\\vhb\proj\Bedford\52380.09\docs\Permits\Wetlands Permit Amendment\Amendment_cover letter.docx
April 30, 2018 Ref: 52380.09 Matt Urban NH Department of Transportation Bureau of Environment John O. Morton Building 7 Hazen Drive, PO Box 483 Concord, NH 03302-0483 Re: Bridge #089/099 Rehabilitation Project (NHDOT #24497)
NH 18 Over Lafayette Brook, Franconia, New Hampshire NHDES Wetlands Permit #2017-00004 Amendment
Dear Mr. Urban,
The NH Department of Transportation (NHDOT) submitted a Wetlands Permit Application to the NH Department of Environmental Service (NHDES) in December 2016 for the proposed rehabilitation of Bridge #089/099 in Franconia, NH (NHDOT #24497). This letter requests a minor amendment of Wetland Permit #2017-00004 to allow for the construction of the project.
Bridge #089/099 carries NH 18 (Profile Road) over Lafayette Brook, immediately adjacent to its intersection with NH 141 (Butterhill Road) (refer to Figure 1, attached). The proposed rehabilitation of the bridge will address deficiencies found within the superstructure, which placed the bridge on the NHDOT Red List in 2010. The proposed rehabilitation includes replacing the bridge superstructure, while retaining the existing abutments and wingwalls, with modifications to the upper railing sections. The NHDES Wetlands Permit (NHDES #2017-00004) was granted for this project on April 6, 2017 (see attached).
Since the permit was issued, the proposed design for the project has been updated to modify the rip-rap slope along Lafayette Brook (refer to the revised Wetland Permitting Plans, attached). The NHDOT Bureau of Bridge Maintenance recommends that the toe of the slopes down to Lafayette Brook around the bridge structure be further secured due to the history of erosion that has occurred along the slopes of the brook. The proposed change would extend the rip-rap slope stabilization along Lafayette Brook, resulting in a slight increase of bed and bank impact along the eastern side of the proposed rip-rap slope on the southern slope of the brook. An increase in rip-rap is also proposed along the majority of the northern slope of Lafayette Brook, resulting in additional bed and bank impact relative to the permitted limits. These modifications would result in a decrease in the temporary impacts proposed along the northern slope of Lafayette Brook, which would result from equipment accessing the slopes of the brook to conduct the slope stabilization work.
The approved permit currently reads:
Ref: 52380.09 Page 2
\\vhb\proj\Bedford\52380.09\docs\Permits\Wetlands Permit Amendment\Amendment_cover letter.docx
Restore rip rap stabilization and reconstruct drainage swale impacting 1,899 sq. ft. of riverine and palustrine wetlands temporarily impacting 1,096 sq. ft. for access and water diversions.
NHDOT respectfully requests an amended permit to read as follows:
Restore rip rap stabilization and reconstruct drainage swale impacting 2,068 sq. ft. of riverine and palustrine wetlands temporarily impacting 991 sq. ft. for access and water diversions.
The slight increase in total impacts from 1,899 SF to 2,068 SF will result in the total impact fee to be raised from $379.80 to $413.60, resulting in an increase of $33.80. This additional fee of $33.80 is included with this memorandum to cover the additional proposed impacts.
The proposed project involves the addition of riprap along the banks of Lafayette Brook where riprap already exists. The additional riprap proposed in this amendment complies with the NHDES rules found in Env-Wt 404. The updated Wetland Plans include a typical section and plan views of the proposed riprap installation work. NHDOT will use Class V riprap which includes a nominal size of 18” and a maximum size of 36”. The percentage of distribution by particle size for this class is 1.3” for <15%, 3.5” for 15% - 85%, and 8.5” for >85%. The maximum particle size allowed for this class is 22”.
The increased bank impact will not require mitigation since the modifications involve additional bank armoring and stabilization along the existing rip-rap slope. These additional permanent wetland impacts are limited to the existing riprap slope. Lori Sommer and Gino Infascelli confirmed that mitigation was not required for these types of permanent wetland impacts at the NHDOT Natural Resource Agency Coordination Meeting on August 19, 2015 (refer to Appendix F in the original Wetlands Permit application for the proposed project).
Please do not hesitate to contact me if you have questions at (603) 391-3900 or [email protected]. Sincerely, Peter Walker Principal, Environmental Services Attachments: Figure 1 – USGS Locus Map NHDES Permit #2017-00004 Updated Wetland Plans Updated NHDES Wetlands Permit Application Form cc: R. Landry, Administrator, Bureau of Bridge Design R. Crickard, Chief, Project Management Section
J. Whitmore, VHB
Figure 1- USGS Locus MapFranconia (NH#24497)Profile Road (NH 18) over Lafayette Brook
Franconia, New Hampshire
l0 2,000 4,000 Feet
Approximate Project Limits
Project Location
Path: \\Vhb\proj\Wat-LD\08518.05\reports\Block 5 NOI\Figures
USGS Quads: Franconia, Sugar Hill
Lovetts Inn
BUTTERHILL ROAD
The State of New Hampshire
Depat trnent of Envi; onmental Sci vices
Clark B. Freise, Assistant Commissioner
April 06, 2017
NH DEPT. OF TRANSPORTATIONdO MAlT URBANP0 BOX 483CONCORD NH 03302-0483
RE: NH Dept. of Transportation - File #2017-00004 - FranconiaTax Map/Lot 4*: Right-of-Way
Dear Mr. Urban:
Attached please find Wetlands Permit # 2017-00004 to replace the bridge superstructure, restore rip rap stabilizationand reconstruct drainage swale impacting 1,899 sq. ft. of riverine and palustrine wetlands temporarily impacting 1,096sq. ft. for access and water diversions. NHDOT project 24497
The decision to approve this application was based on the following findings:
1. This is a major impact project per Administrative Rules Env-Wt 303.02(p), a replacement of a stream crossingstructure in a tier 3.2. The need for the proposed impacts has been demonstrated by the applicant per Env-Wt 302.01.3. The applicant has provided evidence which demonstrates that this proposal is the alternative with the least adverseimpact to areas and environments under the department’s jurisdiction per Env-Wt 302.03.4. The applicant has demonstrated by plan and example that each factor listed in Env-Wt 302.04(a) Requirements forApplication Evaluation, has been considered in the design of the project.5. The project was coordinated through the Natural Resource Agency monthly meetings and discussed on August 19,2015.6. The project does not require mitigation as this meets rule Env-Wt 302.03(c)(2)(c), protection of existinginfrastructure.7. In accordance with RSA 482-A:8, DES finds that the requirements for a public hearing do not apply as the permittedproject is not of substantial public interest, and will not have a significant impact on or adversely affect the values of theriverine resource, as identified under RSA 482-A:1.8. The NHDES has determined the applicant has met the purpose of the current stream rules relative to not causingdamage upstream or downstream and not impeding aquatic organisms.
Any person aggrieved by this decision may appeal to the New Hampshire Wetlands Council (the Council) by filingan appeal that meets the requirements specified in RSA 482-A:l0, RSA 21-0:14, and the rules adopted by theCouncil, Env-WtC 100-200. The appeal must be filed directly with the Council within 30 days of the date of thisdecision and must set forth fully every ground upon which it is claimed that the decision complained of isunlawful or unreasonable. Only those grounds set forth in the notice of appeal can be considered by the Council.
www.des.nh.gov29 ilazen Drive • P0 Box 95 • Concord, NH 03302-0095
(603] 271-3503 • TDD Access: Relay NH 1-800-735-2964
2017-00004Page 2 of 2
Information about the Council, including a link to the Council’s rules, is available at <http://nhec.nh.gov/> (ormore directly at <http://nhec.nh.gov/wetlands/index.htm>.) Copies of the rules also are available from the NewHampshire Department of Environmental Services (NHDES) Public Information Center at (603) 271-2975.
Your permit must be signed, and a copy must be posted in a prominent location on site during construction.
If you have any questions, please contact our office at (603) 271-2147.
Sincerely,
Gino InfascelliPublic Works Project SupervisorNHDES Wetlands Bureau
cc: Franconia Conservation CommissionFranconia Municipal ClerkRobert Landry, NH DOT, Bureau of Highway Design
The State of New Hampshire
Department of Environmental Services
Clark B. Freise, Assistant Commissioner
WETLANDS AND NON-SITE SPECIFIC PERMIT 2017-00004
Permittee: NH DEPT. OF TRANSPORTATION NOTE CONDITIONSP0 BOX 483CONCORD, NH 03302-0483
Project Location: NH ROUTE 18 (PROFILE ROAD), FRANCONIATAX MAP/LOT NO: ROW / ROW
Waterbody: LAFAYETTE BROOK
APPROVAL DATE: APRIL 06, 2017 EXPIRATION DATE: APRIL 06, 2022
Based upon review of the above referenced application, in accordance with RSA 482-A and RSA 485-A:17, a WetlandsPermit and Non-Site Specific Permit was issued. This permit shall not be considered valid unless signed as specifiedbelow.
