Page 1: Allied engineering

Civil Engineering

Geotechnical Engineering

ConstructionServices

Land Surveying

COMPANY PORTFOLIO

www.alliedengineering.com

Page 2: Allied engineering

Civil Engineering . Geotechnical Engineering . Land Surveying

32 Discover y Drive Bozeman, Montana 59718

P h : ( 4 0 6 ) 5 8 2 - 0 2 21 F a x : ( 4 0 6 ) 5 8 2 - 5 7 7 0

Bi l l ings Ph: (406) 259-0221

Dear Prospective Employees:

Thank you for taking this time to review our Company Portfolio. As we begin our second decade of service, it is with pride that I look back and reflect upon our growth from a firm of 5 employees to a firm with over 30 full-time staff and the requisite building, lab space, and state of the art equipment and management systems. At the same time, the magnitude and complexity of our projects has also grown to include federal highway reconstruction projects, municipal infrastructure projects, and multi-million dollar developments in Montana, Wyoming, and Colorado.

Allied employs a dynamic and experienced staff, including civil engineers, geotechnical engineers, land surveyors, an environmental and wetland specialist, a GIS specialist, CAD designers, a graphic designer, and a cutting edge administrative group. Allied's professionals approach each project with a focus on exceptional client relationships in combination with state of the art technology, sound design principles, and an understanding of the regulatory and economic environment. These factors allow us to provide unparalleled service to our clients.

I am also proud to mention that in October 2007 our firm was awarded Honorable Mention in the CE News "Best Civil Engineering Firms To Work For 2007" contest, which was judged based on the best employment practices, and employee responses to contest queries. Allied ranked well above the competition in areas such as company culture, employee programs, company practices, and overall business philosophy.

As you review the enclosed Company Portfolio, we invite you to consider our Company charter: "Diverse Projects - Solutions that Last." This is not simply a slogan, but a promise to our clients. For more information, see our organization’s website.

Sincerely,

Allied Engineering Services, Inc.

Douglas S. Chandler, PE, PhD President

www.alliedengineering.com

Page 3: Allied engineering

October 5, 2007

Press Release Business Briefs, Bozeman Daily Chronicle

*** For Immediate Release ***

Contact: Douglas S. Chandler, PhD, PE, President Allied Engineering Services, Inc. 32 Discovery Drive Bozeman, Montana 59718 (406) 582-0221 www.alliedengineering.com

AAllied Engineering Services, Inc. of Bozeman was awarded Honorable Mention in the national CE News "Best Civil Engineering Firms To Work For 2007" contest, as published in the October 2007 issue of CE News. Allied Engineering received Honorable Mention for creating high levels of employee satisfaction and

satisfaction survey. The contest, which is a featured annual event for the national publication, lists the top firms that have made workplace satisfaction and employee well-being high priorities in their businesses. Allied is pleased to have ranked so well in terms of leadership, benefits, and growth

opportunities among a variety of providing an excellent workplace large and mid-sized firms across environment. the country.

Allied Engineering, an employee- Allied Engineering stands out as a owned Bozeman firm founded multi-disciplinary firm that attracts in 1996, ranked well above the a diverse workforce and applies competition in areas such as advanced knowledge to unique company culture, employee engineering projects. Allied programs, company practices, and has experience with residential, overall business philosophy. With 32 total staff members as of last spring, Allied Engineering was one of the smallest firms to be featured out of 145 firms that applied this year.

The CE News Best Firms To Work For contest is judged based upon the firms' best employment practices and responses to a confidential employee

commercial, and municipal civil designs within Montana

and throughout the Rocky Mountain region. We provide complete engineering solutions, from feasibility studies to final construction of homes and businesses. Our expertise includes geotechnical, civil, and hydraulic engineering, surveying, geographic information systems, project management, and construction inspection.

Page 4: Allied engineering

Company Portfolio

Table of Contents

Services Civil Engineering Land Surveying

Geotechnical Engineering Construction Services

Project Highlights Municipal Subdivisions and Residential

Commercial Hydrology Transportation

Resumes Principals

Company Culture

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 5: Allied engineering

SERVICES

Page 6: Allied engineering

Specialized Services

• Civil engineering, drawings and specifications

• Subdivisions • Highway / road design

and improvements • Community and individual

water and wastewater systems • Site evaluations • Environmental assessments • Land reclamation • Design / build • City / County design review

coordination and permits • Hydrology / hydraulics • Dam design and rehabilitation • Flood plain delineation • Wetland delineation • River and stream mechanics • Stream reclamation • Water rights • Storm water design • Irrigation systems

Civil Engineering

Company Portfolio

Allied's Civil Engineering Department provides services ranging from the design of municipal, state, and federal highway and infrastructure projects to multi-million dollar residential and commercial developments. The primary products are feasibility studies, land entitlements, community planning, road and utility design, and municipal water treatment. Our specialized staff also provides wetland delineation and permitting, floodplain studies, hydrology/hydraulics, and flood control design.

