Education :
S1 Chemical Engineering
Universitas Negeri Sultan Ageng Tirtayasa – Banten
Work experience:
SPV Alumina Processing Process - PT. ICA
Tayan - Kalbar (Oct. 2013 – Now)
Officer Process Sulphonation & Detergent – PT. Sinar Antjol
Tangerang - Banten (Dec 2012 – Sept 2013)
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Overview
Structure Organization AL-2 Production
Introduction to Process APRP
Report Achievement Quantity Target & Quality of Alumina Processing Process - ICA Production Period January – October 2015
On going Improvement
Next plan Improvement 2016ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Structure Organization AL-2 Production
AL 2 Production Manager
Sidik Gandana
SI APRP (Temporary)
Rinto dh
SPV AG1 & AG2
Abigail Anang
SPV AB123 & ARE
Satriawan
SPV AG3 ATR & AAN
Noven Enggar S
SI HPRP
(Temporary)
Rinto dh
SI Calcination
Muammar
Foreman Day
Rendi
Foreman Shift (ABCD)
Eka, Heri, Rahmad, Ya dwi
28 Operators 23 Outsourcing
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Introduction to Process APRPProses Main Equipment Total Brand Name
ProductExample Brand Name
Alumina Grinding 1 (AG1) Tube mill (continue operation)
10 Products A-42-2 , A-42-6 , etc.
Alumina Grinding 2 (AG2) Jet mill ( continue operation)
1 Product A-44J
Alumina Grinding 3 (AG3) Ball mill (batch Operation) 25 Products A-43-L, AL-160SG-3 , etc.
Alumina Blending (AB) 1 2 3 Tank Blending (batch Operation)
38 Products A-12-40M, A-13-M-BL , etc.
Alumina Repacking (ARE) Tank (batch Operation) Only repacking Repack product to (C75) or (C87) , etc.
Alumina Surface Treatment (ATR)
Mixer (batch Operation) 3 Products A-42-2ST-H, AL-43MS-T
Alumina Annealing (AAN) Electric Furnace(batch Operation)
1 Product AL-160SG-4ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Report Alumina Processing ProcessICA Production 2015
Achievement Quantity Target of Alumina Processing Process
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
PEN
CA
PA
IAN
% Quantity Main Product Target from PPD
-
500
1,000
1,500
2,000
2,500
3,000
Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Ton
Tahun 2015
Alumina Processing Process - ICA Production 2015
Total Production Target in APrP Total Packaged in APrP
PeriodeTarget Produksi
from PPD (Kg)Total Produksi (Kg)
Total Produksi
yang sesuai
Target PPD (Kg)
Persentase
pencapaian
target PPD
Januari - 495,650 - #DIV/0!
Februari 277,825 948,176 108,200 38.9%
Maret 643,410 1,979,949 15,948 2.5%
April 736,900 774,823 173,117 23.5%
Mei 1,433,540 921,440 339,202 23.7%
Juni 1,623,000 2,262,625 950,000 58.5%
Juli 2,050,875 1,503,720 986,389 48.1%
Agustus 1,995,750 682,224 380,700 19.1%
September 1,210,575 479,348 348,000 28.7%
Oktober 2,409,050 2,082,569 1,166,575 48.4%
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Report Alumina Processing ProcessICA Production 2015
Achievement Quality of Alumina Processing process
Data Quality Alumina Processing process
Produk Selesai Analisa Produk On-Spect Produk Reject
Target 80% Maximal 20%
Januari 26% 45.3% 54.7%
Februari 43% 86.8% 13.2%
Maret 50% 100.0% 0.0%
April 60% 100.0% 0.0%
Mei 37% 100.0% 0.0%
Juni 68% 100.0% 0.0%
Juli 30% 100.0% 0.0%
Agustus 15% 96.6% 3.4%
September 14% 100.0% 0.0%
Oktober 1% 90.9% 9.1%
Percentage Data quality Product Alumina Processing
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Target Januari Februari Maret April Mei Juni Juli Agustus September Oktober
% On-Spect Quality Produk Alumina (APrP)
Process
Total Produksi
(Kg)
Produk Selesai analisa
(Kg)
Reject Produk
(Kg) On-Spect (Kg)
Januari 495,650 127,875 70,000 57,875
Februari 948,176 408,774 54,000 354,774
Maret 1,979,949 990,181 - 990,181
April 774,823 465,251 - 465,251
Mei 921,440 345,000 - 345,000
Juni 2,262,387 1,527,855 - 1,527,855
Juli 1,503,720 446,895 - 446,895
Agustus 682,224 101,325 3,450 97,875
September 479,348 69,000 - 69,000
Oktober 2,082,569 22,000 2,000 20,000
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
On Going Improvement
Improvement
Man
Awareness Safety
Awareness Neatness
Method Manage Area
Machine
MoneyModificationABIG
AIL A
NANG PRATAM
A
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Improvement & Corrective Action (1)
The hygiene at Work Area
Issue :
Work area dirty condition
Mixed messy condition between waste alumina powder, plastic and jumbo bag after charging
Lack of awareness of workers against The hygiene at Work Area
Problem solving :
Make standard regulation the hygiene at Work Area
Training to operator & outsourcing
Controlling with foreman & SPV
Benefit :
The hygiene at work area preserved
Arises a sense of comfort and sense of belonging,
And increasing the sense of responsibility for each work area
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
The hygiene at Work Area
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
The hygiene at Work Area
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Improvement & Corrective Action (2)
Neatness Packing Paper Bag
Issue :
Forming Paper bag not stable & not neat
Paper bag dirty (by powder)
Complain / claim from costumer
Cancel sales from costumer
Problem solving :
Make standard regulation forming Paper bag
Training to operator & outsourcing
Controlling with foreman & SPV
Cooperate with Team PPD & PKSS
Benefit :
Forming Paper bag good & neat
Avoid broken product / claim costumer
Reach Costumer satisfaction
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Neatness Packing Paper Bag
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Improvement & Corrective Action (3)
Mapping Area Raw Material (Genrio)
Issue :
Work Area untidy
Untidy raw material AL5-1/2/3
Very difficult search raw material, if Work Area untidy
Delay Transfer raw material from warehouse
LOSS TIME = Decrease Production base
Problem solving :
Make standard regulation / Mapping area for raw material (Genrio)
Training to operator & outsourcing
Controlling with foreman & SPV
Cooperate with Team PPD & PKSS
Benefit :
Raw material organized tidy
Easy find Raw material
Reduce LOSS TIME
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Mapping Area Raw Material (Genrio)
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Improvement & Corrective Action (4)
Increase Base AG1 using new line transfer
Issue :
Tank product Limited (2 pcs)
Can’t Continue Grinding
Low Base grinding
Can’t reach Target production
Problem solving :
Modification line transfer product (make tank become 3pcs)
Cooperate with Technical Team
Benefit :
Continue grinding
Increase Productivity
Reach Target production
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Increase Base AG1 using new line transfer• Old Facility • New Modification
AG2 TK 101
JET MILL
AG2 TK 201
AG2 TK 301
AG1 TK 101
TUBE MILL
AG1 TK 201
AG1 TK 301
AG2 TK 201
AG1 TK 101
TUBE MILL
AG1 TK 201
AG1 TK 301
AG2 TK 101
JET MILL
AG2 TK 201
AG2 TK 301ABIG
AIL A
NANG PRATAM
A
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
NEXT PLAN IMPROVEMENT 20161. Zero accident Awareness Safety Training
2. Stability Process Adjustment Process & Set parameter
3. Increase percentage Quality on speck Adjustment Process & In-plant analysis
4. Increase Productivity (Quantity)
• AG1
Raw material charging (New Air lifter/Blower). Cooperate with Technical Team
• AG2
Van del hoist Rotor (Replica Rotor) Cooperate with Technical Team
Base up Grinding base (now 0.5t/hr to 1.0t/hr) Trial Production
• AB4
New Facility AB4 Cooperate with Technical Team
AB1/2/3/4 raw material charging & Packing Parallel (Base Up) Trial Production
• AG3
Additional CH New Purchase
Sampling Point TK-122/132/142/152/162/172/182 Cooperate with Technical TeamABIG
AIL A
NANG PRATAM
A
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
NEXT PLAN IMPROVEMENT 2016IMPROVEMENT AG1 AG2 AG3 AB123 ARE ATR AAN
MAN S S S S S S S
MACHINE QtQl
QtQl
QtQl
QtQl
Qt QtQl
QtQl
METHOD St St St Qt St St St
MATERIAL StQt
St St StQt
St St
MONEY Qt QtQl
Qt
S=Safety St=Stability Qt=Quantity Ql =QualityABIG
AIL A
NANG PRATAM
A
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast
Thank you very much for your attentionWe Are Alumina Processing Team
ABIGAIL
ANANG P
RATAMA
PT INDONESIA
CHEM
ICAL
ALUM
INA
@pr
atam
ast