amanda d. kimball brennan johnson andrew bennett timothy hardy engineering science research building

Download Amanda D. Kimball Brennan Johnson Andrew Bennett Timothy Hardy Engineering Science Research Building

If you can't read please download the document

Upload: osborne-greene

Post on 20-Jan-2018

216 views

Category:

Documents


0 download

DESCRIPTION

Problem The Engineering Science and Research Building houses laboratories which require high ventilation air rates. 54,000 cubic feet per minute of outside air twenty-four hours per day, seven days per week to meet OSHA regulations. There are currently no systems installed to recover wasted energy that is released to the atmosphere after passing through the air conditioning system.