ALPS Electric Ireland
Ltd.
2011 Annual Environmental
Report for ALPS Electric
Ireland Ltd. Clara Road,
Millstreet, Co Cork. IPPC
Licence (Reg: P0835-01)
March 2012
Annual Environmental Report 2011
ALPS ELECTRIC (IRELAND) LTD.
ANNUAL ENVIRONMENTAL REPORT
March 2012
Contents
1. Introduction ........................................................................................................ 1 1.1 Licence Details .........................................................................................1 1.2 Summary Data Table ...............................................................................1 1.3 Company Profile.......................................................................................2 1.4 Economic Contribution............................................................................2 1.5 Company Environmental Policy..............................................................3 1.6 Process Description ..................................................................................4 1.6.1 Fabrication of plastic parts: .......................................................................4 1. Moulding Process ........................................................................................4 2. Painting and Laser Tech Process...............................................................4 3. Raw Material Detrashing............................................................................4 4. Surface Mount Technology (SMT) Process...............................................5 5. Manual Assembly Process..........................................................................5 6. Final Assembly Process ...............................................................................5 1.7 Environmental Management System .....................................................5
2. Discharges, Wastes & Resource Summary Data.............................................. 6 2.1 Discharges to Air .......................................................................................7 2.1.2 Compliance Summary............................................................................11 2.2 Discharges to Water ...........................................................................12 2.2.1 Monitoring of Storm Water Emissions....................................................12 2.3 Waste Management ............................................................................14 2.3.1 Hazardous Waste.....................................................................................14 2.3.2 Non- Hazardous Waste ............................................................................15 2.4 Noise Monitoring ..................................................................................20 2.5 Resource Consumption........................................................................21 2.5.1 Summary of Water Consumption for 2010 and 2011...........................22 2.5.2 Summary of Electrical Consumption for 2010 and 2011 .....................23 2.6 Monitoring and Enforcement ................................................................28 2.7 Reported Incidents Summary................................................................32 2.8 Complaints Summary .............................................................................32
3. Environmental Management Programme – Summary Update .................... 33 3.1 EMP Report 2011.....................................................................................33 3.1.2 Bunding and containment....................................................................33 3.1.3 Decommissioning and Residuals Management Plan.........................34 3.1.4 Environmental Liabilities Risk Assessment.............................................34 3.1.5 Efficiency in the Use of Raw Materials ...............................................35
Annual Environmental Report 2011
Attachments
Attachment A Company Organisation Structure
Attachment B Site Location
Attachment C Process Flow Diagram
Attachment D Paint and Lazer Process
Attachment E Status Update Environmental Management Plan 2010
Attachment F Proposed Environmental Management Plan 2011
Annual Environmental Report 2011 March 2012
Page 1 of 35
1. Introduction
This document is the third Annual Environmental Report (AER) covering
environmental performance at Alps Electric (Ireland) Ltd. located on Clara
Road, Millstreet, Co. Cork.
This report covers the period from January 1st to December 31st 2011 and has
been prepared in accordance with the EPA ‘Guidance note for: Annual
Environmental Report’ (October 2001) and other relevant guidance as
provided by the EPA on the Agency website (www.epa.ie).
Since the IPPC Licence was issued by the Agency in June 2008, Alps Electric
(Ireland) Ltd. have issued detailed regular reports to the Agency in order to
demonstrate routine compliance with the terms of the licence (Reg: P0835-01).
Alps Electric (Ireland) Ltd. operate an Environmental Management
Programme, which sets out targets on a range of environmental projects
including energy efficiency and reduction in water consumption, together with
environmental training and awareness, to deliver ongoing improvements in
environmental performance at the plant. Progress in achieving targets set
within the EMP, together with the revisions to the Programme for 2012 are
included in Attachments E and F of this AER.
The next AER will cover the calendar year 2012 and will be issued in the first
quarter of 2013.
1.1 Licence Details
Licensee: ALPS Electric (Ireland) Limited
Location of Activity: Clara Road, Millstreet, County Cork.
IPC Licence Register No.: P0835-01
Date of Issue 11th June 2008
Principal Class of Activity 12.2.2: Surface Coatings
1.2 Summary Data Table
Current IPPC Licence annual reporting requires the submission of an EPA
Pollution Release Transfer Register (PRTR) Form which documents the emissions
and IPPC management information in the form of a spreadsheet, which is
transmitted to the Agency electronically. The spreadsheet has been submitted
electronically to the EPA.
Annual Environmental Report 2011 March 2012
Page 2 of 35
1.3 Company Profile
Alps Electric (Ireland) Ltd. is a Japanese company producing parts for the
automotive industry. The following components are manufactured at the
facility: electronic components, car electronics, communications and
broadcasting- related equipment.
Alps Electric (Ireland) Ltd. was established in Millstreet Town, Co Cork in March
1988 to manufacture computer peripherals (keyboards, mouse products). In
1996 Alps Electric (Ireland) Ltd. commenced manufacturing car electronics at
its facility in Millstreet and now specifically produce parts for the automotive
industry and employ all the disciplines demanded by this sector.
A copy of Alps Electric (Ireland) Ltd.’s Company Organisational Structure is
appended as Attachment A of the Report. The location of Alps Electric
(Ireland) Ltd. IPPC Licence boundary is illustrated in Figure 1 of Attachment B.
1.4 Economic Contribution
Alps Electric (Ireland) Ltd. are a significant employer in Millstreet, employing
over 450 personnel. Indirectly, taking a 1:3 multiplier, there is an estimated 1,350
people involved in the supply of services and materials to the plant.
The annual economic contribution to the local economy is estimated to
exceed €20 million both directly in salaries, and materials and services
purchased.
Annual Environmental Report 2011 March 2012
Page 3 of 35
1.5 Company Environmental Policy
ENVIRONMENTAL POLICY STATEMENT
ALPS Electric (Ireland) Limited as a major participant in the Electronics industry and as
a member of the global community, is committed to protecting our Environment by
safeguarding precious resources through the use of technologically advanced
business practices and the efforts of its employees. The manufacturing processes
within ALPS Electric (Ireland) Ltd., will be controlled so as to minimise waste & emissions
from the plant and recycling of product, where possible, will be carried out. Alps
Electric (Ireland) Ltd., will actively encourage its suppliers to make a meaningful
contribution in order to promote a cleaner Environment.
To sustain and protect the Environment, Alps Electric (Ireland) Ltd., will
strive to:
o Implement continual improvement, prevention of pollution, re-use and
recycling in all its operations in order to cause the minimum impact on
the Environment.
o Conduct all activities in an Environmentally responsible manner in
compliance with European ,National legislative and regulatory
regularions, Alps Electric (Ireland) Ltd. Corporate Requirements and our
Integrated Pollution Prevention Control Licence P0835-01.
o Conduct activities according to corporate Alps Electric (Ireland) Ltd.
Environmental principles, Alps Electric (Ireland) Ltd. Environmental action
plans, goals and Management philosophy.
o Communicate and implement Environmental policy objectives, and
targets to available management programmes of Alps Electric (Ireland)
Ltd. at all levels within the organisation.
o Make information on Alps Electric (Ireland) Ltd. Environmental policy,
objectives and targets available to
staff, other interested parties and the public on request.
o Conduct regular Environmental Audits of the Environmental Management
System and manufacturing operations to ensure compliance with this
policy, our Environmental objectives and targets and the requirements of
the Environmental Management System Standard ISO 14001.
o Implement an energy usage monitoring system to reduce energy costs,
through management of fuel cost, equipment efficiency, plant
efficiency, awareness and training.
This Environmental Policy Statement has full commitment and support of site
Management team.
--------------------------------- Managing Director
--------------------------------- ISO 140001 Management Representative
Annual Environmental Report 2011 March 2012
Page 4 of 35
1.6 Process Description
The production process involves fabrication of plastic parts and assembly of
components onto printed wiring boards.
The main processes involved in the manufacture of the product have been as
follows:
� Injection moulding of “non-cosmetic” plastic parts used in the assembly
of the products;
� Paint and lasering of decorative cosmetic parts;
� Surface Mounting Process and wave soldering mount processes (Printed
wiring board stuffing);
� Final assembly of units (assembling plastic parts to Printed wiring boards);
and including inspection and testing of finished units.
A Process Flow diagram is appended as Attachment C of the report.
There are six key steps involved in the production of the wiring boards as
follows:
1.6.1 Fabrication of plastic parts:
1. Moulding Process
Plastic granules undergo injection moulding. The moulds are annealed,
cooled and cleaned.
2. Painting and Laser Tech Process
Moulds (plastic parts) requiring cosmetic coating are coated with a
mixture of paint, thinner, and hardener using high volume low pressure
(HVLP) technology. Coated parts undergo a flash period of 15 minutes
followed by curing in an oven at 80oC.
Moulds are coated in two enclosed booths using automatic high volume
low pressure (HVLP) spray guns. Overspray is captured by a water curtain
and solvents are emitted without further abatement to emission point A1-
3. Solvents losses from mixing areas, flash off area and curing ovens are
emitted unabated through emission point reference A2-1. Solvent losses
from manual assembly process (flux and conformance coating) are
directed unabated to emission point A1-3 and A2-3. Emissions are
approximately 3 kg/hr.
Laser etching of some parts is also undertaken. Annual solvent usage for
this coating activity is estimated at 50 tonnes.
A flow diagram of the paint and laser process is appended as Attachment
D of the report.
3. Raw Material Detrashing
Printed wiring boards and components are delivered to the site and
packaging is removed.
