( BIM) Partnering Framework For Public Construction Projects

By : Muhammad Gouda

Objectives :

1. Reduce Projects time.

2. Reduce Projects Cost.

3. Building Trust Between Project Stakeholder.

4. Reduce Conflicts and disputes .

5. Enhance Communication between Project Parties

6. Support Management Faster/Correct Decision Making

Current Status of BIM in The Construction Industry

Disagreement Increases 6 % From 2018Agreement Increases 11% From 2018

82% Identified Themselves as BIM user with an increase of 3%

Status Based on AEC 2nd Annual BIM Report For 2019 :

Current Status of BIM in The Construction Industry

BIM Barriers:

Public Procurement Methods

Public Procurement Methods

McGraw Hill Construction Report, 2014

Public Procurement Methods

Integrated Project Delivery ( IPD) : Integrated project delivery is a delivery system that seeks to align interests, objectives and practices, even in a single business, through a team-based approach. The primary team members include the architect, key technical consultants as well as a general contractor and key subcontractors. The IPD system is a process where all disciplines in a construction project work as one firm, creating faster delivery times, lower costs, no litigation and a more enjoyable process for the entire team –including the owner.

Emerging Project Delivery : The way to find anew project delivery approach that can optimize the achievement of project constraints, facilitate communication process, and satisfy the needs of the project stakeholders .

McGraw Hill Construction Report, 2014

Public Procurement Methods

Change Drivers For BIM

• ( BIM) Partnering Framework For Public Construction Projects is an integration between traditional delivery systems with an optimization to IPD system using BIM capabilities in in collaboration , coordination , visualization and clash detections.

• Early Contractor Involvement is one of the most notable success step between D/B/B and D/B, In the proposed Early BIM Partnering (EBP) approach, commitment to BIM is made very early in the project planning phase to overcome expected potential problems

Change Drivers For BIM

Suggested Approach for BIM Parenting

Change Drivers For BIM

The following are the requirements that can help the implementation :

1. Illustrate the ROI ( Return on Investment ) to Senior Management Level.

2. Senior Management Support.

3. Increase Software Learning Curve.

4. Include Qualified BIM Contractor in Selection Criteria

5. Include the roles and regulations in contract terms and conditions.

Thank You