Our Clients range across a wide spectrum from private owners, architects, developers, and engineers to Municipal, State, and Federal Governments. We take pride in providing the same high-quality services to a single homeowner as we do for a multi-million dollar highway reconstruction project. Truly, no project is too big or small for us to provide a lasting solution.

Bozeman Public Library

Bozeman, Montana

Construction of a one million gallon buried water tank Big Sky, Montana

Master plan and zoning exhibit

Construction of Black Bull Subdivision and a Tom Weiskopf designed signature golf course Gallatin County, Montana

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 7: Allied engineering

Specialized Services

• A.L.T.A. / A.S.C.M. surveys • Boundary surveys • Construction staking • Land ownership maps • Parcel maps • Mortgage surveys • Topographic surveys • State-of-the-art equipment

and surveying software

Land Surveying

Company Portfolio

We are particularly proud of our Survey Department which provides the needed support for virtually all engineering designs. Using state of the art equipment, our Survey Department provides the topographic mapping and utility location required to design and construct any system on or under the earth's surface. Our Survey Staff also includes an expert in Geographic Information Systems (GIS) to enhance the value of our data and improve coordination with other consultants and government agencies.

In addition to support services, our Survey Department also acts independently to provide boundary surveys, easements, mortgage surveys, family transfers, and platting of commercial and residential subdivisions. We invite you to review their impressive list of projects.

Surveyed section corner

GPS base setup for static survey

Allied survey crew member conducting a boundary survey with a total station instrument

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 8: Allied engineering

Specialized Services

• Geotechnical exploration and analysis

• Geophysical engineering • Hydro-geological analysis • Earthwork construction • Foundations • Soils testing • Slope stability • Seismic stability

Company Portfolio

Geotechnical Engineering

Allied takes pride in offering Geotechnical Services not normally performed by similar firms. We have four geotechnical engineers on staff, two of whom possess advanced degrees in soil mechanics and one with an additional degree in geologic engineering. This added specialty, combined with our in-house testing lab, provides additional levels of design and efficiency to almost any project.

Geotechnical work includes geologic and hydrogeologic evaluations, foundation investigations, and soils testing for projects ranging from private residential homes to water supply projects, bridges, multi-story commercial buildings, highway reconstruction projects, and dams. The products include overall site analysis and foundation and road design recommendations. Our geotechnical staff provides services from project inception through construction, working closely with contractors to provide field testing and recommendations for all types of soils.

In recent years, slope stability analyses and the remediation of landslides have been a particularly important focus of geotechnical study. As land development takes place on mountain hillsides, our staff has utilized increasingly sophisticated software models to assess the risk of slope movement and provide recommendations to improve safety.

Allied Engineering soils lab

Allied engineer conducting an

Atterberg limits soil anaylsis

Site grading Village Center One

Big Sky, Montana

Allied geotechnical engineer using a bedrock coring machine

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 9: Allied engineering

Specialized Services

• Construction management • Construction inspection and

testing • Concrete testing (ACI Certified) • Compliance testing of soils

and materials • Compaction testing • Non-destructive testing

Company Portfolio

Construction Services

Construction Services are often the most critical, but often most overlooked portion of a successful project. Experienced inspectors provide the key element needed to transform a design into reality and address real-time field conditions. Our team includes inspectors experienced in all facets of construction ranging from materials testing to water, sewer, and roadway inspection.

The primary focus is on performing quality control of the constructed improvements to ensure they are installed according to plan. Additional services include construction staking, as-built surveys, contract preparation, and assistance with the bidding process. Our construction capabilities truly make Allied Engineering a multi-disciplinary Civil Engineering firm.