Annual Environmental Report 2011 March 2012
Page 5 of 35
4. Surface Mount Technology (SMT) Process
Printed wiring boards are loaded onto a surface mount technology
machine. The boards are applied with solder paste, cleaned with solvent
to remove dirt and applied with glue (adhesive coating). Components are
mounted automatically onto the boards. The solder paste is cured and the
boards are inspected. Solvent used for cleaning in this area is
approximately 2.4 tonnes per year.
5. Manual Assembly Process
Larger components from the SMT process are both manually placed onto
the printed wiring boards in conjunction with Semi Automated Assembly
(SAM). Solder is applied with either a wave solder or by point spraying
application. A solvent flux is sprayed over the area to be soldered. A
solvent based protective coating (conformance coating) is applied to the
wiring board followed by curing. Approximately 17 tonnes of solvent per
year is used in this process.
6. Final Assembly Process
Moulds and wiring boards are assembled and parts are manually cleaned
using solvent. Solvent usage in final assembly is 1.5 tonnes per annum.
1.7 Environmental Management System
Alps Electric (Ireland) Ltd. have implemented an Environmental Management
System (EMS) and are certified to ISO 14001. The EMS has been in place since
1987 and documents the overall management system that includes
organisational structure, planning activities, responsibilities, practices,
procedures, processes and resources for developing, implementing, achieving,
reviewing and maintaining the Environmental Policy.
Since 1994, Alps Electric (Ireland) Ltd. environmental preservation plans have
expanded to include a global management structure, and a corporate turn
towards “green” products. Lowering the impact our business activities have on
the environment is a necessary step in “perfecting the art of electronics”.
The company has identified an environmental aspects register which identifies
potential environmental emissions associated with the site and the actions Alps
Electric (Ireland) Ltd. will implement to manage and prevent an environmental
incident. The objectives and targets of the EMS ensure conformance with the
IPPC Licence which are set a defined time period for achievement. These
include environmental training and awareness, and monitoring. Emergency
procedures associated with the operation of the site are also prepared as part
of the EMS.
Annual Environmental Report 2011 March 2012
Page 6 of 35
2. Discharges, Wastes & Resource Summary Data
This section of the Annual Environmental Report (AER) summarises all
environmental and resource monitoring information for the calendar year 2011.
Information on emissions and discharges to air and water are summarised as
annual mass emissions and are based on the average measured concentration
for the relevant parameter multiplied by the volumetric flow data for the year
from the relevant emission point.
Information on waste arisings is presented in accordance with the AER
electronic report spreadsheet as issued by the EPA.
Summary totalised and relative data on resource (power and fuel) and water
usage at the plant during 2011 are presented in comparison with previous years
data to allow comparison.
Summary information on all emissions and discharges, waste arisings and
resource use have been compiled on an electronic spreadsheet which has
been submitted to the Agency by e-mail to [email protected].
Annual Environmental Report 2011 March 2012
Page 7 of 35
2.1 Discharges to Air
Air monitoring is undertaken in accordance with the IPPC licence requirements.
Odour Monitoring Ireland were commissioned by Alps Electric (Ireland) Ltd. to
perform emission testing of the process vent stacks A2-1 A2-2, A2-3, A2-4 A2-6
and A2-7. A summary of compliance with mass emission limit values is outlined
below.
The actual mass emissions are based upon average sampling results and
permitted flow values for each source expressed as hourly mass emissions
(kg/hr). The annual mass emission is calculated on the basis of annual hours of
operation for each source.
Permitted mass emissions are based on the IPPC licence emission limit value for
each source. This is multiplied by the permitted hourly flow limit and taking a
24/365 operational period.
A description of the process area from which the air emission locations were
tested is provided in Table 2.1.1.
Table 2.1.1 Description of Process Area Emission Points
Monitoring
Location
Description
A1-3 Outlet from VOC Abatement system
A2-1 Paint and Lazer Process
A2-2 Concoat process and Wave solder 1&2
A2-3 Spot Dip (x3) and manual soldering
A2-4 SMT machine extract point
A2-6 PAL Area Extract 1
A2-7 PAL Area Extract 1
In order to achieve licenced emission limit values Alps Electric (Ireland) Ltd.
installed an abatement plant to treat the exhaust air from the Paint and Laser
process stacks (A2-6 & A2-7) and the Solderwave/Concoat process stack (A2-2).
The abatement plant comprised of a system is based on a zeolite concentrator
followed by a regenerative thermal oxidiser.
The exhausted air loaded with solvents from the process is routed through a
rotating activated zeolite adsorption wheel. The VOCs are adsorbed in the
pores of the zeolite in the area of the wheel in the adsorption mode. The
adsorption is performed in one site while desorption is performed on the other
site. The outlet stream from the adsorption wheel is clean air and can be
discharged directly to the atmosphere via a new stack (A1-3).
A small portion of the clean air (10%) is diverted to a heat exchange unit to be
heated by the clean air leaving the oxidation chamber. This warm air is then
directed back over a small isolated section of the spent zeolite in the desorption
section. The heated stream of gas is required to remove the VOC and allows
Annual Environmental Report 2011 March 2012
Page 8 of 35
them to overcome the physical attraction forces of the zeolite adsorbent. By
using a smaller stream of air than the original VOC laden air stream the system
has effectively concentrated the exhaust gas. The resulting low-volume, high
concentration air is then directed to the oxidiser for oxidation of the VOC prior
to discharge to atmosphere.
The abatement treatment plant was installed in April 2009 and a new emission
point A1-3 replaced previous emission points A2-2, A2-6, and A2-7.
Total Organic Carbon is monitored on a quarterly basis for emission points A3-1,
A2-1, A2-3, A2-4. The results of analysis for the 2011 reporting period are outlined
in Table 2.1.2.
Annual Environmental Report 2011 March 2012
Page 9 of 35
Table 2.1.2 Total Organic Carbon Emissions from Process Vents during the 2011 Survey Period
IPPC
Licence
Limit
Value
mg/m3
TOC conc. Emission Limit
Value Volumetric
airflow rate
(Nm3/hr)
Mass
loading/
emission
Annual
Mass
Emission
Permitted
Mass
Emission
(mgC/Nm3) (kg/hr) Kg/Yr Kg/Yr
Monitoring
Location
Measurement
Period
NormalisedVolumetric
airflow rate (Nm3/s)
Quarter 1 4.14 8.43 0.13 19272
Quarter 2 7.47 8.39 0.23
Quarter 3 4.10 8.35 0.12
A1-3 50
Quarter 4 2.29 7.61
44,000
0.06
956
Quarter 1 6.74 4.57 0.11 7279
Quarter 2 6.16 4.33 0.1
Quarter 3 6.00 4.11 0.09
A2-1 50
Quarter 4 9.60 3.57
16,619
0.12
743
Quarter 1 36.75 0.78 0.1 2015
Quarter 2 38.03 0.85 0.12
Quarter 3 27.20 0.85 0.08
A2-3 75
Quarter 4 31.00 0.78
3,067
0.09
690
Quarter 1 4.78 1.42 0.24 0
Quarter 2 5.45 1.23 0.24
Quarter 3 5.33 1.22 0.23
A2-4
Quarter 4 6.08 1.17
0.03
1310
Annual Environmental Report 2011 March 2012
Page 10 of 35
Figure 2.1.1 provides an illustration of the Total Organic Carbon (TOC)
emissions from process vents during the 2011 survey period.
0
5000
10000
15000
20000
25000
A1-3 A2-1 A2-3
Monitoring Emission Points
Kg/Yr
Actual Mass Emission
Permitted Mass Emission
Limit Value
Figure 2.1.1 Annual Mass Emissions for Total Organic Carbon
As can be seen from Figure 2.1.1 Total Organic Carbon (TOC) emissions from
process vents during the 2011 survey period were well below IPPC licence
limit values.
It is also noted that the actual annualised mass emissions for all process
sources are significantly lower than the permitted annual discharges in
accordance with the IPPC Licence P0835-01.
Carbon monoxide, and oxides of nitrogen are monitored for emission point
A1-3 (Outlet from VOC Abatement system) on a biannual basis. The results of
analysis for the 2011 monitoring period are outlined in Tables 2.1.3 and 2.1.4.
Table 2.1.3 Flue Gas Analysis of Carbon Monoxide from A1-3
IPPC
Licence
Limit
Value
mg/m3
Carbon Monoxide
(mg/Nm3)
Actual Mass Emission
Kg/Yr
Total Mass Emission
Limit Value kg/Yr
100 Average 21.3 4457.9
38544
Annual Environmental Report 2011 March 2012
Page 11 of 35
Table 2.1.4 Flue Gas Analysis of Oxides of Nitrogen from A1-3
IPPC
Licence
Limit Value
mg/m3
Oxides of
nitrogen as
NO2 (mg/Nm3)
Actual Mass Emission
Kg/Yr
Total Mass Emission
Limit Value kg/Yr
200 Average 6.74 1406.6 77088
Figure 2.1.2 provides an illustration of the annual mass emissions for carbon
monoxide, and oxides of nitrogen from process vent A1-3 during the 2011
survey period.
0.0
5000.0
10000.0
15000.0
20000.0
25000.0
30000.0
35000.0
40000.0
Carbon Monoxide Nitrogen Oxides
Monitoring Parametera
Kg/Yr
Actual Mass Emission
Permitted Mass Emission Limit Value
Figure 2.1.2 Annual Mass Emissions for Carbon Monoxide and Oxides of
Nitrogen from A1-3
As can be seen from Figure 2.1.2 annual mass emissions for carbon monoxide,
and oxides of nitrogen from process vent A1-3 during the 2011 survey period
were below permitted IPPC licence limit values.