PERMIT DESCRIPTION: Replace the bridge superstructure, restore rip rap stabilization and reconstruct drainage swaleimpacting 1,899 sq. ft. of riverine and palustrine wetlands temporarily impacting 1,096 sq. ft. for access and waterdiversions. NHDOT project 24497
THIS APPROVAL IS SUBJECT TO THE FOLLOWING PROJECT SPECIFIC CONDITIONS:1. All work shall be in accordance with plans labeled as Preliminary Plans by NHDOT Bureau of Highway Design dated10/26/16, as received by the Department on January 3, 2017.2. This permit is contingent upon the submission of Final Wetland Impact Plans at least 10 days prior to construction.3. Stamped engineering plans are to be submitted to the file at least 10 days prior to construction as required per ruleEnv-Wt 404.04(a) including plan sheets specifically addressing the information required per Env-Wt 404.04 (b).4. Dredged material shall be placed out of the DES Wetlands Bureau jurisdiction.5. Unconfined work within the brook, exclusive of work associated with installation of a cofferdam, shall be doneduring periods of low flow.6. Cofferdams shall not be installed during periods of high flow, whether due to seasonal runoff or precipitation.Once a cofferdam is fully effective, confined work can proceed without restriction.7. Prior to commencing work on a substructure located within surface waters, a cofferdam shall be constructed toisolate the substructure work area from the surface waters.8. Temporary cofferdams shall be entirely removed immediately following construction.9. Construction equipment shall not be located within surface waters.10. Discharge from dewatering of work areas shall be to sediment basins that are: a) located in uplands; b) lined withhay bales or other acceptable sediment trapping liners; and c) set back as far as possible from wetlands and surfacewaters, in all cases with a minimum of 20 feet of undisturbed vegetated buffer.11. Appropriate turbidity controls shall be installed prior to construction, shall be maintained during construction suchthat no turbidity escapes the immediate dredge area, and shall remain in place until suspended particles have settledand the water at the work site has returned to normal clarity.12. Within three days of the last activity in an area, all exposed soil areas, where construction activities are complete,shall be stabilized by seeding and mulching during the growing season, or if not within the growing season, by mulchingwith tack on slopes steeper than 3:1 or netting /matting and pinning on slopes steeper than 2:1.
www.des.nh.gov29 Hazen Drive • P0 Box 95 • Concord, NH 03302-0095
(603] 271-3503 • TDD Access: Relay NH 1-800-735-2964
2017-00004Page 2of2Conditions Cont’d
13. Where construction activities have been temporarily suspended within the growing season, all exposed soil areasshall be stabilized within 14 days by seeding and mulching or if temporarily suspended outside the growing season, allexposed areas shall be stabilized within 14 days by mulching, mulching with tack on slopes steeper than 3:1 andstabilized by matting and pinning on slopes steeper than 2:1.14. The contractor responsible for completion of the work shall utilize techniques described in the New HampshireStormwater Manual, Volume 3, Erosion and Sediment Controls During Construction (December 2008).15. Extreme precautions to be taken within riparian areas to limit unnecessary removal of vegetation during roadconstruction and areas cleared of vegetation to be re-vegetated as quickly as possible.16. There shall be no further alteration to wetlands or surface waters without amendment of this permit.17. Standard precautions shall be taken to prevent import or transport of soil or seed stock from nuisance, invadingspecies such as purple loosestrife or Phragmites.18. All activity shall be in accordance with the Shoreland Water Quality Protection Act, RSA 483-B.
GENERAL CONDITIONS THAT APPLY TO ALL NHDES WETLANDS PERMITS:1. A copy of this permit shall be posted on site during construction in a prominent location visible to inspecting
personnel;2. This permit does not convey a property right, nor authorize any injury to property of others, nor invasion of rights of
others;3. The Wetlands Bureau shall be notified upon completion of work;4. This permit does not relieve the applicant from the obligation to obtain other local, state or federal permits, and/or
consult with other agencies as may be requited (including US EPA, US Army Corps of Engineers, NH Department ofTransportation, NH Division of Historical Resources (NH Department of Cultural Resources), NHDES-Alteration ofTerrain, etc.);
5. Transfer of this permit to a new owner shall require notification to and approval by NHDES;6. This project has been screened for potential impacts to known occurrences of protected species and exemplary
natural communities in the immediate area. Since many areas have never been surveyed, or have only receivedcursory inventories, unidentified sensitive species or communities may be present. This permit does not absolvethe permittee from due diligence in regard to state, local or federal laws regarding such communities or species.
7. Review enclosed sheet for status of the US Army Corps of Engineers’ federal wetlands permit.
1 /1 ezAPPROVED: -z-
- Gino InfascelliNHDES Wetlands Bureau
BY SIGNING BELOW I HEREBY CERTIFY THAT I HAVE FULLY READ THIS PERMIT AND AGREE TO ABIDE BY ALL PERMITCONDITIONS.
OWNER’S SIGNATURE (required) CONTRACTOR’S SIGNATURE (required)
w
DRIVEWAYS
BUILDINGS
FOUNDATION
STEPS AND WALK
INTERMITTENT WATER COURSE
SHORE LINE
BRUSH OR WOODS LINE
TREES (PLANS)
HEDGE
WELL
SEPTIC TANK
LEACH FIELD
GAS PUMP
FUEL TANK (ABOVE GROUND)
GRAVE
ROCK OUTCROP
ORIGINAL GROUND
(TYPICALS & SECTIONS ONLY)
(TYPICALS)
ROCK LINE
STONE WALL
RETAINING WALL (LABEL TYPE)
SIGNS
MAILBOX
(label type)
(label type)
river/stream
(deciduous)(coniferous) (stump)
(double post)
(single post)
(label type)
SATELLITE DISH ANTENNA
DELINEATED WETLAND
BORING LOCATION
TEST PIT
CONSTRUCTION BASELINE
PC, PT, POT (ON CONST BASELINE)
PI (IN CONSTRUCTION BASELINES)
INTERSECTION OR EQUATION OF
TWO LINES
ORIGINAL GROUND LINE
(PROFILES AND CROSS-SECTIONS)
PROFILE GRADE LINE
(PROFILES AND CROSS-SECTIONS)
SLOPE LINE (FILL)
SLOPE LINE (CUT)
ORIGINAL GROUND ELEVATION (LEFT)
FINISHED GRADE ELEVATION (RIGHT)
INTERSTATE NUMBERED HIGHWAY
UNITED STATES NUMBERED HIGHWAY
STATE NUMBERED HIGHWAY
PROFILES AND CROSS SECTIONS:
(label surface type)
pond
(label size & type)
FLAG POLE
ENGINEERING
SLOPE LINE
79.14
72.5
CLEARING LINE
EDGE OF PAVEMENT
TRAVELED WAY
ROADWAY
PROPOSED
roadway
existing
outside slope lines)
(pavement removed
be removed)
(building to
of building)
(label house or type
water body)
(label name of
fp
field
leach
retained ground)
(points toward
s
gp
ft
gr
mb
da
vpVENT PIPE
PHONE
TIDAL BUFFER ZONE
ORDINARY HIGH WATER
SPECIAL AQUATIC SITE
TOP OF BANK
TOP OF BANK & ORDINARY HIGH WATER
VERNAL POOL
INVASIVE SPECIES
SLOPE LINE
CLEARING LINE
30 31 32
GENERAL
ph
STORAGE TANK FILLER CAP
2
PUB2E
cgr
JERSEY BARRIER
fc
B
WATER FRONT BUFFER
NATURAL WOODLAND BUFFER
POTENTIAL WET AREA SYMBOL
MONITORING WELL
II
I.S.
