Prior to commencement of every construction, it is important to understand and
appreciate the Engineering (geotechnical) properties below and around the site. So
that Geohazards can be foreseen and suitably addressed. Geotechnical Investigation
is therefore vital for timely and efficient construction. A need arose for speedy
and authentic testing of Building Construction material. After studying the
requirement M/s Allied Research Center carried out feasibility study of test In
House.Presently Allied Research Center has support of dedicated technical team. It
has made it possible us to start Research in Material Testing It is known fact that
to achieve any goal, committed guidance is must. For this we found proper
support from the professionals having specialized qualification and vast experiences
in their respective fields.
CUSTOMER SATISFACTION
Customer’s process needs might require a set of parameters for delivering the
highest efficiency. Keeping this in view, we also design customized Laboratory
according to client’s requirement.
OUR EXPERIENCE
Who can do it? Well, one who understand the seriousness of various process
parameter, one who is keen and capable to surpass all standard and continuously
benchmark himself against has own achievement time & again and believes that
achievement is a dynamic process. Only a specialist who understands the
intricacies of process engineering can do the entire above. We at M/s ALLIED
RESEARCH CENTER fully understand the minute details and take care during
Quality Testing.
ALLIED RESEARCH CENTER
QUALITY CONTROL
It has been our continuous Endeavour to innovate and develop high quality
methods indigenously in order to provide you with a world-class edge for your
operation and hence enhance your ultimate productivity & profitability, which is
essential in this global environment. We bring world-class technology right at your
door-steps, that too with a world class quality.
We believe in outperforming established standard in order to give our customer
the best. The main objective for our organization is to perform quality tests at
competitive rates, timely delivery of reports and best available service to our
patrons.
CONTACT :
Mr. Pramod P. Kadam Mr. Sachin S. Shinde Mrs Yojana P. Kadam Chairman Jt. Managing Director/CEO Jt. Managing Director
Regd. Office: M/S Allied Research Center Ashirwad CHS Ltd, Plot No.13 Shop No.: A-9, Sec-6, Ghansoli. Navi Mumbai-400 701. Office Tel. No.: 022-64525253 / 022-7640022 Tele fax : 022-7640022 E-Mail ID : [email protected] alliedsalesnservive @gmail.com [email protected]
ALLIED RESEARCH CENTER
BRIFE SUMMURY OF TESTS CARRIED OUT
TESTS IN SOIL
Grain size analysis
Liquid /Plastic Limit/Plasticity Index
Shrinkage Limit
Specific Gravity
Standard Proctor Test
Modified Proctor Test
Lab C.B.R. Test
Field C.B.R. Test
Insitu density by core cutter method
Insitu density by sand replacement method
Consolidation test
Swelling test
Swelling pressure Test
Direct shear Test
Triaxial compression Test
Unconfined compression Test
Bulk density/Dry Density
Water/Moisture content
Coff. Permeability by constant head method
Coff. Permeability by variable head method
Permeability on Irregular Specimen
Deformation Modulus
TESTS ON ROCK
Unconfined Compressive Strength
Density
Porosity
Water absorption
Specific Gravity
E-value
Point load Index
Braziliean Test
Triaxial compressive test
ALLIED RESEARCH CENTER
Sleke Durability Index
Tensile Strength
Sulphate Soundness test
TEST ON BENTONITE
Liquid Limit
Sand Contest
Wet & Dry Sieve Analysis
Free Swell Index
Viscosity
Gel Formation
Moisture Content
Density
TEST ON OTHER BUILDING MATERIAL
Cement
Corse and Aggregates
Bricks
Concrete Block
Paver Block
Concrete/Mosaik/Checkered Tile
Ceramic Tile
Timber
Ply Wood
Doors
Rubble
Marble, Granite
Water
Admixture
NON-DESTRUCTIVE TEST
Ultrasonic Pulse Velocity Test
Rebound Hammer
Load Test on Flexural Members (Slab load Test)
Half cell Potentiometer
Carbonation Test
ALLIED RESEARCH CENTER
TEST ON FRESH/HARDEN CONCRETE
Concrete Mix Design
Compression tests on cubes, cylinder and prizm
Core Capping and testing
Concrete permeability test
TEST FOR ROAD/RUNWAYS WORK
Mix design for sub base , Granular sub base, Wet Mix Macadam , WBM
Mix Design Asphalt, Asphalt Concrete, Dry Lean Concrete
Benkelman Beam Test for Bituminous Road
TEST FOR GEOTECHNICAL INVESTIGATION
Boring in Land and Marine
Geotechnical Investigation reports with recommendation
Safe bearing capacity calculations
Standard Penetration Test
Dynamic cone penetration Test
Field Vane Shear Test
Pressurometer Test
Permeability in overburden and in Rock by single packer and Double
packer
Inclinometer Installation
Pizometer Installation
Cross Hole Seismic
Electrical Resistivity Test
Other tests as per Client’s Request
ALLIED RESEARCH CENTER
LIST OF OUR VALUABLE CLIENT’S
Nashik Muncipal Corporation
MMRDA
Brihanmumbai Muncipal Corporation
Thane Muncipal Corporation
Navi Mumbai Muncipal Corporation
ITD Cementation India Ltd
Indian Railways
Aakar Abhinav Con. Pvt. Ltd.
Span Consultants Pvt. Ltd.
M/s. Reliance Engineering Associates (p) Ltd. Navi Mumbai/Gujarat
PBA Infrastructure Pvt. Ltd. Mumbai
Vitco Tiles Thane
Nitco Tiles Mumbai
Vatan Singh & co., Chembur
Jmc Projects(India)Ltd
Koti Charitable Trust. Shahapur
Adani Mundra Sez Infrastructure Pvt. Ltd. Kutch, Gujarat
Sahara India Ltd,. Lonavala
Cps Developers and consultancy Pvt. Ltd
Zed Geotechnics And Construction
Capricon Geotechnical Services
S. K. Shintre And Sons, Nashik
Bhujal Borewells, Nashik
Jupiter Foundations
Om Geo Technical
J. P. Associates
A to Z Maintanance & Engineering
Chembond Construction Chemicals
Chemeferbo Construction Chemicals
And many more…………….
ALLIED RESEARCH CENTER
LIST OF MAJOR EQUIPMENTS
Triaxial Load frame 5T Capacity
Lateral pressure assembly
Bishops Pore pressure Apparatus
Triaxial Cell 20 bar capacity
Sample Extactor
Direct Shear Test Load Frame 5T Capacity
Shear Box with U arm
Consolidation Test Apparatus 3 gang (odeometer)
Hydrometer with stirrer and accessories
Casagrande Liquid limit devise
Plastic limit and shrinkage limit accessories
Lab CBR Mould with its accessories
Proctor compaction apparatus with its apparatus
Sand Pourind cylinder 110mm dia with its accessories
Sand Pourind cylinder 150mm dia with its accessories
Sand Pourind cylinder 200mm dia with its accessories
Core cutter with dolly and rammer
Permeability Mould
Stand pipe of various dia for falling head permeability
Over head Tank for Constant Head permeability
Sieves of aperture size : 100mm, 90mm, 80mm, 75mm, 65mm, 50mm, 45mm, 40mm,
37.5mm, 30mm, 25mm, 20mm, 16mm, 12.5mm, 10mm, 8mm, 6.3mm, 4.75mm,
3.00mm 2.36mm, 2mm, 1.7mm, 1.18mm, 1mm, 0.800mm, 0.600mm, 0.500mm,
0.425mm, 0.300mm, 0.150mm, 0.090mm, 0.75mm, 0.045mm, 0.032mm
Pychnometer
Density Bottles
Field CBR Load Frame
Compressin Testing Machine 2000 kN Capacity
Compression Test Machine 1500 kN Capacity
ALLIED RESEARCH CENTER
Compression Test Machine 1000 kN Capacity
Flexural Tesing Machione 100 kN Capacity
Laboratory Mixer 110 L Capacity
Vibrating Table
Mortor Vibrating Maschine
Vicat Apparatus
Initial Final Stting Time niddles
Le- Chatelier Mould
Le-chatelier Flask
Length comparator
Flow Table 300mm Dia
Marsh Cone with stand
Cube Moulds 70.6x70.6x70.6mm – 40 Nos
Cube Moulds 150x150x 150mm – 40 Nos
Cylindrical Mould 100mm dia.
Cylindrical Mould 150mm dia.
Slump Cone
Drying Ovan 0 to 350oC
Density Basket
DLBD Container 3L 15 L and 30L capacity
Weighing Balance 300 g with 0.01g L.C.
Weighing Balance 5kg with 0.1g L.C.
Weighing Balance 30 kg with 2g L.C.
Weighing Balance 100 kg with 10g L.C.
Benkelman Deflection Beam with Axle Load Pad Test
Plate Laod Test Equipment.