2.1.2 Compliance Summary
The overall combined annual mass emissions for TOC, carbon monoxide, and
oxides of nitrogen from all process sources are significantly lower than annual
permitted mass emissions. As a result Alps Electric (Ireland) Ltd. have
demonstrated 100% compliance with monitoring results are noted for the 2011
monitoring period.
Annual Environmental Report 2011 March 2012
Page 12 of 35
2.2 Discharges to Water
There is no process effluent generated and therefore no emissions to water.
2.2.1 Monitoring of Storm Water Emissions
Storm water, which arises from rainfall from roof and hardstanding area and
the air handling units, is discharged at 2 points which merge at a monitoring
reference SW1 (E126798 N089581) located off-site. The storm water discharges
to the Finnow River.
Monitoring point SW1 is visually inspected and monitored for pH, on a weekly
basis and Chemical Oxygen Demand (COD) on a monthly basis.
A second water monitoring point M1 is located to the west of the site (E126805,
N089578) and monitors water runoff from the paint and lazer process and
cooling machine. Monitoring point M1 is monitored for pH on a weekly basis,
Chemical Oxygen Demand (COD) on a monthly basis, and is visually
inspected on a daily basis. Organic compounds are monitored on a biannual
basis.
All visual inspections for both SW1 and M1 for the 2011 reporting period
indicate the water was good, clear, and colourless.
PH results for monitoring point SW1 ranged between 6.29- 7.98 for the 2011
reporting period, and between 6.45 -8.76 for monitoring point M1.
COD results for both SW1, and M1 for the 2011 reporting period are outlined in
Table 2.2.1.
Table 2.2.1 COD and Organic Compounds Results for SW1 and M1 for 2011
Month Parameter SW1 M1
January COD (mg/L) 16.9 2.3
February COD (mg/L) <5.0 <5.0
March COD (mg/L) 9.4 7.5
April COD (mg/L) <5.0 <5.0
May COD (mg/L) 7.7 <5.0
May Organic Compounds (µg/L) <0.01
June COD (mg/L) 6.3 7.7
July COD (mg/L) <5.0 <5.0
August COD (mg/L) <5.0 <5.0
September
COD (mg/L)
14 10
October COD (mg/L)
November COD (mg/L) 12 4
December COD (mg/L) 3 <2
December Organic Compounds (µg/L)
US EPA 624 Volatile Screen <1
December
Organic Compounds (µg/L)
US EPA 625 Semi-Volatile
Screen <0.01
Annual Environmental Report 2011 March 2012
Page 13 of 35
M1 was analysed for organic compounds in May, and December. The results
showed that concentrations for the parameter analysed in May were
<0.01µg/L. In December water from M1 was analysed for both volatile
compounds (US EPA 624), and semi-volatile compounds ((US EPA 625) the
results of which were <1 and <0.01µg/L respectively.
There are no licenced emission limit values for the water parameters.
Annual Environmental Report 2011 March 2012
Page 14 of 35
2.3 Waste Management
Management of solid non-hazardous and hazardous wastes are recorded in
accordance with Condition 8 of the IPPC Licence.
2.3.1 Hazardous Waste
Hazardous waste generated on-site is waste solvent and materials
contaminated with waste solvent, which is forwarded to Germany for
incineration. A significant portion of the solvent used at the installation each
year is transferred to waste.
All documentation is retained on-site in accordance with legislative
requirements and the IS0 14001certified Environmental Management System. A
summary of hazardous wastes which arose for the 2011 monitoring period are
outlined in Figure 2.3.1. Hazardous material taken offsite for the 2010 monitoring
period is provided for comparative purposes.
Empty unused drums
Fluorescent Tubes
WASTE Empty drums
Waste Oil
Waste Flux,Thinners, and Water w,
Paint, Hardeners,Sludge etc.(X10)
Waste Wipes
Waste Grease
0
5
10
15
20
25
30
35
40
45
Weight (Tonnes)
Waste Type
2010 (Tonnes)
2011 (Tonnes)
Figure 2.3.1 Summary of Hazardous Wastes which Arose for in 2010 and 2011
There was a 17% increase noted in the quantities on hazardous waste removed
off site in 2011 (70.079 Tonnes) when compared with those in 2010
(59.854Tonnes). This increase in 2011 corresponds with the increase in
production at the facility.
Annual Environmental Report 2011 March 2012
Page 15 of 35
2.3.2 Non- Hazardous Waste
All non-hazardous waste generated on-site during 2011 was sent for
recovery/disposed which is managed using authorised contractors.
All documentation is retained on-site in accordance with legislative
requirements and the IS0 14001certified Environmental Management System. A
summary of non-hazardous wastes which arose for the 2011 monitoring period
are outlined in Figure 2.3.2. The waste arisings for 2010 are also shown for
comparative purposes.
0
0.02
0.04
0.06
0.08
0.1
0.12
Cardboard packaging
Plastic
Plastic packaging
Wooden packaging
C&I dry mix
Electronic waste
Mixed packaging
We
igh
t (T
on
ne
s)
2010 2011
Figure 2.3.2 Summary of Non- Hazardous Wastes which Arose for in 2010 and
2011
Non hazardous waste increased in 2011 increased by 48% which is reflective of
the increase in production hours at the facility. As can be seen from figure 2.3.2
there was a significant increase in the amount of plastic (48%), cardboard
(28%) and plastic packaging (20%) removed from the facility in 2011.
Full details of hazardous and non-hazardous waste arisings for the 2011
reporting period including European Waste Catalogue references, name of
waste disposal /recovery contractor and disposal/recovery codes are outlined
in Table 2.3.1.
Annual Environmental Report 2011 March 2012
Page 16 of 35
Table 2.3.1 Summary Information on Waste Arisings for the 2011 Reporting Period
European
Waste
Code
Hazardous Quantity
(Tonnes
per Year)
Description of Waste
Waste
Treatment
Operation
Location of
Treatment
Name and
Licence/Permit No of
Next Destination
Facility
Address of Next
Destination Facility
15 01 01 No 88.02 paper and cardboard
packaging
R3 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
15 01 02 No 39.791 plastic packaging R3 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
15 01 03 No 20.38 wooden packaging R3 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
20 01 35 Yes 4.497 discarded electrical and
electronic
R5 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
15 01 06 No 1.03 mixed packaging R3 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
20 01 39 No 108.32 plastics R3 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
20 03 07 No 72.162 bulky waste D1 Offsite in
Ireland
Greenstar Recycling
(Munster)
Ltd.,W0136-02
Sarsfield Court Industrial
Estate ,Glanmire ,Co.
Cork,.,Ireland
15 01 10 Yes 3.116 packaging containing
residues of or
contaminated by
D10 Offsite in
Ireland
Veolia
Environmental
Services Technical
Corrin ,Fermoy ,Co. Cork ,
,Ireland
Annual Environmental Report 2011 March 2012
Page 17 of 35
European
Waste
Code
Hazardous Quantity
(Tonnes
per Year)
Description of Waste
Waste
Treatment
Operation
Location of
Treatment
Name and
Licence/Permit No of
Next Destination
Facility
Address of Next
Destination Facility
dangerous substances Solutions Ltd.
,W0050-02.
15 01 10 Yes 1.534 packaging containing
residues of or
contaminated by
dangerous substances
R4 Abroad ATM Moerdijk B.V.
,Licence No:
1538449
Vlasweg 12 ,4782 PW
,Moerdijk,.,
Netherlands
15 01 10 Yes 2.733 packaging containing
residues of or
contaminated by
dangerous substances
R4 Offsite in
Ireland
Veolia
Environmental
Services Technical
Solutions Ltd.
,W0050-02.
Corrin ,Fermoy ,Co. Cork ,
,Ireland
15 01 10 Yes 0.912 packaging containing
residues of or
contaminated by
dangerous substances
D10 Abroad Veolia Ellesmere Port
,BS5193IE
,Bridges Road Ellesmere
Port ,South Wirral
Cheshire , CH65
4EQ;,United Kingdom
15 01 10 Yes 0.145 packaging containing
residues of or
contaminated by
dangerous substances
Abroad Sava,A51G00508 SAVA GmbH & Co. KG
,Ostertweute 1
,Brunsbuttel,25541,German
y
07 05 04 Yes 5.437 other organic solvents,
washing liquids and
mother liquors
R2 Abroad Recyfuel,DPA
D3200/61080/RGPED
/2008/AP-PU
Zoning Industriel d’Ehein
,4480 Engis (Liege)
Belgium
07 05 04 Yes 2.021 other organic solvents,
washing liquids and
mother liquors
R2 Offsite in
Ireland
Veolia
Environmental
Services Technical
Solutions Ltd.
Corrin ,Fermoy ,Co. Cork ,
,Ireland
Annual Environmental Report 2011 March 2012
Page 18 of 35
European
Waste
Code
Hazardous Quantity
(Tonnes
per Year)
Description of Waste
Waste
Treatment
Operation
Location of
Treatment
Name and
Licence/Permit No of
Next Destination
Facility
Address of Next
Destination Facility
,W0050-02.
19 02 09 Yes 0.227 solid combustible wastes
containing dangerous
substances
D10 Abroad Sava,A51G00508 GmbH & Co. KG
,Ostertweute 1
,Brunsbuttel,25541,German
y
20 01 21 Yes 0.07 fluorescent tubes and
other mercury-containing
waste
R4 Offsite in
Ireland
KMK Metals,W0113-
04
Cappincur Industrial Estate
, Daingean Road ,
Tullamore ,.,Ireland
13 02 08 Yes 0.158 other engine, gear and
lubricating oils
R1 Offsite in
Ireland
Veolia
Environmental
Services Technical
Solutions Ltd.
,W0050-02.
Corrin ,Fermoy ,Co. Cork ,
,Ireland
15 01 10 Yes 0.633 packaging containing
residues of or
contaminated by
dangerous substances
D10 Abroad Veolia Ellesmere Port
,BS5193IE
VEOLIA ES (UK) Ltd.
,Bridges Road Ellesmere
Port ,South Wirral
Cheshire , CH65
4EQ;,United Kingdom
15 02 02 Yes 7.342 absorbents, filter materials
(including oil filters not
otherwise specified),
wiping cloths, protective
clothing contaminated
by dangerous substances
R1 Abroad Recyfuel,DPA
D3200/61080/RGPED
/2008/AP-PU
Zoning Industriel d’Ehein
,4480 Engis (Liege)
,Belgique,.,Belgium
Annual Environmental Report 2011 March 2012
Page 19 of 35
European
Waste
Code
Hazardous Quantity
(Tonnes
per Year)
Description of Waste
Waste
Treatment
Operation
Location of
Treatment
Name and
Licence/Permit No of
Next Destination
Facility
Address of Next
Destination Facility
15 02 02 Yes 0.861 absorbents, filter materials
(including oil filters not
otherwise specified),
wiping cloths, protective
clothing contaminated
by dangerous substances
R1 Abroad ATM Moerdijk B.V.
,Licence No:
1538449
Vlasweg 12 ,4782 PW
,Moerdijk,.,Netherlands
15 02 02 Yes 0.358 absorbents, filter materials
(including oil filters not
otherwise specified),
wiping cloths, protective
clothing contaminated
by dangerous substances
D10 Abroad Sava,A51G00508 SAVA GmbH & Co. KG
,Ostertweute 1
,Brunsbuttel,25541,German
y
20 01 27 Yes 43.948 paint, inks, adhesives and
resins containing
dangerous substances
R1 Abroad ATM Moerdijk B.V.
,Licence No:
1538449
Vlasweg 12 ,4782 PW
,Moerdijk,.,Netherlands
20 01 27 Yes 0.584 paint, inks, adhesives and
resins containing
dangerous substances
R2 Offsite in
Ireland
Veolia
Environmental
Services Technical
Solutions Ltd.
,W0050-02.
Corrin ,Fermoy ,Co. Cork ,
,Ireland
Annual Environmental Report 2011 March 2012
Page 20 of 35
2.4 Noise Monitoring
An annual noise monitoring survey was undertaken by OES in 2011 in
accordance with Condition 6 of the IPPC Licence.
A total of six (AN1-AN6) noise monitoring locations were surveyed as part of
the assessment. One additional location, namely: AN6, which is located within
the residential area north of the facility, was added during the noise survey.
Results for the 30 minute readings recorded on the August July 2011 are
summarised in Table 2.4.1.
Table 2.4.1 Daytime Noise Measurement (17th August 2011)
Location Grid Ref. Time LAeq LA10 LA90 EPA
Emission
Limit
Value
AN1 12679E,
89670N 14:29-15:30 48.0 51.1 36.5
AN2 126798E,
89581N 16:45-17:30 56.4 53.6 50.6
AN3 126915E,
89528N 18:30-19:00 52.4 54.1 51.1
AN4 126965E,
89572N 15:38-16:08 51.8 52.0 42.5
AN5 126892E,
89711N 15:03-15:33 52.9 50.1 39.8
AN6 126851E,
89763N 17:27-17:57 49.0 49.0 36.3
55 dB(A)
Nighttime noise measurements were also undertaken to monitor noise
emissions from the monitoring locations the results of which are outlined in
Table 2.4.2.
Table 2.4.2 Nighttime Noise Measurement (17th /18th August 2011)
Location Grid Ref. Time LAeq LA10 LA90 EPA
Emission
Limit Value
AN1 12679E,
89670N 22:00-22:30 48.7 51.2 33.0
AN2 126798E,
89581N 22:34-23.04 51.5 50.9 48.8
AN3 126915E,
89528N 23:08-23:38 49.7 50.0 48.8
AN4 126965E,
89572N 23:42-00:12 50.5 49.5 43.6
AN5 126892E,
89711N 00:17-00:47 50.3 44.7 40.9
AN6 126851E,
89763N 00:55-01:25 41.1 45.1 29.4
45 dB(A)
Based on the results above the following conclusions were drawn:
Annual Environmental Report 2011 March 2012
Page 21 of 35
• Noise levels measured at the agreed monitoring points (AN-1 to AN-6) are
attributable to both the operation of the ALPS facility and to external
(transient) sources, which are not associated with ALPS. Predominant
among these other sources are vehicular movements associated with
other commercial enterprises operating within the industrial estate, which
are a significant contribution to overall noise levels in the area.
• Based on observations made during the survey, and taking account of the
influence of off-site transient noise sources, it is considered appropriate to
determine compliance with the noise requirements of the ALPS IPPC
License based on the LA90 parameter (This parameter gives a more
representative indication of the actual plant noise as the contribution of
traffic and other extraneous noises, which may unduly influence the LAEQ
parameter are not included).
• All measurements within the residential area (AN6) were within both the
daytime and night-time limits of 55dB LAeq and 45dB LAeq (30minutes)
respectively. Therefore, the site activities and plant operation at ALPS
Electric (Ireland) Ltd. are not resulting in a negative impact on the nearby
residential area.
• The daytime limit of 55dB LAeq was not exceeded at locations AN1, AN3,
AN4 and AN5 for the monitoring events.
• The daytime limit of 55dB LAeq was exceeded at location AN2 for the
monitoring events. The primary factor driving noise levels in this area was
deemed to be the vehicle traffic moving to and from the loading dock
zone, together with vehicles with their engines left running while waiting to
load or offload. A review of the LA90 shows that the noise level
attributable to the ALPS facility at this location was 50.6 dBA, which is well
within the limit value and marginally below the level measured in Year
2010.
• Using the LA90 parameter, all daytime measurement locations were found
to comply with the IPPC Limit of 55dBA.
• Extraneous traffic noise contributes to night-time noise levels at all of the
perimeter measurement points. Again, although the LAEQ parameter
shows higher than licensed noise levels, the LA90 descriptor shows that
resultant noise levels at the perimeter (with the exception of AN-2 and
AN3) are quite low and well within the relevant limit.
• The night-time noise levels at of AN2 and AN3 exceed the IPPC Limit of
45dBA. The LA90 values at AN2 and AN3 indicate that the likely source of
noise is from equipment running at the ALPS facility.
The report recommended that a review of equipment contributing to the
noise levels detectable at AN2 and AN3 is carried out to identify options to
limit noise emissions at source. The review should include noise sources
contributing to the tonal component of the noise levels.
2.5 Resource Consumption
Annual Environmental Report 2011 March 2012
Page 22 of 35
Gas oil is used in the standby generator and the space heating boiler.
Electricity consumption is mainly related to machine operations and ovens
along with utilities.
Energy consumption (electricity and fuel oil) at the site over the 2011 reporting
period is summarised on Tables 2.5.1. Data for the same period last year is
provided for comparison purposes.
2.5.1 Summary of Water Consumption for 2010 and 2011
A summary of water consumption for 2011 is outlined in Table 2.5.1 and Figure
2.5.1. Water consumption for the 2010 monitoring period is provided for
comparison purposes.
Table 2.5.1 Summary of Water Consumption between 2010 and 2011
Water Consumption (M3)
2010 2011
Jan 423 475
Feb 436 452
Mar 457 481
Apr 438 428
May 439 490
Jun 391 453
Jul 192 274
Aug 361 355
Sep 417 425
Oct 461 401
Nov 494 357
Dec 392 344
0
100
200
300
400
500
600
January
February
March
April
May
June Ju
ly
August
September
October
November
December
Month
M3
2011 2010
Figure 2.5.1 Summary of Water Consumption between 2010 and 2011
Annual Environmental Report 2011 March 2012
Page 23 of 35
Alps Electric (Ireland) Ltd. have made significant efforts to reduce the amount
of water consumed onsite as part of their processing operations which is
reflected in the above results.
As can be seen from Figure 2.5.1 there no significant change in water use for
the 2011 reporting period.
2.5.2 Summary of Electrical Consumption for 2010 and 2011
A summary of electrical consumption for 2011 is outlined in Table 2.5.2 and
Figure 2.5.2. Electrical consumption for the 2010 monitoring period is provided
for comparison purposes.
Table 2.5.2 Summary of Electricity Consumption between 2010 and 2011
Electricity Consumption kWh
2010 2011
Jan 460080 570517
Feb 483620 522011
Mar 530586 576319
Apr 486755 502875
May 466572 491044
Jun 469417 444460
Jul 373048 312432
Aug 428184 436154
Sep 492150 479435
Oct 492217 487391
Nov 547707 467892
Dec 521083 385781
0
100000
200000
300000
400000
500000
600000
700000
January
February
March
April
May
June Ju
ly
August
September
October
November
December
Month
kWh
2011 2012
Figure 2.5.2 Summary of Electrical Consumption between 2010 and 2011
Annual Environmental Report 2011 March 2012
Page 24 of 35
Electricity consumption is mainly related to machine operations and ovens
along with utilities. There was no significant change in water use for the 2011
reporting period which increase by 1% compared with 2010.