I
I.S.INVASIVE SPECIES LABEL
TP
PRIME WETLAND
WETLAND DESIGNATION AND TYPE
293
3
102
BRIDGE CROSSINGS
STREAM OVERPASS
TREE OR STUMP (CROSS-SECTIONS)
(show station, circumference in feet & type)
existing PROPOSED
500 YEAR FLOODPLAIN BOUNDARY
100 YEAR FLOODPLAIN BOUNDARY
FLOODPLAIN / FLOODWAY
FLOODWAY
GROUND LIGHT/LAMP POST gl lp
FENCE (LABEL TYPE)
CURB (LABEL TYPE)
w
mon
SHEET 1 OF 2
NON-JURISDICTIONAL DRAINAGE AREA
COWARDIN DISTINCTION LINE
PRIME WETLAND 100' BUFFER
WIDTH AT BANK FULL
MEAN HIGH WATER
MEAN LOW WATER
DEVELOPED TIDAL BUFFER ZONE
REFERENCE LINE
SHORELAND - WETLAND
GUARDRAIL (label type)bgr
NORMAL HIGH WATER
HIGHEST OBSERVABLE TIDE LINE
PROTECTED SHORELAND
REVISION DATE
11-21-2014
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
24497
DGN
STDSym.dgn
STATE OF NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
STANDARD SYMBOLS
2 8
TELEPHONE POLE
POWER POLE
JOINT OCCUPANCY
MISCELLANEOUS/UNKNOWN POLE
POLE STATUS:
AS APPLICABLE e.g.:
LIGHT POLE
LIGHT ON POWER POLE
LIGHT ON JOINT POLE
(plot point at face
not center of symbol)
RIGHT-OF-WAY LINE
PROPERTY LINE
TOWN LINE
COUNTY LINE
STATE LINE
BOUND
DRILL HOLE IN ROCK
NATIONAL FOREST
(label type)
BOW
CONCORD
COOS
GRAFTON
MAINE
IRON PIPE OR PIN
NHDOT PROJECT MARKER
PEDESTAL WITH PEDESTRIAN SIGNAL
HEADS AND PUSH BUTTON UNIT
CONTROLLER CABINET
METER PEDESTAL
PULL BOX
LOOP DETECTOR (QUADRUPOLE)
LOOP DETECTOR (RECTANGULAR)
(label size)
(label size)
PROPERTY PARCEL NUMBER
HISTORIC PROPERTY
WATER SHUT OFF
GAS SHUT OFF
RAILROAD
RAILROAD SIGN
RAILROAD SIGNAL
(label ownership)
HYDRANT
UTILITY JUNCTION BOX
MAST ARM (existing)
OPTICOM RECEIVER
OPTICOM STROBE
MANHOLE
CATCH BASIN
DROP INLET
DRAINAGE PIPE (existing)
EROSION CONTROL/ STONE
SLOPE PROTECTION
(existing)
DRAINAGE
BOUNDARIES / RIGHT-OF-WAY
UTILITIES
di
cb (PROPOSED)
RCP
g os
H Y D
12
DRAINAGE PIPE (PROPOSED)
HEADER (existing & PROPOSED)
REMOVE, LEAVE, PROPOSED, OR TEMPORARYEND SECTION (existing & PROPOSED)
OPEN DITCH (PROPOSED)
SEWER
TELEPHONE
ELECTRICAL
GAS
30' MA
NEW HAMPSHIRE
S/L T/L
bnd
TOWN LINE MONUMENT
STATE LINE/
of flow
direction
show& type)
(label size
& type)
(label size
W/ FLUSHING BASIN
UNDERDRAIN (PROPOSED)
STAN'S
SIGN
MANHOLES
TRAFFIC SIGNAL
RR RIGHT-OF-WAY LINE
PROPERTY LINE (COMMON OWNER)
TAX MAP AND LOT NUMBER
protection)
(with stone outlet
6.80 Ac.±
1642/341
14
156
note if abandoned)
label size, type and
(on existing lines
UNDERGROUND UTILITIES
W/ FLUSHING BASINUNDERDRAIN (existing)
L P+04
25.0'
R T+04
25.0'
jb
M H T
M H E
M H S
M H G
SOG
W
SO
m h
e
m h
g
hy d
m ht
m h
s
wso
cc
pb
mp
PB
MP
(NOTE ANGLE FROM Å)
FENCING NOTE
CLEARING AND GRUBBING AREA
DRAINAGE NOTE
GUARDRAIL NOTE
G-1
B-1
LIGHTING NOTE
EROSION CONTROL NOTE
A
1
A
A
1
A
CONSTRUCTION NOTES
(PROPOSED)
GUY POLE OR PUSH BRACE
BENCH MARK / SURVEY DISK
METAL or PLASTIC
CURB MARK NUMBER - GRANITE
CURB MARK NUMBER - BITUMINOUS
fb
TELEPHONE
ELECTRIC
GAS
LIGHTING
FIBER OPTIC
INTELLIGENT TRANSPORTATION SYSTEM
WATER
SEWER
JB
CC
SIGNAL CONDUIT
PROPOSEDexistingPROPOSEDexisting
dh
ip
1TRAFFIC SIGNAL NOTE
SHEET 2 OF 2
m h
uUNKNOWN
m hd
TRAFFIC SIGNALS / ITS
ITS NOTE 1
FIBER OPTIC DELINEATOR
s vf
ITSitsVS F
FODfod
VARIABLE SPEED LIMIT SIGN
DYNAMIC MESSAGE SIGN
FIBER OPTIC SPLICE VAULT
ROAD AND WEATHER INFO SYSTEM
CAMERA POLE (CCTV)
ITS EQUIPMENT CABINET
CONSERVATION LAND
OVERHEAD WIRE
(label type)
REVISION DATE
9-1-2016
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
24497
DGN
STDSym.dgn
STATE OF NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
STANDARD SYMBOLS
3 8
w
post
post
post
post
post
postmd
mb
lp
lp
lplp
ip
ip
glgl
gl
gl
gl
glgl
gl
gl
gl
glgl
gl
bnd
bnd
bnd
bnd
an
an
an
1105.6
16
TRUST
2010 FAMILY
LOVETT-RETZ
n/f
REALTY TRUST
STONY HILL
n/f
REALTY TRUST
STONY HILL
n/f
CORPORATION
DEVELOPMENT
MOUNTAIN
LAFAYETTE
n/f
GARY R.
POWELL,
n/f
FAMILY TRUST
DAVID SYMMES
1
2'c
.5'c
4.3'c
2'c
benchgran
lawn
stre
am
5.7' from ep
tree face
w/chevron
w/chevron
brushb
rush
State park"
Franconia Notch
in Mtn.Tw
"So. Franconia
hdr
stone
Symmes"
David and Jean
"1421
SC 203
+09.22
204
205
CS 205
+55.00
206 207 208 209 305 210 211
PC
21
0+
76.
94
PT 305
+67.42
212
PCC 304+23.00
PC 303+05.38
302
303
304
305
ST
20
7+
05.
00
R = 1050.00'
T = 123.46'
Xs= 149.92
Ls= 150.00'
E = 7.23'
Lc= 245.79'
Dc= 5°27'24.27"
Sc= 396.86
Ç = 13°24'42.90" RT
E = 969600.34
N = 621248.79
PI= 204+32.67
PROFILE ROAD (NH 18)
CURVE# 1
R = 5729.58'
T = 143.15'
E = 1.79'
Lc= 286.25'
Dc= 1°00'00.00"
Ç = 2°51'44.94" RT
E = 969342.55
N = 621993.70
PI= 212+20.09
PROFILE ROAD (NH 18)
CURVE# 2
R = 1800.00'(1) R = 400.00'(2)
T = 58.83'(1) T = 73.00'(2)
E = 7.57'
Lc= 117.63'(1) Lc=144.42'(2)
Dc= 3°10'59.16"(1) Dc= 14°19'26.20"(2)
Ç = 24°25'48.28" RT
E = 969543.08
N = 621622.55
PCC = 304+23.00
BUTTERHILL ROAD (NH 141)
CURVE# 1
63A
psnh
64psnh78
net
15T
G3
psnh
77
net
62S
79
net
61
130
psnh
75
1
net
76
1
net
•45
62
130
psnh
6T
64 PB
psnhbrac
epush
not in u
sepole w/mete
rtemp wood
fp1/74
fp1G
60
130
psnh
(NH 18)
PROFILE ROAD12'
12'
089/099
BRIDGE NO.
