albany operation and maintenance

36
Albany Eng Pump Deta ineering Co. ails Pump Mo Pump Se Site Loca Other De Ltd O odel: erial No.: ation No.: etails: perating & M Maintenance Manual (OM Albany E Church R Lydney Gloucest GL15 5EQ England Telephon Fax: +44 E-mail: sa Web: www INSTA L OPERA MAINT E GEAR PU ORIGI N MM-GP:1.0) Engineering Road tershire Q ne: +44 (0) 1 (0) 1594 84 ales@alban w.albany-pu Alba L LATIO N TION E NANC E UMP MA N N AL INS T g Co. Ltd 1594 84227 42574 ny-pumps.co umps.co.uk any Pu N E N UAL T RUCTI O Page: 1 75 o.uk k umps O NS

Upload: robert-stuart

Post on 23-Jan-2016

83 views

Category:

Documents


2 download

DESCRIPTION

Albany Operation and Maintenance

TRANSCRIPT

Page 1: Albany Operation and Maintenance

Albany Eng

Pump Deta

ineering Co.

ails

Pump Mo

Pump Se

Site Loca

Other De

Ltd O

odel:

erial No.:

ation No.:

etails:

perating & M

Maintenance Manual (OM

Albany EChurch RLydney GloucestGL15 5EQEngland TelephonFax: +44 E-mail: saWeb: www

INSTALOPERAMAINTE

GEAR PUORIGIN

MM-GP:1.0)

EngineeringRoad

tershire Q

ne: +44 (0) 1(0) 1594 84

[email protected]

Alba

LLATIONTION

ENANCE

UMP MANNAL INST

g Co. Ltd

1594 8422742574 ny-pumps.coumps.co.uk

any Pu

N

E  

NUAL TRUCTIO

Page: 1

75

o.uk k

umps

ONS

Page 2: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 2

TABLE OF CONTENTSINTRODUCTION ....................................................................................................................................................... 3 

USING THIS MANUAL ..................................................................................................................................................... 3 

HEALTH & SAFETY .................................................................................................................................................... 4 

LIMITS OF USE ................................................................................................................................................................ 4 NOISE ............................................................................................................................................................................. 4 PUMP INSTALLATION / MAINTENANCE ........................................................................................................................ 5 WORK ON ELECTRICAL EQUIPMENT .............................................................................................................................. 6 WORKING ON PRESSURISED SYSTEMS .......................................................................................................................... 6 COSHH ............................................................................................................................................................................ 6 MAGNETIC COUPLINGS ................................................................................................................................................. 6 

INFORMATION ON ALBANY PUMPS ......................................................................................................................... 7 

DESCRIPTION ................................................................................................................................................................. 7 OPERATING PRINCIPLE .................................................................................................................................................. 7 RECEIVING THE PUMP ................................................................................................................................................... 8 USING YOUR ALBANY PUMP ......................................................................................................................................... 8 SERIAL NUMBERS .......................................................................................................................................................... 9 

STORAGE AND LIFTING OF GEAR PUMPS ................................................................................................................ 10 

STORAGE ...................................................................................................................................................................... 10 LONG TERM STORAGE ................................................................................................................................................. 10 LIFTING ......................................................................................................................................................................... 12 

INSTALLATION ....................................................................................................................................................... 13 

GENERAL INFORMATION ............................................................................................................................................. 13 DIRECTION OF ROTATION ............................................................................................................................................ 14 BUILD CONFIGURATION .............................................................................................................................................. 14 REVERSING YOUR PUMP ROTATION ........................................................................................................................... 14 PIPING .......................................................................................................................................................................... 15 COUPLINGS .................................................................................................................................................................. 16 PUMP ALIGNMENT ...................................................................................................................................................... 17 EQUIPMENT INSTALLATION ........................................................................................................................................ 18 TYPICAL INSTALLATION ............................................................................................................................................... 18 

OPERATING & MAINTENANCE ................................................................................................................................ 19 

PUMP START UP .......................................................................................................................................................... 19 PREVENTATIVE MAINTENANCE ................................................................................................................................... 20 STRIPPING, CLEANING & REFITTING ............................................................................................................................ 21 CLEARANCE GUIDE....................................................................................................................................................... 22 

SEALING METHODS ................................................................................................................................................ 23 

MECHANICAL SEALS..................................................................................................................................................... 24 PACKED GLAND ............................................................................................................................................................ 25 LIP SEALS ...................................................................................................................................................................... 26 

RELIEF VALVES ....................................................................................................................................................... 27 

MAINTENANCE OF RELIEF VALVE ................................................................................................................................ 28 

SPARES & REPAIRS ................................................................................................................................................. 30 

SPARES ......................................................................................................................................................................... 30 REPAIRS ....................................................................................................................................................................... 31 

INFORMATION ON ‘ALTERNATIVE’ ALBANY MODELS .............................................................................................. 32 

ATEX ...................................................................................................................................................................... 33 

TROUBLE SHOOTING .............................................................................................................................................. 34 

CONTACTS ............................................................................................................................................................. 36 

Page 3: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 3

INTRODUCTION This manual contains general instructions for the storage, installation, operation and maintenance of an Albany gear pump. Albany gear pumps are available in many configurations, whilst they may look the same, there may be differences from one pump to another, and therefore supplementary instructions can be supplied. To get the best from the pump, carefully read and understand this manual before installation and start-up. Albany cannot anticipate all of the situations a user may encounter while installing and using Albany products. Therefore, the user of an Albany product MUST know and follow all applicable industry specifications on the safe installation and use of these products. Albany Engineering Company Limited will not be held responsible for any consequence due to the improper installation and use of the pump. USING THIS MANUAL  

• Read and understand the manual. Contact us if anything is not clear.

• Keep the manual for the life of the pump.

• If pump maintenance is necessary use this manual for safety and technical information.

• For safe working, observe the operating and maintenance instructions for

associated motors, engines, couplings and relief valves.

Page 4: Albany Operation and Maintenance

Albany Eng

The followUnited Kinadvise theoperating, Personnel the pump. 1. The app2. Installat3. Normal accidents The follow

LIMITS O

• Nev

• Nev

• Nev

sold

• Nev

• Alwma

• Nev

• Nev NOISE On certain noise level When workAbove 70 dAbove 85 d Remove th

ineering Co.

ing are gengdom Healtir customermaintaining

must undeThe user's

propriate seion and sersafety prec

ing symbols

Warn

Refer

Cauti

OF USE 

The pexcessubje

ver use hea

ver operate

ver operated.

ver run the

ways lock ouintenance.

ver operate

ver operate

installationl of 80 dB, c

king in a pudBA, wear edBA, wear e

he pump to

Ltd O

eral safety th and Safe

rs on the sag and servic

rstand and attention is

ctions of thrvicing mustautions mu

s are used t

ning – non co

rs to electric

tions, Safe op

pump/pump sss of those focted to extre

at to disasse

e the pump w

e the pump

pump when

ut and post

e the pump w

e the pump w

ns, pump mocan be exce

ump house cear defendeear defende

somewhere

perating & M

precautionsety At Work fety and thecing their pr

apply theses therefore d

is manual mt only be cast be taken

throughout

ompliance wi

al safety poin

peration of p

sets must noor which it waemes of temp

emble the p

without all g

beyond the

n dry.

a permit on

with discha

with suction

odels and aeeded.

check the ners. ers and limi

e quieter to

Maintenance

s not relatedAct 1974 S

e handling products.

e precautiondrawn to the

must be reaarried out by and approp

this manua

ith this point

nts which ca

pump

ot be subjecteas originally perature and/

pumps due

guards corre

rated cond

n the power

rge valve c

n valve clos

at certain op

noise.

t your time

carry out a

Manual (OM

d to any speSection 6(a)precautions

ns during boe following:

d before woy suitably trapriate proce

al to draw at

could result

an cause inju

ed to pressurquoted and s

d/or humidity

to risk of ex

ectly installe

ditions for w

r to the drive

losed.

sed.

peration poi

working in t

ny mainten

MM-GP:1.0)

H

ecific proce requires m

s to be obse

oth operatin

orking on thained or quaedures obse

ttention

in injury/har

ury/harm

res and tempsupplied. It mfor which it w

xplosion fro

ed.

which the pu

er before pe

nts shown o

this area.

ance.

HEALTH &

edure, howemanufactureerved when

ng and main

he equipmenalified persoerved to avo

rm

peratures in must not be was not desig

m trapped l

mp was orig

erforming a

on the pum

Page: 4

& SAFETY

ever, the rs to installing,

ntenance of

nt. onnel. oid

gned.

iquid.

ginally

ny pump

p curves a

4

Y

f

Page 5: Albany Operation and Maintenance

Albany Eng

PUMP IN Please ins Bef 1) 2) 3) 4)

It is1) 2) 3)

The pump Alterations

ineering Co.

NSTALLAT

tall your pu

fore workingHazardousDepressuriDisconnectDisconnect

s hazardousRun the puChange theFail to main

user is resp

s to your pu

Pumps

Restric

Use the

Lock oSwitch

Do not

Wear y

Assum

In the csystem

Considfrom fa

Ltd O

TION / MA

mp in acco

g on an insts liquid – drase the pumt the power t the shaft c

s to: ump withoute use of thentain the pu

ponsible for

mp are not

s can be dan• inc• inc• no

ct access to t

e correct too

off the electrich off and isola

t touch rotatin

your PPE an

me that the pu

case of pumpms, vent them

der whether talling parts, e

perating & M

INTENAN

rdance with

talled pumpain and clea

mp and all linsupply. Lo

coupling

t the coupline pump or mump, as this

r the safe us

allowed.

gerous if thecorrectly instacorrectly usedt serviced

the pump to

ols for mainte

c starter; posate any elect

ng parts.

nd goggles.

ump is hot, c

ps for hot liqm when cool.

the pump or especially if t

Maintenance

NCE 

h the latest N

p: an the systenes ock it off, po

ng guard fittmodify it withs can cause

se of the pu

ey are: alled d

competent p

enance.

st a permit totrical heating

check; allow

uids allow to

its parts maythe pump is l

Manual (OM

National Sa

em

ost a permit

ted hout Albany

e injury or fir

ump.

people.

o prevent unag system.

to cool befor

o cool. Shut o

y topple overlarge or heav

MM-GP:1.0)

H

afety Regula

y approval re

authorised st

re starting wo

off all oil or s

r. Take care vy.

HEALTH &

ations.

tarting.

ork.

team heating

to avoid inju

Page: 5

& SAFETY

g

ury

5

Y

Page 6: Albany Operation and Maintenance

Albany Eng

WORK ONTake extrapump; cheensure the

Refer to or WORKIN Check and

First close Bleed the p Take great COSHH  

MAGNET 

ineering Co.

N ELECTRa care wheneck that the e pump has

Do notelectric Wherethe mo

Do not

Only u

riginal manu

NG ON PRE

d observe th

Liquids

Vent alunder p

all valves.

pump and s

t care with t

Control OfAs far as wwhen it leathe pump, materials a

TIC COUPL

If fitted, whin the vicinheart pacecare is req

Ltd O

RICAL EQUn working wmotor terma proper gr

t attempt anyc supply.

e possible locotor terminals

t work on we

use a qualifie

ufacturer of

ESSURISED

he system p

s under press

ll pressure copressure.

system; this

toxic/hazard

f Substancewe are awaaves our woor any reac

are not haza

LINGS 

hen each hanity of the coemakers arequired to en

perating & M

UIPMENTith any elecinals are noround conne

y inspection o

ck off the swis are not live

et equipment

d electrician

motor / eng

D  SYSTEM

pressure reg

sure can cau

ontaining pa

s includes a

dous liquids

es Hazardoure there are

orks. Howevction of thosardous.

alf of the coouplings cae especiallysure fitting

Maintenance

ctrical equipot live even ection.

or repair bef

itch gear ande before start

gine for ma

MS 

gularly.

use injury, we

rts to atmosp

ny thermal

s.

us To Healte no hazardver, we canse products

oupling is sean be affectey vulnerabletakes place

Manual (OM

pment assocafter switch

fore disconne

d post a permting work.

ker’s install

ear goggles

phere, taking

oil heating

th ous substanot confirm

s that are pu

eparated, aned. Items su

e. During ase with the m

MM-GP:1.0)

H

ciated with thing off the

ecting the pu

mit on it, you

ation manu

and PPE

g care in cas

system.

nces presem that produumped and

ny magneticuch as watcssembly of t

minimum of i

HEALTH &

the operatiosupply. Ear

ump set from

rself. Test th

al.

se the system

nt in this Alct to be hanany adjace

c or electronches, credit the two halvimpact.

Page: 6

& SAFETY

on of the rthing -

the

hat

m is

bany pumpndled by ent

nic device cards and

ves, great

6

Y

p

Page 7: Albany Operation and Maintenance

Albany Eng

 DESCRIPThe Albancounter-rotrotate free The pumpmating facfluid under The drivingof the pumseal. Drive to ththe pumps The couplipicture).

OPERATI

ineering Co.

PTION ny gear pumtating shaftly inside the

ping rotors ces being ser pressure.

g shaft of thmped fluid by

he pump is s drive shaft

ing is in tur

Guardsany wo

Guards

ING PRINC

Ltd O

mp is an ets. The geae pump cas

are containealed by the

he pump why means of

achieved vt using a co

rn covered

s can only bork that requi

s are not des

CIPLE 

perating & M

external geaars (rotors) wsing bores.

ned within e use of a g

hich protrudeither a pa

via a prime upling. This

by a secur

e removed wires the guar

signed to sup

Maintenance

ar positive which are a

a rigid hougasket (pap

des from thcked gland

mover (eles unit is nor

rely mounte

with the use rd to be remo

pport any we

Liquid flowbranch (scround by toutlet (deliContact bethe suctionThis createpressure ointo the puAll the timefrom the s

Manual (OM

INFORM

displacemeattached to

using whichper or liquid

e pump casor lip seal (

ctric motor,mally moun

ed guard fo

of tools andoved has bee

eight

ws into the pcrewed or flahe rotating ivery) port (etween the n side from es the vacuor a positiveump. e the pump uction side

MM-GP:1.0)

MATION O

ent pump wthese shaf

h is secured) or O-ring

sing is seal(pressure re

, engine etcnted on a co

or safety pu

d must be repen completed

pump througanged connrotors and

(screwed orgear teeth sthe delivery

uum which ae suction he

is rotating,to the disch

ON ALBAN

which consfts mesh to

ely fixed tog to prevent

led to preveelieved) or m

c.) being coombination

urposes (no

placed as sod.

gh the inlet nection); is pumped our flanged coseparates ay side of theallows atmoead to get th

liquid will bharge side.

Page: 7

NY PUMPS

sists of twoogether and

gether withleakage of

ent leakagemechanical

onnected tobed plate.

ot shown in

oon as

(suction) carried t of the

onnection). and seals e pump. ospheric he liquid

be moved

7

S

o d

h f

e l

o

n

Page 8: Albany Operation and Maintenance

Albany Eng

RECEIVIN

Before reaaccordancThis meanpumps mahowever, is

• co• pro• pe• ca

These pumdesign and Inspect thenotes of da To avoid p

Remembe USING YO

ineering Co.

NG  THE P

Read t

aching you, e with your s that the d

ake them cas enhancedrrect applicoper installa

eriodic inspereful mainte

mps can trand componen

e pump as samage or m

problems: • On

• Takfollo

r to remove

OUR ALBA

• It is vitasolids a

• Pipe foup you

• Liquid those A

• Heat: w

• Do not can be

• Changduty orinvalida

Ltd O

UMP 

this manual b

Albany will enquiry an

design, mateapable of givd by: ation ation ection, condenance/serv

nsfer a widents, howeve

soon as it ismissing item

arrival, che• Co• Co• