 1,60
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 41,47 1,60
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 121,20 1,60
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 89,86 1,60
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 86,06 1,60
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 74,56 1,60
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 90,96 1,90
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 69,60 1,60
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 86,21 1,60
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 107,07 1,90
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 240,82 1,90
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 106,97 1,90
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 120,50 1,90
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 134,81 1,90
Estaca L
Inicial Final
>3,00m A <=4,50m > 4,50m
Volume
Total
Largura da
ValaLocalização
Ø
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
VOLUME DE ESCAVAÇÃO
QUANTITATIVOS - 03.00.00 - TRABALHOS EM TERRA
PR-147/14A
PROJETO:
OBRA:
TRECHO:
(mm) (m) (m³) (m) Total Lateral Caminhão Manual Total Lateral Caminhão Manual
Estaca L
Inicial Final
>3,00m A <=4,50m > 4,50m
Volume
Total
Largura da
ValaLocalização
Ø
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
VOLUME DE ESCAVAÇÃO
QUANTITATIVOS - 03.00.00 - TRABALHOS EM TERRA
PR-147/14A
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 77,84 1,90
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 52,77 1,90
3 + 1,500 3 + 14,400 1000 12,90 63,36 1,90
0 + 0,000 1 + 4,000 1000 24,00 119,02 1,90
0 + 0,000 1 + 3,000 800 23,00 78,02 1,60
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 115,14 1,60
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 96,19 1,60
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 310,13 1,60 134,40 134,40 7,73 7,73
0 + 0,000 1 + 10,000 800 30,00 174,48 1,60 30,48
0 + 0,000 1 + 0,000 800 20,00 62,40 1,60
1 + 0,000 2 + 14,000 800 34,00 100,64 1,60
1 + 0,000 2 + 10,000 800 30,00 92,16 1,60
0 + 0,000 1 + 5,000 800 25,00 84,60 1,60
0 0,000 1 12,000 1000 32,00 127,98 1,90
1 12,000 3 0,000 1000 28,00 119,97 1,90
0 0,000 1 13,000 800 33,00 185,86 1,60 27,46
0 0,000 1 12,000 800 32,00 102,91 1,60
1 12,000 3 5,000 800 33,00 93,19 1,60
0 0,000 1 0,000 800 20,00 59,52 1,60
0 0,000 2 4,000 1000 44,00 194,79 1,90
2 4,000 3 10,000 1000 26,00 128,69 1,90
3 10,000 5 17,000 1000 47,00 233,97 1,90
5 17,000 6 7,000 1000 10,00 44,93 1,90
6 7,000 6 9,500 1000 2,50 10,50 1,90
0 5,000 1 10,000 1200 25,00 145,75 2,20
1 10,000 3 10,000 1200 40,00 243,76 2,20
3 10,000 4 5,000 1200 15,00 106,10 2,20 7,10
7 15,000 6 15,000 1000 20,00 88,73 1,90
6 15,000 5 10,000 1000 25,00 123,98 1,90
5 10,000 4 15,000 1000 15,00 108,30 1,90 22,80
0 0,000 4 12,000 800 92,00 754,40 1,60 294,40 92,00
0 0,000 1 3,000 800 23,00 67,34 1,60
0 0,000 1 2,000 800 22,00 61,25 1,60
0 0,000 2 0,000 800 40,00 332,16 1,60 128,00 44,16
0 0,000 0 16,000 800 16,00 62,08 1,60
0 0,000 1 9,000 800 29,00 277,24 1,60 92,80 68,44
TOTAL = - - - - - - - - 11.595,33 132,40 737,43 134,40 0,00 0,00 212,33 7,73 0,00 0,00
PROJETO:
OBRA:
TRECHO:
19.04.01 19.04.02 19.04.03 19.04.05 19.04.07 19.04.09 19.04.11
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 30,00
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 50,00
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 60,00
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 50,00
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 85,00
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 55,00
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 50,00
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 45,00
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 40,00
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 45,00
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 70,00
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 50,00
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 50,00
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 50,00
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 50,00
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 60,00
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 31,50
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 35,00
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 11,70
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 30,00
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 16,70
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 40,00
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 40,00
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 24,00
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 9,00
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 30,00
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 26,00
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 23,80
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 20,00
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 25,00
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 25,00
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 24,00
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 23,00
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 50,00
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 20,00
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 24,30
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 33,00
Localização
Estaca
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Ø L
Inicial Final
QUANTITATIVOS - 19.04.00 - REDE TUBULAR DE CONCRETO - PA-1
PR-147/14A
PROJETO:
OBRA:
TRECHO:
19.04.01 19.04.02 19.04.03 19.04.05 19.04.07 19.04.09 19.04.11
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Localização
Estaca
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Ø L
Inicial Final
QUANTITATIVOS - 19.04.00 - REDE TUBULAR DE CONCRETO - PA-1
PR-147/14A
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 17,00
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 11,50
3 + 1,500 3 + 14,400 1000 12,90 12,90
0 + 0,000 1 + 4,000 1000 24,00 24,00
0 + 0,000 1 + 3,000 800 23,00 23,00
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 28,00
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 36,00
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 42,00
0 + 0,000 1 + 10,000 800 30,00 30,00
0 + 0,000 1 + 0,000 800 20,00 20,00
1 + 0,000 2 + 14,000 800 34,00 34,00
1 + 0,000 2 + 10,000 800 30,00 30,00
0 + 0,000 1 + 5,000 800 25,00 25,00
0 0,000 1 12,000 1000 32,00 32,00
1 12,000 3 0,000 1000 28,00 28,00
0 0,000 1 13,000 800 33,00 33,00
0 0,000 1 12,000 800 32,00 32,00
1 12,000 3 5,000 800 33,00 33,00
0 0,000 1 0,000 800 20,00 20,00
0 0,000 2 4,000 1000 44,00 44,00
2 4,000 3 10,000 1000 26,00 26,00
3 10,000 5 17,000 1000 47,00 47,00
5 17,000 6 7,000 1000 10,00 10,00
6 7,000 6 9,500 1000 2,50 2,50
0 5,000 1 10,000 1200 25,00 25,00
1 10,000 3 10,000 1200 40,00 40,00
3 10,000 4 5,000 1200 15,00 15,00
7 15,000 6 15,000 1000 20,00 20,00
6 15,000 5 10,000 1000 25,00 25,00
5 10,000 4 15,000 1000 15,00 15,00
0 0,000 4 12,000 800 92,00 92,00
0 0,000 1 3,000 800 23,00 23,00
0 0,000 1 2,000 800 22,00 22,00
0 0,000 2 0,000 800 40,00 40,00
0 0,000 0 16,000 800 16,00 16,00
0 0,000 1 9,000 800 29,00
TOTAL = - - - - - - - - 0,00 0,00 0,00 1.177,50 585,20 613,20 0,00
PROJETO:
OBRA:
TRECHO:
19.05.01 19.05.02 18.05.03 19.05.05 19.05.07 19.05.09 19.05.11
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00
PISTAS ESQUERDA E DIREITA
AVENIDA MARACANÃ
Localização
QUANTITATIVOS - 19.05.00 - REDE TUBULAR DE CONCRETO - PA-2
PR-147/14A
Estaca Ø L
Inicial Final
PROJETO:
OBRA:
TRECHO:
19.05.01 19.05.02 18.05.03 19.05.05 19.05.07 19.05.09 19.05.11
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
PISTAS ESQUERDA E DIREITA
AVENIDA MARACANÃ
Localização
QUANTITATIVOS - 19.05.00 - REDE TUBULAR DE CONCRETO - PA-2
PR-147/14A
Estaca Ø L
Inicial Final
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50
3 + 1,500 3 + 14,400 1000 12,90
0 + 0,000 1 + 4,000 1000 24,00
0 + 0,000 1 + 3,000 800 23,00
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00
0 + 0,000 1 + 10,000 800 30,00
0 + 0,000 1 + 0,000 800 20,00
1 + 0,000 2 + 14,000 800 34,00
1 + 0,000 2 + 10,000 800 30,00
0 + 0,000 1 + 5,000 800 25,00
0 0,000 1 12,000 1000 32,00
1 12,000 3 0,000 1000 28,00
0 0,000 1 13,000 800 33,00
0 0,000 1 12,000 800 32,00
1 12,000 3 5,000 800 33,00
0 0,000 1 0,000 800 20,00
0 0,000 2 4,000 1000 44,00
2 4,000 3 10,000 1000 26,00
3 10,000 5 17,000 1000 47,00
5 17,000 6 7,000 1000 10,00
6 7,000 6 9,500 1000 2,50
0 5,000 1 10,000 1200 25,00
1 10,000 3 10,000 1200 40,00
3 10,000 4 5,000 1200 15,00
7 15,000 6 15,000 1000 20,00
6 15,000 5 10,000 1000 25,00
5 10,000 4 15,000 1000 15,00
0 0,000 4 12,000 800 92,00
0 0,000 1 3,000 800 23,00
0 0,000 1 2,000 800 22,00
0 0,000 2 0,000 800 40,00
0 0,000 0 16,000 800 16,00
0 0,000 1 9,000 800 29,00 29,00
TOTAL = - - - - - - - - 0,00 0,00 0,00 29,00 0,00 0,00 0,00
PROJETO:
OBRA:
TRECHO:
19.06.01 19.06.02 18.06.03 19.06.05 19.06.07 19.06.09 19.06.11
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00
Estaca
Inicial Final
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Localização
Ø L
QUANTITATIVOS - 19.06.00 - REDE TUBULAR DE CONCRETO - PA-3
PR-147/14A
PROJETO:
OBRA:
TRECHO:
19.06.01 19.06.02 18.06.03 19.06.05 19.06.07 19.06.09 19.06.11
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Estaca
Inicial Final
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Localização
Ø L
QUANTITATIVOS - 19.06.00 - REDE TUBULAR DE CONCRETO - PA-3
PR-147/14A
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50
3 + 1,500 3 + 14,400 1000 12,90
0 + 0,000 1 + 4,000 1000 24,00
0 + 0,000 1 + 3,000 800 23,00
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00
0 + 0,000 1 + 10,000 800 30,00
0 + 0,000 1 + 0,000 800 20,00
1 + 0,000 2 + 14,000 800 34,00
1 + 0,000 2 + 10,000 800 30,00
0 + 0,000 1 + 5,000 800 25,00
0 0,000 1 12,000 1000 32,00
1 12,000 3 0,000 1000 28,00
0 0,000 1 13,000 800 33,00
0 0,000 1 12,000 800 32,00
1 12,000 3 5,000 800 33,00
0 0,000 1 0,000 800 20,00
0 0,000 2 4,000 1000 44,00
2 4,000 3 10,000 1000 26,00
3 10,000 5 17,000 1000 47,00
5 17,000 6 7,000 1000 10,00
6 7,000 6 9,500 1000 2,50
0 5,000 1 10,000 1200 25,00
1 10,000 3 10,000 1200 40,00
3 10,000 4 5,000 1200 15,00
7 15,000 6 15,000 1000 20,00
6 15,000 5 10,000 1000 25,00
5 10,000 4 15,000 1000 15,00
0 0,000 4 12,000 800 92,00
0 0,000 1 3,000 800 23,00
0 0,000 1 2,000 800 22,00
0 0,000 2 0,000 800 40,00
0 0,000 0 16,000 800 16,00
0 0,000 1 9,000 800 29,00
TOTAL = - - - - - - - - 0,00 0,00 0,00 0,00 0,00 0,00 0,00
PROJETO:
OBRA:
TRECHO:
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 1,60 65,28
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 1,60 108,80
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 1,60 130,56
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 1,60 108,80
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 1,60 184,96
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 1,60 119,68
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 1,90 156,75
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 1,90 141,08
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 2,20 169,84
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 2,20 191,07