Energy costs contribute significantly to overall operating costs. As a result,
energy efficiency is a high priority both in terms of cost and environmental
benefits through the reduction of green house gases. Alps Electric (Ireland) Ltd.
aims to continuously reduce energy consumption by implementing goals
which are measured and tracked on at weekly basis.
Alps Electric (Ireland) Ltd. has implemented an employee energy awareness
campaign in 1997, which has significantly increased over the past few years.
The objective of the programme is to educate and engage employees in
energy management.
2.5.3 Summary of Oil Consumption for 2010 and 2011
A summary of oil consumption for 2011 is outlined in Table 2.5.3 and Figure 2.5.3.
Oil consumption for the 2010 monitoring period is provided for comparison
purposes.
Table 2.5.3 Summary of Oil Consumption between 2010 and 2011
Oil Consumption
2010 2011
Jan 1667 1667
Feb 1667 1667
Mar 1750 1833
Apr 938 1770
May 893 1858
Jun 938 1858
Jul 536 973
Aug 714 1593
Sep 982 1947
Oct 893 833
Nov 1719 917
Dec 1250 625
Annual Environmental Report 2011 March 2012
Page 25 of 35
0
500
1000
1500
2000
2500
January
February
March
April
May
June Ju
ly
August
September
October
November
December
Month
litres
2011 2010
Figure 2.5.3 Summary of Oil between 2010 and 2011
Analysis of the data indicates that total consumption of oil increased by 10%
between the 2011 (15,321 litres) when compared with the 2010 (13,947litres)
period. The increase is a result of the increase in production in 2011.
2.5.4 Summary of LPG Consumption for 2010 and 2011
A summary of LPG consumption for 2011 is outlined in Table 2.5.4 and Figure
2.5.4. LPG consumption for the 2010 monitoring period is provided for
comparison purposes.
Table 2.5.4 Summary of LPG Consumption between 2010 and 2011
LPG Oil Consumption Heating
2010 2011
Jan 6339 6946
Feb 6339 6946
Mar 6656 7641
Apr 6705 6383
May 6386 6702
Jun 6705 6702
Jul 3831 3510
Aug 5109 5744
Sep 7024 7021
Oct 6703 1085
Nov 7127 1194
Dec 6091 814
Annual Environmental Report 2011 March 2012
Page 26 of 35
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
January
February
March
April
May
June Ju
ly
August
September
October
November
December
Month
litres
2011 2010
Figure 2.5.4 Summary of LPG between 2010 and 2011
Analysis of the data indicates that total consumption of LPG decreased
by 20% between the 2011 (84,004 litres) and 2010 (75,015 litres) period.
Gas oil is used in the standby generator and the space heating boiler.
Alps Electric (Ireland) Ltd. has improved the energy monitoring system
which has resulted in better tracking and awareness and consumption.
2.5.4 Summary of Calor Gas Consumption for 2010 and 2011
A summary of Calor Gas consumption for 2011 is outlined in Table 2.5.5 and
Figure 2.5.5. Calor Gas consumption for the 2010 monitoring period is provided
for comparison purposes.
Table 2.5.5 Summary of Calor Consumption between 2010 and 2011
Calor Gas Consumption Canteen
2011 2010
Jan 314 276
Feb 314 276
Mar 345 290
Apr 111 129
May 117 123
Jun 117 129
Jul 61 74
Aug 100 98
Sep 123 135
Oct 54 123
Nov 60 236
Dec 41 172
Annual Environmental Report 2011 March 2012
Page 27 of 35
0
50
100
150
200
250
300
350
400
January
February
March
April
May
June Ju
ly
August
September
October
November
December
Month
litres
2011 2010
Figure 2.5.5 Summary of Calor Gas between 2010 and 2011
Calor Gas is used for the canteen area for food processing. There was a
14%decrease in the amount of calor gas used onsite in 2011.
Annual Environmental Report March 2011
Page 28 of 35
2.6 Monitoring and Enforcement
EPA Inspections
A single unannounced Agency inspection (non-monitoring) was undertaken
on 6th July 2011. The site inspection commenced at 10.00 a.m. and the
following personnel were in attendance:
Representing Alps Electric (Ireland) Ltd.
Ms. Maria Walsh Quality Systems Engineer
Mr. John Foley Quality Assurance Manager
Representing the Environmental Protection Agency:
Maria Lenihan Inspector
During the inspection, the Agency Inspector did not raise any non-
compliance with the IPPC licence. The inspector commended the licensees
approach in addressing an odour complaint in October 2010 and
commitment to carrying out weekly odour monitoring surveys since February
2011.
During the inspection special attention was paid to the diesel tank and bund,
chemical store, paint and laser sludge room, surface water monitoring points
and fire water retention tank.
During the site inspection 5 observations were noted. These observations,
although not non-compliances, were addressed by Alps Electric (Ireland) Ltd.
as outlined in Table 2.6.1.
Annual Environmental Report 2011 March 2012
Page 29 of 35
Table 2.6.1 Summary of Site Inspection Observations non compliances and current status of corrective actions implemented by Alps
Electric (Ireland) Ltd.
Ref. Observations Corrective Action Action Status
1 On review of the diesel bund integrity
test report the following was noted:
• The water level was to the oil filter
level of the diesel tank only due to a
possibility of waster damage to the
insulation that had been put in place
around the filter. The report states
that “the vast majority of bund
failures occur at the
vertical/horizontal joint so the
hydrostatic test will address this
statistically high leak area. The risk of
leakage at a higher level in the bund
was addressed by detailed
inspection of the external wall on 3
accessible sides”. One of the walls
was therefore inaccessible for visual
inspection and there was No sign off
by a suitably qualified person
regarding this visual inspection.
• The height of the water in the bund
was 1,360m at the beginning of the
test and the height of the water was
1,355m at the end of the test. The
detail for pass/fail criteria was not
specified in the report.
• The report states that “the diesel tank
Diesel Bund Integrity Testing
1. Submit a proposal to the
Agency within one month of
receipt of this report to verify
the integrity of the diesel
tank bund on-site.
2. Ensure the pass/fail criteria
for integrity testing of bunds
on-site is specified in all
future bund integrity reports.
A re-test of the diesel tank bund took place on the 16th
of August and Tuesday the 23rd of August by
Chemstore. The bund passed the test and the results
of the test were submitted to the Agency on the 7th of
September 2011.
Annual Environmental Report 2011 March 2012
Page 30 of 35
Ref. Observations Corrective Action Action Status
surface is now showing
2
It was noted that integrity testing of the
storm water drainage system had not
been undertaken as it runs under the
building.
It was noted that repairs necessary for
the storm water drainage system have
not been completed to date due to
associated costs and locations.
Integrity Testing & Repair of
Storm Water Drainage
System
Submit a proposal within one
month of receipt of this
report to address the
integrity of the stormwater
drainage system from S10
onwards and for the repair
of the identified failed
sotrmwater pipework S1-S2,
S3-S4, S4-S7, S7-S8, S8-S9, and
S9-S10.
A camera survey of the storm lines S9-S14 was
completed by Kerry Drain Services on the 29th of July
2011. The survey indicated that the section is in good
condition and does not require repair.
A section which was previously obstructing the
camera was cut from between S9-S10 thus allowing
access to S10, S11, and S14.
S12 and S13 were not accessible at these are sealed
off underneath the Quality Laboratory floor. Due to
this inaccessibility the pressure test cannot be
completed.
Repairs to storm drains S1-S2, and S9-S10 have been
completed. It is planned to complete the remaining
repairs as follows at a cost of €11,500:
A3-S4 December 2011
S4-S7 March 2012
S7-S8 July 2012
S8-S9 July 2012
3 On review of the storm water monitoring
results for the site it was noted that the
pH buffer 10 is being utilised as an
Analytical Quality Control (AQC) for pH
monitoring onsite.
AQC for PH Monitoring
Put in place a representative
AQC for pH monitoring with
an acceptable tolerance
range. When sufficient AQC
data is gathered carry out a
A representative AQC for pH monitoring with an
acceptable tolerance range will be implemented. A
pH buffer of 7 will be used. This information will be
included in a quality control chart for analysis. It is
planned to commence from 11th July 2011 onwards.
Annual Environmental Report 2011 March 2012
Page 31 of 35
Ref. Observations Corrective Action Action Status
statistical analysis of this
date for the generation of a
quality control chart that
can be utilised going
forward.
4 The licencing officer raised concern that
sludge removed by the pulse jet system
is taken offsite as hazardous waste
sludge among the waste sludge
generated from the paint process area.
Concern was raised regarding the use of
the EWC code for both sludge and dust.
The EWC code used for waste hazardous
sludge from this facility is 20 01 27 and is
not appropriate EWC Code.
Disposal of Dust from the
Pulse Jet System
Submit a proposal to the
Agency within one month of
receipt of this report for the
designation of appropriate
EWC codes for the waste
sludge and dust generated
from the paint process on-
site for Agency review and
approval.
Following consultation with our hazardous waste
disposal contractors, Veolia, we have confirmed that
the hazardous waste sludge will be classified under
EWC Code 08 01 13 pending approval from the EPA.
This was later approved with the Agency via email
dated 10th of August 2011.
5 The night-time LA90 was exceeded at the
boundary locations AN2 and AN3.