ALLIED RESEARCH CENTER
LIST OF SOIL INVESTIGATION WORKS COMPLETED
Sr.No. Project Complited Period
1 GEOTECNICAL INVESTIGATION FOR PROPOSED BUILDING OF G + 14 at Bldg No. 121 Tilak Nagar Chembur, Mumbai 400089.for AM REALTY PVT.LTD.
MARCH 2007
2 GEOTECNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF BUILDING(G + 4) AT SHIVAJI WADI, NASHIK FOR TOSCANO INFRASTRUCTURE PVT. LTD.NASHIK
JULY 2007
3 GEOTECNICAL INVESTIGATION FOR PROPOSED 8 MLD CETP AT SITARGANJ FOR JINDAL WATER INFRASTUCTURE LTD.
NOVEMBER 2007
4 GEOTECNICAL INVESTIGATION FOR PROPOSED BUILDING OF G + 17 WITH SINGLE BASEMENT FOR KAMALNATH UNIVERSAL PVT. LTD.
FEBRUARY 2008
5 GEOTECNICAL INVESTIGATION FOR PROPOSED BUILDING OF G + 8 WITH SINGLE BASEMENT at Vidyavihar / Ghatkopar (E) FOR BEST BUILDERS & DEVLOPERS.
FEBRUARY 2008
6 GEOTECNICAL INVESTIGATION FOR PROPOSED DESIGNING OF SEWAGE PUMPING STATION (7 UNITS) AT WEST LAKE VILLAGE FOR M/s SAHARA INDIA COMMERCIAL CORPORATION LTD.
FEBRUARY 2008
7 GEOTECNICAL INVESTIGATION FOR PROPOSED WORK FOR 70 MLD STP & STP AT AGAR TAKALI IN NASHIK CITY FOR SUBASH PROJECTS AND MARKESTING LTD.
FEBRUARY TO MAY 2008
8 GEOTECNICAL INVESTIGATION FOR PROPOSED G + 3 (WITH BASEMENT) COMMERCIAL COMPLEX FOR SUN INFRASTUCTURE PVT. LTD.
MARCH 2008
9 GEOTECNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF BUILDING FOR SUGUNA POULTRY FARM LTD.
APRIL 2008
10 GEOTECNICAL INVESTIGATION FOR PROPOSED BUILDING OF G + 20 FOR OSHO DEVELOPERS.
MAY 2008
ALLIED RESEARCH CENTER
11 GEOTECNICAL INVESTIGATION FOR PROPOSED
BUILDING OF G + 15 at BLDG NO. 33 TAGOR NAGAR, VIKROLI (E) FOR ADITYA ENTERPRISES
MAY 2008
12 GEOTECNICAL INVESTIGATION FOR PROPOSED WORK FOR 70 MLD STP & STP AT AGAR TAKALI IN NASHIK CITY FOR SUBASH PROJECTS AND MARKESTING LTD.
MAY 2008
13 GEOTECNICAL INVESTIGATION FOR PROPOSED CONSTRUCTION OF BUILDING FOR SUGUNA POULTRY FARM LTD.
MAY 2008
14 GEOTECNICAL INVESTIGATION FOR PROPOSED CONSTUCTION OF G + 5L BUILDING NEAR MICO CIRCLE, NASHIK CITY FOR SPAN BUILDERS PVT. LTD. NASHIK.
SEPTEMBER 2008
15 GEOTECNICAL INVESTIGATION FOR PROPOSED BUILDING OF G + 11 at BLDG NO. 18, TAGOR NAGAR, VIKROLI (E) FOR HAWARE BUILDERS. 416, VARDHAMAN MARKET,4TH FLOOR, SECTOR 17, VASHI ,NAVI MUMBAI - 400 703.
JANUARY 2009
16 GEOTECNICAL INVESTIGATION FOR NASHIK (SATPUR ANBAD), INDUTRIAL AREA, PERMANENT WATER SUPPLY SCHEME FROM GANGAPUR DAM.
APRIL 2009
17 GEOTECNICAL INVESTIGATION FOR M/S.V. S. KOKATE. NASHIK FOR CONSTUCTION OF BUILDING AT SINNAR BUS STAND.
MAY 2009
18 GEOTECNICAL INVESTIGATION FOR ROCK QUARRY FOR M/S SANKLECHA CONSTRUCTION PVT. LTD. NASHIK.
MAY 2009
19 GEOTECNICAL INVESTIGATION FOR PROPOSED RESIDENTIAL BUILDING BEHIND BHONSALA MILITRY SCHOOL FOR AMBER ESTATE, NASHIK.
MAY TO JUNE 2009
20 GEOTECNICAL INVESTIGATION FOR RAHEJA GARDEN, VANVADI,PUNE. FOR M/S. DURACRETE ENJINEERING SERVICES PVT. LTD. PUNE.
JUNE 2009
21 GEOTECNICAL INVESTIGATION FOR HOSPITAL BUILDING ( G +5 WITH DOUBLE BASEMENT) AT APOLLO HOSPITAL, NASHIK FOR APOLLO HOSPITAL ENTERPRISE LTD. CHENAI.
NOVEMBER 2009
22 GEOTECNICAL INVESTIGATION FOR XYLO BODY SHOP FOR MAHINDRA & MAHINDRA LTD. M.I.D.C. SATPUR, NASHIK.
NOVEMBER 2009
ALLIED RESEARCH CENTER
23 GEOTECNICAL INVESTIGATION FOR DG MAP
PHASE II AT LOCATION A TO L OF AHEMEDNAGAR STATION, DIST- AHEMEDNAGER. PUNE ARMY AREA, LONAVALA ARMY AREA, NASHIK ARMY AREA FOR GHERZI EASTERN LIMITED 1ST FLOOR, S. SAPHLYA,1206/A-7, APTE ROAD, SHIVAJINAGAR PUNE-411 005.
SEPTEMBER 2009- DECEMBER 2009
24 GEOTECNICAL INVESTIGATION FOR PROPOSED UNDERGROUND SEWERAGE SYSTEM FOR VIRAR TOWN AT NALA SOPARA (EAST) , NEAR FIRE STATION , VASANT NAGARI. FOR EXECUTIVE ENGINEERS MAHARASTRA JEEVAN PRADHIKARAN, VIRAR, DIST- THANE.
DECEMBER 2009
25 GEOTECNICAL INVESTIGATION FOR PROPOSED CONSTUCTION OF BUILDING AT NASHIK FOR ASHOKLAL MOHANLAL BHANDARI.
DECEMBER 2009
26 GEOTECNICAL INVESTIGATION FOR PROPOSED METROPOLIS PROJECT AT NASHIK FOR PARANJAPE SCHEMES CONSTUCTION LTD.
JANUARY 2010
27 GEOTECNICAL INVESTIGATION FOR PROSED METROPOLIS PROJECT AT NASHIK FOR PARANJAPE SCHEMES CONSTUCTION LTD.
JANUARY 2010
28 GEOTECNICAL INVESTIGATION FOR PROPOSED WATERRETAING STRUCTURE AT GHOTI, DIST - NASHIK FOR JYOTI STRUCTURE LTD, MIDC, SATPUR, NASHIK.
APRIL 2010
29 GEOTECNICAL INVESTIGATION FOR BALANCING TANK AT VADANGALI, TAL - SINNAR, DIST - NASHIK FOR RENUKAMATA BANDHKAM SAHAKARI SANATHA MARYADIT, THANGAON, SINNAR, DIST - NASHIK FOR EXECUTIVE ENGINEERS MAHARASTRA JEEVAN PRADHIKARAN WORKS DIVISION NASHIK.
APRIL 2010
30 GEOTECNICAL INVESTIGATION FOR PROPOSED HOTEL BUILDING( G + 9 ) WITH SINGLE BASEMENT AT SHIRDI, DIST - AHMEDNAGAR FOR M/S GIRIRAJ ENTERPRISES,SANGAMNER, AHMEDNAGAR.
MAY 2010
ALLIED RESEARCH CENTER
31 GEOTECNICAL INVESTIGATION FOR ALF
ENGINEERING PVT. LTD. AT MAHINDRA & MAHINDRA LTD. PLOT NO. A1/3, VENDOR PARK, MIDC, PHASE 4, VILLAGE - NIGOJE, CHAKAN PUNE - 411013.
JUNE 2010
32 GEOTECNICAL INVESTIGATION FOR M/S SHARDA MOTORS INDUSTRIES LTD. AT MAHINDRA & MAHINDRA LTD. PLOT NO. A1/8, VENDOR PARK, MIDC, PHASE IV, VILLAGE - NIGOJE, CHAKAN PUNE - 411013.
JUNE 2010
33 GEOTECNICAL INVESTIGATION FOR M/S TRACK COMPONENTS LTD. AT MAHINDRA & MAHINDRA LTD. PLOT NO. A1/4, VENDOR PARK, MIDC, PHASE IV, VILLAGE - NIGOJE, CHAKAN PUNE - 411013.
JUNE 2010
34 GEOTECNICAL INVESTIGATION FOR PROPOSED BRIDGE AT BANGANGA RIVER [CH 398.713] AT OZHAR, DIST - NASHIK FOR M/S ASHOKA BUILDCON LTD. NASHIK.
JUNE 2010
35 GEOTECNICAL INVESTIGATION FOR PROPOSED G + 7 (WITH DOUBLE BASEMENT) COMMERCIAL BUILDING COMPLEX AT MAHATRE BUNGLOW, NASHIK FOR M/S UNIVERSAL EDU INFRA PVT. LTD.
AUGUST 2010
36 GEOTECNICAL INVESTIGATION FOR PROPOSED NAYANTARA CITY 1 AT TIDKHE COLONY, NASHIK FOR M/S BAFANA BUILDERS AND DEVELOPERS, NASHIK.
AUGUST 2010
37 GEOTECNICAL INVESTIGATION FOR PROPOSED KRISHNA RESIDENCY (G + 7) AT SHIVSHAKTI NAGAR, NEW NASHIK FOR M/S BODKE BUILDCON PVT. LTD. , NASHIK.
AUGUST 2010
38 GEOTECNICAL INVESTIGATION FOR PROPOSED CECIL RESIDENTIAL BUILDING ( G + 11 ) OPP PTC FOR M/S ANANT JAYANTI DEVELOPERS. AT NASHIK.
SEPTEMBER 2010
39 GEOTECNICAL INVESTIGATION FOR PROPOSED NISHANT HEIGHT, RESIDENTIAL BUILDING (G + 7) AT NASHIK FOR M/S NISHANT INFRADWELL PVT LTD. NASHIK.
NOVEMBER 2010
40 GEOTECNICAL INVESTIGATION FOR PROPOSED CRNO - STAMPING PLOT AT KANHE, PUNE FOR MAHINDRA STEEL SERVICES LTD. KANHE, PUNE.
NOVEMBER 2010
ALLIED RESEARCH CENTER
41 GEOTECNICAL INVESTIGATION FOR PROPOSED
WORK FOR 40 MLD STP AT AGAR TAKALI IN NASHIK CITY FOR SMS PARYAVARAN LTD.
FEBRUARY 2011
42 GEOTECNICAL INVESTIGATION FOR PROPOSED BUILDING (WITH DOUBLE basement ) AT WAGALE ESTATE, THANE FOR CYBERTECH SYSTEMS AND SOFTWERE LTD. THANE.
MARCH 2007
43 GEOTECNICAL INVESTIGATION FOR PHASE 1A - KHED SEZ (ALONG SPINE ROAD ) FOR KALYANI GLOBAL PVT. LTD.
MARCH TO APRIL 2011
44 GEOTECNICAL INVESTIGATION FOR PROPOSED MANDIR AT KEVADIVAN, TAPOVAN, NASHIK FOR BAPS, SWAMINARAYAN MANDIR, NASHIK.
APRIL TO MAY 2011
45 GEOTECNICAL INVESTIGATION FOR PROPOSED (56) 577 QUARTERS FOR C. P. AURANGABAD CITY H. Q. AT AURANGABAD, MAHARASTRA FOR GANERAL MANAGER MAHARASTRA STATE POLICE HOUSING WELFARE CORPORETION.
APRIL TO MAY 2011
46 GEOTECNICAL INVESTIGATION FOR PROPOSED BFNESL MANUFACTURING UNIT AT MUSTI VILLAGE, DIST. SOLAPUR, MAHARASTRA FOR BF-NTPC ENERGY SYSTEMS LIMITED (BFNESL).
APRIL TO MAY 2011
47 GEOTECNICAL INVESTIGATION FOR PROPOSED G + 11 GULMOHAR VASANT VIHAR, SOLAPUR. M/S PANDHE INFRACON PVT. LTD.
JUNE 2011
48 GEOTECNICAL INVESTIGATION FOR PROPOSED RESIDENTIAL BUILDING AT VN'S GREENARIES, KUMTHA, SOLAPUR FOR M/S ACHANAK ASSOCIATES REALTORS PVT. LTD.
JUNE 2011
ALLIED RESEARCH CENTER
Our Laboratories is full Equipped with advance
Instruments & well knowledge staff