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 2,20 297,22
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 2,20 212,30
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 2,20 212,30
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 2,20 212,30
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 2,20 212,30
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 2,20 254,76
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 2,20 133,75
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 2,20 148,61
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 2,20 49,68
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 1,60 65,28
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 1,60 36,34
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 2,20 169,84
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 1,60 87,04
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 1,60 52,22
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 1,60 19,58
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 1,60 65,28
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 1,60 56,58
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 1,60 51,79
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 1,60 43,52
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 1,90 78,38
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 1,60 54,40
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 1,60 52,22
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 1,90 72,11
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 1,90 156,75
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 1,90 62,70
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 1,90 76,18
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 1,90 103,46
Ø LEstaca
Inicial Final
Localização
VOLUME DA REDE (m³)Largura da
Vala
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
PLANILHA DE QUANTITATIVOS DE ESCAVAÇÃO
PR-147/14A
PROJETO:
OBRA:
TRECHO:
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Ø LEstaca
Inicial Final
Localização
VOLUME DA REDE (m³)Largura da
Vala
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
PLANILHA DE QUANTITATIVOS DE ESCAVAÇÃO
PR-147/14A
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 1,90 53,30
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 1,90 36,05
3 + 1,500 3 + 14,400 1000 12,90 1,90 40,44
0 + 0,000 1 + 4,000 1000 24,00 1,90 75,24
0 + 0,000 1 + 3,000 800 23,00 1,60 50,05
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 1,60 60,93
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 1,60 78,34
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 1,60 91,39
0 + 0,000 1 + 10,000 800 30,00 1,60 65,28
0 + 0,000 1 + 0,000 800 20,00 1,60 43,52
1 + 0,000 2 + 14,000 800 34,00 1,60 73,98
1 + 0,000 2 + 10,000 800 30,00 1,60 65,28
0 + 0,000 1 + 5,000 800 25,00 1,60 54,40
0 0,000 1 12,000 1000 32,00 1,90 100,32
1 12,000 3 0,000 1000 28,00 1,90 87,78
0 0,000 1 13,000 800 33,00 1,60 71,81
0 0,000 1 12,000 800 32,00 1,60 69,63
1 12,000 3 5,000 800 33,00 1,60 71,81
0 0,000 1 0,000 800 20,00 1,60 43,52
0 0,000 2 4,000 1000 44,00 1,90 137,94
2 4,000 3 10,000 1000 26,00 1,90 81,51
3 10,000 5 17,000 1000 47,00 1,90 147,35
5 17,000 6 7,000 1000 10,00 1,90 31,35
6 7,000 6 9,500 1000 2,50 1,90 7,84
0 5,000 1 10,000 1200 25,00 2,20 106,15
1 10,000 3 10,000 1200 40,00 2,20 169,84
3 10,000 4 5,000 1200 15,00 2,20 63,69
7 15,000 6 15,000 1000 20,00 1,90 62,70
6 15,000 5 10,000 1000 25,00 1,90 78,38
5 10,000 4 15,000 1000 15,00 1,90 47,03
0 0,000 4 12,000 800 92,00 1,60 200,19
0 0,000 1 3,000 800 23,00 1,60 50,05
0 0,000 1 2,000 800 22,00 1,60 47,87
0 0,000 2 0,000 800 40,00 1,60 87,04
0 0,000 0 16,000 800 16,00 1,60 34,82
0 0,000 1 9,000 800 29,00 1,60 63,10
TOTAL = - - - - - - - 2.404,90 132,40 0,00 0,00 0,00 2.625,34 1.834,60 2.603,65 0,00
PROJETO:
OBRA:
TRECHO:
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 18,30
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 30,50
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 36,60
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 30,50
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 51,85
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 33,55
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 42,50
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 38,25
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 44,80
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 50,40
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 78,40
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 56,00
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 56,00
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 56,00
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 56,00
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 67,20
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 35,28
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 39,20
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 13,10
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 18,30
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 10,19
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 44,80
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 24,40
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 14,64
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 5,49
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 18,30
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 15,86
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 14,52
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 12,20
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 21,25