Contributors to noise in these areas
included the abatement plant and
compressor on-site. It was noted that no
noise complaints were received in 2010
and 2011 and that annual noise
monitoring for 2011 is due to be
completed on-site shortly.
Noise Monitoring Report
2010
On completion of the noise
monitoring survey for 2011,
the licensee shall take
necessary measure to
address any noise
monitoring location that
does not comply with the
noise emission limits
specified in the licence.
Noise monitoring took place on the 17th and 18th of
August by OES Consulting Ltd. A copy of the report
was issued to the Agency under separate cover.
As recommended in the report a review of the
equipment contributing to the noise levels at AN2 and
AN3 was undertaken to identify options to limit noise
levels. In addition the tonal components of the noise
levels were reviewed.
Annual Environmental Report 2011 March 2012
Page 32 of 35
Monitoring Inspections
No EPA monitoring inspections were undertaken for the 2010 monitoring
period.
2.7 Reported Incidents Summary
There were no environmental incidents for the 2011 reporting period.
2.8 Complaints Summary
Alps Electric (Ireland) Ltd. has established and maintains an IS0 14001:2004
accredited Environmental Management System (EMS). This has been in place
since 1997. This is used to manage environmental performance, and
implement procedures to monitor, investigate and log any complaints of an
environmental nature.
There were no complaints for the 2011 reporting period.
Annual Environmental Report 2011 March 2012
Page 33 of 35
3. Environmental Management Programme – Summary Update
Section 3 of the AER contains summary information on the Alps Electric
(Ireland) Ltd. Environmental Management Programme (EMP), together with a
review of performance in meeting specified targets throughout 2011.
A summary of the progress achieved in relation to the objectives and targets
for 2011 EMP is presented in Attachment E of the Annual Environmental
Report.
It is noted that both the EMP and Schedule of Objectives and Targets fall
under the site Environmental Management System and accordingly, are
included within a structured system of management review and periodic
auditing by internal auditors.
3.1 EMP Report 2012
Much of the effort undertaken in relation to environmental management at
the site is focused on compliance with the conditions of the IPPC licence.
Significant progress has been made in this area, and Alps Electric (Ireland)
Ltd. have a high level compliance with the Licence. The following sections
contain a summary of progress during 2011 and the revised plant objectives
and targets and EMP for 2012 is included as Attachment F.
3.1.1 Solvent Management Plan (SMP)
In accordance with Condition 6.15 of the IPPC licence Alps Electric (Ireland)
Ltd. has prepared a Solvent Management Plan (SMP) for the 2011 reporting
period. The SMP has been prepared as per the definition of an organic
solvent (Council Directive 1999/13/EC), and in accordance with any relevant
guidelines in Annex Ill of the Directive. Alps Electric (Ireland) Ltd. retain records
and supporting documentation including the methodology used for data
collection as part of the SMP plan.
Solvent consumption for cleaning product, and adhesive coating has not
exceeded 2 and 5 tonnes per annum respectively in accordance with
Condition 6.16 of the IPPC licence.
3.1.2 Bunding and containment
In accordance with Condition 3.5 of the IPPC Licence all tanks and
containers and their resistance to penetration by water or other materials
carried or stored therein shall be tested at least once every three years.
Bund testing was undertaken in 2010 and all of the bunds onsite passes
inspection. The next bund integrity inspection will be undertaken in 2013.
Kerry Drain Services undertook pressure testing of storm water lines around the
facility. The report was later amended to include storm water lines that were
Annual Environmental Report 2011 March 2012
Page 34 of 35
not surveyed during the first inspection. A programme of works is in place to
address repairs identified as part of the survey.
Following an Agency inspection in 2011it was noted that integrity testing of
the storm water drainage system which runs under the production facility had
not been undertaken. A camera survey of the storm lines S9-S14 was
completed by Kerry Drain Services on the 29th of July 2011. The survey
indicated that the section is in good condition and does not require repair.
Repairs to storm drains S1-S2, and S9-S10 have been completed. It is planned
to complete the remaining repairs as follows:
A3-S4 December 2011
S4-S7 March 2012
S7-S8 July 2012
S8-S9 July 2012
3.1.3 Decommissioning and Residuals Management Plan
Condition 10.2 of the IPPC Licence requires the preparation and submission to
the Agency of a Decommissioning and Residual Management Plan (RMP).
The plan was prepared by external independent consultants OES in 2009.
The RMP is updated on an annual basis as part of subsequent AER’s. This
update will takes account of any changes in the plant layout, processes,
materials and chemicals stored which may affect the RMP through
contribution to additional disposal or cleaning costs in accordance with
Condition 10.2.2.
The overall cost will be updated to reflect inflation over the interval and will
be revised on the basis of the most recent WPI* at that time. In accordance
with Agency guidance a detailed review of the Decommissioning and
Residuals Management Plan is scheduled for 2012.
WPI = Appropriate Wholesale Price Index (Capital goods Building and Construction (i.e.
Materials and wages) Index as published by the Central Statistics Office for the year since last
closure cost calculation.
3.1.4 Environmental Liabilities Risk Assessment
Under Condition 12.2.2 of the IPPC Alps Electric (Ireland) Ltd. were required to
carry out an Environmental Liabilities Risk Assessment (ELRA). OES were
commissioned by Alps Electric (Ireland) Ltd. to carry out an ELRA of facility.
The assessment consisted of a site inspection, interviews and documentation
review. The report on this assessment was submitted to the Agency 2009. The
Environmental Liabilities Risk Assessment (ELRA) was reviewed and update in
2012.
The ELRA is intended to form the basis for determination of an appropriate
level of environmental insurance cover and is to be reviewed annually. The
IPPC licence Condition 12.2.2 requires Alps Electric (Ireland) Ltd. to review the
ELRA as necessary to reflect any significant change on site, and in any case,
every three years following initial agreement.
Annual Environmental Report 2011 March 2012
Page 35 of 35
The ELRA indicates that the Alps Electric (Ireland) Ltd. facility is well defined in
terms of historic and current environmental impacts. The site is also subject to
an on-going monitoring programme for emissions to air and noise, and water.
The current environmental management programme on the site has reduced
the risk of the development of new significant environmental liabilities to a low
level.
In overall terms, Alps Electric (Ireland) Ltd. have insurance policies in place to
deal with the eventualities evaluated in this assessment, and at levels far in
excess of the financial implications of any single or combined liability.
3.1.5 Efficiency in the Use of Raw Materials
Alps Electric (Ireland) Ltd. continually strives to improve the efficiency of its
processes in order to reduce the raw materials consumed and the waste
produced.
Efficiencies throughout the plant are tracked using the “Operational
Equipment Efficiency” system. This system details process information such as
quantities built, time worked, downtime issues, equipment issues, reject items
etc.
This information is inputted into a tracking system which generates a weekly
report. The data is reviewed and actions are taken for continuous
improvement.
Human Resources Manager Breda Flaherty
Organisation Structure of Alps Electric Ireland Ltd.
Finance Manager Roland Neher
Business Planning Manager
Yoshiriro MurakamiMIS
Mgr Patrick Tuohy
Customer Service Group (CSG)
Mgr Patrick Tuohy
Logistics and WHMgr George O’Callaghan
Operations ManagerSr Manager Alan Perry
Quality Control Section 1
Mgr Thomas O’Leary
EngineeringMgr James Sugrue
Engineering Manufacturing & Facilities
Mgr Peter Creagh
Moulding and PaintingMgr Anthony Barry
Final AssyMgr Alan Perry
SMT/ Manual Production Mgr Kieran O’Sullivan
Managing DirectorBrendan O’Shaughnessy
Supply Chain Management Sr Mgr
Patrick Tuohy
Residential DirectorYoshiriro Murakami
EngineeringSr Manager James Sugrue
Quality Assurance Sr Manager John Foley
NPIMgr Patrick Tuohy
# Change
O= Promotion
&= Holds two or more positions
Note Ref
Scale.
Issue no. CheckedDate Approved
Client
Date Scanned
Title
Project No.
Figure No.
environmental health and safety engineering project management © Copyright of OES Consulting, 2nd Floor, FBD House, Fels Place, Tralee Co. Kerry.
Tel: 353 (0)667128321 Fax: 353 (0)66 7180061 Email: [email protected]
By
Rev.
NTS 1141_01
Figure 1
Site Location
01
ALPS ELECTRIC IRELAND LTD.
ALPS Electric Ireland
Ltd. Site Boundary
N
Production Floor
Car Park
WorkshopCar Park
Car Park
Canteen
Car Park
Car ParkSite Boundary
Alps Electric Ireland Ltd. Process Flow Diagram
3) Detrashing of
Components
4) Surface
Mount Process
5) Manual
Assembly/Semi-
Automated
Assembly (SAM)
6) Final
Assembly
2) Painting and
Lazer Etch
Process
1) Moulding
Process
Printing
Required
YES
NO
OVERALL PROCESS FLOWThe overall production process at Alps Electric involves the simultaneous fabrication
of structural plastic parts and assembly of components onto printed circuit boards.
These are then brought together to form the final product. The plastic parts may
require painting and laser etching for cosmetic purposes. The fabrication of plastic
parts involves a moulding process, step 1, and, if required, a painting and laser
etching process, step 2. Assembly of printed circuit boards incorporates detrashing
of delivered components, surface mount process and manual assembly, steps 3, 4
and E respectively.
Alps Electric Ireland Ltd.
