Alstom’s CCS activities. World Bank Workshop – CCS Perspectives for the Southern African Region. Mark Boneham Sales and Marketing Director – Southern Africa. Johannesburg , 1 st June 2011. 5. Alstom Clean Power strategy CCS – A reality today. Emissions CO 2 (Gt/y). Technological mix. - PowerPoint PPT Presentation

TRANSCRIPT

  • Alstoms CCS activitiesWorld Bank Workshop CCS Perspectives for the Southern African RegionJohannesburg, 1st June 2011 Mark BonehamSales and Marketing Director Southern Africa

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    5Efficiency: Plant optimisation & retrofitFirst CO2 capture demo plant in the world Alstom is the world leader in clean integrated solutionsAlstom Clean Power strategyCCS A reality todayWind, solar & geothermalN 1 hydro* Conventional islands

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    AgendaUpdate on CO2 capture within AlstomCCS Parasitic Power and costCCS-ReadyCO2 Capture SystemsConclusion

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Technologies developed by AlstomCO2 capture technologies pursued by AlstomPost-combustionOxy-combustion(New + retrofit)(New + retrofit)Chilled AmmoniaAdvanced AminesOxy combustion with Air Separation UnitChemical Looping Combustion

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    1st and 2nd Generation CCS: Alstom status

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Mountaineer - Validation pilot - USA WV - AEPDesigned to capture & store 100,000 tCO2/year (flue gas from coal)Captured CO2 will be sequestered into two wells on the plant propertyCommenced engineering and permitting Oct07First CO2 captured in Sept 09, injection started 1st of October 2009Alstom responsible for CAP island, AEP responsible for utilities to/from CAP island and CO2 storageAEP and Alstom working to develop commercial scale project (CSP) to capture 1.5 MTPY at Mountaineer facilityPlant availability raised to 85/90% since early Jan 2011CO2 captured and injected near design values

    Chilled Ammonia Process:Validation pilot - MontaineerAlstoms Chilled Ammonia Process at AEPs Mountaineer Plant

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    2nd Generation - Chemical Looping ProcessTechnology OverviewA Promising Break-through TechnologyPrinciple Solid oxygen carrier circulates between Air Reactor and Fuel Reactor: Carrier picks up O2 in the Air Reactor, leaves N2 behind and burns the fuel in the Fuel ReactorTypically, Oxygen Carriers can be metal oxide or limestone-based. Alstom is developing both typesAdvantagesAvoids large costs and parasitic power Captures CO2 at temperatures higher than the power cycle temperatures, eliminating thermodynamic penalty associated with CO2 captureUses conventional material of construction and fabrication techniquesLargely based on Alstoms proven CFB technology

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Dedicated building Darmstadt University (Germany)Fuel Reactor ReducerAir Reactor OxidizerChemical looping 1 MWth MeOx Prototype - CoalMain objectives: Design and operation of a Chemical Looping Combustion (CLC) 1 MWth prototype with coalAssessment of technical, environmental and economical potential of CLC power plants48 months program:Design of main components finalized in July 2009Hot Commissioning started in October 2010First tests with coal scheduled for 1Q 2011 Total budget: 6.5 M - RFCS Funding : 2.27 M Partners: TU Darmstadt, Chalmers, CSIC, SINTEF, Air Liquide, Vattenfall, Alstom2nd Generation - Chemical Looping Process ECLAIR Prototype - DarmstadtJust Inaugurated

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Total Lacq France - 30 MWth Oxy - GasVattenfall Schwarze Pumpe Germany - 30 MWth Oxy - LigniteVattenfall Jnschwalde Germany - 250 MWe Oxy - LigniteDow Chemical Co. USA, West Virginia Advanced Amines - CoalAEP Mountaineer USA - 58 MWth Chilled Ammonia - Coal ComingTCM Mongstad Norway - 40 MWth Chilled Ammonia - GasTransalta Canada - >200 MWe Post - CoalAlstom BSF Windsor US - 15 MWth Oxy - CoalsCET - Getica (Turceni) Romania >250MWe Chilled Ammonia - LigniteSelected for receiving EEPR fundingSelected by Alberta and Federal Canadian fundingSelected by US DOE to receive CCPI Round 3 fundingEDF Le Havre France 5 MWth Adv. Amines - CoalPGE Belchatow Poland 260 MWe Adv. Amines - LignitePre-commercial ProjectsAEP Mountaineer USA 235MWe Chilled Ammonia - Coal Alstom activity on demonstrations 1st and 2nd Generation CCSRFCS EU - Darmstad Germany 1 MWth Chemical looping - CoalDOE/Alstom Windsor US 3 MWth Chemical looping - CoalDrax - Selby UK - 426 MWe Oxy Hard Coal2nd GEN2nd GENNER300 appl.NER300 appl.NER300 appl.NER300 appl.Operating

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    Chilled Ammonia ProcessValidation Pilot - MongstadMongstad - Validation Pilot - NorwayEuropean CO2 Technology Centre MongstadFlue gases from natural gas CHP plant and a catalytic cracker (refinery)Designed to capture 80 000 t CO2/yearAmine-based post tested in parallelProject schedule:Engineering started June 09Construction on goingPlant Commissioning complete: Q1 2012Concrete part of Alstom's absorber tower completed (June 2010)3D Model of Capture facilities

    Analyst Days

    ALSTOM 2010. All rights reserved. Information contained in this document is indicative only. No representation or warranty is given or should be relied on that it is complete or correct or will apply to any particular project. This will depend on the technical and commercial circumstances. It is provided without liability and is subject to change without notice. Reproduction, use or disclosure to third parties, without express written authority, is strictly prohibited.

    C2A2 - field pilot - Le Havre - FranceDesigned to capture 25 tCO2/ dayAdvanced flow scheme & operation validationFlue gas: slipstream from 600 MWe coal plant (EDF host facility) Project partners: EDF and Alstom. Alstom has a partnership with Dow Project schedule Overall 2010-2013 program Test from Q2 12 to Q1 13 (one year)No storageFrench funding by ADEMEEDF 600 MWe coal power plant (field pilot represented in or