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 15,25
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 14,64
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 19,55
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 42,50
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 17,00
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 20,66
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 28,05
LØ
Final
Localização
Estaca
Inicial
PISTAS ESQUERDA E DIREITA
QUANTITATIVOS - 03.22.00 - REATERRO DE VALA
PR-147/14A
AVENIDA MARACANÃ
03.22.01 - Reaterro Manual
PROJETO:
OBRA:
TRECHO:
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500
(mm) (m) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
LØ
Final
Localização
Estaca
Inicial
PISTAS ESQUERDA E DIREITA
QUANTITATIVOS - 03.22.00 - REATERRO DE VALA
PR-147/14A
AVENIDA MARACANÃ
03.22.01 - Reaterro Manual
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 14,45
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 9,78
3 + 1,500 3 + 14,400 1000 12,90 10,97
0 + 0,000 1 + 4,000 1000 24,00 20,40
0 + 0,000 1 + 3,000 800 23,00 14,03
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 17,08
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 21,96
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 25,62
0 + 0,000 1 + 10,000 800 30,00 18,30
0 + 0,000 1 + 0,000 800 20,00 12,20
1 + 0,000 2 + 14,000 800 34,00 20,74
1 + 0,000 2 + 10,000 800 30,00 18,30
0 + 0,000 1 + 5,000 800 25,00 15,25
0 0,000 1 12,000 1000 32,00 27,20
1 12,000 3 0,000 1000 28,00 23,80
0 0,000 1 13,000 800 33,00 20,13
0 0,000 1 12,000 800 32,00 19,52
1 12,000 3 5,000 800 33,00 20,13
0 0,000 1 0,000 800 20,00 12,20
0 0,000 2 4,000 1000 44,00 37,40
2 4,000 3 10,000 1000 26,00 22,10
3 10,000 5 17,000 1000 47,00 39,95
5 17,000 6 7,000 1000 10,00 8,50
6 7,000 6 9,500 1000 2,50 2,13
0 5,000 1 10,000 1200 25,00 28,00
1 10,000 3 10,000 1200 40,00 44,80
3 10,000 4 5,000 1200 15,00 16,80
7 15,000 6 15,000 1000 20,00 17,00
6 15,000 5 10,000 1000 25,00 21,25
5 10,000 4 15,000 1000 15,00 12,75
0 0,000 4 12,000 800 92,00 56,12
0 0,000 1 3,000 800 23,00 14,03
0 0,000 1 2,000 800 22,00 13,42
0 0,000 2 0,000 800 40,00 24,40
0 0,000 0 16,000 800 16,00 9,76
0 0,000 1 9,000 800 29,00 17,69
TOTAL = - - - - - - - - 0,00 0,00 0,00 735,97 497,42 686,78 0,00
PROJETO:
OBRA:
TRECHO:
Escavação 03.22.02
TotalReaterro
Comp.
(mm) (m) (m³) (m³) (m³) (m³)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 140,16 74,88 19,03 Lateral
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 209,60 100,80 38,91 Lateral
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 240,48 109,92 50,00 Lateral
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 197,60 88,80 42,51 Lateral
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 312,80 127,84 79,20 Lateral
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 194,04 74,36 53,76 Lateral
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 240,35 83,60 76,42 Lateral
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 176,98 35,91 80,58 Lateral
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 213,84 44,00 98,40 Lateral
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 249,48 58,41 108,03 Lateral
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 407,33 110,11 162,27 Lateral
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 305,25 92,95 111,62 Lateral
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 310,20 97,90 110,13 Lateral
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 308,55 96,25 110,63 Lateral
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 307,45 95,15 110,96 Lateral
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 367,62 112,86 133,54 Lateral
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 141,72 7,97 85,49 Lateral
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 179,79 31,18 88,29 Lateral
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 66,28 16,60 27,66 Lateral
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 85,92 20,64 35,30 Lateral
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 54,78 18,44 17,57 Lateral
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 208,56 38,72 99,98 Lateral
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 124,16 37,12 44,18 Lateral
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 82,18 29,95 24,21 Lateral
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 41,47 21,89 5,88 Lateral
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 121,20 55,92 24,71 Lateral
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 89,86 33,28 25,97 Lateral
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 86,06 34,27 22,63 Lateral
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 74,56 31,04 18,35 Lateral
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 90,96 12,59 46,97 Lateral
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 69,60 15,20 30,01 Lateral
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 86,21 33,98 23,00 Lateral
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 107,07 34,96 36,20 Lateral
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 240,82 84,07 76,28 Lateral
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 106,97 44,27 27,32 Lateral
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 120,50 44,32 36,03 Lateral
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 134,81 31,35 57,58 Lateral
Final
Bota-Fora EmpréstimoTipo de
Escavação
Estaca
Inicial
Localização
QUANTITATIVOS - 03.22.00 - REATERRO DE VALA / BOTA-FORA / EMPRÉSTIMO
PR-147/14A
AVENIDA MARACANÃ
LØ
PISTAS ESQUERDA E DIREITA
PROJETO:
OBRA:
TRECHO:
Escavação 03.22.02
TotalReaterro
Comp.