Painting and Laser etch Process
INPUTS PROCESS Emissions
Moulded Parts
from Step 2
Step 2
2.1 Loading of
Parts
2.2 Mixing of Paint
and Thinners
2.3 Ionised Air
2.5 Application
of Paint
2.4 Addition of
Hardner
2.6 Flash off Period
2.7 Curing Oven
2.8 Repeat for
each colour
required
Solvent
emissions
waste drums
Solvent emission
paint particles
heat output
solvent emission
Paints, thinners
Energy/
Compressed air
Mixed paint,
Hardener
Energy Mixed
paint
Energy
Energy
heat output
solvent emission
Alps Electric Ireland Ltd.
Painting and Laser etch Process
INPUTS PROCESS Emissions
Energy
2.9 Move to
laser Machine
2.10 Laser
etching of
painted parts
2.11 Unload &
Transfer of Parts
Fume from
etched paint
Attachment E
Attachment E
Status Update Environmental M
anagement
Status Update Environmental M
anagement
Plan 2011
Plan 2011
1
4.0 Management Programmes, Objectives & Targets
5.0 The following table consists of Management Programmes set for 2011.
Management Programmes Tasks Responsible Completion
Date
Comments
MP 66. Compliance with
legal requirements
• Completion and submission of AER
(Annual Environmental Report) for 2010.
• Review and update if necessary the
Decommissioning Management Plan.
• Review and updated if necessary the ELRA
(Environmental Liabilities Risk
Assessment).
John Foley 31/03/2011 Complete.
AER submitted to the EPA
electronically on 30/03/11.
MP 52 Control of emissions
to atmosphere.
Ensure that all emission levels are in compliance
with IPPC limits.
James Sugrue 30/12/2011 Quarter 3 monitoring took place
on 28/09/11. All emission limits
within compliance levels..
MP 60 Control of resource
usage & energy efficiency
(oil, gas, LPG)
Monitor, control and reduce where possible the use
of energy, water, oil, gas, LPG.
Peter Creagh 16/12/2011 Ongoing monitoring taking place.
MP56 Control of
Hazardous Waste
Ensure that all hazardous waste in stored correctly
and removed off site by a licensed contractor.
Peter Creagh 30/12/2011 Planned visit of Veolia to take
place.
MP 58 Control of Noise
emissions.
External Environmental Noise monitoring to take
place.
John Foley 31/08/2011 Noise survey completed on
17/08/11. Exceedance at locations
AN2 & AN3 additional analysis
of equipment to take place.
MP62 Monitoring &
Reduction of water
consumption
ALIR to reduce water usage thereby reduce costs.
Planned 3.5% reduction for 2011.
Peter Creagh 23/12/2011 Ongoing monitoring taking place.
MP61 Control of Supplier
Activities
ALIR to ensure that all suppliers are compliant to
relevant legal requirements.
George O Callaghan 01/09/2011 As detailed on the Purchase
Order.
MP 54 Solvent Reduction
Plan
Investigate the possibility of reducing the amount of
solvent in use within the plant
James Sugrue 30/06/2011 Complete. The elimination of the
wave solder machine reduced the
consumption of solvent by 25%.
MP 59 Control of Non-
Hazardous Waste
Reduction in the amount of plastic parts being
scrapped and sent for re-cycling.
Thomas O Leary 23/12/2011 See overall presentation on
reduction of scrap.
2
Management Programmes Tasks Responsible Completion
Date
Comments
MP63 Safe Place of work
for all personnel.
Occupational exposure monitoring to be completed
where necessary.
Joanne O Sullivan 16/12/2011
28/02/12
Occupational monitoring for PAL
Laser area and SAM area to be
completed early 2012
MP 57 Odour Prevention ALIR to ensure that zero odour is being emitted
from the plant.
Thomas O Leary 31/05/2011 Ongoing odour sniff test taking
place.
MP64 Product Design
Activities
Ensure that all environmental considerations are
taken into account in conjunction with Auto Japan
when new products are being implemented.
James Sugrue 16/12/2011 Planned introduction of Y555 all
environmental concerns
addressed at ALPS Japan.
MP32 Safe system of work
for all employees
Ensure that all requirements of the EPD (Explosive
Protection Document) are completed.
James Sugrue 30/06/2011 All recommendations
implemented with the exception
of the 3k mixing process as this is
no longer in use.
MP65 Visual Impact Visual impact to be taken into consideration for any
modifications to current building or for any new
proposed building projects.
James Sugrue 16/12/2011 N/A
MP53 Control of
Contractors while working
on site
All contractors to be informed of the
environmental/Health & Safety requirements while
working on site.
All Managers
31/05/2011
Feb 2012
Contractors list to be updated and
new information to be submitted
to all contractors. Safety Code of
Practice for contractors to be
updated.
All information submitted
awaiting replies and training to be
completed.
MP67 Maintain
Registration to ISO14001
EMS
Re-certification audit due on 19/20/21 April 2011 Marie Walsh 30/04/2011 Complete. Continued registration.
MP70 Control of Aqueous
Discharge
Zero hazardous discharge from the plant. Alan Perry 30/12/2011 Complete
MP72 Site preparation in
the event of an emergency.
Completion of fire water retention tank James Sugrue 29/07/2011
30/04/12
Door ways to be completed
during summer shutdown.
MP69 Compliance with air
emission monitoring
requirements.
No exceedance in air emissions from the plant. James Sugrue
31/03/2011
No air emission exceedance to
date for 2011.
3
The following table consists of the objectives and targets set for 2011.
Objectives Targets
Management
Programmes
Tasks Responsible Date Status
OBJ 66: Product
Design.
ALIR in conjunction with
Auto Japan to ensure that
any new products
introduced or any
modification to existing
products are
environmentally friendly
where possible.
MP64 Product
Design Activities
Review of ECN’s for any new
products or modification to
current products that may have
an environmental impact.
Patrick Tuohy 22/12/10 Closed
OBJ 69: Completion
and submission of
AER (Annual
Environmental
Report) for 2010.
All associated requirements
of the IPPC Licence P0835-
01 to be completed.
MP 66 Compliance
with legal
requirements
Compile 2010 licence
information and submit to
EPA.
Marie Walsh &
OES Consulting.
31/03/11 Closed
OBJ 70: Compliance
with air monitoring
requirements.
All monitoring requirements
to be completed.
MP69 Compliance
with legal
requirements on air
monitoring
Quarterly monitoring of the
following vents: A1-2,,A2-
3,A2-4. Continuous monitoring
of FID for A1-3.
Marie Walsh &
Odour
Monitoring.
23/12/2011 No exceedance to
date on any
emission points.
OBJ 68: Maintain
certification to
ISO14001 EMS
Zero major non-
conformances during ISO
14001 surveillance audit or
internal audits by 22-Dec-
2011
MP 67 Continue
compliance to
ISO14001 EMS
certification.
Continuous review of EMS. Marie Walsh 22/12/11 Continued
certification
achieved.
OBJ 71: Control of
aqueous discharge
from the plant. Zero
environmental
contamination from
any discharge from
the plant.
ALIR to ensure that no
environmental
contamination of surface
water, groundwater, subsoil
etc shall take place.
MP 70 Control of
Aqueous Discharge.
Continuous analysis of water
samples for Ph, visual
appearance and COD.
Marie Walsh &
Southern
Scientific.
22/12/11 No contamination
detected.
4
Objectives Targets
Management
Programmes
Tasks Responsible Date Status
OBJ 54 & OBJ 70:
Control of
emissions to
atmosphere for
2011 period.
All monitoring
reports to be
reviewed to ensure
compliance.
Continuous
monitoring of
abatement plant for
Total Organic
Carbon (as C).
Discussion with
EPA to take place to
amend current
licence re emissions
from new chemical
shed.
MP 52 Control of
emissions to
atmosphere.
(a) Ensure that all
emission Limit Values
are within the
allowable limits.
(b) Amendment of IPPC
licence to incorporate
emissions from the
new chemical shed
into A1-3.
Marie
Walsh/James
Sugrue/Odour
Monitoring
Ireland.
22/12/10 All emission levels
compliance. Following
discussions with EPA
No amendment
required to IPPC
licence. Emissions
from chemical shed to
be incorporated into
solvent mgt plan.
OBJ 61:
Management of
non hazardous
waste to final
disposal.
No environmental
contamination due to
non hazardous waste
Removal of non
hazardous waste by
licensed contractor
at all times.
MP59 Control of
non Hazardous
Waste.
Correct storage and segregation
of non hazardous waste at all
times.
Use of licensed contractors.
George O
Callaghan
30/12/11 Complete
OBJ 60: Control of
external Noise emissions.
Environmental noise
survey to take place.
MP 58 Control of
Noise Emissions.
Noise monitoring to take place
as per EPA recommendations.
Marie Walsh 30/12/2011 Survey took place on
17th
August
2011.Locations AN2 &
AN3 exceeded
allowable levels.
OBJ 59: Zero
Odour Pollution
Zero complaints re
odour pollution
MP:57 Odour
Prevention
Odour sniff test to take place to
confirm if there is an odour
being emitted from the plant.
Marie Walsh 30/06/2011 No complaints to date
for 2011.
5
Objectives Targets
Management
Programmes
Tasks Responsible Date Status
OBJ 36:
Control/reduce the
risk of incidents
from
explosive/flammable
atmosphere.
Recommendations
from EPD to be
implemented.
MP 32 Safe place
of work for all
ALIR personnel
(Explosive
Atmosphere).
All recommendations to be
implemented.
James Sugrue March
2011
Complete
OBJ:55 Control of
Contractors.
