Agenda WEDNESDAY 5 DECEMBER 2012 (0900 ‐1700)  1 Preliminary Session (Chair)  

1.1 Welcome and Introductions  1.2 Apologies and Observers  1.3 Correspondence  1.4 Conflict of Interest Declarations  1.5 Governance  1.5.1 Draft ARRTC Terms of Engagement  

2 ARRTC28 Outcomes (Chair)  2.1 ARRTC28 – Meeting Summary  2.2 ARRTC28 ‐ Actions   

3 Stakeholder Reports  3.1 Uranium Equities Ltd ‐ Nabarlek (Ms Taylor)  3.2 Environment NGOs (Dr Mudd)  3.3 Department of Mines and Energy (Mr Ball)  3.4 Northern Land Council (Dr Smith)  3.5 Parks Operations and Tourism Branch (South Alligator Valley) (Mr Issaverdis)  3.6 Supervising Scientist (including Monitoring) (Mr Hughes)   

4 Science underpinning regulatory decisions (Mr Ball)  4.1 Regulatory applications/approvals  4.2 MTC Minutes  

5 Research Reports  5.1 Supervising Scientist Division  

5.1.1 eriss 2011‐12 research outcomes (Dr van Dam)  5.2 Energy Resources of Australia Ltd  

5.2.1 ERA operations and ITWC update (Dr Sinclair)  

6. KKN research and revisions – joint status report (eriss)  6.1 Joint KKN status summary  6.2 KKN Technical Presentations  

Independent Surface Water Review Working Group Update (Prof Barry Hart by phone ‐ 1500‐1530)   THURSDAY 6 DECEMBER 2012 (0900 ‐ 1700)  6. KKN research and revisions ‐ joint status report (cont.)  7 Other Business  

7.1 SSD publications since ARRTC28  7.2 ERA publications since ARRTC28  7.3 ARRAC37 Meeting Summary 7.4 Chair meeting report  

8 Next Meeting 

ARRTC29 Meeting Summary Page 3 of 21

Attendance Members 

Dr Simon Barry   Independent Scientific Member and Chairperson

Dr Jenny Stauber  Independent Scientific Member

Prof Paul Boon  Independent Scientific Member

Ms Jane Coram  Independent Scientific Member

Prof David Mulligan  Independent Scientific Member

Prof Colin Woodroffe  Independent Scientific Member

Mr Andrew Johnston  Independent Scientific Member

Dr Gavin Mudd  Environment NGO stakeholder member

Dr Greg Sinclair   Energy Resources of Australia Ltd 

Dr Howard Smith   Northern Land Council

Mr Russell Ball  NT Department of Mines and Energy

Mr Alan Hughes  Supervising Scientist

Apologies   

Ms Melissa Taylor  Uranium Equities Limited 

Ms Anna Morgan  Parks Australia Division

Mr Justin O’Brien  Permanent Observer ‐ Gundjeihmi Aboriginal Corporation 

Presenters/Observers 

Mr Peter Waggitt  NT Department of Mines and Energy 

Ms Sally Strohmayr  NT Department of Mines and Energy

Ms Lauren Cooper  NT Department of Mines and Energy

Ms Shelly Iles  Energy Resources of Australia Ltd 

Dr Ping Lu  Energy Resources of Australia Ltd 

Dr Matt Kozak   Intera Pty Ltd

Dr. John Sigda  Intera Pty Ltd

Ms Sharon Paulka  Energy Resources of Australia Ltd 

Mr Nathaniel Toll  Energy Resources of Australia Ltd 

Ms Nicole Jacobsen  Energy Resources of Australia Ltd 

Mr Reid Miller  Energy Resources of Australia Ltd

Ms Kyla Clark  Energy Resources of Australia Ltd

Ms Linda Pugh  Energy Resources of Australia Ltd

Professor Barry Hart   Chair, Independent Surface Water Working Group 

Mr Adam Thompson  Northern Land Council

Jean‐Pierre Issaverdis  Parks Australia Division

Dr Rick van Dam  Environmental Research Institute of the Supervising Scientist 

Dr Che Doering  Environmental Research Institute of the Supervising Scientist 

Dr Andreas Bollhöfer  Environmental Research Institute of the Supervising Scientist 

Dr Chris Humphrey  Environmental Research Institute of the Supervising Scientist 

Dr Amy George  Environmental Research Institute of the Supervising Scientist 

Dr Renée Bartolo  Environmental Research Institute of the Supervising Scientist 

Dr Mike Saynor  Environmental Research Institute of the Supervising Scientist 

Dr Wayne Erskine  Environmental Research Institute of the Supervising Scientist 

Dr Andrew Harford  Environmental Research Institute of the Supervising Scientist 

Other SSD staff   

SECRETARIAT 

Mr Scott Parker  Office of the Supervising Scientist 

Ms Shannon Traut  Office of the Supervising Scientist

 

ARRTC29 Meeting Summary Page 4 of 21

1 Preliminary Session

1.1  WELCOME AND INTRODUCTIONS 

The Chair  (Dr Barry) welcomed members to the 29th meeting of the Alligator Rivers Region Technical Committee. Members were provided a facilities and safety briefing. Dr Barry thanked ERA for arranging the tour of Ranger mine prior to the meeting. He noted that all members had found the tour interesting and appreciated the opportunity to see first‐hand the status of the various minesite developments. ARRTC noted the recent retirement of Dr David  Jones as Director of eriss. Members commended Dr  Jones  for his outstanding  contribution  to  the ongoing protection of  the Alligator Rivers Region  environment  through his  leadership of eriss’s world class  scientific  research program.  It was agreed  that  the Chair would also note Dr  Jones’ contribution  in his  report  to  the Minister following the meeting. Members also agreed to send a card to Dr Jones. 

ARRTC29‐1:  ARRTC  commended  Dr  David  Jones  on  his  outstanding  contribution  to  improving  the  level  and  quality  of scientific understanding of the impacts of uranium mining on the environment of the Alligator Rivers Region. 

ARRTC29‐2: ARRTC agreed the Chair would formally record ARRTC’s recognition of Dr Jones’ contribution in his letter to the Minister following the meeting. 

1.2  APOLOGIES 

Apologies from the following members were noted: Ms Melissa Taylor  UEL Ms Anna Morgan  Parks Australia Mr Justin O’Brien   GAC (permanent observer)

1.3  CORRESPONDENCE 

The following correspondence was noted. 

Outgoing ‐   Letter to Minister Burke – ARRTC28 outcomes (17 February 2012) 

Incoming ‐   Letter from Minister Burke – ARRTC28 outcomes (15 March 2012) 

1.4  CONFLICT OF INTEREST DECLARATIONS 

No conflicts of  interest were declared. Dr Barry advised that he  is currently contractually engaged to provide technical services as part of  the  review of  the National Water Quality Guidelines being managed by eriss. Ms Coram advised  that as an employee of Geoscience Australia  she  is periodically  requested  to provide  technical  advice on groundwater  issues  at Ranger  to  a number of Australian Government departments. Dr Stauber advised that CSIRO is currently engaged by Energy Resources of Australia Ltd on a range of  technical and  rehabilitation  related projects, and  is working collaboratively with eriss on a sediment  toxicity project. Dr Mudd advised that he is contractually engaged by Gundjeihmi Aboriginal Corporation to provide scientific and technical advice on a range of water and rehabilitation related issues. 

1.5 GOVERNANCE 

Mr Parker advised that the draft Terms of Engagement document had not been tabled at this meeting as there are a number of remaining  issues with the proposed structure and wording that need to be resolved. He noted further out‐of‐session consultation with members may be required in relation the clauses dealing with Intellectual Property and Non‐disclosure. It was noted that not all  current ARRTC members have  signed non‐disclosure agreements although ARRTC members are generally bound by decisions from  previous meetings  preventing  the  disclosure  and/or  unauthorised  use  of  commercially  sensitive  information.  Dr  Sinclair requested  that  the Terms of Engagement be  finalised and  signed by members as  soon as possible  so  that ERA  can  continue  to provide ARRTC with the same  level of technical and scientific  information. It was asked  if shares held by members’ partners, or  in family trusts, could be considered a conflict of interest. Mr Parker advised he would seek further advice on this. Dr Barry advised he is generally comfortable with the approach being proposed with the Terms of Engagement but suggested that members raise any specific concerns with the Secretariat. ARRTC noted the Secretariat will circulate the draft Terms of Engagement out‐of‐session  in early 2013. 

ARRTC29‐3: Mr Parker to provide clarification as to whether shares held by partners of ARRTC members or in family trusts of which the member is a beneficiary, constitute a potential conflict of interest. 

ARRTC29‐4: Secretariat to circulate the final draft Terms of Engagement out‐of‐session in early 2013. 

2 ARRTC28 Outcomes

2.1  ARRTC28 ‐ SUMMARY RECORD 

The ARRTC28 draft Meeting Summary was approved without amendment. 

ARRTC29 Meeting Summary Page 5 of 21

2.2  ARRTC28 ‐ ACTIONS ARISING  Action/Outcome Status Previous ARRTC27-4 ARRTC requested Ms Paulka to seek agreement from UEL to provide closure criteria and Hydrogeological review reports to Prof Mulligan and Gavin Mudd. UEL to address

Carried over ARRTC27-5 ARRTC agreed that UEL be invited to submit a proposal to amend the KKN and that ARRTC then consider based on the evidence that has been provided to

support this. UEL to address Carried over

ARRTC28 ARRTC28-1 ARRTC approved the ARRTC27 meeting summary as tabled with one minor amendment (p.20). Complete ARRTC28-2 ARRTC agreed that the meeting summary for this and future meetings should be more concise and should aim to capture the key discussion points and

outcomes of the meeting without attributing individual members. Complete

ARRTC28-3 ARRTC agreed the draft actions should be circulated to members within 4 weeks of each meeting, and the draft minutes circulated within 8 weeks. Complete ARRTC28-4 ARRTC requested that DoR provide the outcomes of ongoing work on the new Maximum Operating Level to members out-of-session. Overtaken by current work on

application for new MOL. ARRTC agreed to leave as action.

ARRTC28-5 ARRTC requested that DoR and ERA circulate their respective reports from the Bureau of Meteorology on Probable Maximum Precipitation. Papers tabled. Completed. ARRTC28-6 ARRTC requested that Parks Australia provide a copy of the O’Kanes Pty Ltd proposal (if possible) and further details on the groundwater monitoring

program being put in place for the SAV rehabilitation project. Addressed under Agenda Item 3.5

ARRTC28- 7 ARRTC requested that the Secretariat circulate the SSD report to ARRAC37 to members, and that SSD ARRAC reports be circulated with the draft ARRTC minutes for future meetings

Addressed under Agenda Item 7.3

ARRTC28-8 ARRTC noted the implications of current budget constraints in terms of the prioritisation and possible deferral of some SSD research activities for 2012-13. Complete ARRTC28-9 ARRTC commended SSD staff on the quality of their 2012-13 Research Report and technical presentations to this meeting. Complete ARRTC28-10 ARRTC commended ERA on the quality and depth of work being done on closure activities at Ranger and the high quality of information presented this

meeting. Complete

ARRTC28-11 ARRTC requested that SSD provide a presentation on ERICA and the ARPANSA approach on non-human biota to next meeting. Addressed under Agenda Item 6 ARRTC28-12 ARRTC agreed there should be a new separate KKN addressing radiation impacts on non-human biota. Complete ARRTC28-13 ARRTC requested a presentation be provided to next meeting outlining the conceptual framework for closure at Ranger (covering the decommissioning,

post-rehabilitation, and long-term post rehabilitation phases). Addressed under Agenda Item 5.2.1

ARRTC28-14 Prof Boon to circulate to members an overview of the use of conceptual models in ecological rehabilitation. Complete

ARRTC28-15 ARRTC agreed that the ERA proposed approach of using existing data is sound, but that further data should be collected so that the derived trigger values can be reviewed and refined in the future.

Complete

ARRTC28-16 ARRTC commended ERA on the quality of current groundwater modelling work and the good progress to date in implementing the Weaver report recommendations.

Complete

ARRTC28-17 ARRTC requested that Dr Smith provide a presentation to next meeting on the integration of Aboriginal Traditional Knowledge (and expectations) into the closure planning process.

Addressed under Agenda Item 3.4

ARRTC28-18 ARRTC agreed that ERA and SSD should undertake further work as part of the proposed risk assessment process to draft a risk based framework for prioritising the KKNs associated with the decommissioning and rehabilitation phases at the Ranger mine. ARRTC agreed members will be involved where possible in person by or email/teleconf.