(mm) (m) (m³) (m³) (m³) (m³)Final
Bota-Fora EmpréstimoTipo de
Escavação
Estaca
Inicial
Localização
QUANTITATIVOS - 03.22.00 - REATERRO DE VALA / BOTA-FORA / EMPRÉSTIMO
PR-147/14A
AVENIDA MARACANÃ
LØ
PISTAS ESQUERDA E DIREITA
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 77,84 24,55 27,15 Lateral
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 52,77 16,72
3 + 1,500 3 + 14,400 1000 12,90 63,36 22,92
0 + 0,000 1 + 4,000 1000 24,00 119,02 43,78
0 + 0,000 1 + 3,000 800 23,00 78,02 27,97
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 115,14 54,21 22,46 Lateral
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 96,19 17,86 44,43 Lateral
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 310,13 218,74 -7,53 Lateral
0 + 0,000 1 + 10,000 800 30,00 174,48 109,20
0 + 0,000 1 + 0,000 800 20,00 62,40 18,88
1 + 0,000 2 + 14,000 800 34,00 100,64 26,66
1 + 0,000 2 + 10,000 800 30,00 92,16 26,88
0 + 0,000 1 + 5,000 800 25,00 84,60 30,20
0 0,000 1 12,000 1000 32,00 127,98 27,66
1 12,000 3 0,000 1000 28,00 119,97 32,19
0 0,000 1 13,000 800 33,00 185,86 114,05
0 0,000 1 12,000 800 32,00 102,91 33,28
1 12,000 3 5,000 800 33,00 93,19 21,38
0 0,000 1 0,000 800 20,00 59,52 16,00
0 0,000 2 4,000 1000 44,00 194,79 56,85
2 4,000 3 10,000 1000 26,00 128,69 47,18
3 10,000 5 17,000 1000 47,00 233,97 86,62
5 17,000 6 7,000 1000 10,00 44,93 13,58
6 7,000 6 9,500 1000 2,50 10,50 2,66
0 5,000 1 10,000 1200 25,00 145,75 39,60
1 10,000 3 10,000 1200 40,00 243,76 73,92
3 10,000 4 5,000 1200 15,00 106,10 42,41
7 15,000 6 15,000 1000 20,00 88,73 26,03
6 15,000 5 10,000 1000 25,00 123,98 45,60
5 10,000 4 15,000 1000 15,00 108,30 61,27
0 0,000 4 12,000 800 92,00 754,40 554,21
0 0,000 1 3,000 800 23,00 67,34 17,30
0 0,000 1 2,000 800 22,00 61,25 13,38
0 0,000 2 0,000 800 40,00 332,16 245,12
0 0,000 0 16,000 800 16,00 62,08 27,26
0 0,000 1 9,000 800 29,00 277,24 214,14
TOTAL = - - - - - - - 11.595,33 4.531,74 2.333,65 7,53 -
PROJETO:
OBRA:
TRECHO:
Tipo A Tipo B Tipo A Tipo B Tipo C
(mm) (m) (m³) (m²) (m²) (m²) (m²) (m²)
Canteiro Central 0 + 0,000 1 + 10,000 800 30,00 175,20 Desc.B 175,20
Canteiro Central 1 + 10,000 4 + 0,000 800 50,00 262,00 Desc.B 262,00
Canteiro Central 4 + 0,000 7 + 0,000 800 60,00 300,60 Desc.B 300,60
Canteiro Central 7 + 0,000 9 + 10,000 800 50,00 247,00 Desc.B 247,00
Canteiro Central 9 + 10,000 13 + 15,000 800 85,00 391,00 Desc.B 391,00
Canteiro Central 13 + 15,000 16 + 10,000 800 55,00 242,55 Desc.B 242,55
Canteiro Central 16 + 10,000 19 + 0,000 1000 50,00 253,00 Desc.B 253,00
Canteiro Central 19 + 0,000 21 + 5,000 1000 45,00 186,30 Desc.B 186,30
Canteiro Central 21 + 5,000 23 + 5,000 1200 40,00 194,40 Desc.B 194,40
Canteiro Central 23 + 5,000 25 + 10,000 1200 45,00 226,80 Desc.B 226,80
Canteiro Central 25 + 10,000 29 + 0,000 1200 70,00 370,30 Desc.B 370,30
Canteiro Central 29 + 0,000 31 + 10,000 1200 50,00 277,50 Desc.B 277,50
Canteiro Central 31 + 10,000 34 + 0,000 1200 50,00 282,00 Desc.B 282,00
Canteiro Central 34 + 0,000 36 + 10,000 1200 50,00 280,50 Desc.B 280,50
Canteiro Central 36 + 10,000 39 + 0,000 1200 50,00 279,50 Desc.B 279,50
Canteiro Central 39 + 0,000 42 + 0,000 1200 60,00 334,20 Desc.B 334,20
LANÇAMENTO 42 + 0,000 43 + 11,500 1200 31,50 128,84 Desc.B 128,84
0
Av. Albert Scwwartzer - LE 2 + 10,000 0 + 15,000 1200 35,00 163,45 Desc.B 163,45
Av. Albert Scwwartzer - LE 0 + 15,000 0 + 3,300 1200 11,70 60,25 Desc.B 60,25
Av. Albert Scwwartzer - LD 2 + 10,000 1 + 0,000 800 30,00 107,40 Desc.A 107,40
Av. Albert Scwwartzer -LD 1 + 0,000 0 + 3,300 800 16,70 68,47 Desc.B 68,47
Rua Che Guevara 0 + 0,000 2 + 0,000 1200 40,00 189,60 Desc.B 189,60
Rua G (Tancredo Neves) 0 + 0,000 2 + 0,000 800 40,00 155,20 Desc.A 155,20
Talvegue Natural (Est 5+0.00 - PD) 0 + 0,000 1 + 4,000 800 24,00 102,72 Desc.B 102,72
Talvegue Natural (Est 5+0.00 - PD) 1 + 4,000 1 + 13,000 800 9,00 51,84 Desc.B 51,84
Talvegue Natural (Est 13+12.00 - PD) 0 + 0,000 1 + 10,000 800 30,00 151,50 Desc.B 151,50
Talvegue Natural (Est 17+0.00 - PD) 0 + 0,000 1 + 6,000 800 26,00 112,32 Desc.B 112,32
Talvegue Natural (Est 25+1.00 - PD) 0 + 0,000 1 + 3,800 800 23,80 107,58 Desc.B 107,58
Rua Sem Nome 2 (Est 32+0.00 - PD) 0 + 0,000 1 + 0,000 800 20,00 93,20 Desc.B 93,20
Talvegue Natural - 49+6.00 - PE 0 + 0,000 1 + 5,000 1000 25,00 95,75 Desc.A 95,75
Talvegue Natural - 70+0.00 - PE 0 + 0,000 1 + 5,000 800 25,00 87,00 Desc.A 87,00
Talvegue Natural - 41+9.00 - PD 0 + 0,000 1 + 4,000 800 24,00 107,76 Desc.B 107,76
Talvegue Natural - 68+16.00 - PD 0 + 0,000 1 + 3,000 1000 23,00 112,70 Desc.B 112,70
Rua Manoel Jacinto Jr. - Pista Esquerda 0 + 0,000 2 + 10,000 1000 50,00 253,50 Desc.B 253,50
Rua Manoel Jacinto Jr. - Pista Esquerda 2 + 10,000 3 + 10,000 1000 20,00 112,60 Desc.B 112,60
Rua Manoel Jacinto Jr. - Pista Esquerda 3 + 10,000 4 + 14,300 1000 24,30 126,85 Desc.B 126,85
Rua Manoel Jacinto Jr. - Pista Direita 0 + 0,000 1 + 13,000 1000 33,00 141,90 Desc.B 141,90
Estaca
Inicial Final
Localização
19.32.00 - Descontínuo
AVENIDA MARACANÃ
QUANTITATIVOS - ESCORAMENTO DE VALAS
PR-147/14A
19.33.00 - ContínuoEscavação
TotalLØ
Tipo de
Escoramento
PISTAS ESQUERDA E DIREITA
PROJETO:
OBRA:
TRECHO:
Tipo A Tipo B Tipo A Tipo B Tipo C
(mm) (m) (m³) (m²) (m²) (m²) (m²) (m²)
Estaca
Inicial Final
Localização
19.32.00 - Descontínuo
AVENIDA MARACANÃ
QUANTITATIVOS - ESCORAMENTO DE VALAS
PR-147/14A
19.33.00 - ContínuoEscavação
TotalLØ
Tipo de
Escoramento
PISTAS ESQUERDA E DIREITA
Rua Manoel Jacinto Jr. - Pista Direita 1 + 13,000 2 + 10,000 1000 17,00 81,94 Desc.B 81,94
Rua Manoel Jacinto Jr. - Pista Direita 2 + 10,000 3 + 1,500 1000 11,50 55,54 Desc.B 55,54
3 + 1,500 3 + 14,400 1000 12,90 66,69 Desc.B 66,69
0 + 0,000 1 + 4,000 1000 24,00 125,28 Desc.B 125,28
0 + 0,000 1 + 3,000 800 23,00 97,52 Desc.B 97,52