Allied Engineering's inspection team reviewing plan sets

Nuclear Densometer compaction testing prior to paving

Lime water bath for concrete cylinder curing

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 10: Allied engineering

PROJECTHIGHLIGHTS

Page 11: Allied engineering

MU

NIC

IPA

L

Page 12: Allied engineering

Allied Engineering Services, Inc. - Project Profile

City of Bozeman Public Library Bozeman, Montana

Client Reference Mark Headley

Studio Forma Architects 411 W. Arthur Street

Bozeman, Montana 59715 406-585-1400

Completion Date 2006

Construction Cost $7.2 million

Project Personnel John Schlegelmilch, PE

Taylor Lonsdale, PE Matt Miller, EI

Lee Evans, PE

Allied Engineering Services provided full civil, structural, and geotechnical engineering. In addition, surveying, grading, drainage, utility design, construction inspection, and testing services were furnished for the new 52,000 square foot, two story steel frame facility located on the historic East Main Depot site.

The building is a unique combination of glulaminated wood and steel roof structural elements and steel floor systems. The lateral load elements are welded moment frames. The project features extensive green design elements such as natural night-flushing ventilation, capture and recycling of rainwater runoff, photo-voltaic cells for supplementing electrical energy demands, and striking visual elements to enjoy the scenic adjacent Lindley Park.

The Northwest Energy Efficiency Alliance has recognized the new library as one of 10 civic projects in several states that exemplify "green building" techniques and materials that maximize energy efficiency.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 13: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Big Sky Water Improvements & Sewer Outfall Transmission Main

Big Sky, Montana

Client Reference Big Sky Water & Sewer District

Ron Edwards - General Mgr. P.O. Box 160670

Big Sky, Montana 59716 406-995-2660

Completion Date 2004

Construction Cost $3 Million

Project Personnel Scott R. Smith, PE

Lee Evans, PE

This project involved design and construction management for a one million gallon fully buried concrete water reservoir, a multiple pump booster station with complex telemetry controls, four PRV stations, 10,000 feet of ductile iron water main, and demolition and removal of three water storage reservoirs.

WaterCAD water modeling software was used extensively to design the most efficient system for placement and sizing of new pipelines, PRV stations, multiple reservoirs, booster stations and supply wells.

Allied was responsible for preparing easements and obtaining all necessary permits and approvals. Allied Engineering also secured State Revolving Fund funding for the project. The one million gallon reservoir was designed and constructed in an environmentally sensitive, mountainous area meeting seismic zone four requirements.

Allied Engineering received two awards for this project from the Montana Contractors Association; one for the Best Specialty Project and the other was a Montana Environmental Excellence Award.

Allied Engineering was also responsible for the design and construction over-sight of three miles of sewer outfall transmission from the Mountain Village to Hidden Village in Big Sky.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 14: Allied engineering

Allied Engineering Services, Inc. - Project Profile

West Yellowstone Composting Facility West Yellowstone, Montana

Client Reference WY/HBSWD

10 South Faithful Street West Yellowstone, Montana

59758 406-646-7795

Completion Date 2003

Construction Cost $4.2 Million

Project Personnel Taylor Lonsdale, PE

Chris Budeski, PE John Schlegelmilch, PE

This Municipal Solid Waste Compost Facility is located near the west entrance to Yellowstone National Park and is the first in the State of Montana. This compost facility will receive all the municipal solid waste from Yellowstone National Park and from the West Yellowstone/Hebgen Basin Solid Waste District (WY/HBSWD).

The facility will process the municipal solid waste into compost using in-vessel composting technology. Allied Engineering Services provided geotechnical analysis for the site, site grading, pavement and utility improvements, structural design, and construction inspection for the 19,000 square foot facility.

Phase I of the project included the preparation of technical specifications and bid documents for the equipment and process design, working with composting equipment suppliers, and organizing and managing the bidding process. Once the equipment and process design was awarded the second phase of the project required the design of the facility around the proposed equipment.

Phase II required the design and specifications for the building and foundation, site, grading, utilities and roadways based on the process proposed by the equipment supplier in Phase I. The facility site, located on a lease from the National Forest Service, has required coordination with various federal and state agencies. The second phase of the project was completed in the spring of 2003.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 15: Allied engineering

SU

BD

IVIS

ION

S-R

ES

IDE

NT

IAL

Page 16: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Yellowstone Bend Ranch Subdivision Sweet Grass County, Montana

Client Reference Taylor Walker

P.O. Box 1070 Hailey, Idaho 83333

(208) 788-8099

Completion Date 2007

Firm’s Contract Amount 77,000

Project Personnel Paul Sanford, PE Mark Fasting, PE Alex Hallenius, EI

Scott Quin, EI

Allied Engineering provided professional surveying and engineering services to obtain entitlements for the Yellowstone Bend Ranch Planned Unit Development in Sweet Grass County. The entire property is approximately 3,634 acres, of that acreage, 502 acres are designated as 22 single family residential lots. The remaining area 3,131 acres of the ranch are preserved from development.

Upon preliminary plat approval, Allied provided design of 6.4 miles of internal roads, septic system design, site design for the "Homestead" common area, and design for a 1/3 acre recreational pond located in the "Homestead" common area.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 17: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Ameya Preserve Park County, Montana

Client Reference Greenfield Financial Group L.L.C.

Wade Dokken 1007 East Main Street

Suite 101 Bozeman, MT 59715

(406) 586-9418

Completion Date Fall 2010

Construction Cost $45 Million

Project Personnel Doug Chandler, PE, PhD

Scott R. Smith, PE Greg Finck, LS

Allied Engineering provided complete civil design and development for this 250 home, 3 phase, 11,000 acre environmentally friendly community. The design and development included project management, geotechnical exploration and design, boundary and topographic surveys, mapping, platting, permitting, road, water and wastewater design. Also provided were water resource inventories, water rights analysis, and hydrology and hydraulics for water features and ponds and construction inspection and materials testing.

Ameya Preserve is a sustainable new community in Montana's majestic Paradise Valley that is developing a small portion of its 11,000 acres into a village core surrounded by a limited number of residences with world-class amenities. Ameya's outdoor lifestyle, diverse ecologies and rich cultural resources will combine to nurture the physical and creative potential of its residences and members. Ameya Preserve will become the benchmark for communities around the world that seek to preserve land and wildlife in an ecological manner.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 18: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Black Bull Subdivision and Golf Course Development

Gallatin County, Montana

Client Reference Mike Rowe

41-865 Boardwalk, Suite 209 Palm Desert, CA 92211

760-776-5689

Completion Date January 2008

Construction Cost $10 million

Project Personnel Craig Madson, PE Scott R. Smith, PE Taylor Lonsdale, PE

In the fall of 2004, Allied Engineering was retained by the developers of Black Bull Subdivision to provide platting, civil design, environmental permitting, and construction services for a 378 lot major subdivision and a signature golf course designed by Tom Weiskopf.

The initial work included completion of a feasibility study that studied all aspects of the proposal that potentially had a bearing on approval including environmental, zoning, water rights, and water and sewer facilities.

Surface water rights research prompted changes to existing statements of claim and subsequent negotiation and water court submittal prior to a change application through the Montana DNRC. Groundwater studies included aquifer testing and modeling to document aquifer characteristics and effects the development could have on nearby water users and surface water resources as part of new appropriation.

The preliminary plat was submitted and approved in 2005 and Phase 1 final plat approval was received in July 2007. Phase 1 water, sewer, storm drainage, roads, stream reclamation and wetlands restoration/erection were completed in the summer of 2007.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 19: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Baxter Meadows Subdivision Bozeman, Montana

Client Reference Jerry Williams

Baxter Meadows Development, LLC 207 N. Broadway, Suite MZ1

Billings, Montana 59101 406-698-4549

Completion Date December 2002

Construction Cost $5 Million

Project Personnel Scott R. Smith, PE

Paul Sanford, PE

Allied Engineering provided all facets of project development and civil design including city streets, water, sewer, storm sewer, grading, and a multi-pump wastewater lift station design. Geotechnical, and structural engineering as well as construction inspection and surveying services were also provided for this multi-phased PUD development in Bozeman, Montana.

Baxter Meadows is one of the largest subdivisions in Bozeman and will include almost a section of land at full build-out. This development also includes a 100-acre regional park.

PHASE 1

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 20: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Genesis Business Park Subdivision Bozeman, Montana

Client Reference Steve Daines

77 Discovery Drive Bozeman, Montana 59718

406-522-2906

Completion Date 2000

Construction Cost $1 Million

Project Personnel Scott R. Smith, PE

Paul Sanford, PE

Genesis Business Park Subdivison is a 27 lot commercial subdivision that features a community water and wastewater system and a reconstructed creek channel with two large ponds that serve as an on-site source of water for structural fire protection.

Project tasks included the design of approximately 2500 lf of sewer main, 2300 lf of water main, pumping facilities, Ultraviolent (UV) disinfection of water and wastewater systems, recirculating sand filter, roads, and earthwork. The project also received strong endorsements from both the City Planners and Gallatin County Commissioners.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 21: Allied engineering

CO

MM

ER

CIA

L

Page 22: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Village Center One Big Sky, Montana

Client Reference Kurt Ratz

CTA Architects 10180 Cottonwood Rd.