Action delayed to Q1 2013. Addressed under Agenda Item 6

ARRTC28-19 ARRTC agreed to look at the feasibility of holding a one day workshop in Canberra in September 2012 to enable members to review and comment on the draft risk framework and revised KKNs.

Workshop not held – see ARRTC28-18 above

ARRTC28-20 ARRTC agreed that, consistent with the approach agreed last meeting, the draft revised KKNs would be reviewed at the November 2012 meeting on a by exception basis.

Addressed under Agenda Item 6

ARRTC28-21 ARRTC noted the Secretariat will finalise the draft ARRTC Terms of Appointment form and circulate out-of-session. Complete ARRTC28-22 ARRTC agreed that members would advise the Secretariat of their availability for the last two weeks of September and November 2012. Complete

ARRTC29 Meeting Summary Page 6 of 21

3 Stakeholder Reports

3.1  NT DEPARTMENT OF MINES AND ENERGY (MS STROHMAYR) Ms  Strohmayr provided an update on DME  regulatory activities during  the  reporting period. Key points are  summarised below. There  are  currently  six  authorised  exploration  operations  on  a  number  of  tenements  in  the  Alligator  Rivers  Region,  including: Uranium Equities Limited  (Nabarlek, Headwaters), Cameco  (Arnhem), UXA  (Nabarlek North and Nabarlek W) and Alligator Energy (Tin Camp Creek). The following regulatory proposals and approvals for Ranger during the reporting period were noted. 

Application to raise the Maximum Operating Level (MOL) on the Ranger Tailings Dam Stage VII – The TSF crest raise to RL 58m was completed in early November 2011. An application to increase the MOL to RL 57m (dry season) and RL 56.5m (wet season) was submitted. The Ranger Authorisation was varied on 24 September 2012 to incorporate the MOL of the TSF taking into account the Bureau of Meteorology’s estimates of Probable Maximum Precipitation  (PMP). An  independent expert  review of  the TSF design commissioned  by  SSD  recommended  that  triaxial  testing  be  conducted  to  confirm  the  assumed  cohesion  values  in  the  design stability are representative of the materials used in construction. 

Application to raise the MOL on the Ranger Tailings Dam Stage VIII RL60.5m (under review) – The  lift of clay core of the TSF to RL60.5m was  completed  in November 2012. An  application was  submitted  to  raise  the MOL  to RL 59.25m  (dry  season)  and RL 57.91m (wet season). When contingency pumping of 200ML/day from TSF to Pit 3 has been demonstrated by ERA, the wet season MOL will  increase up  to 58.71m RL. A TSF  inspection was conducted by stakeholders on 14 November 2012 and  the annual TSF inspection report was submitted on 27 November 2012. Triaxial test results were updated and submitted to MTC. The application is still  under  review  and  is  subject  to  conditions  being met  by  ERA  (including  status  of  GA  2011  report  on  TSF  seepage model recommendations). 

2012 Ranger exploration program – A proposal was submitted on 1 June 2012. ERA responded to MTC stakeholder comments and Exploration Management  Plan was  updated  accordingly. Drill  sites were  inspected  during  Routine  Periodic  Inspections.  The  R3 Deeps exploration decline boxcut has been completed and infilling commenced in November 2012. 

Application for construction of an earthen levee to the north of Pit#3 – An application was submitted in October 2012 to construct levee to mitigate the movement of surface water into pit#3 via cracks in the pit wall and the adjacent access road. The location of the levee borrow pit was changed to avoid an archaeological site prior to approval by MTC. Matting is being installed to minimise erosion and  turbidity monitoring will be carried out up and downstream of  the site. ARRTC noted  there  is expected  to be some disturbance sediment generated by the construction of the proposed levee and also from the ongoing weathering of the rock used in  its construction. ERA will monitor turbidity and pH downstream of the site (using grab sampling). SSD also operates continuous monitoring of  turbidity upstream and downstream of  the site. ERA advised  that, consistent with  the  Independent Surface Water Working Group recommendations, it is currently upgrading its continuous monitoring network and this may include installation of continuous turbidity recording. 

Key areas of interest to DME – It was noted the key research areas of interest to DME include the outcomes of the ISWWG review, the development of  site‐specific  groundwater  trigger  values  and  closure  criteria,  and brine  injection/disposal  in Pit#3.  ERA  also advised weekly water quality reports are provided  to stakeholders. ARRTC agreed  it would be useful  to see  these reports and  to have some level of feedback on the effectiveness of the levee and associated mitigation works going forward. ERA agreed to provide this information in its operational reports to future ARRTC meetings. 

ARRTC29‐5: ERA to  include details on the effectiveness and associated water quality  impacts associated with the  levee  in  its operational reports to future ARRTC meetings. 

Discussion ‐ ARRTC noted ERA has provided information to the regulator and relevant stakeholders on the cause of the cracks in the pit wall  and  the proposed mitigation measures. ERA  advised  the  significance of  the  cracks had been  assessed using  an  internal formal risk assessment register. ERA also advised that ensuring the geotechnical stability of the pit wall is critical given the pit is now being backfilled. ARRTC noted that ERA will continue to provide stakeholders with periodic updates as required through the MTC and directly if necessary. Dr Mudd advised he thought the construction of a levee is an appropriate mitigation measure and that he had advised GAC that something of this nature would probably be required. He also acknowledged that such cracking is a common issue with open cut mining. ARRTC noted the key issues are (1) whether the identified risks are being appropriately and effectively mitigated and (2) whether there are any associated knowledge gaps requiring further investigation. ERA will continue to monitor the effectiveness of the levee during the forthcoming wet season. It was noted that if the deep sands underlying the levee prove to be an  issue, ERA will  likely  install a cut‐off  trench. The cracks at  the bottom of  the pit wall are now  less of an  issue as  the wall has unloaded and the key focus now is on surface inflow mechanisms. ERA was asked if any pore moisture measurements of the pit wall have been taken and agreed to provide further details on this at the next meeting. 

ARRTC29‐6: ERA to provide details on any measurements of pore moisture in the wall of Pit#3 to next meeting. 

3.2  NORTHERN LAND COUNCIL (DR SMITH) 

Dr  Smith provided  a presentation on how NLC  is working with ERA, DME  and other  stakeholders  to define  appropriate  closure criteria as part of a rehabilitation and post‐closure plan. He noted it is important that Traditional Owners and their knowledge are 

ARRTC29 Meeting Summary Page 7 of 21

effectively integrated into this process to assist with establishing stewardship arrangements for managing the land post mining. The Environment Requirements require (1) that mining operations at Ranger do not impact on the World Heritage values and attributes of Kakadu National Park  (KNP) and  (2)  that  the Ranger Project Area environment be  rehabilitated  to a  level  such  that  it  can be incorporated  into KNP post mining. He noted the Mirrar determine this to mean that any rehabilitation must consider cultural as well  as  environmental  attributes.  The process developed by NLC  and  ERA  for  integrating  Traditional  Ecological  Knowledge with Western science  to determine mutually acceptable closure criteria  involves  testing whether  the proposed criterion  is  technically, culturally and economically viable. ARRTC noted that balancing belief structures and scientific data is always difficult, but a table of agreed  closure  criteria  has  been  developed.  Dr  Smith  advised  that  cultural  landscaping  was  also  undertaken  using  archival information,  living memory  and  archaeological/anthropological  reports  to determine how  the  area was used by Mirrar prior  to mining. This  information was then used to  inform a cultural risk assessment which  identified five main categories (and more sub‐categories) of risks to cultural activities. Seven pilot projects have been agreed as first steps towards re‐establishing relationships (i.e.  restoration  of  Magela  Creek  riparian  zones,  progressive  rehabilitation  of  Land  Application  Areas;  closure  of  Pit#1  and rehabilitation of Ranger access tracks; removal of the interim water management pond at Jabiluka; removal of bores in Mine Valley and rehabilitation of Djarr Djarr mining camp). 

Discussion  ‐  It was asked  if ARRTC has a role to play  in assisting with building TO trust  in relation to the formal science. Dr Smith noted ARRTC has a legitimate interest but not a direct role. The current focus is on establishing and strengthening the relationship between ERA and GAC, with NLC providing a supportive role. Dr Smith suggested Mirrar would not want  to engage directly with ARRTC as NLC and GAC represent their interests. ARRTC agreed that cultural and scientific knowledge needs are equally important and that better  integration of these needs to be based on trust and mutual understanding. There was some discussion regarding whether  cultural  knowledge  should  be  included  as  part  of ARRTC’s  Key  Knowledge Needs  process. ARRTC  agreed  that  cultural aspects should be addressed as part of the proposed KKN risk assessment methodology. Dr Smith noted that there are a number issues  already  addressed  under  the  KKNs which  have  cultural  implications  (e.g.  contaminants  in  bushfoods).  It was  noted  that ARRAC plays an important role in providing a forum for stakeholders to share information and this should include cultural aspects. ERA  noted  that  the  ERs  require  the  rehabilitation  process  to  be  undertaken  in  accordance with  best  practice which  includes consideration of environmental, social and cultural values. It was noted that in practice this is can be extremely difficult and that is why it is important to focus on getting the relationships right and building trust to facilitate this. ARRTC noted that ERA has included cultural criteria  in  its Best Practicable Technology assessment criteria and  is working  to build  relationships with TOs  through  the successful  implementation of the pilot projects.  It was agreed that the rehabilitation of Pit#1 provides a good opportunity to test how  the  process works.  ARRTC  agreed  to  track  progress  of  the  pilot  projects  and  associated  processes  to  see  if  the  scientific outcomes are robust and workable. Dr Smith advised that, due to the culturally sensitive  issues  involved, the process  is currently being managed via a small working group outside of the Closure Criteria Working Group. Once a document has been finalised, this will go to MTC and then presumably to ARRTC. Dr Mudd agreed that GAC engaging directly with ERA to ensure cultural issues are appropriately addressed as part of the rehabilitation process is a welcome and positive step forward. He also noted that the David Lawrence book “Kakadu – making of a national park” on the history of Kakadu provides a good historical insight into the issue. 

ARRTC29‐7: ARRTC commended Dr Smith and ERA on  their excellent work  to date  in developing approaches  for  integrating traditional indigenous knowledge into the rehabilitation and closure planning processes for Ranger. 

ARRTC29‐8: Dr Smith  to provide ARRTC members with  copies of his other papers on approaches  for  integrating  traditional indigenous knowledge into the rehabilitation and closure planning processes. 

3.3  PARKS AUSTRALIA (MR ISSAVERDIS) 

Mr  Issaverdis provided an update on the status of rehabilitation works  in the South Alligator Valley. Operational responsibility for the site has been transferred to Kakadu National Park. Contractors will be onsite in early December 2012 to remediate and mitigate the  erosion  gullies  that  formed  in  the  south  east  corner  of  the  containment  facility  during  the  next wet  season.  Revegetation (predominately with Acacia species)  is progressing well across the whole facility and will aid  in stabilising the site over future wet seasons. Mr  Greg  Balding  has  been  engaged  on  a  short  term  contract  to  supervise  rehabilitation  works  and  to  prepare  an ‘Acceptable Limits’ report for ARPANSA. ARPANSA issued a new Facility Licence to the Director of National Parks (DNP) in February 2012. An annual  report was submitted  to, and accepted by, ARPANSA  in September 2012. As  required under  the new  licence, a monitoring program has been developed  in  conjunction with SSD which  covers  containment performance,  surficial  radioactivity, groundwater and vegetation. SSD undertook gamma dose rate and radon flux density surveys at the site in September 2012 which showed that radioactivity is low and similar to typical background values elsewhere in the Alligator Rivers Region. SSD undertook an inspection of  the  site  in  June 2012 and made a number of  recommendations  including  clearing around monitoring  stations and remediating  erosion  gullies.  All  of  these  recommendations  have,  or  are  currently  being  addressed.  It  is  expected  that  ongoing investment will  be  required  over  the  next  4‐5  years  to  conduct  the  required monitoring  and  cover  the  licence  fees.  Parks will continue to work with SSD to ensure the site is appropriately maintained.  

Discussion  ‐  ARRTC  noted  that  while  the  erosion  gullies  on  the  site  are  relatively  large,  they  are  not  impacting  the  actual containment which  is  located below grade. It was asked  if the site  is subject to the requirement that tailings be  isolated from the environment for 10,000 years as is the case at Ranger. Questions were also raised about the vegetation composition on the site and the possible effects of fire. Mr Issaverdis noted the vegetation on the site is Acacia dominated and while it is hoped that the site can 

ARRTC29 Meeting Summary Page 8 of 21

be protected from fire for at least 5 years, it is expected a fire will go through the site at some stage. ARRTC noted this and other vegetation management issues are being addressed in the report being prepared by Mr Balding. 

3.4  SUPERVISING SCIENTIST DIVISION (INCLUDING MONITORING) (MR HUGHES) 

Mr Hughes provided a  status  report on SSD operations during  the  reporting period. He advised  that Dr van Dam would provide information  on  SSD monitoring  activities  under  the  eriss  research  report  later  in  the meeting. Mr Hughes  noted  that  SSD  had participated  in  the  Independent  Surface Water Working  Group  and  that  the  review’s  recommendations may  have  significant implications for the current regulatory framework and associated monitoring activities. ARRTC noted that resource constraints and staffing continue to be key challenges for SSD and that ultimately this may mean fewer staff undertaking more targeted activities. Mr Hughes noted the recent retirement of Dr Jones and advised that he was also planning to retire in 2013. ARRTC noted that SSD is having ongoing discussions with the Department on how to deal with staff departures and succession planning going forward.  

3.5  ENVIRONMENTAL NON‐GOVERNMENT ORGANSIATIONS (DR MUDD) 

Dr Mudd provided a report on behalf of environmental NGOs. He acknowledged the significant work being undertaken by ERA at Ranger  is addressing a  range of  complex and  challenging  issues. He noted  that, while he doesn’t necessarily agree with  further mining development at Ranger, ERA should be commended for its efforts to date in implementing the brine concentrator and other rehabilitation/closure related work. Dr Mudd advised that he had recently attended a community forum at Rum Jungle discussing uranium mining development and rehabilitation. The  forum was hosted by NTDME and  included representatives  from a range of indigenous  and  environmental  stakeholder  groups.  He  stressed  the  importance  of maintaining  the  current  good  relationships between government and stakeholders and noted the environment movement is very keen to see the Australian Government make the necessary  investments  to properly  remediate  legacy mine  sites. Dr Mudd advised  that  the environment movement  remains opposed to the proposed development of underground mining at Ranger 3 Deeps, and he will continue to provide  feedback and technical advice to his stakeholders as required. 

3.6  URANIUM EQUITIES LTD (NABARLEK) (MS TAYLOR) 

Apology ‐ No report provided. 

4 Science underpinning regulatory decisions (Mr Ball)

Mr  Ball  suggested  there  is  significant  overlap  between  this  agenda  item  and  agenda  item  3.1.  He  noted  that,  as  part  of  the regulatory process,  the MTC  rarely  commissions  independent  scientific  advice  and  relies mainly on  the  science provided  in  the various  reports  and  proposals  submitted  by  proponents,  and  expert  advice  from  MTC  members  and  internal  NTDME scientific/technical staff. He noted that SSD commissions its own independent scientific and technical advice from time and this can be fed  into the MTC process. He suggested there  is a need to determine what actually constitutes “science”  in the context of this agenda item. Dr Barry noted that this issue has been discussed at length at previous meetings and ARRTC has previously confirmed that part of  its  statutory  role  involves  assessing whether  regulatory decision making  is based on  the best  available  science. He suggested  this  standing  agenda  item  is  addressing  this  but  queried  if  the  current  level  of  information  provided  by  NTDME  is adequate and appropriate. He agreed, however, that ARRTC does not have any direct role in the regulatory process. ARRTC noted that  a more  formal  process  had  been  used  in  the  past  to  document  scientific  knowledge  underpinning  particular  regulatory decisions. Mr Ball noted that, although ARRTC doesn’t have a direct role in the regulatory decision making process, the committee is still free to discuss and review the science related to various applications and decisions as required. Mr Ball indicated that NTDME would be happy to provide further information if ARRTC has specific concerns in relation to a particular regulatory matter and noted there  is also scope for the MTC to seek specific advice from members out‐of‐session  if required. ARRTC agreed that  independent scientific members should be able to consider and, if warranted, comment on, the science on which particular regulatory decisions have been based. It was noted there is currently no requirement that ARRTC’s advice needs to be taken into account as part of the regulatory process. 

It was suggested that members could highlight in their reports to each meeting those issues on which ARRTC comment is sought and the outcomes  can be  captured  in  the meeting  summary. ARRTC agreed  there  is no need  for a detailed  compendium of  science underpinning each regulatory decision and supported this approach. ARRTC also agreed the science generated and used to guide operational decision making by ERA on the mine site is of equal importance and interest.  

ARRTC29‐9: Parks Australia  to provide  further details on  the groundwater and  vegetation monitoring programs  for  the  El Sherana containment including any relevant reports and data to next meeting. 

ARRTC29‐10:  ARRTC  agreed  that members  will  clearly  identify  in  their  reports  and  presentation  to  each meeting  those scientific issues relating to operational or regulatory decision making on which they seek ARRTC’s views. 

ARRTC29 Meeting Summary Page 9 of 21

5 Research Activities

5.1  SUPERVISING SCIENTIST DIVISION 

5.1.1 SSD PROPOSED 2012‐13 RESEARCH PROGRAM (DR VAN DAM) Dr van Dam provided a presentation on SSD proposed 2012‐13 research program. Key points are summarised below. 

Overview 2011‐12 wet season ‐ Overall, total rainfall for 2011‐12 as measured at Jabiru Airport was just above average. Rainfall for December was almost double the average which resulted  in some water quality  issues  in Magela and Gulungul Creeks. Cease‐to‐flow  in Magela  Creek was  slightly  later  than  usual  (7 August  2012)  due  to  the  catchment  being well  recharged. Water  quality generally improved in Magela Creek while there was some slight deterioration of water quality in Corridor Creek. ERA is looking at doing  further analysis of water quality data  to determine possible causes. Water quality  in RP1 also  improved during  the period. There was no deterioration of water quality in Gulungul Creek although a number of EC spikes occurred (none exceeding 25 µS/cm) due to  local  flushing of groundwater.  It was noted that, from 2010‐11 onwards ERA has captured run‐off  from the TSF walls and prevented it reporting to Gulungul Creek, which may be a factor in the reduction of peak frequency observed. 

Research priorities ‐ ERA provided updated rehabilitation and closure timelines earlier this year and SSD took this  into account  in 

assessing  and  reprioritising  the  eriss  research  program,  reflecting  the  increased  focus  on  rehabilitation.  Communication  and cooperation between SSD and ERA staff on key projects continues to  improve. The eriss work program  is dominated by research projects  in different  stages of  completion across a  range of programs due  to  staffing and  resourcing  limitations. The  research  is addressing relevant KKNs and it is expected that ERA research projects are addressing most of the gaps. 

Issues ‐ In response to Departmental budget cuts in 2012‐13 and 2013‐14, savings are largely being made by reduced consultancies and not filling vacant positions. Unfortunately, the main Program affected by staff departure is the Physico‐chemical Processes (PCP) Group. Internal review of the research program is planned for early 2013 to align staff resources and work priorities. It was noted that the ISWWG outcomes may have implications for SSD (e.g. bioaccumulation work) and will need to be considered in planning. In relation to the KKN revision process, ARRTC has already made some suggestions but will need to await outcomes of risk assessment workshop in early 2013. Advancement of Pit#1 rehabilitation may also have work planning implications for eriss. 

Key activities in 2013 ‐ Other key activities for eriss in 2013 include: repeating the billabong macroinvertebrate sampling program during  recessional  flow  period;  continuing  the  4th  year  of  data  collection  on  the  trial  landform  and  determining  future  work requirements;  conducting  the 3rd and  final  sediment uranium  toxicity  field experiment; and  internal  implementation of duration based EC trigger framework (based on previous work on Mg Pulse) for Magela Creek. 

Discussion ‐ There was discussion regarding the future of the trial landform work and strong agreement that it should continue. It was noted that the erosion plots have been going for four years and while there has been good work on bedload (which has shown that bedload decreases significantly over time so there may not be a need to monitor annually), further work is required on analysis of the sediment and solute data. ARRTC noted that that decisions regarding future work on the trial landform will be made in the context of available resources. It was suggested one option may be to not monitor all of the plots and make greater use of remote sensing. It was noted however that a good understanding of what the data are showing is required before any work is ceased. It was noted that the current work is focused on defining the solute loads coming off the landform, so it would be useful have a hiatus to allow the four years of existing data to be properly reviewed rather than have a further year of monitoring data. It was suggested a higher degree research student could be engaged to do some of this work. ARRTC noted this and agreed that other potential areas for collaboration between the parties should be explored. 

5.2  ENERGY RESOURCES OF AUSTRALIA LTD 

5.2.1  ERA ‐ INTEGRATED TAILINGS WATER AND CLOSURE (ITWC) 2011 (DR SINCLAIR) 

Dr Sinclair advised that under current approvals ERA  is required to complete the Ranger closure process by 2026. Consistent this timeframe, ERA is planning to manage process water over 4 discrete phases namely: (1) safe containment of process water in TSF and Pit#1/ TSF  lift (complete), (2) reducing  inventory using brine concentrator, cease mining  in Pit#3, backfill and rehabilitation of Pit#1  (which  is  the current  focus); and  (3 and 4) use TSF as evaporation pond,  lower process water  inventories, manage brines, transfer  tailings  into Pit#3 and  store  salts until  closure.  It was noted  this phased approach  represents a major package of work involving a  range of projects out  to 2026. The PFS  is expected  to be completed by 2013 and a detailed closure plan and costing should be finalised by April 2013. ERA anticipates making a statement to the market in early 2013 regarding its obligations from the rights  issue. A preferred “base case” Closure Strategy has been defined  following a  final Best Practicable Technology assessment undertaken with assistance from Dr Arthur Johnston and will be presented to MTC in December 2012. The Closure Criteria Working Group  is  continuing  to make good progress and  is working on how  to  integrate TO  cultural knowledge  into  the process and an agreed definition of “detrimental  impact”. Dr Sinclair noted the Ranger site  is not going to be the same as  it was pre mining but highlighted  the need  for appropriate closure criteria  to  inform engineering design decisions. ARRTC noted  that ERA and SSD are continuing to work collaboratively on a range of rehabilitation/closure related projects. 

Dr Sinclair advised  it  is critical to ensure that Pit#3 tailings and salt disposal options provide the best environmental outcome. He noted the current preferred option  is to use thickened tailings and  inject salt as  liquid brine  into Pit#3. Further studies are being done to improve knowledge and confidence in relation to this approach. Dr Sinclair outlined the current preferred closure strategy 

ARRTC29 Meeting Summary Page 10 of 21

to  finalise  closure by 2026 which  covers options  for  tailings  transfer, brine management and pit backfilling, water management arrangements and controls  required  to  reduce  inflows  into Pit#3 and  limit seepage  to Magela Creek.  It was noted  the proposed backfill plan for Pit#3 involved placing 30M t of low grade ore in the bottom of the pit over the next year (to Dec 2014) to be used as the brine repository,  followed by 41M tonnes tailings  from milling  (14M tonnes 2014‐16    ) and the TSF  (27M t 2015‐2020). After tailings have  settled,  remaining  low grade  rock will be added  followed by approximately 62M  tonnes of waste  rock  to  the  final landform over the period 2023‐2025. 

ERA has developed a holistic BPT framework and criteria which is being used to guide technical and engineering decision making and the whole closure strategy. The criteria also  include TO cultural heritage components which will be  further refined based on  the outcomes  of  the  pilot  rehabilitation  projects.  Based  on  the  BPT  assessment,  the  “Milling  to  2020  without  extended  water treatment” option was rated best. It was noted that final closure criteria and options for dealing with solutes coming off the rock capping  still need  to  resolved.  If  solute  issues  can’t be  successfully addressed using pit barriers, or other engineered  structures, extended water treatment will be required. It was noted the principal pathway for dispersal of solutes from tailings is via the sand lens between the North‐East corner of the Pit#3 and Magela Creek and a range of mitigation options are under consideration.  

Dr Sinclair noted that the restoration of Djalkmarra Billabong is a key cultural objective for TOs, however, ERA currently believes that restoration is not a feasible option as modelling is showing this could be a massive solute trap. ARRTC noted that ERA will consult further with stakeholders and TOs on this issue. It was noted that ERA will accelerate rehabilitation of Pit#1 as it is a good test bed for Pit#3 rehabilitation. Dr Sinclair advised that current consolidation modelling  indicates that the tailings  in Pit#1 will settle at an average 5m above RL 0m. He noted  that ERA  is planning  to  submit an application  to MTC  in early 2013  for  the higher  level. Dr Sinclair suggested this may be something that ARRTC could comment on. It was noted future work includes completing modelling for  full  landform  and  investigate  source  definition,  investigating  measures  for  solute  reduction  within  a  BPT  framework  and reviewing the closure criteria. 

Discussion –  

There was discussion about the proposed seepage barrier between Pit#3 and Magela Creek. It was noted that the specific criteria required are still being considered but that if salts are an issue, options may include trenching in Pit around sands in the weathered zone  to  prevent  shallow  contaminated  groundwater  from  entering Magela  Creek.  Dr  Sinclair  noted  that  release  of  solutes  is predicted to occur during recessional flow periods so there is minimal dilution. He noted that a geo‐fabric could also be placed over the tailings as well.  It was noted that reactive solute transport  is not expected to be an  issue but  if required the barrier could be customised  to  limit  solutes of main  concern.  There was  also discussion  regarding  the  effects of  the dolomite units  in Pit#3. Dr Sinclair noted the dolomites are massive and  in competent rock. He noted that placing acid  in the bottom of the Pit will result  in some activity but this should be neutralised fairly quickly. ERA is planning to use directional drilling to target the injection of brines within the rock backfill of the repository.  It was suggested that existing preferential pathways could be an  issue. Dr Sinclair noted the rock capping is expected to be the key issue in terms of solute signature. 

Dr Sinclair was asked if data from water samples collected from the trial landform drainage have been analysed. He advised the data needs to be further analysed and reported but that the current data are based on flows from fresh rock dumps and therefore may be conservative. It was noted that sulfides associated with the low grade ore underlying the waste rock contributed to the neutral drainage observed. It was noted that ERA is significantly reliant on the brine concentrator working effectively. Dr Sinclair noted the brine  concentrator  is proven  technology  so  there  is  a high degree of  confidence  that  the  treatment plant will work effectively. Scaling of the brine concentrator falling film tubes may present a maintenance/increased downtime risk which will be mitigated by the addition of anti scaling materials and/or gypsum seeding crystals. He advised any teething issues would be resolved when the plant is commissioned. He was asked if there is any possibility of mill production at Ranger being expanded to 4m tonnes per year. Dr Sinclair advised that increasing mill throughput had been considered as part of the Heap Leach Pre Feasibility Study but was not currently an option given the current mine  life. There was some discussion about the status of the  final  landform and Dr Sinclair advised the final  landform work  is progressing well but discussions with TOs will continue and modelling results (e.g. gullies) also need to be factored into the final design. 

 

6.0 Joint KKN Review and Status Reporting (ERA/eriss)

Dr Humphrey provided an overview of the process used to develop the joint KKN status report for this meeting. It was noted that ARRTC’s comments from ARRTC28 have been taken into account. ARRTC noted that further revisions to the existing KKNs and the identification of new knowledge gaps would be  informed by the outcomes of the rehabilitation/closure risk assessment workshop now proposed  to be held  early  2013.  It was  also noted  the process  to date had  identified  a number of  themes  and  structural elements (e.g. the need to deal separately with aquatic/terrestrial ecosystems and radiological threats to human/other biota, and removal of offsite solute budgets from monitoring). Other  issues  included the need for water/sediment quality closure criteria to acknowledge different ecosystem types and derivation methods, possibly with different temporal phasing. Dr Humphrey outlined a matrix which he suggested could be used to reorganise the KKNs across the different temporal phases and ecosystem types and also 

ARRTC29‐11: ERA to provide a presentation on Pit#1 rehabilitation status and proposed final landform to next meeting. 

ARRTC29 Meeting Summary Page 11 of 21

inform the rehabilitation/closure risk assessment approach. ARRTC noted that the implications of underground mining also need to be factored into the KKN review process. ARRTC agreed that the proposed matrix approach and the existing conceptual contaminant pathways work should both be considered as part of the rehabilitation/closure risk assessment. SSD and ERA then jointly presented the current research and revision status for each of the KKNs. A number of technical presentations under a number of KKNs were also presented. Key points raised under each KKN are summarised below. 

KKN 1.1.1 SURFACE WATER TRANSPORT OF RADIONUCLIDES 

ARRTC noted  that  research  addressing  this  KKN  is on  track  and  agreed  that  separate  KKNs  are  required  for human health  and aquatic biota, and that dietary aspects should be included. 

KKN 1.1.2 ATMOSPHERIC TRANSPORT OF RADIONUCLIDES 

ARRTC noted that research addressing this KKN is on track and agreed the KKN should be updated as additional information arises and new standards are developed (e.g. the change in radon risk coefficient (ICRP 115) and ICRP (XXX)). 

PRESENTATION: RADIATION PROTECTION OF THE ENVIRONMENT (NON‐HUMAN BIOTA) ‐ DR CHE DOERING 

Dr Doering provided a presentation covering the philosophy and recommendations of the International Commission on Radiological Protection (ICRP), the ICRP framework for environmental protection and other relevant international and national initiatives. ICRP is an independent non‐government body established to provide guidance and recommendations on protection against risks associated with  Ionising  radiation. Recommendations by  the  IRCP  in 1990  (IRCP60) assumed  that protection of man would de  facto provide protection  for  all  biota.  Following  increased  global  community  awareness  of  environmental  issues  and  the  development  of multilateral  conventions,  many  governments  developed  new  legal  frameworks  for  environmental  protection.  This  led  to reassessment of the technical basis of this recommendation noting that man doesn’t co‐exist with other biota in all environments and the fact that different biota have different exposure characteristics. A revised recommendation (IRCP103) in 2007 proposed the use of reference plants and animals. Since then the IRCP Framework and further guidance on applying the framework to different exposure  situations has been developed. The  ICRP  framework  involves using  reference animals and plants  for  relating  radiation exposure to dose and derived consideration reference levels for relating dose to effect for four endpoints including early mortality, morbidity, reproductive success and genetic effects. It was noted that derived consideration reference levels for non‐human biota are  not  legally  enforceable  but  dose  limits  for  radiation  protection  of  humans  are.  Translating  the  ICRP  framework  into  the environmental  assessment  context  involves measuring  or modelling  radionuclide  concentrations  in  environmental media  (soil, water,  sediment),  use  of  transfer  factors  (concentration  ratios)  to  determine  radionuclide  uptake  by  biota  and  use  of  dose conversion  factors  to  determine  internal  and  external  doses  rates  to  biota. Other  elements  of  the  assessment  context  include selection  of  representative  organism  (based  on  likelihood  of  exposure,  sensitivity  to  radiation,  importance  to  ecosystem structure/function and  its ecological significance/status), developing a reference organism (based on geometry)and occupancy. Dr Doering advised  that relevant  international  initiatives  include  the  IAEA EMRAS  II  (2009‐2012)  (eriss  is  involved  in working groups dealing with biota modelling and development of a wildlife  transfer  coefficient handbook); and  the  IAEA MODARIA  (2012‐2015) initiative  (eriss  involved  in working  groups dealing with  analysis of  radioecological data  and biota modelling). Relevant national initiatives include the Review of methods and models for radiation protection of non‐human biota and applicability to the Australian context  (ARPANSA  2009‐10),  the  Review  of  concentration  ratios  for  non‐human  biota  inhabiting  Australian  uranium  mining environments  (ARPANSA/DRET  2011‐12)  and  the  development  of  a  safety  guide  for  radiation  protection  of  the  environment (Radiation health Committee 2011‐14). ARRTC noted that other work done under the Uranium Council included the collection of site specific data, the development of guidance for operators and a workshop on the use of the ERICA tool. 

Discussion ‐ Dr Doering was asked if different transfer factors are used to take account of the ingestion method and he advised that the method  just  looks at the average  internal uptake and activity concentration  in the whole of the organism.  It was asked  if the IRCP guideline on exposure had been derived from laboratory studies and Dr Doering advised that different methods had been used including expert judgement based on literature review. He noted that in relation to screening level, species level sensitivity analysis was done as part of the ERICA European work and a derived No effect level of 10 micro grays/hr looked at a 5% effect mark. It was noted that this is similar to the process used to develop guidelines for ecotoxicology. 

KKN 1.2.1 ECOLOGICAL RISKS VIA THE SURFACE WATER PATHWAY  

ARRTC noted  the  current  research needs under  this KKN have been  completed. The Contaminant Pathways Conceptual Models internal  report  is expected  to be  finalised by  the end of  the  year and  the  surface water hydrodynamic model  to assess  far‐site impacts from solutes and erosion products from proposed landform and tailings disposal options will be completed by ERA in early 2013. It was noted that outputs from this work feed into KKN 2.7.1. 

PRESENTATION ‐ RECOMMENDATIONS FROM INDEPENDENT SURFACE WATER WORKING GROUP (PROF BARRY HART) 

The  Chair  of  the  Independent  Surface Water Working  Group  (ISWWG),  Professor  Barry  Hart,  presented  the  outcomes  of  the committee’s recent review. The ISWWG was established following on from the Ranger Groundwater review process. Prof Hart was appointed as independent Chair. The objective of the Working Group was to review surface water issues and practices at Ranger to address a range of concerns identified by GAC. Work was undertaken with GAC to identify a number of key issues of concern under four  broad  categories:  surface  water  management  and  releases  on  and  off  site;  existing  monitoring  practices;  compliance framework and downstream monitoring; and integrity and reporting of data. The terms of reference for the review were approved in June 2012. Independent consultants were engaged to undertake work under each of the four categories. The consultant reports 

ARRTC29 Meeting Summary Page 12 of 21

were reviewed by an  independent science reviewer  in October who wrote a consolidated report. A total of 60 recommendations were  initially  identified and following a 2 day workshop these were refined and consolidated to a final 15 recommendations. The review confirmed that the current water management and monitoring system at Ranger is of a very high standard. ERA is currently developing an action plan to  address the recommendations. 

Discussion  ‐ Prof Hart noted  the use of an  independent  scientific  reviewer had proved very helpful  in ensuring  the process was underpinned by a high degree of mutual trust. ARRTC commended Prof Hart and the members of the Working Group on their work. ARRTC also noted that some of recommendations could have implications for a number of the KKNs. ARRTC noted that the relevant stakeholders strongly support  the  recommendations and are committed  to  their  implementation.  It was noted  that while ARRTC had not been directly involved in the work, a number of ARRTC stakeholder members were on the Working Group. ERA advised that while a number of the issues addressed had previously been raised with ARRTC, a number were low level issues between GAC and ERA, so it was decided to keep the process focused and to only report the outcomes of the work to ARRTC, ARRAC and the MTC. It was noted that the project had been completed much quicker than had been expected. ERA  is currently  looking at actions under each  recommendation and will  likely need  to establish a number of sub‐groups  to work on  this.  It was asked  if ARRTC members would have access  to  the  final  report and  recommendations and ERA advised  the  report  is  still being worked on and would be provided  to ARRTC when  finalised. Prof Hart advised  the  final  report and  recommendations and  the separate consultant  reports would be published  as  2  separate  volumes.  It was noted  that  the  independent  scientific members of ARRTC were welcome  to provide any comments on the recommendations to ERA. 

KKN 1.2.2 LAND IRRIGATION 

ARRTC  noted  that  research  addressing  this  KKN was mostly  on  track  and  near  completion.  ARRTC  agreed  the  KKN  should  be refocused to  investigate the fate of the contaminants  in the LAA’s and their potential  impacts on groundwater and surface water quality, including potential off‐site contributions to loads and their effects. 

PRESENTATION ‐ LAND APPLICATION AREA REHABILITATION –TRIAL REHABILITATION (DR PING LU) 

Dr Lu noted  this  is a collaborative project between ERA, eriss and Safe Radiation Pty Ltd. There are 2 main exposure pathways: direct (gamma) irradiation and inhalation of dust. Dose contribution from the entire LAAs is quite low at 80 µSv yr‐1, which is about 27% of the dose constraint (assuming RPA overall public dose constraint is 300 µSv/yr). Magela LAAs (A & B) contribute the majority of the dose  (>72%). Dr Lu was asked why all pathways were added together and he explained the aim  is to understand the dose from the whole site including impacted LAA and the landform covered by waste rock. Dr Lu was asked why the occupancy of 1400 hours was  chosen and  it was noted  these  figures were used as examples.  It was  suggested  the annual dose  figure  for  the dust inhalation pathway looked a little high and Dr Lu noted that most of the radioactivity in the LAAs is in the top 5cm. It was noted that software  is  being  used  to  adjust  the  occupancy  scenarios  (which  are highly  conservative)  in  consultation with  TOs.  The  trial  in Magela LAA was designed to test the effectiveness of various rehabilitation methods and refine associated parameters. Four options were  tested:  (1)  baseline  (removal  of  pipes),  (2)  soil mixing,  (3)  soil  removal  and  (4)  soil  removal  and mixing.  Pre  and  post remediation measures were  taken on soil gamma  radiation, soil  radionuclides and chemistry analysis,  radon exhalation and dust suspension using previously established dose  factors. External gamma  radiation dose  rate was measured at different heights  for adults  and  children  sitting  and  standing.  Results  indicate  that  surface  activity  concentration  in  section  1  (without  remediation) reading was around 100 which dropped to 10% of pre remediation levels in section 2. In section (scrapped) surface activity dropped to  10‐18% of pre  remediation  level. Regarding dust  suspension,  results  in  section  4 based on modelling data dust  radioactivity dropped to 19% of pre‐remediation level. It was noted that the focus on dust was because in natural soil it is expected the activity is distributed but in the LAA most of the activity is in the top 5cm and the due to the activity in the top 2cm (the fraction of dust that would be resuspended), the dust numbers were so high. It was noted the numbers would be different for waste rock and the final dose would depend on how people access the land. A conservative occupancy scenario has been used based on different levels of activities and posture for adults and children/babies. It was noted that access to the site changes between wet and dry season. It was  noted  that  radiation  dose  rate  received  through  occupancy  of  the  land  application  areas  after  different  rehabilitation treatments through all pathways reduced between 45% (mixing or scrapping) and 75% (mixing and scrapping). The final product will provide  annual  effective  radiation  dose  figures  through  4  key  exposure  pathways.  A  computer  based  dose  model  has  been developed and  this  information will guide optimisation of dose allocation and  rehabilitation strategies. The computer model has been updated to include all of the different scenarios and rehabilitation options. Future activities include developing a rehabilitation plan for Magela LAA A and B in consultation with TOs and commencing rehabilitation in 2014 subject to MTC approval. 

Discussion – It was asked how the top soil scraped for the construction of the levee would be disposed of and whether this posed any issues for the environment or workers. ERA advised the top soil will be disposed of in the borrow pit and that there are no risks posed to workers. 

KKN 1.2.3 WETLAND FILTERS 

See KKN 253. 

ARRTC29‐12: ARRTC thanked Prof Hart for his presentation and commended the Working Group on its work. 

ARRTC29‐13:  ERA/GAC  to provide  copy of  the  ISWWG  report and  recommendations  to ARRTC members once  it has been finalised. 

ARRTC29 Meeting Summary Page 13 of 21

KKN 1.2.4 ECOTOXICOLOGY 

ARRTC noted that research addressing this KKN is mostly on track and revisions to the KKN would be based on the outcomes of the rehabilitation/closure risk assessment. 

 

PRESENTATION – MAGANESE TOXICITY (DR ANDREW HARFORD) 

Dr Harford advised that Mn has been listed as a lower‐priority contaminant of concern for many years. More recently elevated levels of Mn in bores have been observed and limited toxicity testing in 2008 showed higher toxicity compared to literature especially for Hydra viridissima (IC10 = 60 µg L‐1 Mn). Testing of brine concentrator distillate containing 130 ‐ 230 µg L‐1 Mn resulted in reduced Hydra growth rates. Also recently became aware of a draft environment quality statement for European Union of 62‐123 µg L‐1 Mn. To date work has been completed for 2 species: Lemna (Duckweed) IC10 = 2.4 mg L‐1 and Chlorella (Alga) IC10 = 14 mg L‐1. Preliminary toxicity estimates have been completed for 4 species: Hydra viridissima IC10 = 0.09 mg L‐1; Moinodaphnia macleayi IC10 = 0.48 mg L‐1; Amerianna cumingi IC10 = 0.60 mg L‐1; and Mogurnda mogurnda IC10 = 74 mg L‐1. A significant loss of Mn (~200‐300 µg L‐1) was observed in the Hydra test which was not seen in 2008.  A Mn fate test was done which recovered 70‐87% and an aqua regia extraction will be done to see if Mn is precipitating onto the test plates. It was noted that as a precipitate was observed, bacteria could be contributing to Mn oxidation or potentially something may be being released by the Hydra. It was also noted the same effect wasn’t observed in the Ngarradj water sample tested in 2008. It was suggested the effect could be light related. ERA noted that water would be directed to a retention pond prior to release and that the brine concentrator will have a chevron which will remove metals. It was noted that DOC is not a significant modifying factor for Mn. It was also noted that redox is a key determinant factor and that further laboratory work will be done.  

PRESENTATION ‐ TOXICITY OF U TO SEDIMENT BIOTA – DERIVATION OF SEDIMENT GUIDELINE FOR U (DR ANDREW HARFORD) 

ARRTC noted the aim of this work is to derive a sediment quality guideline for uranium. Two pilot studies have been completed to date, however,  the main experiment was postponed  last  season. Datasets, data analysis  and main experiment design has been completed. For pilot study 2, macroinvertebrate counts for all U treatments and  lab control have also been completed as has the microinvertebrate ecogenomics work. Bacteria have been  re‐sequenced but  there was an  issue with  the  first  run which  requires further investigation. Macroinvertebrate results show a significant difference in richness (ANOVA) and the microinvertebrate results indicate “NOEC” at 500 mg kg‐1  (PERMANOVA), and  that Uranium was a  strong predictor of differences.  It was noted  that Total Organic Carbon was also a  factor. The results show that effects are evident but need to determine how to use these community data  to  calculate  a  No  Effect  Concentration  (NEC)  and  derive  a  Sediment  Quality  Guideline.  Also  looking  at  thresholds  and investigating three recent methods: Non‐Linear CAP  (Millar et al 2005); Threshold  Indicator Taxa ANalysis  (TITAN; Baker and King 2010);  and Gradient  Forests  (Ellis  et  al  2012).  Key  conclusions  from  this work  are  that  a number of  assemblage‐based  analysis methods are useful  for deriving a NEC,  species  identification will add value  to  the  results, and  that an experimental design  that maximises the number of concentrations is best for determining a NEC. The final experimental design will involve the agreed spiking method and more  treatments, which will be deployed  following rain and retrieved  in April 2013. The results of  this work will be reported in late 2013/early 2014.  

 

KKN 1.2.5 MASS BALANCES AND ANNUAL LOAD LIMITS 

ARRTC noted that research addressing this KKN is mostly on track and revisions to the KKN would be based on the outcomes of the rehabilitation/closure risk assessment and updated to reflect current activities on the mine site. 

PRESENTATION ‐ GULUNGUL CREEK MG LOADS (DR WAYNE ERSKINE) 

Dr Erskine advised the results being presented are based on work by Dr Alana McKay. SSD maintains 3 gauging stations upstream, mid and downstream on Gulungul Creek. There are some missing data (Feb‐Mar 2007) but this has been completed using Hydstra. Continuous  monitoring  data  were  collected  between  2005‐06  and  2011‐12  by  eriss  (earlier  data  for  G8210012  by  NRETAS). Discharge has been calculated from heights using rating curves and there  is a  large dataset of  lab EC, field EC and continuous EC. ARRTC noted this work arose from stakeholder concerns regarding level of mine derived solute loads in Gulungul Creek. Results of this work are similar to those reported by Chris LeGras for ERA. MgSO4 is a key indicator of mine derived waters and Mg and EC are 

strongly related. Mg  loads were calculated by converting EC to Mg concentrations and multiplying by simultaneous discharge  for each time increment and summed over total time period. Mg loads were compiled for upstream and downstream stations. Results show an average of 7.8 tonnes per annum of Mg, or 37 % of the mean annual difference of 21 tonnes per annum, is derived from the mine, while the rest is from diffuse sources. It was estimated that about 2‐4 tonnes per annum were coming of the TSF wall. It was noted the lower difference between upstream and downstream during low flow years is due to the diffuse sources. 

Discussion ‐  It was asked why Mg rather than SO4  is used as a surrogate for EC and  it was noted this was because Mg has higher 

toxicity than SO4. It was also asked if the EC results include contributions from other non‐mine areas such as tributaries on the LHS 

bank.  ARRTC  noted  that  the  Gulungul  Creek  results  show  that  the mine  derived  contribution  to Magela  Creek  is  an  order  of magnitude greater. It was asked if EC can be affected by bicarbonate downstream and if this would change the relationship and it was noted that data are not available to investigate this currently. ARRTC noted that one of the recommendations from the ISWWG was to get reference from downstream station to improve knowledge of catchment as a whole. Dr Mudd noted that GAC also has 

ARRTC29 Meeting Summary Page 14 of 21

concerns about  the  levels of uranium  in Gulungul Creek and asked  if  there would be a much different methodology  involved  to determine this. It was noted that LeGras also measured uranium so may be possible to do a comparison, but there is probably less confidence in the uranium data. 

KKN 1.3.1 SURFACE WATER, GROUNDWATER, CHEMICAL, BIOLOGICAL, SEDIMENT AND RADIOLOGICAL MONITORING 

ARRTC noted research addressing this KKN is mostly on track. It was noted that this KKN informs a range of other KKNs and will be revised on the basis of the outcomes of the rehabilitation/closure risk assessment. ARRTC also noted that ERA is undertaking a range 

of on‐ and offsite monitoring while eriss is more focused on offsite monitoring, with a significant biological monitoring component. ARRTC also noted there are also potential implications for monitoring generally arising from the ISWWG recommendations. 

PRESENTATION – ONSITE/OFFSITE WATER QUALITY MONITORING (MS ILES) Ms  Iles  advised  the main  point  sources  of mine water  in Magela  Creek  are  RP1  and  Corridor  Creek. Water  quality  in  RP1  has significantly improved due to the interception trench and addition of permeate. Late season releases from RP1 can cause problems with EC due to  low flows. Water quality  in GTB‐Corridor Creek system deteriorated during the dry season and macroinvertebrate studies also showed some changes. The season variation  in EC  in GTB has been  increasing over recent years and was particularly pronounced in the 2010 dry season and more so in 2012. Mg levels have also increased while U levels have remained low with a few spikes since 2004. ERA  is continuing to manage water quality onsite by diverting pond water through RP1 and CC wetland filters. ERA is also looking at how to improve water quality outcomes for GC2. It was previously though that the influence on the western channel at 009 was dominated by RP1, but work by Tilliard for the ISWWG found higher levels of EC coming from GTB than RP1 and has recommended  that  the  five monitoring sites along  the creek be used  to better understand sources  from  the mine site. Grab sample data for Magela Creek show that EC has remained very  low but  it was noted that continuous monitoring provides a much better overview of changes in EC over time. A paper has been prepared proposing the move towards using continuous monitoring as part of  the compliance  framework.  In Gulungul Creek, Mg  levels upstream were higher  than downstream and uranium  levels remained under the Magela Creek focus limit. It was noted that the ISWWG recommended measuring unfiltered metals and Ms Iles advised this was due to issues with event based sampling and potential problems with samples being left in the field too long and the Australia WQ guidelines recommending that total metals be used. It was noted that SSD have a conversion between total versus filtered  metals.  It  was  also  noted  that  stakeholders  have  previous  raised  concerns  about  the  potential  for  metals  to  slowly accumulate on the floodplain and that measuring loads was important. Potential issues with this include difficulties in capturing the entire load for full season due to patchy datasets and interpreting the data. It was noted that the ISWWG recommended looking at this further. 

PRESENTATION – ATMOSPHERIC RADIOACTIVITY MONITORING AT RANGER AND JABILUKA (DR ANDREAS BOLLHÖFER) 

Dr Bollhöfer advised that eriss has three atmospheric monitoring stations (Jabiru, Jabiru East and Mudginberri), measuring radon decay product potential  alpha energy  and dust  long  lived  alpha  activity  (LLAA)  concentration,  respectively,  and now has  similar continuous monitoring data record (2 years) to that for the surface water monitoring program. The monitoring results from Jabiru and Mudginberri  radon station were presented.  In 2012  the downtime of  the stations was  less  than 20%. ARRTC noted  that  the mine related doses from radon decay products for the reporting period was 0.021 mSv at Jabiru and 0.003 at Mudginberri, and for LLAA, the mine related dose was less than 1 micro sievert at Jabiru and less than 0.1 micro sievert at Mudginberri. It was suggested the differences in SSD and ERA results may be due to ERA only measuring weekly and instrument failures during the wet season. 

PRESENTATION – BIOACCUMULATION OF URANIUM AND RADIUM IN FRESHWATER MUSSELS FROM MUDGINBERRI AND SANDY BILLABONGS (DR ANDREAS BOLLHÖFER) Dr Bollhöfer advised that SSD undertakes an annual collection and analysis of a bulk mussel sample from Mudginberri Billabong at the end of each dry season. Aged mussels  from Mudginberri Billabong and Sandy Billabong are analysed every 3rd year and  the results are compared to previous years. In 2011, SSD also looked at polonium in mussels. ARRTC noted that the Ra and 210Pb results for 2011 were within one standard deviation from previous collections which indicates there has been no change in U, Ra and 210Pb over  this  time. There  is some variability across age classes but no  trend. Mussels collected at end of wet season are generally  in poorer condition and thus may have higher radionuclide activity concentrations. ARRTC noted the annual committed effective dose of 0.14 mSv based on  assumption of 2kg of mussels being  ingested by  a 10  year old  child was  almost exclusively  from natural background and was not mining related. 

PRESENTATION – TOXICITY MONITORING USING FRESHWATER SNAIL REPRODUCTION (DR CHRIS HUMPHREY) Dr Humphrey advised  that monitoring  results  indicate  that  snail egg production  is  responsive  to mine‐associated elevated EC  in Magela and Gulungul Creeks. Continuous monitoring data indicate there is a significant relationship between seasonal variability in mean  upstream‐downstream  difference  values  in  EC  and  corresponding  variability  in mean  egg  number,  with  egg  production increasing with increased EC. There is also a significant interacting effect of water temperature and EC on snail egg counts with egg production  increasing  with  increasing  EC  at  lower  water  temperatures  (27‐29oC)  and  significantly  reducing  at  higher  water temperatures (>30oC). ARRTC noted that these relationships were not able to be replicated  in the  laboratory with only  increasing egg production with increasing water temperature being observed. It was also noted that it is not clear at this stage whether these results are ecologically significant but SSD will continue to monitor.  

KKN 2.1.1 DEFINING THE REFERENCE STATE AND BASELINE DATA 

ARRTC29 Meeting Summary Page 15 of 21

ARRTC noted that a number of research projects addressing this KKN have been completed  (e.g. pre‐mining radiation conditions; soils data and literature as part of LAA assessment; Magela water quality triggers based on reference data) but a number of other projects have been delayed (e.g. groundwater baseline derivation; geomorphic characterisation of Gulungul catchment;  landscape dynamic from aerial photographs). It was noted last meeting that this KKN overlaps with the analogue site and criteria development KKNs and ARRTC agreed this KKN should be revised based on the outcomes from the rehabilitation/closure risk assessment process. 

KKN 2.2.1 LANDFORM DESIGN 

ARRTC agreed that, due to Mr Lowry’s absence, the presentation on landform modelling should be deferred to next meeting. Ms Iles advised the  latest version of  final  landform has been developed by ERA based on consultations with TOs and previous modelling results. The design takes account pre‐mining drainage conditions and has Djalkmarra Billabong reinstated but not in same spot. The CAESAR model has been updated to take account of consolidation with and without surcharging and the model has been run across the whole of final  landform. Work  is proposed to  incorporate sediment traps and rock armouring and also data from erosion and water quality monitoring and eco‐hydrology work on the trial landform. SSD is also doing evolution modelling on trial landform and a LiDAR capture looking at erosion characteristics. A new framework will be developed for landform design which will incorporate a range of other  factors  including  the  various development  scenarios, extreme  rainfall and associated  flooding events. There was considerable  discussion  about  the  current  state  of  understanding  of  erosion,  vegetation  dynamics,  surface  and  groundwater chemistry  and  hydrology  derived  from  the  trial  landform  and  whether  this  is  adequately  representative  of  how  the  actual rehabilitated  landform will perform. ARRTC noted  the KKN will be  re‐sequenced with  the other  rehabilitation  related KKNs  and revised based on the outcomes from the risk assessment process. 

PRESENTATION ‐ LIDAR CAPTURE FOR THE ALLIGATOR RIVERS REGION (DR RENEE BARTOLO) Dr Bartolo advised that SEWPaC and DCCEE commissioned a LiDAR data capture for the ARR floodplains which  included Nabarlek catchment, Myra Camp and the East Alligator landslip area. SSD is keen to assess if LiDAR is the best method to use in ARR. LIDAR can provide information on canopy structure (height and cover) which can be used to assess ecosystem and landscape health post rehabilitation.  It  was  noted  that  ERA  has  a  matching  dataset  (which  overlaps  the  SSD  one)  which  is  being  used  to  model hydrodynamics  for part of  the Magela Creek catchment pertaining  to Ranger. This modelling will now be extended  to  the whole catchment with the input of the LiDAR data. It was also noted the intensity image can be used as a substitute for aerial imagery and provides good contextual imagery. GA and the CRC‐Spatial Information are currently doing work to validate data. The LiDAR derived DEM provides  good  information on water  and  vegetation  types.  SSD  is  currently working with NT Government  to  compare  the precise point positioning approach using aerial photography to the LiDAR approach. LiDAR  is also being used to generate canopy height  and  foliage models.  ARRTC  noted  that  future work will  include  using  LiDAR  data  to  develop  hydrodynamic models  and assessing sea level rise impacts as part of NERP/NAH, using DEM in the application of landscape evolution modelling to determine erosion and landslip potential within the catchment and the validation of the LiDAR dataset by the CRC for Spatial Information. 

PRESENTATION ‐ SOIL EROSION AND WATER QUALITY ON TRIAL LANDFORM (DR WAYNE ERSKINE) Dr Erskine advised his presentation is based on work by Dr Mike Saynor. The results for rainfall and bedload yield for the four plots on the trial landform were published in the 2011‐12 SSD Annual Report. Results for plots 2 and 3 are still being calculated. Previous issues with probes have been resolved and results will be presented to next ARRTC. Data is now being collected at 30sec intervals. Results from plot 1 indicate that runoff was lower during the first year due to the presence of pore spaces in fresh rock but by year 3 pore space has been  filled. A hydrological threshold exists where a rainfall event of greater than 29mm  is required to  fill surface storage and generate  runoff. As  ripping differed on other plots,  further work being done  to determine differences  in  runoff and looking at using  laser scanning to determine pore space. The bedload results for all plots confirm previous evidence that bedload yield decreases significantly over time. The results also indicate that gravel increases over time while silt and clay decreases leading to  surface  armouring. Weathered material  from  Jabiru  industrial  area was mixed  and  run  through  plot  1.  The  absence  of  any instantaneous spikes provides confidence that the mica was the cause of background noise observed previously. It was noted that as waste rock mixed with weathered material is not a viable cap material there may be limited value in continuing with plots 3 and 4. ERA agreed and noted that there will be limited available laterite anyway. There was discussion about the implications of ceasing this work and whether further data are required. It was noted the key issue is the time required for data processing.  KKN 2.2.2 ‐ DEVELOPMENT AND AGREEMENT OF CLOSURE CRITERIA FROM THE LANDFORM PERSPECTIVE 

ARRTC noted that research addressing this KKN  is mostly on track and that closure themes and objectives and a post closure  land use statement are being developed. ARRTC noted that the ERs require that “detrimental impact” be defined and SSD is developing a discussion paper on this. Working groups will be established for each closure theme. ARRTC noted that further revision of this KKN will be based on  the outcomes of  the rehabilitation/closure risk assessment as applied  to  the decommissioning, stabilisation and monitoring, and post closure phases. 

KKN 2.2.3 ‐ WATER QUALITY IN SEEPAGE AND RUNOFF FROM THE FINAL LANDFORM 

It was noted the some research addressing this KKN has been reported in presentations under previous groundwater related KKNs. ARRTC noted  that elements of  research have been delayed and other aspects have been addressed by  Intera.  It was noted  that reworking of some stockpiles on site can make it difficult to get good water quality data but the 1c stockpiles are less dynamic than others and provide an opportunity to get good data. It was noted that the outcomes of research under this KKN should be able to be reported at next meeting. ARRTC also noted that the ISWWG report recommended that more continuous monitoring of solutes be 

ARRTC29 Meeting Summary Page 16 of 21

undertaken to enable a solute mass balance to be developed for the release circuit. ERA advised that a number of further water quality studies are planned. ARRTC noted that further revision of this KKN would be based on the outcomes of the risk assessment.  

KKN 2.2.4 ‐ GEOMORPHIC BEHAVIOUR AND EVOLUTION OF THE LANDSCAPE 

ARRTC noted that research addressing this KKN is on track and modelled results have been compared with actual data from plot 1 on  the  trial  landform. Work  on  the  CAESAR  landform  evolution modelling  by  Lowry  et  al  is  progressing well  and  results were presented at the 2012 Life of Mine conference. Prof Tom Coulthardt worked with SSDI on consolidation and evolution of the Pit#1 cap and the IR on this work is currently being reviewed. Further research looking at slack water deposits and paleofloods in the ARR is planned. SSDI may also be involved in developing hydrodynamic models. ARRTC noted this KKN will be revised on the basis of a logical  framework  to  be  developed  for  a  range  of  rehabilitation  and  post  closure  related  KKNs  and  the  outcomes  of  the  risk assessment. It was noted KKN currently doesn’t recognise the need for hydro‐meteorological data for landform simulations. 

KKN 2.2.5 ‐ RADIOLOGICAL CHARACTERISTICS OF THE FINAL LANDFORM 

ARRTC noted that research addressing this KKN is on track and the KKN remains valid. It was noted this KKN should be considered as part of the proposed FEPS process given the need to consider radiological exposure and dose model development. Further work is required to determine levels of radon and decay products generated by the final landform in air (inhalation pathways). ARRTC noted that the far field is very low and is expected to be lower once the minesite has been rehabilitated, although near field exposure to people accessing the minesite may be different.  

PRESENTATION ‐ RADON EXHALATION FROM TRIAL LANDFORM (DR ANDREAS BOLLHÖFER) Dr Bollhöfer advised  this  three year project aims  to predict  long‐term  222Rn exhalation  flux  from  the  rehabilitated  landform and contribute to the development of closure criteria by  investigating seasonal and  long‐term changes  in radon  (222Rn) exhalation  for four different treatments, and dependency on season, cover type, weathering and compaction effects and developing vegetation. It was noted that Radon  is part of the U decay series with a half  life of approximately 4 days. Radon  is generated  in the soil and  if injected  into  the  soil pore  space  can be  transported by diffusion  following  concentration  gradient  (Fick’s  law) or by  convection (Dacy’s Law) proportional to pressure difference. Radon is a noble gas and exhaled from the soil surface, radon decay products are isotopes of heavy metals so may attach to aerosol and  lodge and further decay  in  lungs. Therefore measuring radon exhalation  is the first step in calculating inhalation dose. Radon exhalation from the Trial Landform has been determined by collecting 222Rn using activated  charcoal  cups  and measuring  radon decay products using Nal  γ‐spectroscopy.  In  addition  environmental  gamma dose rates  on  the  Trial  Landform  and    226Ra  activity  concentrations  have  been  measured  using  HPGe  γ‐spectroscopy.  The  main conclusions  from  this work are  that  222Rn  activity  flux density  is higher during  the dry  season  from waste  rock and  laterite mix compared to waste rock only and the wet season, and there is no difference due to vegetation. ARRTC noted that SSD will continue measurements to determine  if seasonal variability establishes  in waste rock only and a new  joint SSD/ERA project  is proposed to determine the radon diffusion length for waste rock using columns of variable heights filled with waste rock.  

KKN 2.3.1 ‐ CONTAINMENT OF TAILINGS AND OTHER MINE WASTES 

ARRTC noted that research addressing this KKN  is on track. It was noted that no revisions are required but the KKN overlaps with KKN2.3.2 and KKN2.3.3 and there is a need to agree scenarios to model for 10,000 years.  

KKN 2.3.2 ‐ GEOCHEMICAL CHARACTERISATION OF SOURCE TERMS 

ARRTC noted  that  the geochemical modelling work being done by  Intera  for ERA  is addressing  this KKN.  It was noted  that Pit#1 provides best opportunity to test assumptions regarding  in situ waste rock and water  interaction. Future research will be refined based on outcomes from FEPS process.  ARRTC noted this KKN overlaps with a number of other KKNs but no revisions are required at this stage. 