All contractors to
remain compliant to
environmental and
health/safety
requirements while
working on site.
MP:53 Control of
contractors while
working on site
All current contractors to
receive re-training on the
environmental, health and
safety requirements while
working on site.
Peter
Creagh/Marie
Walsh/Joanne O
Sullivan
30/06/2011
Feb 2012
A complete review
of all contractors
have taken place all
now re-catergoised.
New documentation
submitted to all
contractors.
OBJ 62: Control of
energy usage
Increase average
production value per
KW from €11.29 to
€11.70.
MP 60 Control of
resource usage (oil,
gas, , LPG) and
energy efficiency.
Continuous emphasis on
reduction of resources.
Peter Creagh 16/12/10 Complete
OBJ 67: Control of
Visual Impact
Visual impact to be
considered for any
planned
modifications to the
premises.
MP:65 Visual
impact
All planning requirements to
be considered in the event of
any proposed modifications to
the building.
James Sugrue 30/12/2011 N/A. No
modifications to
plant took place.
OBJ 64: Reduction
in water usage.
Monitoring and
reduction of water
consumption
MP62 Monitoring
and reduction of
water consumption.
Reduce water usage where
possible (eg sanitation)
Peter Creagh 30/12/2011 Water usage
reduced due to
reduction in
headcount.
OBJ 65:
Occupational
Exposure
Monitoring
Ensure that
occupational
exposure monitoring
is completed in
relevant areas.
MP63 Occupational
Exposure
monitoring of all
relevant personnel
Ensure safe place of work for
all employees.
Joanne O Sullivan 30/12/2011
31/03/12
Rescheduled to be
completed early
2012.
6
Objectives Targets
Management
Programmes
Tasks Responsible Date Status
OBJ 56: Solvent
usage reduction
programme.
(a)To reduced the
amount of solvent
used within the
washing processes.
MP54 Solvent
Reduction Plan.
Completion of an accurate
solvent management plan for
2010 and reduce if possible the
amount of solvents in use for
cleaning.
Anthony
Barry/Alan
Perry/Thomas O
Leary.
22/12/11 Complete.
Updated
Solvent Mgt
Plan submitted
to EPA.
OBJ 73: Site
preparation in the
event of an
emergency.
Remaining exit
points to be sealed
up to 25mm during
summer shutdown.
MP 72 Prevention
of Environmental
Pollution resulting
from as emergency
situation.
Modification to exits in
order to seal the areas and
prevent fire water
escaping.
James
Sugrue/Peter
Creagh
30/09/2011
30/04/12
Rescheduled to
early 2012.
OBJ:63 ALIR to
ensure that all
suppliers in use are
compliant to
relevant
regulations eg
ROHS, REACH.
ALIR to use confirm
suppliers
conformance to legal
requirements.
MP61 Supply Side
Activities
All new suppliers to submit
written confirmation of
compliance or approved green
procurement document.
George O
Callaghan
30/12/2011 No new suppliers in
use.
OBJ:58 Investigate
the possibility of
disposal of sludge
waste to landfill as
opposed to
hazardous waste
disposal.
Reduction in the
quantity of
hazardous waste
going for disposal.
MP:56 Control of
Hazardous Waste
Analysis of paint sludge to take
place to confirm solvent
content when paint is dry. If
acceptable investigate
possibility to send to landfill
Marie Walsh 30/06/2011 Currently not
possible to send to
landfill due to
excess cost. Sludge
will continue to be
sent to Veolia for
hazardous water
disposal.
Attachment F
Attachment F
Proposed Environmental M
anagement Plan
Proposed Environmental M
anagement Plan 2012
2012
ALPS ELECTRIC (IRELAND) LTD
AGENDA FOR ISO 14001 ENVIRONMENTAL MANAGEMENT REVIEW
1 of 4
4.0 Management Programmes, Objectives & Targets
The following table consists of Management Programmes, Objective and Targets set for 2012.
Management Programmes Objectives Tasks/Target Responsible Completion Date
MP 76. Compliance with
legal requirements
OBJ 77 Ensure that ALIR
remains compliance with all
the requirements of the IPPC
license.
• Completion and
submission of AER
(Annual
Environmental
Report) for 2011.
• Review and update if
necessary the
Decommissioning
Management Plan.
• Review and update if
necessary the ELRA
(Environmental
Liabilities Risk
Assessment).
John Foley/ Marie
Walsh
31/03/2013
MP 77 Control of emissions
to atmosphere.
OBJ 78 Ensure that all emission
levels are in compliance with
IPPC limits.
Quarterly monitoring of stacks
A1-3, A2-1, A2-3, A2-4
Monthly analysis of RTO
abatement download
information.
James Sugrue/Marie
Walsh
31/12/12
MP 84 Control of electrical
energy usage.
OBJ 85 Monitor, control and
reduce where possible the use of
energy within the plant.
Sustain current rate of €11.68
per KWA.
• Investigate
updating/changing
current compressors.
• Investigate the
implementation of
standby and
hibernation rules for
PC’ & laptops.
Peter Creagh 28/12/12
ALPS ELECTRIC (IRELAND) LTD
AGENDA FOR ISO 14001 ENVIRONMENTAL MANAGEMENT REVIEW
2 of 4
MP 80 Control of Hazardous
and contaminated Waste
OBJ 81 Ensure that all hazardous
waste in stored correctly and
removed off site by a licensed
contractor.
• Review of all
hazardous waste
categories to ensure
that they are correct
for the specific waste
type.
• Review new online
system introduced by
Veolia to ensure it
retains all relevant
information.
Peter Creagh/Marie
Walsh
28/12/12
MP 82 Control of Noise
emissions.
OBJ Compliance with IPPCL
requirements for noise. • External
Environmental Noise
monitoring to take
place.
• Investigate the cause
of exceedance at
AN2 & AN3
locations.
• Noise considerations
to be taken into
account when
replacing/investing in
any equipment.
James Sugrue/Marie
Walsh
28/12/12
MP 88 Monitoring &
Reduction of water
consumption
OBJ 90
ALIR to reduce water usage
where possible.
• Implement the
metering of chillers.
• Implement new water
control system ie
monthly checking
and dosing of water
systems.
Peter Creagh
30/06/12
MP Control of Supplier
Activities
ALIR to ensure that all suppliers
are compliant to relevant legal
requirements.
Review of all current MSDS
on file to ensure they are the
most up to date revision.
Patrick Tuohy / Marie
Walsh
30/06/12
ALPS ELECTRIC (IRELAND) LTD
AGENDA FOR ISO 14001 ENVIRONMENTAL MANAGEMENT REVIEW
3 of 4
MP 74 Solvent Reduction
Plan
OBJ 88 Investigate the possibility
of reducing the amount of solvent
in use within the plant
• Investigate the
possibility of
implementing PVD
Testing in order to
reduce solvent usage.
• Remove spot dip and
replace with robotic
soldering.
• Investigate
eliminating PVA
concoat.
James Sugrue/Peter
Creagh
Dec 2015
MP 81 Control of Non-
Hazardous Waste
OBJ 82 Reduction in the amount
of plastic parts being scrapped and
sent for re-cycling.
Maintain emphasis of scrap
reduction.
Thomas O Leary 28/12/12
MP 63 Safe Place of work
for all personnel.
OBJ 65 Occupational exposure
monitoring to be completed where
necessary.
PAL, SAM areas to be
completed.
Joanne O Sullivan 28/12/12
MP Odour Prevention ALIR to ensure that zero odour is
being emitted from the plant.
Ensure correct control
methods are maintained at all
times when handling/using
hazardous chemicals.
Alan Perry 18/12/12
MP 85 Product Design
Activities
OBJ 86 Ensure that all
environmental considerations are
taken into account in conjunction
with Auto Japan when new
products are being implemented.
Continue to create
environmentally friendly parts
as per customer requirements
and legal requirements.
James Sugrue/Patrick
Tuohy
MP 86 Visual Impact OBJ 87 Visual impact to be taken
into consideration for any
modifications to current building
or for any new proposed building
projects.
In the event of any
modifications to the plant
ALIR to comply with any
planning requirements.
James Sugrue 28/12/12
MP 89 Control of
Contractors while working
on site
OBJ 80 All contractors to be
informed of the
environmental/Health & Safety
requirements while working on
site.
Ensure all contractors comply
with ALIR rules while
working on site.
Peter Creagh/Marie
Walsh/Joanne O
Sullivan
30/04/12
MP 67 Maintain Registration OBJ 91 Maintain compliance Ensure that zero major non- Marie Walsh 28/12/12
ALPS ELECTRIC (IRELAND) LTD
AGENDA FOR ISO 14001 ENVIRONMENTAL MANAGEMENT REVIEW
4 of 4
to ISO14001 EMS with ISO14001 requirements. conformances are raised
during internal and external
audits.
MP83 Control of Aqueous
Discharge
OBJ 84 Zero hazardous discharge
from the plant.
Maintain good work practices
and environmental training
within the plant.
Alan Perry 28/12/12
MP72 Site preparation in the
event of an emergency.
OBJ 73 Completion of fire water
retention tank.
Ensure that all door levels are
raised.
James Sugrue 30/06/12
MP 87 Env Health & Safey
control of ozone depletion
substances.
OBJ 89 Control and use of
substances that deplete the ozone
layer and control of certain
fluorinated greenhouse gases (F
gas)
• Eliminate the use of
equipment that
contains R22 gas.
• Maintain an F Gas
Register
Peter Creagh 28/12/12