Talvegue Natural - 96+10.00 - PD 0 + 0,000 1 + 8,000 800 28,00 143,92 Desc.B 143,92
Talvegue Natural - 100+0.00 - PE 0 + 0,000 1 + 16,000 800 36,00 120,24 Desc.A 120,24
Talvegue Natural - 102+0.00 - PD 0 + 0,000 2 + 2,000 800 42,00 387,66 Cont.B 387,66
0 + 0,000 1 + 10,000 800 30,00 218,10 Cont.A 218,10
0 + 0,000 1 + 0,000 800 20,00 78,00 Desc.A 78,00
1 + 0,000 2 + 14,000 800 34,00 125,80 Desc.A 125,80
1 + 0,000 2 + 10,000 800 30,00 115,20 Desc.A 115,20
0 + 0,000 1 + 5,000 800 25,00 105,75 Desc.B 105,75
0 0,000 1 12,000 1000 32,00 134,72 Desc.B 134,72
1 12,000 3 0,000 1000 28,00 126,28 Desc.B 126,28
0 0,000 1 13,000 800 33,00 232,32 Cont.A 232,32
0 0,000 1 12,000 800 32,00 128,64 Desc.B 128,64
1 12,000 3 5,000 800 33,00 116,49 Desc.A 116,49
0 0,000 1 0,000 800 20,00 74,40 Desc.A 74,40
0 0,000 2 4,000 1000 44,00 205,04 Desc.B 205,04
2 4,000 3 10,000 1000 26,00 135,46 Desc.B 135,46
3 10,000 5 17,000 1000 47,00 246,28 Desc.B 246,28
5 17,000 6 7,000 1000 10,00 47,30 Desc.B 47,30
6 7,000 6 9,500 1000 2,50 11,05 Desc.B 11,05
0 5,000 1 10,000 1200 25,00 132,50 Desc.B 132,50
1 10,000 3 10,000 1200 40,00 221,60 Desc.B 221,60
3 10,000 4 5,000 1200 15,00 96,45 Cont.A 96,45
7 15,000 6 15,000 1000 20,00 93,40 Desc.B 93,40
6 15,000 5 10,000 1000 25,00 130,50 Desc.B 130,50
5 10,000 4 15,000 1000 15,00 114,00 Cont.A 114,00
0 0,000 4 12,000 800 92,00 943,00 Cont.C 943,00
0 0,000 1 3,000 800 23,00 84,18 Desc.A 84,18
0 0,000 1 2,000 800 22,00 76,56 Desc.A 76,56
0 0,000 2 0,000 800 40,00 415,20 Cont.C 415,20
0 0,000 0 16,000 800 16,00 77,60 Desc.B 77,60
0 0,000 1 9,000 800 29,00 346,55 Cont.C 346,55
TOTAL = - - - - - - - - 12.744,44 - 1.236,22 8.754,94 660,87 387,66 1.704,75
PROJETO:
OBRA:
TRECHO:
<= 1,50m 1,50m A 3,00m 3,00m A 5,00m > 5,00m TOTAL
0,00 0,00 0,00 0,00 0,00
<= 1,50m 1,50m A 3,00m 3,00m A 5,00m > 5,00m TOTAL
6.586,98 4.220,99 134,40 7,73 10.950,10
<= 1,50m 1,50m A 3,00m 3,00m A 5,00m > 5,00m TOTAL
0,00 0,00 0,00 0,00 0,00
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500 TOTAL
0,00 0,00 0,00 1.177,50 585,20 613,20 0,00 2.375,90
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500 TOTAL
0,00 0,00 0,00 29,00 0,00 0,00 0,00 29,00
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500 TOTAL
0,00 0,00 0,00 0,00 0,00 0,00 0,00 0,00
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500 TOTAL
0,00 0,00 0,00 735,97 497,42 686,78 0,00 1.920,17
BOTA-FORA EMPRÉSTIMO
(m³) (m³)
4.531,74 2.333,65 7,53 1.236,22 8.754,94 660,87 387,66 1.704,75
19.05.00 - COMPRIMENTO DE TUBOS - CLASSE PA-2 (m)
19.04.00 - COMPRIMENTO DE TUBOS - CLASSE PA-1 (m)
19.06.00 - COMPRIMENTO DE TUBOS - CLASSE PA-3 (m)
19.07.00 - CONCRETO D0 BERÇO (m³)
03.22.01 - REATERRO MANUAL (m³)
19.33.01 - ESC.
CONT.A (m²)
19.33.02 - ESC.
CONT.B (m²)
19.33.03 - ESC.
CONT.C (m²)
RESUMO GERAL
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
19.32.02 - ESC.
DESC.B (m²)
19.32.01 - ESC.
DESC.A (m²)
03.22.02 - REAT.
COMP. (m³)
03.19.00 - ESCAVAÇAO MECANICA DE VALAS COM DESC. S/ CAMINHOES (CAIXÃO) (m³)
03.18.00 - ESCAVAÇAO MECANICA DE VALAS COM DESCARGA LATERAL (CAIXÃO) (m³)
03.17.00 - ESCAVAÇÃO MANUAL DE VALAS (CAIXÃO) (m³)
PROJETO:
OBRA:
TRECHO:
<= 1,50m 1,50m A 3,00m 3,00m A 5,00m > 5,00m TOTAL
RESUMO GERAL
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
03.17.00 - ESCAVAÇÃO MANUAL DE VALAS (CAIXÃO) (m³)
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500 TOTAL
0,00 0,00 0,00 518,80 386,23 576,41 0,00 1.481,44
Ø 400 Ø 500 Ø 600 Ø 800 Ø 1000 Ø 1200 Ø 1500 TOTAL
0,00 0,00 0,00 1.061,72 643,72 809,42 0,00 2.514,86
19.08.00 - FORMA DO BERÇO (m²)
PROJETO:
OBRA:
TRECHO:
Extensão Escavação ReaterroCompac. Sub-
leitoLastro Revestimento Forma Cimbramento Enrocamento
Junta de
Retração
Concreto
fck≥ 10MPa
Concreto
fck≥ 25MPaArmação
(m) (m) (m) (m³) (m³) (m2) (m³) (m³) (m³) (m³) (m³) (m) (m³) (m³) (kg)
Bacia 2 - Esta 57 + 3.75 - PD FECHADO 0 + 0,00 1 + 13,00 2.50 x 2.50 0,80
Talvegue Natural - Est. 33+4.00 - PE FECHADO 0 + 0,00 2 + 4,00 1.50 x1.50 1,90
Talvegue Natural - Est. 76+0.00 - PD FECHADO 0 + 0,00 1 + 3,00 1.50 x1.50 1,00
Rua Dulce Diniz- Est. 143+8.00 - PD FECHADO 0 + 0,00 6 + 18,00 1.50 x1.50 2,50
Bacia 3 - Est. 153+3.40 - PD FECHADO 0 + 0,00 2 + 3,50 2 x 2.50 x 1.50 1,70
Bacia 4 - Est. 151+7.00 - PE FECHADO 0 + 0,00 2 + 9,00 2.50 x 2.00 0,80
Bacia 5 - Est 184+16.00 - PE FECHADO 0 + 0,00 4 + 6,00 2.50 x 2.50 8,50
0,00 0,00 0,00 0,00 0,00TOTAL =
Localização Tipo
Altura do AterroSeção
QUANTITATIVO - Canais Retangulares (DNITT)
ABERTO
Estaca
Inicial Final
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
Extensão Escavação ReaterroCompac. Sub-
leitoLastro Revestimento Forma Cimbramento Enrocamento
Junta de
Retração
Concreto
fck≥ 10MPa
Concreto
fck≥ 25MPaArmação
(m) (m³) (m³) (m2) (m³) (m³) (m³) (m³) (m³) (m) (m³) (m³) (kg)
33,00 869,22 475,20 165,00 10,56 4,29 372,90 165,00 99,00 129,36 0,00 64,68 7.936,24
44,00 762,08 454,08 176,00 9,24 3,52 356,40 99,00 82,28 116,16 0,00 43,56 2.313,04
23,00 398,36 237,36 92,00 4,83 1,84 186,30 51,75 43,01 60,72 0,00 22,77 1.209,09
138,00 3.836,40 2732,40 552,00 28,98 11,04 1117,80 310,50 258,06 364,32 0,00 136,62 9.317,48
43,50 1.705,20 935,25 348,00 25,67 10,88 643,80 326,25 213,15 269,70 0,00 141,38 18.378,75
49,00 1.666,00 1087,80 245,00 15,68 6,37 553,70 245,00 147,00 192,08 0,00 96,04 11.784,11
86,00 3.295,52 2107,00 430,00 29,24 11,18 1388,90 537,50 258,00 385,28 0,00 301,00 59.176,60
416,50 12.532,78 8.029,09 2.008,00 124,20 49,12 4.619,80 1.735,00 1.100,50 1.517,62 0,00 806,05 110.115,30
FECHADO
QUANTITATIVO - Canais Retangulares (DNITT)[
31/10/2018
PROJETO:
OBRA:
TRECHO:
05.19.01 05.04.00 05.05.00 05.07.20
Grelha Forma AçoConcreto
20 Mpa
(m) (un) (m²) (kg) (m³)
1 Rua Dulce Geralda Diniz 0 + 0,000 1,10 1 11,00 21,63 0,83
2 Rua Dulce Geralda Diniz 2 + 7,000 1,00 1 10,00 19,66 0,75
2,10 2 21,00 41,29 1,58
QUANTITATIVOS - POÇO DE VISITA DE CANAL
PR-147/14A
AVENIDA MARACANÃ
PISTAS ESQUERDA E DIREITA
N.º Localização Estaca
Chaminé
Observação
TOTAL
30/30