KKN 2.3.3 ‐ AQUIFER CHARACTERISATION AND WHOLE‐OF‐SITE MODEL 

ARRTC noted that research addressing this KKN is on track. ERA advised that an extra 78 bores have been installed and 102 bores are being sampled annually with data being  reported  to MTC on quarterly basis. This  is updating ERA’s whole‐of‐site conceptual understanding of groundwater contamination dynamics and feeds into systems assessment and FEPS process. ERA will continue to monitor the TSF and undertake further  in situ hydraulic testing around Pit#3 and R3 Deeps. There was some discussion regarding the number of statutory monitoring bores on site and whether more are required. It was noted that the water management plan is a statutory document and that all bores (operational and statutory) are reported in the annual wet season report. There was also discussion about whether further in situ testing is required for the Magela Creek sands and characterisation of the TSF plume. ERA advised that a CBD characterisation study was done to determine density of tailings  in the TSF and stratified pore water samples were used to get a foundation sample 1m depth below tailings mass. ERA advised that there are no plans to drill more deep bores through the tailings mass at this stage due to concerns that a pathway could be created. ARRTC noted that the work by  Intera  is addressing the issue of connection between the Pit#3 and Magela Creek. ARRTC noted that Pit#1 contains tailings from Pit#3 so will provide valuable information on groundwater aspects associated with Pit#3 rehabilitation. There was discussion about the possible cause of the high concentrations observed at the SW end of the TSF. It was noted that when the TSF was constructed there was fault in that location and there is probably a preferential pathway established. It was also noted, however, that monitoring bores down gradient indicate that the plume hasn’t migrated very far if it’s there. It was also noted that the TSF dam wall was constructed with a 

ARRTC29 Meeting Summary Page 17 of 21

collection system that flows to the South interception trench so the elevated levels are probably due to toe drainage water. ARRTC noted this KKN probably could be split to place greater emphasis on the aquifer characterisation aspects.  

KKN 2.3.4 ‐ HYDROLOGICAL/HYDROGEOCHEMICAL MODELLING 

ARRTC noted research addressing this KKN is being undertaken by Intera on behalf of ERA. 

PRESENTATION –PIT 3 SOLUTE LOADING TO MAGELA CREEK (INTERA, DR JOHN SIGDA) ARRTC noted this  is a collaborative project work with range of contributors  including CSIRO, RioTinto and Intera. Dr Sigda advised the objectives of  the project  are  to  characterise  groundwater  flows  and  associated  solute  source  strength  and duration,  assess transport of solutes from Pit#3 waste rock and tailings to Magela Creek, assess brine migration from Pit#3 closure and carry out a systems analysis of Pit#3 closure. Conceptual and numerical models of groundwater‐surface water  interactions near pits and a 3D groundwater flow model have been developed. Flow rate  in Magela Creek  is the key driving force  influencing groundwater‐creek stage  dynamics  and  dilution  over  different  temporal  scales.  Shallow  sands  between  Pit#3  and Magela  Creek  are  an  important hydrogeological  feature.  Conceptual  model  shows  that  interactions  between  groundwater  driving  forces  determine  when groundwater can discharge into Magela Creek surface water (groundwater inflow can occur when there is no flow in creek) and that there are potential “fast paths” due to the unconsolidated Magela sands, the Djalkmarra fault and carbonates located between the two pits. It was decided to extend model domain to include both pits and include leaching from waste rock and tailings. Waste rock and  tailings  sources were  characterised using  tailings  studies  to estimate Mg  concentrations  and  tailings pore water expression rates,  concentration  and  duration. Waste  rock  leaching  occurs  predominately  in  the  vadose  zone  where  pyrite  oxidation  can increase  the  rate  of Mg  release.  Findings  from  the  waste  rock  source  strength modelling  included  that  the maximum Mg2+ concentration for 2s waste rock  is an overestimate of waste rock Mg2+  leachate concentration, pyrite oxidation and Mg2+ release are not expected to be important in saturated waste rock and that pyrite oxidation/exhaustion rate is a function of residence time, sulphide  content,  and  reactive mineral  surface  area.  Solute  loading  to Magela Creek was  simulated  for  a number of  scenarios. Findings  included that Mg will quickly migrate through shallow sand  into Magela Creek sediments and surface water, that highest Mg concentrations in Magela Creek surface water are predicted to occur during end of the wet season and into the dry season when surface water  levels  regress  faster  than groundwater  levels, and  for given  flow/transport conditions, creek  loading  is  likely  to be directly proportional to Mg concentration in waste rock leachate. The reactive solute modelling indicates that reactive constituents will  not  be  significant  attenuated.  Results  of  the  brine migration modelling  indicate  that  this  should  not  be  a  significant  issue through  there  are  a  number  of  uncertainties  associated with  all  of  the modelling  results.  ARRTC  noted  next  steps will  include simulation of how Pit#3 closure designs could mitigate solute egress from the pit to Magela Creek by changing residence times or geochemical conditions, and further studies to reduce uncertainty about waste rock source behaviour. 

PRESENTATION – SYSTEMS ANALYSIS OF RANGER CLOSURE PROCESS (INTERA, DR MATT KOZAK) Dr  Kozak  noted  that  scenario  approaches  are  a  useful  systems modelling  technique  for  dealing with  regulatory  requirements involving  long  timeframes  such as  the Ranger 10,000 year  tailings  isolation  requirement. Such  long  timeframes need  to address changes in boundary conditions, geological processes uncertain events (e.g. extreme weather events). Modelling for very long time frames involves very long run times so probabilistic analyses can be useful. Scenario development can also be helpful to deal with operational uncertainty, habitual and behavioural uncertainty of site operator and natural and human induced disruptive events. It was noted  that  Intera has  looked  at possible  scenarios  that would  lead  to different  evolutions of  the  systems  and  then  assess implications.  Scenarios  are  useful  in  establishing  context  for modelling,  informing  stakeholder  communication  and  post  closure safety assessments. Systems analysis is complementary to modelling process and incorporates all uncertainties. So need numerical analysis of deterministic outcomes and abstraction to develop system  level models. The systems assessment approach e.g. use of Features, Events and Processes (FEPS) process  identifies the critical  issues and the key scenarios that cover the range of  issues of concern. ARRTC noted the systems analysis report for Ranger will be revisited after the recent Ranger FEPS workshop.  It was also noted  that  the  systems model will  incorporate  all  key  features  of  the mine  and  include  climate  change  scenarios,  alternative conceptual models (as required) and probabilistic treatment of parameter uncertainty. 

KKN 2.4.1 ‐ ACTIVE TREATMENT TECHNOLOGIES FOR SPECIFIC MINE WATERS 

ARRTC noted that research addressing this KKN is on track. It was noted this KKN will be revised based on the outcomes from the rehabilitation/closure risk assessment. 

KKN 2.4.2 ‐ PASSIVE TREATMENT OF WATERS FROM THE REHABILITATED LANDFORM 

See KKN 253 

KKN 2.5.1 ‐ DEVELOPMENT AND AGREEMENT OF CLOSURE CRITERIA FROM ECOSYSTEM ESTABLISHMENT PERSPECTIVE  

ARRTC noted that research addressing the aquatic and terrestrial aspects of this KKN is mostly on track and is being coordinated by the Closure Criteria Working Group. It was noted that closure criteria for new onsite aquatic ecosystems are being addressed under 

ARRTC29‐14: ARRTC thanked Dr Sigda and Dr Kozak for their presentations and commended Intera on the quality of the work undertaken to date. 

ARRTC29‐15: ARRTC noted Dr Toll is leaving ERA and thanked him for his valuable contribution to the work of the Committee. 

ARRTC29 Meeting Summary Page 18 of 21

KKN 2.5.3. ARRTC noted that there is scope to rationalise this KKN with other relevant KKNs into logical spatial and temporal phases. It was noted that the KKN will be revised based on the outcomes from the rehabilitation/closure risk assessment. 

PRESENTATION – BILLABONG CLOSURE CRITERIA FOR SOLUTES (DR CHRIS HUMPHREY) Dr Humphrey outlined the results of a case study to develop water quality closure criteria using Georgetown Billabong (GTB) which is  a  natural waterbody  adjacent  to  an  orebody  (so  pre‐mining  condition) which  has  had  some  level  of mine‐related  chemical contamination. As GTB macroinvertebrate communities are relatively  intact, the existing water quality record was used to derive water quality closure criteria to ensure future protection of the billabong consistent with the ANZECC/ARMCANZ (2000) philosophy (biological  criteria overriding  influence). The  case  study used macroinvertebrate  samples  from over  five  (non  consecutive) years from up to 14 shallow waterbodies in the early dry season and samples collected from aquatic plant and sediment habitats in the littoral  zone. As diversity  in  sediments was  low,  the  focus was on aquatic plant habitat  representing biological  responses  in  the water column. A range of univariate and multivariate analyses were carried out. Results showed that GTB taxa have been declining over time with 2011 being significantly lower than previous years, and that this decline may be due to increasing Mg contamination. Assuming Mg concentrations are the cause of the changes, this correlation suggests that a level of Mg < 5mg/L would be protective of the biota. Results  for community structure  indicate that  for the  first  four years GTB samples were similar to reference but  for 2011 they were significantly different. Further work on the relationship between water quality and community structure indicated a threshold  protection  of  biota  at  between  3  and  4  Mg  mg/L.  This  is  consistent  with  previous  findings.  The  criteria  are  less conservative than if based on reference condition approach but still protective to same level. Different water quality between wet and dry season requires two sets of criteria using 80% percentile values of EC, Mg and U. Other possible explanations for 2011 GTB observations examined  (and to be reported)  include  increasing pig damage, possible aquatic vegetation and trophic changes, but the change in water quality is most noticeable. It was also noted that salinity versus Mg toxicity requires further assessment. There is also evidence of acclimation in Coonjimba Billabong and RP1 which have fauna with higher tolerance to EC than GTB fauna. ARRTC noted  it  is  proposed  to  sample  GTB  in May  2013  and  use  as  a  test  bed  for  examining  water  quality  effects  on  other  local communities. It was also noted that the criteria derived from GTB will be applied to other waterbodies that need to be returned to natural values.  

KKN 2.5.2 ‐ CHARACTERISATION OF TERRESTRIAL AND AQUATIC ECOSYSTEM TYPES AT ANALOGUE SITES  

ARRTC noted that research addressing this KKN  is mostly on track. Most work to date has been focused on terrestrial (vegetation analogues) aspect but new work  is proposed  to address aquatic ecosystem components  (see KKN 2.5.3). ARRTC noted  there are overlaps between this KKN and other KKNs relevant to onsite waterbodies (2.11; 2.4.2; 2.5.3) and the KKN will be revised based on the outcomes of the rehabilitation/closure risk assessment. 

KKN 2.5.3 ‐ ESTABLISHMENT AND SUSTAINABILITY OF ECOSYSTEMS ON MINE LANDFORM 

PRESENTATION – AQUATIC ECOSYSTEM ESTABLISHMENT   (DR AMY GEORGE/MS KYLA VALDRON‐CLARK) Dr George provided a presentation on a potential collaborative SSD/ERA program for integrating aquatic ecosystem establishment into  the  broader  rehabilitation/closure  process  which  would  have  a  strong  research  focus.  Dr  George  and Ms  Valdron‐Clark undertook  a  review of  the  current KKNs  to  identify  aquatic  ecosystem  components/linkages  and  associated  knowledge  gaps. A number of the current KKNs have aquatic ecosystem aspects but these are poorly linked and lack integration. Based on this work, it was proposed that aquatic ecosystem aspects from the existing KKNs be integrated into two new KKNs dealing with (1) provision of ecosystem services and (2) aquatic ecosystem characterisation and functionality (for use in aquatic ecosystem design and deriving closure criteria). It was noted that the initial focus of the research will likely be on vegetation aspects of aquatic ecosystems within a restoration  context.  The  suggestion  is  that  the  restoration  context  address  ecosystem  processes  and  functions  (environmental services) rather than engineering structures, and that aquatic ecosystems be designed for resilience. A scope of possible research was presented rather than specific research questions at this stage. It is proposed that a number of aquatic analogue sites need to be identified in order to represent natural ecological variation and adaption to changing conditions instead of solely as “reference” sites for restoration. It was noted this work will need to be considered in the context of the outcomes of the rehabilitation/closure risk assessment. 