Bozeman, Montana 59718 406-423-5018

Completion Date December 2007

Construction Cost $20 million

Project Personnel Lee Evans, PE

Kyle Thompson, LS

Allied provided surveying, geotechnical engineering, civil site design, water and sewer services, storm drain design and extensive grading and drainage design for Big Sky Resort's Village Center One. This project was done in challenging terrain and geotechnical conditions.

This four-story building will offer innovative slopeside work/play entertainment suites and the pedestrian plaza level features approximately 10,000 square feet of retail and restaurant space.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 23: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Gallatin Center Commercial Development Bozeman, Montana

Client Reference Jimmy Grisham

P.O.B. Montgomery 5550 LBJ Freeway, Ste. 380

Dallas, Texas 75240

Completion Date 2004

Construction Cost $2 Million

Project Personnel Chris Budeski, PE

Greg Finck, LS

Phase IV of the Gallatin Center Commercial Development project includes approximately 48 acres and 9 commercial lots.

Allied Engineering is providing the civil and geotechnical engineering, surveying, construction inspection, and testing services for this high profile project at the gateway to the City of Bozeman.

The subdivision is being developed by Gallatin Center LP, partnering with P.O.B. Montgomery in Dallas Texas. The architect for the development, also from Dallas, is Good, Fulton and Ferrell.

As the local contact for the developer and Architect, Allied Engineering has been a valuable part of this development working closely with the City and State to ensure the development and subdivision moves through the process smoothly.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 24: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Deer Park Chalet Bozeman, Montana

Client Reference Richard T. Prugh

Prugh & Lenon Architects, PC 27 East Main Street

Bozeman, Montana 59715 406-587-1255

Completion Date 1996

Project Personnel Doug Chandler, PE, PhD

John Schlegelmilch, PE

Geotechnical and structural engineering was provided for this uniquely challenging project located at over 6,500 feet in elevation. With the very high snow loads and short construction season, it required two summer construction cycles to build.

Deer Park Chalet is a two-story, 10,000 square foot ski chalet located at mid-mountain Bridger Bowl Ski area encompassing a full basement, a loft and a large outdoor deck area using a steel composite floor system and exposed re-cycled timber wood framing.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 25: Allied engineering

HY

DR

OL

OG

Y

Page 26: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Copper Mountain Ski Resort Copper Mountain, Colorado

Client Reference Matt Weaver

Five Rivers, Inc. (406) 209-1970

Completion Date On-hold - 2007

Project Personnel Paul Sanford, PE, CFM

Alex Hallenius, EI

Allied Engineering provided floodplain modeling and permitting services for a proposed stream relocation/restoration project on West Tenmile Creek which flows through the base of the Copper Mountain ski area. The stream reach modeled consisted of over 600 feet of channel with one existing bridge. Project challenges included FEMA floodplain permitting (floodplain development permit, CLOMR, LOMR), a steep mountain reach subject to highly erosive flows during flood events, and an abundance of existing infrastructure within the stream corridor.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 27: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Winter Park Ski Resort Winter Park, Colorado

Client Reference Matt Weaver

Five Rivers, Inc. (406) 209-1970

Completion Date On-hold - 2007

Project Personnel Paul Sanford, PE, CFM

Alex Hallenius, EI

Allied Engineering provided floodplain modeling and permitting services for a proposed stream restoration project on the Fraser River which flows through the Winter Park Mountain Village. The stream reach consisted of over 1,500 feet of channel with three existing roadway bridges and two existing pedestrian bridges. Project challenges included FEMA floodplain permitting (floodplain development permit, CLOMR, LOMR), a steep mountain reach subject to highly erosive flows during flood events, and an abundance of existing infrastructure within the stream corridor.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 28: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Three Forks Flood Study Three Forks, Montana

Client Reference Joe Van Mullem

Van Mullem Engineering 406-586-0701

Ray Noble, Deputy Clerk City of Three Forks

406-285-3431

Completion Date 2005

Total Project Cost $90,000

Firm’s Contract Amount $32,500

Project Personnel Paul Sanford, PE Allied Survey Dept. Joe Van Mullem

Three Forks Flood Study is complete and awaiting FEMA's final review.The floodplain consists of a study of the Madison and Jefferson Rivers in the vicinity of Three Forks, Montana.

The purpose of the flood study was to create updated FEMAFlood Insurance Rate Maps for the City of Three Forks. The project consisted of project management for surveying, creation of base map, and floodplain mapping. Allied Engineering utilized state of the art software including HEC-GeoRas and ArcView to perform the flood mapping. The studied reach includes upstream and downstream of the junction between the two rivers. Allied's client, Joe Van Mullem, performed the hydrologic analysis and floodplain modeling. The floodplain modeling was performed with the computer program HEC-RAS and involved complicated flow spits, levees, ice jamming analysis, and numerous bridges.

Key Project Elements:

• Automated Geometry Extraction and Floodplain Mapping • HEC-RAS, HEC-GeoRAS, ArcView with 3D Analyst • Compliance with FEMA Guidelines and Specifications for • Flood Hazard Mapping Partners • Floodplain mapping for an area covering roughly 7.5 square

miles • Over 6 miles of river studied • Over 40 bathymetric cross-sections utilizing GPS, a boat,

and conventional techniques.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 29: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Yellowstone River Hazard Mitigation Study Park County, Montana

Client Reference Dan Gutebier Park County

County Commissioner 406-222-4106

Completion Date 1998

Firm’s Contract Amount $41,000

Project Personnel Paul Sanford, PE

Doug Chandler, PE, PhD Allied Survey Dept.

Allied Engineering Services, Inc. assisted Park County to win a FEMA grant to evaluate potential flood mitigation measures on the Yellowstone River.

The intent of the mitigation measures was to encourage the river to better utilize its east channel around some islands near Livingston. The study involved: geomorphic evaluations of the river reach; surveying 40 cross sections of the Yellowstone River, a complex HEC-2 analysis, and coordination with county, state, and federal funding and regulatory agencies. The cross-sectional elevations were measured using a combination of Real Time Kinematic (RTK) Global Positioning System (GPS) equipment, depth finder, and motorized raft.

Key Project Elements:

• 40 cross-sections of the Yellowstone River using GPS, depth finder, motorized raft

• HEC-2 analysis

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 30: Allied engineering

TR

AN

SP

OR

TA

TIO

N

Page 31: Allied engineering

Allied Engineering Services, Inc. - Project Profile

U.S. Hwy. 93 McClure Rd. to N. of Arlee Couplet

Montana Department of Transportation (MDT) Arlee, Montana

Client Reference Gerry Smith

Town Administrator Skillings-Connolly

406-541-7877

Dwane Kailey MDT, Missoula 406-523-5800

Design Completed August 2004

Construction Cost $27 Million

Project Personnel Doug Chandler, PE, PhD

Craig Madson, PE Staci Skifstad, PE

Allied Engineering provided comprehensive design services for the reconstruction of a 6 mile segment of US-93 for MDT. This project was part of the large-scale design effort, under the Design Management team of Skillings-Connolly, to reconstruct 56 miles of US-93 from Evaro to Polson. The project was a unique partnership between MDT, FHWA, and the Confederated Salish and Kootenai Tribes and was considered a "landmark" project for this area of the country.

This project included: rural and urban roadway reconstruction, a new couplet around Arlee, reconstruction of twelve county roads, and accommodating extensive irrigation systems that cross or parallel the project. The downtown Arlee segment involved extensive landscaping, curb & gutter, decorative sidewalk, concrete intersections, decorative lighting, intersection "bulb-outs" for pedestrian safety, ADA ramps to existing buildings, and on-street parking. There were also 1.5 miles of multi-use trail design planned for south of Arlee. The Hydraulics group designed a new storm drain system for Arlee, including retention and detention ponds, and a 2,300 foot open channel outfall. AESI also provided additional surveys, traffic warrant studies, pavement design, signing & striping plans, erosion control plans, geotechnical investigation, public involvement, and final plan set production.

There were many unique and challenging design issues throughout this complex corridor. These included sensitive environmental and tribal cultural issues, architectural designs, and wildlife considerations. Allied Engineering welcomed the extensive design coordination and detailed effort a project of this magnitude requires. This project gave us solid experience with coordination efforts between MDT, Design Management Team, Project Architects, Tribal Representatives, Flathead Agency Irrigation District, MRL, Arlee Sewer District, Utility Companies, and the residents of Arlee.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 32: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Boulder Mainstreet Reconstruction Montana Department of Transportation (MDT)

Boulder, Montana

Client Reference John Leary

Town Administrator Town of Boulder

P.O. Box 68 Boulder, MT 59632

406-225-3381

Dan Clary MDT Construction, Butte

District 3751 Wynne

Butte, MT 59702 406-494-9600

Completion Date Summer 2003

Firm’s Contract Amount $400,000

Project Personnel Doug Chandler, PE, PhD

Craig Madson, PE Staci Skifstad, PE

Allied Engineering designed this 0.6 mile urban reconstruction project through Boulder, Montana for the Montana Department of Transportation (MDT). This project involved extensive landscaping in medians, accommodating large truck movements, decorative sidewalks, on-street parking, water line adjustments, new storm drain system, out fall and detention pond, and ADA ramps to existing buildings.