LAF
AYETTE BR
OO
K
(N
H 141)
BUTTER
HILL R
OA
D
12'
12'
NH 141 (BUTTERHILL ROAD)
> CONSTRUCTION
NH 18 (PROFILE ROAD)
> CONSTRUCTION
POND
RECONSTRUCTION
SWALE
3
4
1 2
1
RADIUS = 9'-0"
BUTTERHILL ROAD STA 305+67.42
PROFILE ROAD STA 209+27.60 =
RIPRAP (TYP)
END TRANSITION
DEPTH CONSTRUCTION
BEGIN FULL
STA 206+50
BEGIN TRANSITION
DEPTH CONSTRUCTION
END FULL
STA 210+50
END TRANSITION
DEPTH CONSTRUCTION
BEGIN FULL
STA 303+50
BEGIN TRANSITION
BEGIN CONSTRUCTION
LIMIT OF WORK
STA 303+00
TO REMAIN
LILAC BUSHES
L
22.0'
P+15
R
R
21.0'
P+75
R
L
20.0'
P+37
R
26.0'
P+62
(TYP)
RADIUS = 5'-0"
BEGIN MILL AND OVERLAY
BEGIN CONSTRUCTION
LIMIT OF WORK
STA 204+50
END MILL AND OVERLAY
BEGIN TRANSITION
STA 206+00
END MILL AND OVERLAY
END CONSTRUCTION
LIMIT OF WORK
STA 212+25
BEGIN MILL AND OVERLAY
END TRANSITION
STA 211+00
APPROACH CURB
GRANITE
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
SH
EE
T
CH
EC
KE
D
AS
BUI
LT
DE
TAI
LS
DA
TE
DA
TE
DA
TE
DA
TE
NU
MB
ER
DA
TE
ST
ATI
ON
ST
ATI
ON
DE
SC
RI
PTI
ON
RE
VI
SI
ON
S
AF
TE
R
PR
OP
OS
AL
24497
DGN
24497_4pl.dgn
STATE OF NEW HAMPSHIRE
SD
R
PR
OC
ES
SE
D
NE
W
DE
SI
GN
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
NA
ME
1
NA
ME
2
NA
ME
3
DA
TE
1
DA
TE
2
DA
TE
3
N
SCALE IN FEET
30 0 30 60
DRAINAGE NOTE
1
GUARDRAIL TABLE
LF
25
275
U
1
1
(STEEL POST)
EAGRT, TL 2)
(TERMINAL UNIT TYPE
BEAM GUARDRAIL
GENERAL PLAN
4
ITEM 606.1255
STA 211+67.0 TO STA 211+92.0, LT
STA 208+92.0 TO STA 211+67.0, LT
STA 206+97.1 TO STA 207+22.1, RT
STA 206+72.1 TO STA 206+97.1, RT
LOCATION
1
2
3
4
ITEM 606.180016" INV. @ OUTLET = 1089.0
6" INV. @ +50.0, RT 12.0' = 1089.9
CONST. UL-2 HEADWALL @ +58.3, RT 21.8'
CONST. 110 LF X 6" PERF. CORR. POLY. PIPE UND., S = 1.6%
STA. 207+58.3, RT 21.8' TO STA. 206+50.0, RT 12.0'
(STEEL POST)
8" OFFSET BLOCK
GUARDRAIL WITH
31" W-BEAM
8
STATE OF NEW HAMPSHIREDEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN
REVISIONS AFTER PROPOSAL
DESIGNED
DRAWN
QUANTITIES
REV. DATE
ISSUE DATE FEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS
FILE NUMBER
OF
BRIDGE SHEET
DATEBY
CHECKED
CHECKED
CHECKED
DATEBY
KDW
JAW
JAW
8
\\nh-b
ed\projects\5
2380.0
9\cad\st\pla
nset\
WE
TL
AN
D\2
4497_5pln
&el0
1.d
gn
SHEET SCALEDRAWING NAMEPLOT DATE
AS NOTED
BRIDGE NO. 089/099 STATE PROJECT 24497
4/27/2018 24497_5pln&el01.dgn
SMH
TOWN FRANCONIA
LOCATION NH 18 OVER LAFAYETTE BROOK
12/17
12/17
12/17
12/17
PLAN
305207 208 209
305
N
TO FRANCONIA
TO LINCOLNFG EL = 1093.47
STA 207+82.75
FG EL = 1092.35
STA 208+36.87
DRAINAGE AREA
DESIGN FLOOD VELOCITY (100 YR) 15 FPS
200 SQ. FEET
HYDRAULIC DATA
DESIGN FLOOD DISCHARGE (100 YR)
DESIGN FLOOD ELEVATION (100 YR)
6.5 SQ. MILES
1610 CFS
1087.3 FEET
LAF
AYETTE BR
OO
K
> BRG ABUT A (EXP) > BRG ABUT B (EXP)
AND ROUTE
3
TO I-
93
ELEVATION
HYDRAULIC NOTES
BRIDGE FULL WATERWAY OPENING PERPENDICULAR TO RIVER
NH 141 (BUTTERHILL ROAD)
> CONSTRUCTION
CURB (TYP)
FACE OF
2.
1.
BRIDGE PLAN AND ELEVATION
CAP AT PILASTER
CONCRETE
TO REMAIN (TYP)
AND STONE FACING
EXISTING PILASTER
BRIDGE SEAT
SH
OU
LD
ER
1'-0"
LA
NE
11'-0"
LA
NE
11'-0"
SH
OU
LD
ER
1'-
0"
45° (TYP)
END OF DECK (TYP)
OU
T-
TO-
OU
T
29'-2"
CU
RB-
TO-
CU
RB
24'-6"
(> BRG TO > BRG)
TOE OF SLOPE (TYP)
TOP OF SLOPE (TYP)
NH 18 (PROFILE ROAD)
> CONSTRUCTION
(T
YP)
11'-0"
SCALE IN FEET
10 0 10 20
AT PILASTER (TYP)
CONCRETE CAP
SCALE: 1" = 10'
SCALE: 1" = 10'
5
(1087.3)
Q100
BRIDGE RAIL (TYP)
PRECAST CONCRETE
UNDERDRAIN
(T
YP)
(T
YP)
BOX BEAM
PRECAST CONCRETE
(C
AP
ST
ON
E)
(CAPSTONE) (TYP)
FACE OF RAIL
1960 CFS
2.5 FEET
3.5 FEET
SCOUR CHECK DISCHARGE (500 YR)
ANTICIPATED DEPTH OF SCOUR (100 YR)
ANTICIPATED DEPTH OF SCOUR (500 YR)
CAPSTONES (TYP)
RESET WINGWALL
RESET CAPSTONES (TYP)
RAIL (SE, NW)
BRIDGE APPROACH
TO REMAIN (TYP)
ABUTMENT AND WINGWALL
CAPSTONES (TYP)
RESET
GRANITE APPROACH CURB
(TYP) (SE, NW)
BRIDGE APPROACH RAIL
FLOOD DISCHARGE ELEVATION.
SURVEYED WATER SURFACE ELEVATION IS SIMILAR TO THE 2 YEAR DESIGN
COMPUTED SCOUR DEPTHS ARE LESS THAN 4 FEET.
LEVEL OF PROTECTION TO STRUCTURES AND DOWN-GRADIENT SENSITIVE RECEPTORS.
DROP INLET SEDIMENT BARRIERS SHOULD NEVER BE USED AS THE PRIMARY MEANS OF SEDIMENT CONTROL AND SHOULD ONLY BE USED TO PROVIDE AN ADDITIONAL 8.4.
CLEAN CATCH BASINS, DRAINAGE PIPES, AND CULVERTS IF SIGNIFICANT SEDIMENT IS DEPOSITED.8.3.
INSTALL SEDIMENT BARRIERS AND SEDIMENT TRAPS AT INLETS TO PREVENT SEDIMENT FROM ENTERING THE DRAINAGE SYSTEM.8.2.
DIVERT SEDIMENT LADEN WATER AWAY FROM INLET STRUCTURES TO THE EXTENT POSSIBLE.8.1.
PROTECT STORM DRAIN INLETS: 8.
DETENTION BASINS SHALL BE DESIGNED AND CONSTRUCTED TO ACCOMMODATE A 2 YEAR STORM EVENT.12.7.
ALL AREAS THAT CAN BE STABILIZED SHALL BE STABILIZED PRIOR TO OPENING UP NEW TERRITORY.12.6.
GRAVEL, OR CRUSHED STONE BASE TO HELP MINIMIZE EROSION ISSUES.
FOR HAUL ROADS ADJACENT TO SENSITIVE ENVIRONMENTAL AREAS OR STEEPER THAN 5%, THE DEPARTMENT WILL CONSIDER USING EROSION STONE, CRUSHED 12.5.
AREAS WHERE HAUL ROADS ARE CONSTRUCTED AND STORMWATER CANNOT BE TREATED THE DEPARTMENT WILL CONSIDER INFILTRATION.12.4.
SLOPES 3:1 OR FLATTER WILL RECEIVE TURF ESTABLISHMENT ALONE.12.3.
SLOPES STEEPER THAN 3:1 WILL RECEIVE TURF ESTABLISHMENT WITH MATTING.12.2.
STRATEGIES.
THE CONTRACTOR SHALL COMPLY WITH RSA 485:A:17 AND ENV-WQ 1500; ALTERATION OF TERRAIN FOR CONSTRUCTION AND USE ALL CONVENTIONAL BMP 12.1.
STRATEGIES SPECIFIC TO OPEN AREAS LESS THAN 5 ACRES:12.
TABLE 1
GUIDANCE ON SELECTING TEMPORARY SOIL STABILIZATION MEASURES
EROSION CONTROL STRATEGIES
NOTES:
2. PRODUCTS CONTAINING POLYACRYLAMIDE (PAM) SHALL NOT BE APPLIED DIRECTLY TO OR WITHIN 100 FEET OF ANY SURFACE
3. ALL EROSION CONTROL BLANKETS SHALL BE MADE WITH WILDLIFE FRIENDLY BIODEGRADABLE NETTING.
1
SLOPES
CHANNELS
APPLICATION AREAS DRY MULCH METHODS HYDRAULICALLY APPLIED MULCHES2
ROLLED EROSION CONTROL BLANKETS3
HMT WC SG CB HM SMM BFM FRM SNSB DNSB DNSCB DNCB
STEEPER THAN 2:1 NO NO YES NO NO NO NO YES NO NO NO YES
2:1 SLOPE YES YES YES YES NO NO YES YES NO YES YES YES
3:1 SLOPE YES YES YES YES NO YES YES YES YES YES YES NO
4:1 SLOPE YES YES YES YES YES YES YES YES YES YES NO NO
WINTER STABILIZATION 4T/AC YES YES YES NO NO YES YES YES YES YES YES
LOW FLOW CHANNELS NO NO NO NO NO NO NO NO NO NO YES YES
HIGH FLOW CHANNELS NO NO NO NO NO NO NO NO NO NO NO YES
ABBREV. STABILIZATION MEASURE ABBREV. STABILIZATION MEASURE ABBREV. STABILIZATION MEASURE
HMT HAY MULCH & TACK HM HYDRAULIC MULCH SNSB SINGLE NET STRAW BLANKET
WC WOOD CHIPS SMM STABILIZED MULCH MATRIX DNSB DOUBLE NET STRAW BLANKET
SG STUMP GRINDINGS BFM BONDED FIBER MATRIX DNSCB 2 NET STRAW-COCONUT BLANKET
CB COMPOST BLANKET FRM DNCB 2 NET COCONUT BLANKET
REVISION DATE
12-21-2015
WATER WITHOUT PRIOR WRITTEN APPROVAL FROM THE NH DEPARTMENT OF ENVIRONMENTAL SERVICES.
1. ALL SLOPE STABILIZATION OPTIONS ASSUME A SLOPE LENGTH \10 TIMES THE HORIZONTAL DISTANCE COMPONENT OF THE SLOPE, IN FEET.
FIBER REINFORCED MEDIUM
GENERAL CONSTRUCTION PLANNING AND SELECTION OF STRATEGIES TO CONTROL EROSION AND SEDIMENT ON HIGHWAY CONSTRUCTION PROJECTS
SWEEP ALL CONSTRUCTION RELATED DEBRIS AND SOIL FROM THE ADJACENT PAVED ROADWAYS AS NECESSARY.7.2.
INSTALL AND MAINTAIN CONSTRUCTION EXITS, ANYWHERE TRAFFIC LEAVES A CONSTRUCTION SITE ONTO A PUBLIC RIGHT-OF-WAY.7.1.
ESTABLISH STABILIZED CONSTRUCTION EXITS:7.
BEST MANAGEMENT PRACTICES (BMP) BASED ON AMOUNT OF OPEN CONSTRUCTION AREA
1 1
HYDROLOGY BEYOND THE PERMITTED AREA.
DIVERT OFF-SITE WATER THROUGH THE PROJECT IN AN APPROPRIATE MANNER SO NOT TO DISTURB THE UPSTREAM OR DOWNSTREAM SOILS, VEGETATION OR 5.5.
AND DISCHARGE LOCATIONS PRIOR TO USE.
STABILIZE, TO APPROPRIATE ANTICIPATED VELOCITIES, CONVEYANCE CHANNELS OR PUMPING SYSTEMS NEEDED TO CONVEY CONSTRUCTION STORMWATER TO BASINS 5.4.
CONSTRUCT IMPERMEABLE BARRIERS AS NECESSARY TO COLLECT OR DIVERT CONCENTRATED FLOWS FROM WORK OR DISTURBED AREAS.5.3.
LOCATION.
DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM DISTURBED AREAS, SLOPES, AND AROUND ACTIVE WORK AREAS AND TO A STABILIZED OUTLET 5.2.
DIVERT OFF SITE RUNOFF OR CLEAN WATER AWAY FROM THE CONSTRUCTION ACTIVITY TO REDUCE THE VOLUME THAT NEEDS TO BE TREATED ON SITE.5.1.
CONTROL STORMWATER FLOWING ONTO AND THROUGH THE PROJECT:5.
WITH SECTION 2.1.2.1. OF THE 2012 NPDES CONSTRUCTION GENERAL PERMIT.
WHEN WORK IS PERFORMED WITHIN 50 FEET OF SURFACE WATERS (WETLAND, OPEN WATER OR FLOWING WATER), PERIMETER CONTROL SHALL BE ENHANCED CONSISTENT 3.5.
WHEN WORK IS PERFORMED IN AND NEAR WATER COURSES, STREAM FLOW DIVERSION METHODS SHALL BE IMPLEMENTED PRIOR TO ANY EXCAVATION OR FILLING.3.4.
PROTECT AND MAXIMIZE EXISTING NATIVE VEGETATION AND NATURAL FOREST BUFFERS BETWEEN CONSTRUCTION ACTIVITY AND SENSITIVE AREAS.3.3.
CONSTRUCTION SHALL BE SEQUENCED TO LIMIT THE DURATION AND AREA OF EXPOSED SOILS.3.2.
CLEARLY FLAG AREAS TO BE PROTECTED IN THE FIELD AND PROVIDE CONSTRUCTION BARRIERS TO PREVENT TRAFFICKING OUTSIDE OF WORK AREAS.3.1.
PLAN ACTIVITIES TO ACCOUNT FOR SENSITIVE SITE CONDITIONS: 3.
MET.
CRITICAL PATH METHOD SCHEDULE (CPM), AND THE CONTRACTOR HAS ADEQUATE RESOURCES AVAILABLE TO ENSURE THAT ENVIRONMENTAL COMMITMENTS WILL BE
MONTHS, UNLESS THE CONTRACTOR DEMONSTRATES TO THE DEPARTMENT THAT THE ADDITIONAL AREA OF DISTURBANCE IS NECESSARY TO MEET THE CONTRACTORS
, OR EXCEED ONE ACRE DURING WINTER TH
THROUGH NOVEMBER 30ST
THE MAXIMUM AMOUNT OF DISTURBED EARTH SHALL NOT EXCEED A TOTAL OF 5 ACRES FROM MAY 14.3.
UTILIZE TEMPORARY MULCHING OR PROVIDE ALTERNATE TEMPORARY STABILIZATION ON EXPOSED SOILS IN ACCORDANCE WITH TABLE 1.4.2.
SHALL BE USED TO REDUCE THE AMOUNT AND DURATION OF SOIL EXPOSED TO THE ELEMENTS AND VEHICLE TRACKING.
CONSTRUCTION SHALL BE SEQUENCED TO LIMIT THE DURATION AND AREA OF EXPOSED SOILS. MINIMIZE THE AREA OF EXPOSED SOIL AT ANY ONE TIME. PHASING 4.1.
MINIMIZE THE AMOUNT OF EXPOSED SOIL:4.
UP AND DOWN THE SLOPE, DISKED, HARROWED, DRAGGED WITH A CHAIN OR MAT, MACHINE-RAKED, OR HAND-WORKED TO PRODUCE A RUFFLED SURFACE.
THE OUTER FACE OF THE FILL SLOPE SHOULD BE IN A LOOSE RUFFLED CONDITION PRIOR TO TURF ESTABLISHMENT. TOPSOIL OR HUMUS LAYERS SHALL BE TRACKED 6.4.
CONVEY STORMWATER DOWN THE SLOPE IN A STABILIZED CHANNEL OR SLOPE DRAIN.6.3.
CONSIDER HOW GROUNDWATER SEEPAGE ON CUT SLOPES MAY IMPACT SLOPE STABILITY AND INCORPORATE APPROPRIATE MEASURES TO MINIMIZE EROSION.6.2.
OUTLET OR CONVEYANCE.
INTERCEPT AND DIVERT STORM RUNOFF FROM UPSLOPE DRAINAGE AREAS AWAY FROM UNPROTECTED AND NEWLY ESTABLISHED AREAS AND SLOPES TO A STABILIZED 6.1.
PROTECT SLOPES:6.
MONITORING OF THE SYSTEM.
DEMONSTRATED EXPERIENCE IN THE DESIGN OF FLOCCULANT TREATMENT SYSTEMS. THE CONSULTANT WILL ALSO BE RESPONSIBLE FOR THE IMPLEMENTATION AND
TREAT AND RELEASE WATER CAPTURED IN STORM WATER BASINS. THE CONTRACTOR SHALL ALSO RETAIN THE SERVICES OF AN ENVIRONMENTAL CONSULTANT WHO HAS
THE CONTRACTOR WILL BE REQUIRED TO HAVE AN APPROVED DESIGN IN ACCORDANCE WITH ENV-WQ 1506.12 FOR AN ACTIVE FLOCCULANT TREATMENT SYSTEM TO 14.3.
AMOUNT OF SEDIMENT IN THE STORMWATER TREATMENT BASINS.
THE DEPARTMENT ANTICIPATES THAT SOIL BINDERS WILL BE NEEDED ON ALL SLOPES STEEPER THAN 3:1, IN ORDER TO MINIMIZE EROSION AND REDUCE THE 14.2.
TREATMENT OPTIONS USED FOR UNDER 5 ACRES AND BETWEEN 5 AND 10 ACRES WILL BE UTILIZED.
THE CONTRACTOR SHALL COMPLY WITH RSA 485:A:17 AND ENV-WQ 1500 ALTERATION OF TERRAIN AND SHALL USE CONVENTIONAL BMP STRATEGIES AND ALL 14.1.
STRATEGIES SPECIFIC TO OPEN AREAS OVER 10 ACRES:14.
ALSO CONSIDER A SOIL BINDER IN ACCORDANCE WITH THE NHDES APPROVALS OR REGULATIONS.
SLOPES 3:1 OR FLATTER WILL RECEIVE TURF ESTABLISHMENT OR OTHER TEMPORARY SOIL STABILIZATION MEASURES DETAILED IN TABLE 1. THE CONTRACTOR MAY 13.4.
BONDED FIBER MATRIXES (BFMS) OR FLEXIBLE GROWTH MEDIUMS (FGMS) MAY BE UTILIZED, IF MEETING THE NHDES APPROVALS AND REGULATIONS.
THE CONTRACTOR MAY ALSO CONSIDER A SOIL BINDER IN ACCORDANCE WITH THE NHDES APPROVALS OR REGULATIONS. OTHER ALTERNATIVE MEASURES, SUCH AS
SLOPES STEEPER THAN A 3:1 WILL RECEIVE TURF ESTABLISHMENT WITH MATTING OR OTHER TEMPORARY SOIL STABILIZATION MEASURES DETAILED IN TABLE 1. 13.3.
DETENTION BASINS WILL BE CONSTRUCTED TO ACCOMMODATE THE 2-YEAR 24-HOUR STORM EVENT AND CONTROL A 10-YEAR 24-HOUR STORM EVENT.13.2.
TREATMENT OPTIONS USED FOR UNDER 5 ACRES WILL BE UTILIZED.
THE CONTRACTOR SHALL COMPLY WITH RSA 485:A:17 AND ENV-WQ 1500 ALTERATION OF TERRAIN AND SHALL USE CONVENTIONAL BMP STRATEGIES AND ALL 13.1.
STRATEGIES SPECIFIC TO OPEN AREAS BETWEEN 5 AND 10 ACRES:13.
LOSS UNTIL PERMANENT VEGETATION IS ESTABLISHED.
SOIL TACKIFIERS MAY BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S SPECIFICATIONS AND REAPPLIED AS NECESSARY TO MINIMIZE SOIL AND MULCH 9.4.
AND PRIOR TO SEPTEMBER 15, OF ANY GIVEN YEAR, IN ORDER TO ACHIEVE VEGETATIVE STABILIZATION PRIOR TO THE END OF THE GROWING SEASON.
EROSION CONTROL SEED MIX SHALL BE SOWN IN ALL INACTIVE CONSTRUCTION AREAS THAT WILL NOT BE PERMANENTLY SEEDED WITHIN TWO WEEKS OF DISTURBANCE 9.3.
2012 CGP. (SEE TABLE 1 FOR GUIDANCE ON THE SELECTION OF TEMPORARY SOIL STABILIZATION MEASURES.)
IN ALL AREAS, TEMPORARY SOIL STABILIZATION MEASURES SHALL BE APPLIED IN ACCORDANCE WITH THE STABILIZATION REQUIREMENTS (SECTION 2.2) OF THE 9.2.
WITHIN THREE DAYS OF THE LAST ACTIVITY IN AN AREA, ALL EXPOSED SOIL AREAS, WHERE CONSTRUCTION ACTIVITIES ARE COMPLETE, SHALL BE STABILIZED. 9.1.
SOIL STABILIZATION: 9.
LINE.
SLOPES. THE PERIMETER CONTROLS SHALL BE INSTALLED ON THE FILL SLOPE TO MINIMIZE THE POTENTIAL FOR FILL SLOPE SEDIMENT DEPOSITS IN THE DITCH
CHANNEL PROTECTION MEASURES SHALL BE SUPPLEMENTED WITH PERIMETER CONTROL MEASURES WHEN THE DITCH LINES OCCUR AT THE BOTTOM OF LONG FILL 11.9.
PLAN, DEVELOPED BY A QUALIFIED ENGINEER OR A CPESC SPECIALIST, IS REVIEWED AND APPROVED BY THE DEPARTMENT.
THE AREA OF EXPOSED SOIL SHALL BE LIMITED TO ONE ACRE, OR THAT WHICH CAN BE STABILIZED AT THE END OF EACH DAY UNLESS A WINTER CONSTRUCTION
WINTER EXCAVATION AND EARTHWORK ACTIVITIES NEED TO BE LIMITED IN EXTENT AND DURATION, TO MINIMIZE POTENTIAL EROSION AND SEDIMENTATION IMPACTS. 11.8.
PERMANENT DITCHES SHALL BE DIRECTED TO DRAIN TO SEDIMENT BASINS OR STORM WATER COLLECTION AREAS.
TEMPORARY AND PERMANENT DITCHES SHALL BE CONSTRUCTED, STABILIZED AND MAINTAINED IN A MANNER THAT WILL MINIMIZE SCOUR. TEMPORARY AND 11.7.
PLACE TEMPORARY STONE INLET PROTECTION OVER INLETS IN AREAS OF SOIL DISTURBANCE THAT ARE SUBJECT TO SEDIMENT CONTAMINATION.
CATCH BASINS: CARE SHALL BE TAKEN TO ENSURE THAT SEDIMENTS DO NOT ENTER ANY EXISTING CATCH BASINS DURING CONSTRUCTION. THE CONTRACTOR SHALL 11.6.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR EROSION AND SEDIMENT CONTROL FOR ONE YEAR AFTER PROJECT COMPLETION.
VEGETATIVE STABILIZATION SHALL NOT BE CONSIDERED PERMANENTLY STABILIZED UNTIL VEGETATIVE GROWTH COVERS AT LEAST 85% OF THE DISTURBED AREA.
PERMANENT STABILIZATION MEASURES WILL BE CONSTRUCTED AND MAINTAINED IN LOCATIONS AS SHOWN ON THE CONSTRUCTION PLANS TO STABILIZE AREAS. 11.5.
STABILIZATION OF THE CONTRIBUTING DISTURBED AREA.
THE CONTRACTOR SHOULD UTILIZE STORM DRAIN INLET PROTECTION TO PREVENT SEDIMENT FROM ENTERING A STORM DRAINAGE SYSTEM PRIOR TO THE PERMANENT 11.4.
ACCORDANCE WITH THE GUIDANCE MEMO FROM THE NHDES CONTAINED WITHIN THE CONTRACT PROPOSAL AND THE EPA CONSTRUCTION GENERAL PERMIT.
AFTER ANY STORM EVENT GREATER THAN 0.25 IN. OF RAIN PER 24-HOUR PERIOD. EROSION AND SEDIMENT CONTROL MEASURES WILL ALSO BE INSPECTED IN
EROSION AND SEDIMENT CONTROL MEASURES WILL BE INSPECTED IN ACCORDANCE WITH SECTION 645 OF NHDOT SPECIFICATIONS, WEEKLY AND WITHIN 24 HOURS 11.3.
MEASURES (TEMPORARY EROSION CONTROL SEED MIX AND MULCH, SOIL BINDER) OR COVERED WITH ANCHORED TARPS.
ALL STOCKPILES SHALL BE CONTAINED WITH TEMPORARY PERIMETER CONTROLS. INACTIVE SOIL STOCKPILES SHOULD BE PROTECTED WITH SOIL STABILIZATION 11.2.
TACKIFIERS, AS APPROVED BY THE NHDES.
USE MECHANICAL SWEEPERS ON PAVED SURFACES WHERE NECESSARY TO PREVENT DUST BUILDUP. APPLY WATER, OR OTHER DUST INHIBITING AGENTS OR
USE TEMPORARY MULCHING, PERMANENT MULCHING, TEMPORARY VEGETATIVE COVER, AND PERMANENT VEGETATIVE COVER TO REDUCE THE NEED FOR DUST CONTROL. 11.1.
ADDITIONAL EROSION AND SEDIMENT CONTROL GENERAL PRACTICES:11.
EROSION, POLLUTION, AND TURBIDITY PRECAUTIONS.
THE CONTRACTOR IS DIRECTED TO REVIEW AND COMPLY WITH SECTION 107.1 OF THE CONTRACT AS IT REFERS TO SPILLAGE, AND ALSO WITH REGARDS TO 1.6.
)HTTP://DES.NH.GOV/ORGANIZATION/COMMISSIONER/LEGAL/RULES/INDEX.HTM(
THE CONTRACTOR SHALL COMPLY WITH RSA 485-A:17, AND ALL, PUBLISHED NHDES ALTERATION OF TERRAIN ENV-WQ 1500 REQUIREMENTS 1.5.
OF ENVIRONMENTAL SERVICES (NHDES).
MANUAL, VOLUME 3, EROSION AND SEDIMENT CONTROLS DURING CONSTRUCTION (DECEMBER 2008) (BMP MANUAL) AVAILABLE FROM THE NEW HAMPSHIRE DEPARTMENT
ALL STORM WATER, EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSTALLED AND MAINTAINED IN ACCORDANCE WITH THE NEW HAMPSHIRE STORMWATER 1.4.
THE SPECIAL ATTENTION ITEMS INCLUDED IN THE CONTRACT DOCUMENTS.
THE CONTRACTOR'S ATTENTION IS DIRECTED TO THE NHDES WETLAND PERMIT, THE US ARMY CORPS OF ENGINEERS PERMIT, WATER QUALITY CERTIFICATION AND 1.3.
GENERAL PERMIT (CGP).
AS ADMINISTERED BY THE ENVIRONMENTAL PROTECTION AGENCY (EPA). THIS PROJECT IS SUBJECT TO REQUIREMENTS IN THE MOST RECENT CONSTRUCTION
THIS PROJECT WILL BE SUBJECT TO THE US EPA'S NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM (NPDES) STORM WATER CONSTRUCTION GENERAL PERMIT 1.2.
REGULATIONS.
THESE GUIDELINES DO NOT RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH ANY CONTRACT PROVISIONS, OR APPLICABLE FEDERAL, STATE, AND LOCAL 1.1.
ENVIRONMENTAL COMMITMENTS:1.
SURROUNDING ENVIRONMENT FROM AREAS OF UNSTABILIZED EARTH DISTURBING ACTIVITIES.
TEMPORARY SEDIMENT BASINS OR TRAPS SHALL BE PLACED AND STABILIZED AT LOCATIONS WHERE CONCENTRATED FLOW (CHANNELS AND PIPES) DISCHARGE TO THE 10.3.
CONSTRUCT AND STABILIZE DEWATERING INFILTRATION BASINS PRIOR TO ANY EXCAVATION THAT MAY REQUIRE DEWATERING.10.2.
STORMWATER RUNOFF FROM A 10-YEAR 24 HOUR STORM EVENT. ON-SITE RETENTION OF THE 10-YEAR 24-HOUR EVENT IS NOT REQUIRED.
TEMPORARY SEDIMENT BASINS USED TO TREAT STORMWATER RUNOFF FROM AREAS GREATER THAN 5-ACRES OF DISTURBANCE SHALL BE SIZED TO ALSO CONTROL
24-HOUR STORM EVENT FOR ANY AREA OF DISTURBANCE OR 3,600 CUBIC FEET OF STORMWATER RUNOFF PER ACRE OF DISTURBANCE, WHICHEVER IS GREATER.
TEMPORARY SEDIMENT BASINS (CGP-SECTION 2.1.3.2) OR SEDIMENT TRAPS (ENV-WQ 1506.10) SHALL BE SIZED TO RETAIN, ON SITE, THE VOLUME OF A 2-YEAR 10.1.
RETAIN SEDIMENT ON-SITE AND CONTROL DEWATERING PRACTICES:10.
.TH
THE REQUIREMENTS OF NO LESS THAN 30 DAYS PRIOR TO THE COMMENCEMENT OF WORK SCHEDULED AFTER NOVEMBER 30
(E) A SWPPP AMENDMENT SHALL BE SUBMITTED TO THE DEPARTMENT, FOR APPROVAL, ADDRESSING COLD WEATHER STABILIZATION (ENV-WQ 1505.05) AND INCLUDING
WINTER CONSTRUCTION PLAN HAS BEEN APPROVED BY NHDOT THAT MEETS THE REQUIREMENTS OF ENV-WQ 1505.02 AND ENV-WQ 1505.05.
(D) WINTER EXCAVATION AND EARTHWORK SHALL BE DONE SUCH THAT NO MORE THAN 1 ACRE OF THE PROJECT IS WITHOUT STABILIZATION AT ONE TIME, UNLESS A
INCOMPLETE ROAD SURFACES, WHERE WORK HAS STOPPED FOR THE SEASON, SHALL BE PROTECTED IN ACCORDANCE WITH TABLE 1.TH
AFTER NOVEMBER 30(C)
SHALL BE STABILIZED TEMPORARILY WITH STONE OR IN ACCORDANCE WITH TABLE 1.
, TH
, OR WHICH ARE DISTURBED AFTER OCTOBER 15TH
ALL DITCHES OR SWALES WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OCTOBER 15(B)
, SHALL BE STABILIZED IN ACCORDANCE WITH TABLE 1. TH
15
, OR WHICH ARE DISTURBED AFTER OCTOBER TH
ALL PROPOSED VEGETATED AREAS WHICH DO NOT EXHIBIT A MINIMUM OF 85% VEGETATIVE GROWTH BY OCTOBER 15(A)
FOLLOWING REQUIREMENTS.
OF ANY YEAR SHALL BE CONSIDERED WINTER CONSTRUCTION AND SHALL CONFORM TO THE ST
AND MAY 1TH
CONSTRUCTION PERFORMED ANY TIME BETWEEN NOVEMBER 302.8.
TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES SHALL REMAIN UNTIL THE AREA HAS BEEN PERMANENTLY STABILIZED.2.7.
A WATER TRUCK SHALL BE AVAILABLE TO CONTROL EXCESSIVE DUST AT THE DIRECTION OF THE CONTRACT ADMINISTRATOR.2.6.
BE REQUIRED.
ALL STOCKPILES SHALL BE CONTAINED WITH A PERIMETER CONTROL. IF THE STOCKPILE IS TO REMAIN UNDISTURBED FOR MORE THAN 14 DAYS, MULCHING WILL 2.5.
TEMPORARY SLOPE STABILIZATION CONFORMING TO TABLE 1 HAS BEEN PROPERLY INSTALLED (D)
A MINIMUM OF 3" OF NON-EROSIVE MATERIAL SUCH AS STONE OR RIP-RAP HAS BEEN INSTALLED;(C)
A MINIMUM OF 85% VEGETATED GROWTH HAS BEEN ESTABLISHED;(B)
BASE COURSE GRAVELS HAVE BEEN INSTALLED IN AREAS TO BE PAVED;(A)
AN AREA SHALL BE CONSIDERED STABLE IF ONE OF THE FOLLOWING HAS OCCURRED:2.4.
SPECIFICATIONS FOR ROAD AND BRIDGES CONSTRUCTION.
EROSION AND SEDIMENT CONTROL MEASURES SHALL BE INSPECTED IN ACCORDANCE WITH THE CONSTRUCTION GENERAL PERMIT AND SECTION 645 OF THE NHDOT 2.3.
SEDIMENTATION BEYOND PROJECT LIMITS THROUGHOUT THE PROJECT DURATION.
EROSION, SEDIMENTATION CONTROL MEASURES AND INFILTRATION BASINS SHALL BE CLEANED, REPLACED AND AUGMENTED AS NECESSARY TO PREVENT 2.2.
INSTALLED AS SHOWN IN THE BMP MANUAL AND AS DIRECTED BY THE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) PREPARER.
PERIMETER CONTROLS SHALL BE INSTALLED PRIOR TO EARTH DISTURBING ACTIVITIES. PERIMETER CONTROLS AND STABILIZED CONSTRUCTION EXITS SHALL BE 2.1.
STANDARD EROSION CONTROL SEQUENCING APPLICABLE TO ALL CONSTRUCTION PROJECTS:2.
STATE PROJECT NO. SHEET NO. TOTAL SHEETS
24497
DGN
EroStrat.dgn
STATE OF NEW HAMPSHIRE
DEPARTMENT OF TRANSPORTATION BUREAU OF HIGHWAY DESIGN
86
WETLAND IMPACT PLANS
md
gl
an
an
1085
1085
1085
1085
1085
1085
1090
1090
1090
1090
1090
10901090
1090
1090
1095
1095
1095
1095
1095
1095
1095
N
WETLAND IMPACT SUMMARY
AREA
PERMANENT IMPACTS
SF
(NON-WETLAND)
N.H.W.B.IMPACTS
TEMPORARY
SF SF
LOCATIONCLASSIFICATION
WETLAND
A.C.O.E. (WETLAND)
N.H.W.B. AND
TOTAL
NOTES
WETLAND DESCRIPTION
SCALE IN FEET
10 0 10 20I
H
G
F
E
D
C
B
A
LAFAYETTE BROOK
LAFAYETTE BROOK
LAFAYETTE BROOK
LAFAYETTE BROOK
LAFAYETTE BROOK
LAFAYETTE BROOK
LAFAYETTE BROOK
LAFAYETTE BROOK
POND 156
509
85
568
359
86
123
22
917 9917
SCALE: 1" = 10'
(SUPERSTRUCTURE NOT SHOWN)
R3RB2H
PUB2H
WETLAND IMPACT SUMMARY
LEGEND
= RIVERINE UPPER PERENNIAL ROCK BOTTOM RUBBLE PERMANENTLY FLOODED
= PALUSTRINE UNCONSOLIDATED BOTTOM SAND PERMANENTLY FLOODED
= EROSION CONTROL BARRIER
STRUCTURE
= TEMPORARY WATER DIVERSION
= TEMPORARY BED IMPACT
= TEMPORARY BANK IMPACT
= PERMANENT BED IMPACT
= PERMANENT BANK IMPACT
R3RB2H (BANK)
R3RB2H (BANK)
R3RB2H (BANK)
R3RB2H (BED)
R3RB2H (BED)
R3RB2H (BANK)
R3RB2H (BANK)
R3RB2H (BANK)
PUB2H (BANK)
RIPRAP FOR SLOPE STABILIZATION
TEMPORARY ACCESS FOR BRIDGE CONSTRUCTION AND SLOPE STABILIZATION
RIPRAP FOR SLOPE STABILIZATION AND BANK REPAIR
TEMPORARY ACCESS FOR BRIDGE CONSTRUCTION AND SLOPE STABILIZATION
RIPRAP FOR SLOPE STABILIZATION AND BANK REPAIR
RIPRAP FOR SLOPE STABILIZATION AND BANK REPAIR
RIPRAP FOR SLOPE STABILIZATION
TEMPORARY ACCESS FOR BRIDGE CONSTRUCTION
ROADWAY DRAINAGE IMPROVEMENTS - RECONSTRUCT DRAINAGE SWALE
PLAN
2011 ADJUSTMENT.
VERTICAL DATUM IS NAVD88. COORDINATES ARE NH STATE PLANE NAD83,
OF THE UNITED STATES (COWARDIN ET AL., 1979, REVISED 1985).