Discussion – It was suggested that ecosystem resilience may be difficult to measure unless it can be better defined in this context. There was discussion about whether the aquatic ecosystems that may designed as part of the rehabilitation/closure phase will be functioning ecosystems or primarily engineering structures. It was suggested the proposed approach may be more relevant to near field wetlands such as Georgetown and Coonjimba Billabongs. It was noted that this work could apply to other drainage systems in addition to billabongs, and that the work could also  inform closure criteria related to aspects such as flows and water depth etc., thereby highlighting the need for defining hydrological parameters of on‐site and related waterbodies. There was agreement that there should be KKNs specifically addressing aquatic ecosystems as part of  the  rehabilitation process and  the proposed  research approach should be developed further, taking into account the outcomes from the rehabilitation/closure risk assessment. 

KKN 2.5.4 ‐ RADIATION EXPOSURE PATHWAYS ASSOCIATED WITH ECOSYSTEM RE‐ESTABLISHMENT 

ARRTC29‐16: ARRTC noted the proposed research scope developed by Dr George and Ms Valdron‐Clark and requested that a more detailed project proposal be provided to next ARRTC meeting. 

ARRTC29 Meeting Summary Page 19 of 21

ARRTC noted that research addressing this KKN is mostly on track and that new SSD research is underway looking at dose rates to non‐human biota  to establish representative organisms and wholebody concentration ratios  for non‐human biota  in ARR, and  to assess dose rates from planned and existing exposure situations. ARRTC agreed this KKN should be revised to include non‐ human biota impacts and any relevant outcomes from the rehabilitation/closure risk assessment.  

KKN 2.6.1 ‐ MONITORING OF THE REHABILITATED LANDFORM 

ARRTC noted that research addressing this KKN  is on track. ARRTC agreed that this KKN be revised based on the outcomes of the rehabilitation/closure  risk  assessment  and monitoring  requirements  for  the  decommissioning,  stabilisation/monitoring  and  post closure of rehabilitation phases. 

KKN 2.6.2 ‐ OFF‐SITE MONITORING DURING AND FOLLOWING REHABILITATION 

ARRTC noted that research addressing this KKN  is on track. ARRTC noted that work from KKN 5.1.1 has been shifted to this KKN. ARRTC agreed that this KKN should be revised based on the outcomes of the rehabilitation/closure risk assessment and the FEPS process. 

PRESENTATION – VEGETATION MAP FOR MAGELA CREEK FLOODPLAIN (DR TIM WHITESIDE) Dr Whiteside advised  the aim of  this work was  to produce a vegetation map  for  the Magela Creek  floodplain  from high  spatial resolution multispectral satellite imagery from May 2010 and thus establish a baseline of variation. It was noted it has been 30 years since  the  floodplain was mapped. Three WorldView‐2 multispectral  images were geometrically  corrected  (sub‐metre RMSE) and radiometrically calibrated to ground reflectance using FLAASH. It was noted FLAASH correction was used rather than empirical line method  due  to  less  time  and  field  work  involved.  Non  necessary  information  was masked  (e.g.  water,  cloud  and  delineated boundary of floodplain). The image was segmented into homogenous boundaries using thresholds of various bands then classified into different classes. Mixed classes were split. Images then clustered into homogenous subjects using four spectral ratios/indices: NDVI = (NIR2‐Red)/(NIR2+Red); FDI = NIR2 – (RE+B) (Bunting and Lucas 2006); LI = (NIR2+RE)‐B; and EVI (Huete et al. 2008). Class segmentation  produced  a map which was  then  validated  by  helicopter  and  airboat  surveys  in May  2010.  Results  included  13 vegetation classes based on previous work by Finlayson et al. A number of extra classes have been delineated since then including Para Grass new classification and Salvinia named after dominate class in area. Overall accuracy was >72% but there were issues with spectral similarities between some classes (e.g. Eleocharis). It was noted the new map has an increased level of detail to the 1989 map by Finlayson et al. ARRTC noted the method used was able to distinguish between the different vegetation communities. It was also noted that map shows changes  in the distribution of floating vegetation mats.  It  is anticipated the rule set will be able to be applied  to data  from 2011 and 2012. ARRTC noted  the next  steps  include  comparing vegetation distribution between  the  three dates and developing a floodplain vegetation interpretative key.   

KKN 2.7.1 ‐ ECOLOGICAL RISK ASSESSMENTS OF THE REHABILITATION AND POST‐REHABILITATION PHASES 

ARRTC noted that phase 1 of the proposed rehabilitation/closure risk assessment work under this KKN has been deferred to early 2013.  It was  also  noted  that  a  phased  approach  is  being  used with  phase  1  involving  development  of  conceptual models  and integration of traditional knowledge where possible, and phase 2 being the risk assessment. ARRTC noted that it may be useful to delay  the next ARRTC meeting  to  late May 2013  to allow  time  for  the outcomes of  the  risk assessment process  to be properly considered. ARRTC also noted that post closure monitoring requirements will be determined  following the rehabilitation of Pit#1 and based on the risk assessment outcomes. 

KKN 2.8 – LAND STEWARDSHIP 

ARRTC noted research addressing this KKN  is on track but still being developed by ERA  in partnership with relevant stakeholders. ARRTC also noted the KKN title has been changed as agreed at ARRTC28. ARRTC also discussed stewardship as a broader theme and agreed linkages between this and other KKNs dealing with cultural knowledge should be made more explicit.  

PRESENTATION – PROGRESSIVE REHABILITATION PILOT PROJECTS 2012 2017 (MS NICOLE JACOBSON) Ms Jacobson noted stakeholder concerns that there may be insufficient time to properly rehabilitate the Ranger lease. ERA believes that successful closure needs to  include both natural and cultural values as stated  in the Environmental Requirements. Mirrar are the key holders of this cultural knowledge and ERA is keen to tap into the existing work the NLC (Dr Smith) and Mirrar have been doing. ERA recently committed to Mirrar to undertake a five year progressive rehabilitation program comprising 7 pilot projects at Jabiluka  (IWMP  and Hardstand  rehabilitation, Djarr Djarr  rehabilitation  and Mine  Valley  bore  reclamation)  and  Ranger  (Ranger access track and MLAA rehabilitation works, the Magela Creek Riparian Zone restoration and Pit #1 closure). It was noted that the Jabiluka  Rehabilitation  Project  is  fulfilling  ERA’s  commitments  under  the  Jabiluka  Long‐Term  Care  and  Maintenance  LTCM agreement. ARRTC noted good progress  is being made and proposed activities  for 2013  include  the managed discharge of water from the pond and vegetation works at Jabiluka, Mine Valley rehabilitation works and the rehabilitation of the first priority areas of the Ranger access track.  

KKN 3.1.1 MONITORING JABILUKA  

ARRTC  noted  research  addressing  this  KKN  is  on  track  and  that  ERA  has  a  number  of  proposed  projects  focusing  on  the establishment  of  post  rehabilitation  and  bore  monitoring  programmes.  ARRTC  agreed  the  KKN  should  be  revised  to  include reference to the site being in long term care and maintenance. 

ARRTC29 Meeting Summary Page 20 of 21

KKN 3.1.2 RESEARCH REQUIRED PRIOR TO ANY DEVELOPMENT 

ARRTC noted that Jabiluka remains in Long‐Term Care and Maintenance and will not be mined without the consent of the Mirrar. It was  suggested  the  KKN  is  therefore  redundant. ARRTC  agreed  that  the need  for  this  KKN  should  reviewed on  the basis of  the rehabilitation/closure risk assessment outcomes. 

ARRTC29‐17: ARRTC agreed that further work under KKN 3.1.2 be placed on hold pending the outcomes of the risk assessment in 2013. 

KKN 5.1.1 ‐ DEVELOP A LANDSCAPE‐SCALE ECOLOGICAL RISK ASSESSMENT FRAMEWORK FOR THE MAGELA CATCHMENT THAT INCORPORATES, AND PLACES INTO CONTEXT, URANIUM MINING ACTIVITIES AND RELEVANT REGIONAL LANDSCAPE PROCESSES AND THREATS, AND THAT BUILDS ON PREVIOUS WORK FOR THE MAGELA FLOODPLAIN 

ARRTC noted that research addressing this KKN is mostly on track. ARRTC agreed this KKN should be integrated with KKN 2.7.1 and revised based on the outcomes from the rehabilitation/closure risk assessment.  

KKN 5.2.1 ‐ ASSESSMENT OF PAST MINING AND MILLING SITES IN THE SOUTH ALLIGATOR RIVER VALLEY  

ARRTC  agreed  the  KKN  should  be  revised  to  reflect  that  rehabilitation  at  the  South Alligator River Valley  is  complete  and  that monitoring now focuses on the El Sherana containment. 

KKN 5.3.1 BASELINE STUDIES FOR BIOLOGICAL ASSESSMENT IN WEST ARNHEM LAND 

No report presented. 

NEXT STEPS It was  suggested  the current  joint KKN  reporting approach  is  too passive  (i.e. ARRTC does not have  sufficient control over what information  is  presented)  and  does  not  provide  sufficient  opportunity  for  ARRTC  to  discuss  and  assess  scientific  knowledge requirements at a strategic  level.  It was suggested  the  joint  reporting of KKN status should only be done once a year and/or be limited to specific KKNs. It was also suggested that the current reporting format be changed to allow ARRTC scope to identify those KKNs and issues to be reported on prior to meetings. ARRTC agreed the reports and presentations currently provided each meeting provide an appropriate  level of detail to track the status of KKNs. ARRTC also agreed that more time  is required for discussion on strategic knowledge requirements. ARRTC agreed to establish a new standing agenda item titled “Strategic Overview” under which the  status  of  research  addressing  the  agreed milestones  for  each  KKN will  be  reported.  It was  agreed  that  research  resource requirements and priorities for KKNs should be reassessed based on the outcomes of the rehabilitation/closure risk assessment. ERA agreed to provide advice to the next meeting on the status of research informing the development of the closure criteria. 

7 Other Business

7.1  KNOWLEDGE MANAGEMENT ACTIVITIES 

7.1.1  SSD Publications since ARRTC26 ‐ A list of SSD publications since last meeting was tabled. 

7.1.2  ERA Publications since ARRTC26 ‐ A list of ERA publications since last meeting was tabled. 

7.1.3  ARRAC37 Meeting Summary ‐ The ARRAC37 meeting summary was tabled. 

7.1.4 Chair meeting report ‐ It was agreed that items to be included in the Chair’s meeting report to the Minister should include: the current  status  of  research  addressing  the  KKNs;  ARRTC’s  commendation  of  ERA/SSD  on  their  ongoing  cooperative  working arrangements and  the high quality of  their  respective  research and  reporting;  that  the KKN  revision has been deferred pending consideration  of  the  outcomes  of  the  rehabilitation/closure  risk  assessment  in  early  2013;  and  emerging  issues  including  the commencement of Pit#1 and Pit#3 rehabilitation works and implications arising from the groundwater and solute modelling work by Intera. 

7.1.5 ARRTC independent scientific member engagement ‐ There was discussion in relation to the potential for ARRTC independent scientific members to be contacted out‐of‐session to provide expert advice to ERA and SSD on scientific aspects of their research programs.  ERA  advised  that  independent  scientific  members  are  welcome  to  contribute  to  the  rehabilitation/closure  risk 

ARRTC29‐18: ARRTC commended ERA and SSD on  their cooperative working arrangements  to date and  the high quality of their reports and presentations. ARRTC29‐19: ARRTC agreed  that, prior  to each meeting,  the Secretariat will circulate a  table  listing  the KKNs under which presentations will be provided, and that members will highlight any other KKNs on which they would also like presentations. ARRTC29‐20: ERA to provide further  information on the status of research  informing the development of closure criteria for Ranger to next meeting. ARRTC29‐21: ARRTC noted that  resource constraints will continue  to be an  issue  for SSD and  that ongoing prioritisation of research effort will be required. 

ARRTC29‐22: ARRTC agreed to establish a new standing agenda item named “Strategic Overview” under which the status of 

work under each KKN against agreed milestones will be reported.  

ARRTC29 Meeting Summary Page 21 of 21

assessment process and agreed to provide further details on arrangements once finalised. ARRTC also agreed that opportunities for making better use of independent scientific members’ individual expertise should be explored further. 

8 Next Meeting

The meeting closed at 5.40pm.  

Scott Parker 

ARRTC Secretary 

6 December 2012 

ARRTC29‐23: ERA to provide members with details of the proposed approach for the KKN risk assessment workshop (including dates) out of session. 

ARRTC29‐24:  ARRTC  agreed  that  independent  scientific members  are  able  to  contacted  out‐of‐session  if  required  and  to 

explore opportunities for making better use of individual members’ scientific expertise. 

ARRTC29‐25: ARRTC agreed the next meeting should be held in last week of May 2013 to allow time for the outcomes from the KKN risk assessment process to be considered.