Allied also performed surveying, Right-of-Way, Geotechnical, Hydrology and Hydraulics, Traffic Studies & Evaluation, Roadway Design, Signing & Striping, and Public Involvement.

In order to resolve parking and driveway issues Allied worked with a citizen's group, business owners, schools, and residents. During the project, Allied also worked closely with the City of Boulder to resolve other design issues. Additional approved work items pushed the schedule back a couple months. However, this project was successfully completed within the approved budget.

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 33: Allied engineering

Allied Engineering Services, Inc. - Project Profile

Boulder River Bridge Montana Department of Transportation (MDT)

Boulder, Montana

Client Reference Tom Martin

MDT 406-444-6251

Completion Date December 2001

Firm’s Contract Amount $233,000

Project Personnel Doug Chandler, PE, PhD

Paul Sanford, PE Allied Survey Dept.

Allied Engineering was the prime consultant for this bridge replacement project, which connects to the Main Street Boulder Project.

Allied performed all the surveying, right of way, geotechnical, hydrology and hydraulics, road design, traffic counts and a traffic evaluation, signing design and layout, and public involvement for the project.

Allied provided hydraulic modeling of the existing bridge and recommended bridge alternatives using HEC-RAS River Analysis System software. Environmental work was sub-contracted to Hyalite Environmental, LLC and structural design was sub-contracted to Wells Engineers. The new bridge is a two span pre-stressed concrete structure about 54 meters in length.

Key Project Elements:

• Hydraulic study using HEC-RAS to evaluate bridge alternatives

• Bridge scour analysis using HEC-RAS

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Page 34: Allied engineering

RESUMES

Page 35: Allied engineering

Dr. Chandler is a principal and founder of Allied Engineering Services, Inc. Dr. Chandler's primary areas of expertise are in geotechnical engineering, water resources, and applied geosciences including: earthwork construction, foundations, land fills, slope stability, retaining structures, embankments, excavations, roads and streets, seepage and drainage, dams, channel and bank stability, hydrology, hydraulics, and river mechanics. He is experienced in the management and oversight of multi-disciplined projects including subdivisions, transportation projects, buildings, and underground utilities. During his professional career, Dr. Chandler has worked in Alaska, Idaho, Montana, Nebraska, New Jersey, New Mexico, Ohio, Oregon, Colorado, Washington, and Wyoming on a variety of buildings, developments, roads, dams, slope stability, water resource, land and stream reclamation, and environmental projects. He has provided forensic engineering and expert witness services for a number of cases involving earthwork construction, landslides, foundations, and buried pipelines.

RegistrationProfessional Engineer:Montana, Washington, Oregon, Wyoming, & Colorado

EducationMontana State UniversityB.S. Civil Engineering, 1982

Montana State UniversityM.S. Civil Engineering, 1985

University of WashingtonPh.D., Civil Engineering, 1992

Douglas S. Chandler, PhD, PEPresident • Principal • Geotechnical Engineer

Mr. Smith is Principal Civil Engineer and Project Manager at Allied Engineering Services, Inc. He participates in all facets of engineering projects, including contract writing, client meetings, planning, design, project management, and contract administration. He is intimately familiar with the provisions of City of Bozeman Design Standards, MDEQ regulations and Montana Public Works Specifications.

Mr. Smith is experienced in writing PER’s, designing water, wastewater and stormwater infrastructure, and road and grading design. Preparing Environmental Assessments, applications for permits, site plans and SRF funding are also included in his qualifications. Mr. Smith also has experience in surveying, being familiar with topographic and traverse surveys.