METHODOLOGY CLASSIFICATION OF WETLANDS AND DEEPWATER HABITATS
WETLANDS AND SURFACE WATERS WERE CLASSIFIED USING THE USFWS
FOR SECTIONS A-A AND B-B SEE WETLAND IMPACT SECTIONS SHEET.
320 CFS.
THE ESTIMATED 2-YEAR FREQUENCY DISCHARGE OF LAFAYETTE BROOK IS
CONTRACT.
QUALITY OF LAFAYETTE BROOK UNDER ITEM 699 OR SPECIFIC ITEMS IN
TO CONSTRUCTION AND MAINTAINED DURING CONSTRUCTION TO PROTECT WATER
EROSION AND TURBIDITY CONTROL MEASURES SHALL BE INSTALLED PRIOR
PERMIT.
IN THE WETLAND IMPACT PLANS AND DESCRIBED IN THE NHDES WETLAND
THERE SHALL BE NO IMPACTS TO WETLANDS OR STREAMS EXCEPT AS SHOWN
ENV-WT 101.07 AND RSA 483-B:4 (XI-e).
WETLAND SCIENTIST, KRISTOPHER WILKES (CWS#288) IN ACCORDANCE WITH
(R3RB2H) AND ADJACENT POND WAS DELINEATED ON JUNE 5, 2014 BY VHB
STREAM TOP OF BANK AND ORDINARY-HIGH-WATER ALONG LAFAYETTE BROOK
7.
6.
5.
4.
3.
2.
1.
160
160
(N
H 141)
BUTTER
HILL R
OA
D
206207 208 209
304
305
(NH 18)
PROFILE ROAD
NH 18 (PROFILE ROAD)
> CONSTRUCTION
NH 141 (BUTTERHILL ROAD)
> CONSTRUCTION
BR
OO
K
LAF
AYETTE
ABUTMENT A
ABUTMENT B
6" UNDERDRAIN (TYP)
A
BARRIER PRIOR TO CONSTRUCTION
INSTALL EROSION CONTROL
STABILIZATION
RIPRAP SLOPE
STABILIZATION
RIPRAP SLOPE
A
A
STRUCTURE (TYP)
WATER DIVERSION
OF ITEM 503.1,
APPROXIMATE LOCATION
STABILIZATION
RIPRAP SLOPE
REALTY TRUST
STONY HILL
####
APPROX. EXIST. R.O.W.
APPR
OX. E
XIST. R.
O.
W.
APPR
OX. E
XIST. R.
O.
W.
FAMILY TRUST
DAVID SYMMES
####
UNDETERMINED
OWNER
####
APPROX. EXIST. R.O.W.
CORPORATION
DEVELOPMENT
MOUNTAIN
LAFAYETTE
####
BANK REPAIR
LIMIT OF CHANNEL
7:1
1.5:1
2:1
1.5:1
3:1
B
BPOND
B
C
F
E
D
G
H
I
SECTIONS SHEET)
(SEE WETLAND IMPACT
DRAINAGE SWALE
RECONSTRUCT
HEADWALL
CONCRETE
SEED (TYP)
LOAM AND
SEED (TYP)
LOAM AND
STATE OF NEW HAMPSHIREDEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN
REVISIONS AFTER PROPOSAL
DESIGNED
DRAWN
QUANTITIES
REV. DATE
ISSUE DATE FEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS
FILE NUMBER
OF
BRIDGE SHEET
DATEBY
CHECKED
CHECKED
CHECKED
DATEBY
KDW
JAW
JAW
8
\\nh-b
ed\projects\5
2380.0
9\cad\st\pla
nset\
WE
TL
AN
D\2
4497_7ero
pla
n01.d
gn
SHEET SCALEDRAWING NAMEPLOT DATE
AS NOTED
BRIDGE NO. 089/099 STATE PROJECT 24497
1/16/2018 24497_7eroplan01.dgn
SMH
TOWN FRANCONIA
LOCATION NH 18 OVER LAFAYETTE BROOK
12/17
12/17
12/17
12/17
STATE OF NEW HAMPSHIREDEPARTMENT OF TRANSPORTATION * BUREAU OF BRIDGE DESIGN
REVISIONS AFTER PROPOSAL
DESIGNED
DRAWN
QUANTITIES
REV. DATE
ISSUE DATE FEDERAL PROJECT NO. SHEET NO. TOTAL SHEETS
FILE NUMBER
OF
BRIDGE SHEET
DATEBY
CHECKED
CHECKED
CHECKED
DATEBY
KDW
JAW
JAW
8
\\nh-b
ed\projects\5
2380.0
9\cad\st\pla
nset\
WE
TL
AN
D\2
4497_8erosections01.d
gn
SHEET SCALEDRAWING NAMEPLOT DATE
AS NOTED
BRIDGE NO. 089/099 STATE PROJECT 24497
4/27/2018 24497_8erosections01.dgn
SMH
TOWN FRANCONIA
LOCATION NH 18 OVER LAFAYETTE BROOK
12/17
12/17
12/17
12/17
6:1 3:1
À SWALE
SECTION B-B SCALE:•" = 1'-0"
(E
XI
STI
NG)
TO
P
OF
BA
NK
EXISTING GROUND
VARIES (TYP)
FINISH GRADE
SECTION A-A
GEOTEXTILE
3'-0"
(MI
N)
3'-0"
(TOE)
3'-0"
SCALE:•" = 1'-0"
(TYPICAL RIPRAP SLOPE STABILIZATION DETAILS)
VARIES (TYP)
CHANNEL
VARIES (TYP)
EXISTING GROUND
(E
XI
STI
NG)
TO
P
OF
BA
NK
FINISH GRADE
SUMMARY SHEET FOR LOCATION)
(SEE WETLAND IMPACT
DIVERSION STRUCTURE
ITEM 503.1, WATER
SIZE AND GRADATION)
SPECIFICATIONS FOR STONE
(SEE NHDOT STANDARD
583.4, RIPRAP CLASS V
1'-0"
8
WETLAND IMPACT SECTIONS
[email protected] or (603) 271-2147 NHDES Wetlands Bureau, 29 Hazen Drive, PO Box 95, Concord, NH 03302-0095
www.des.nh.gov Permit Application – Revised 6/20/2016 - Valid until 12/31/2016 Page 5 of 5
14. IMPACT AREA: For each jurisdictional area that will be/has been impacted, provide square feet and, if applicable, linear feet of impact Permanent: impacts that will remain after the project is complete. Temporary: impacts not intended to remain (and will be restored to pre-construction conditions) after the project is complete.
JURISDICTIONAL AREA PERMANENT
Sq. Ft. / Lin. Ft. TEMPORARY
Sq. Ft. / Lin. Ft.
Forested wetland ATF ATFScrub-shrub wetland ATF ATFEmergent wetland ATF ATFWet meadow ATF ATFIntermittent stream ATF ATF
Perennial Stream / River 160 / 80 ATF 359 / 102 ATF
Lake / Pond / ATF / ATF
Bank - Intermittent stream / ATF / ATF
Bank - Perennial stream / River 761 / 134 ATF 632 / 145 ATF
Bank - Lake / Pond 156 / 54 ATF / ATF
Tidal water / ATF / ATF
Salt marsh ATF ATF
Sand dune ATF ATF
Prime wetland ATF ATF
Prime wetland buffer ATF ATF
Undeveloped Tidal Buffer Zone (TBZ) ATF ATF
Previously-developed upland in TBZ ATF ATF
Docking - Lake / Pond ATF ATF
Docking - River ATF ATF
Docking - Tidal Water ATF ATF
TOTAL 1,077 / 268 991 / 247
15. APPLICATION FEE: See the Instructions & Required Attachments document for further instruction Minimum Impact Fee: Flat fee of $ 200 Minor or Major Impact Fee: Calculate using the below table below
Permanent and Temporary (non-docking) 2,068 sq. ft. X $0.20 = $ 413.60
Temporary (seasonal) docking structure: sq. ft. X $1.00 = $
Permanent docking structure: sq. ft. X $2.00 = $
Projects proposing shoreline structures (including docks) add $200 = $
Total = $ 413.60
The Application Fee is the above calculated Total or $200, whichever is greater = $ 413.60