2 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Why What When Where How
Asset Management
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
3 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
*BMI Infrastructure Report Q4-2011
6.4
51.7
Asset Creation Asset Maintenance Asset Upgrade
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
4 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
What? It depends on who we ask
PavementEngineer
Bridge Engineer
Senior Mgmt
Safety Analyst
AB
D
Roads Engineer
C
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
5 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
TRAFFIC LIGHTTRAFFIC LIGHT
BRIDGEBRIDGE
BARRIERBARRIER
POT HOLEPOT HOLE
STREET LIGHT:STREET LIGHT:
STREET SIGNSTREET SIGN
TRAFFICTRAFFIC
ALIGNMENTALIGNMENT
ROAD CONDITIONROAD CONDITION
LANES/WIDTHSLANES/WIDTHS
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
6 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
If we put the pieces together:
Category of road Length in Km
Total road network 3.34 million
National Highways 65,569
State Highways 1,30,000
Major Distt. Road, Rural road & Urban road
3.14 million
?
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
7 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Improving the Condition of the Asset
Better Condition
Better Work More Work
BetterQuality
OptimumService Levels
MoreMoney
BetterIntervention
Current Funding More Funding
From Opus International
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
8 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Better Condition
Better Work More Work
BetterQuality
OptimumService Levels
MoreMoney
BetterIntervention
Current Funding More FundingXX??Better AssetBetter Asset
ManagementManagementPracticesPractices
From Opus International
Improving the Condition of the Asset
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
9 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
The AASHTO definition of Asset Management supports this conclusion:
Conclusion Asset Management needs Information!
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
10 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Engineering Information Management through Asset LifeCycle
Asset & Project Portfolio Info Management
(APPIM)
Asset Information Management
(AIM)
Project Information
Management(PIM)
AssetLifecycle
Information Management
(ALIM)
Source: ARC Advisory Group
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
11 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Engineering Information Management (EIM)Through Bentley’s Integrated Asset Information Solution
Bentley traditional market
Design and Project Information
EIM - AssetWise
Asset Information and Decision
Supportbut when we bring them together we provide
asset lifecycle management
Each deliver value in their own right
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
12 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Engineering Information Management (EIM)An operations information modeling platform for delivering asset lifecycle information management
Bentley traditional market
Design And
ProjectWise
Map/Civil/Bridge
MicroStation
More….
Asset Model
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
13 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Engineering Information Modeling
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
14 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
What is Engineering Information Management?An operations information modeling platform for delivering asset lifecycle information management
Bentley traditional market
Design And
AssetWise
ProjectWise
MXRoad
MicroStation
More….
SuperLoad
OPTRAM
Insight
LRS and applications
ProjectWise and AssetWise provide
powerful Information Management
Asset Model
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
15 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Asset Information ProvidesDecision Support !
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
16 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet
TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet
BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet
BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet
BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet
BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet
POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet
POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet
STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet
STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet
STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet
STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
17 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet
TRAFFIC LIGHTCATEGORY: FWY entranceILLUMINATED: yesREPAIR DATE: 15 Mar 2008REPAIR TYPE: Bulb MOUNTING HT: 10.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1516 feet
BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet
BRIDGECATEGORY: OverpassSTREET: Fairbrook Rd.INSPECTED: 30 April 2007INSPECTOR: R. FlanneryHEIGHT: 22.5 feetROUTE: CA-I15-NSEGMENT: MP-127OFFSET START: 2018 feetOFFSET FINISH: 2078 feet
BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet
BARRIERCATEGORY: Cement wallLENGTH: 128 feetROUTE: CA-I15-N-M27SEGMENT: MP-127OFFSET: 1352 feet
POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet
POT HOLECATEGORY: Hwy defectDAMAGE REPORTED: 12 Jul 2009REPAIR PRIORITY: HighDATE REPAIRED: 15 Jul 2009 ROUTE: CA-I15SEGMENT: MP-127OFFSET START: 1270 feetOFFSET FINISH: 1274 feet
STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet
STREET LIGHT:CATEGORY: FWY illuminationREPAIR DATE: 10 Oct 2009REPAIR TYPE: Bulb HEIGHT: 21 feetMOUNTING BRACKET: Pole armLAMP TYPE:1 Low Pressure SodiumSEGMENT:MP-127OFFSET:1592 Feet
STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet
STREET SIGNCATEGORY: mergeILLUMINATED: noMOUNTING HT: 11.5 feetMOUNTING: poleROUTE: CA-I15-NSEGMENT: MP-127OFFSET: 1480 feet
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
18 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Managing more than just physical Road Assets…
Road Works Accidents
Traffic Data Enquiry Management
Parks and Places, BBQ’s…
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
19 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Exor at a Glance
19
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
20 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Solutions footprint…depth and breadth…
EXOR
SOLUTIONS
Road network definition, Customer Service Desk, Field Data collection, Asset recording, Inspections recording, Road condition recording,
Structures recording, traffic volume recording, safety / crash data, Street works notices / permits, asset valuation / depreciation
Construction records, Document management, Spatial data management , Road Information, Structures Information, Traffic
Information, Safety / Crash Information
Contract management, Works ordering and budgeting management, Multi-year
programming, Road works co-ordination, Safety Analysis
Pavement modelling, Asset valuations, Traffic
congestion
Executive Information
Data Recording
Information Management
Operations and Management
Strategic Management & Planning
Executive
Exor Database, Loaders, Web ServicesField Data Collection software
Integrate with other systems like
HDM-4
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
21 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Exor Business Applications
Exor Business Applications
AssetWise – Exor Road Asset Management
Oracle Spatial
Database
Geographic Information
Systems
Existing Legacy
Systems
Existing Legacy
SystemsInformation DashboardInformation Dashboard
GIS/ Spatial Display
Other
Departmental and Corporate
Systems
Integration Using API’s
Exor Hub Technology
Oracle Spatial
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
22 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Oracle Spatial
Database
Asset Valuation Manager
Asset Valuation Manager
Street Lighting Manager
Street Lighting Manager
Maintenance ManagerMaintenance Manager
Schemes ManagerSchemes Manager
Traffic Interface Manager
Traffic Interface Manager
Structures ManagerStructures Manager
Safety ManagerSafety Manager
UKPMSUKPMS
Enquiry ManagerEnquiry Manager
MapCaptureMapCapture
MobileMobile
Public Rights of WayPublic Rights of Way
Noticing ManagerNoticing Manager
Permitting ManagerPermitting Manager
Street Gazetteer Manager
Street Gazetteer Manager
CIM / FIMCIM / FIM
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
23 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
ExorHub
PMS / Condition
Projects
Traffic Data
CRASH(Safety)
Sharing Data without DuplicationSharing Data without Duplication
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
24 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Data Displayed with Integrated Mapping
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
25 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Select Multiple Work Requests and Create a Work Order from the Map
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
26 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Example Engineering reporting – Assets along a route
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
27 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
1 13$ 26,000
Reconstruction Project
185 $ 1,500Planned Maintenance
8 11.5$ 5,000Pothole Repair
(2000)
(100)
(2500)
$8,000$2,000
$6,300$2,100
$16,100$4,600
$3,150$2,100
$500 $100
Segment Cost
Cost per mile
Exor provides powerful reporting across data sets
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
28 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
100.07 101.52 101.7 101.83 101.95 102.16 102.54
5.6 6.2 7.0 8.0 7.0 6.4
Width
102.54100.07 101.52 101.75 101.9 102 102.4
30 40 31 29 41 25
Roughness
100.07 101.52 101.75 101.83 101.95 102 102.54102.4
Merge ResultsWidth < 8
AND
Roughness <40
And Merge Query functionality like this
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
29 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Information Manager: Actionable Intelligence
29
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
30 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Information Manager: Actionable Intelligence
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
31 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
Global Adopters
31
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
32 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
National Road Works Portal www.roadworksonline.org.uk
© 2
012
Ben
tley
Syst
ems,
Inco
rpor
ated
33 | WWW.BENTLEY.COM India Geospatial Forum –February 2012
• Engineering Information Management for Integrated Asset Management
• Enhances interoperability– Other Bentley Asset Lifecycle solutions– Third Party Solutions
• Proven Solutions
• Post Go-Live Support– Active user Community– Enhancements– Safeguard user investment
Summary