RegistrationProfessional Engineer:Montana, Washington, Oregon, Idaho, Colorado

EducationHumboldt State UniversityB.S. Industrial Technology 1988

Montana State UniversityM.S. Civil Engineering 1996

Scott R. Smith, PEPrincipal • Civil Engineer • Project Manager

Page 36: Allied engineering

Mr. Madson is a Principal Engineer, and senior project manager for Civil, Geotechnical, and Transportation projects at Allied Engineering. He is the project manager for some of our largest projects including our Montana Department of Transportation projects and major subdivisions. His MDT experience includes the Boulder Main Street Reconstruction and most recently, the US 93 reconstruction project, which contained a significant urban component. He has also worked with counties, MDEQ and various municipalities including the City of Bozeman and Big Sky on subdivision developments and infrastructure improvements. Mr. Madson’s engineering expertise includes on-site wastewater, geotechnical exploration, analysis, pavement design, and significant on-site construction engineering and inspection. Mr. Madson is also very experienced in hydrologic and hydraulic analysis and design, road design, and testing of asphaltic and Portland cement concrete. This well-rounded background enhances his abilities as a project manager and allows him to work with the different engineering disciplines effectively.

RegistrationProfessional Engineer:Montana

EducationMontana State UniversityB.S. Civil Engineering, 1994

Montana State UniversityM.S. Civil Engineering (Geotechnical), 1996

Craig R. Madson, PEPrincipal • Geotechnical Engineer • Project Manager

Principal Surveyor and Project Manager for Allied Engineering Services, Inc. Mr. Finck has 22 years experience as a land surveyor. He has been involved in land use design and construction projects from the initial scope determination to final plan sheet production. He is a project manager of major and minor subdivisions and has extensive experience interacting and coordinating with local governmental agencies, including planning, review of exemptions and subdivision review. He also coordinates and conducts surveying projects involving boundary, topographic and construction surveys, utilizing both GPS and conventional instrumentation. He is directly responsible for the preparation of Subdivision Plats, Certificates of Surveys and topographic maps.

RegistrationProfessional Land Surveyor:Montana

EducationPeninsula CollegePort Angeles, Washington.Forestry Tech degree, with extensive study in surveyingGraduated 1983

Greg Finck, LSPrincipal • Land Surveyor • Project Manager

Page 37: Allied engineering

Mr. Sanford is a Principal Engineer, Project Manager, and Senior Civil & Hydraulic Engineer with extensive experience and expertise in hydrologic/hydraulic analysis, modeling, and design; flood studies; and stormwater analysis, modeling, and design. He is highly experienced in AutoCAD 2006/Land Development, HEC-RAS, HEC-HMS, HEC-2, Hydraflow Storm Sewers, Culvert Master, FlowMaster, and employing ArcView 3.2 with the HEC-GeoRAS extension to create geometry models for floodplain modeling and to create flood inundation maps. Paul is experienced and quite effective at coordinating and directing large projects with multiple stakeholders including clients, government agencies, contractors, sub-consultants, and the public.

RegistrationProfessional Engineer:Montana, Colorado, Idaho, Wyoming

EducationMontana State UniversityB.S. Civil Engineering 1996

Montana State UniversityM.S. Civil Engineering 1997

Paul J. Sanford, PEPrincipal • Civil & Hydraulic Engineer • Project Manager

Page 38: Allied engineering

COMPANYCULTURE

Page 39: Allied engineering

32 Discovery Drive . Bozeman, Montana 59718 . Ph: (406) 582-0221 . Billings Ph: (406) 259-0221 . Fax: (406) 582-5770 . www.alliedengineering.com

Company Portfolio

Company Culture

Allied Engineering’s mission is to work towards the highest standards of the civil engineering and surveying professions by providing practical solutions and quality services of unmatched value to clients. We strive to protect the health and welfare of the general public while maintaining a positive influence and position of leadership and respect within the engineering community.

To achieve this mission, AESI practices the highest ethical standards and always conducts itself in a professional manner. Our principals and managers strive to add more value to its services by learning and understanding the regulatory and economic environment that affects our clients and their projects. Employees work as an innovative and quality driven team by utilizing unbiased professional judgment, embracing new technology; and performing tasks with enthusiasm, integrity, and excellence.

Our culture offers a team atmosphere, support, trust, and independence. In addition, we offer an exciting diversity of projects in both the public and private sector. We encourage participation and growth from employees in all aspects of the project cycle. We take pride in our hard work, and with that said, we also like to lighten up and have fun. We have quarterly events for our employees and their families, such as barbeques, golf days, river raft floats, ski days, attending the local ice hockey team games, ice-skating and a hay maze (just to name a few).

Allied Engineering is a dynamic engineering consulting company offering excellent salary, benefits and working environment. We look for individuals to have a set of well-rounded skills to support the myriad of services we provide our clients.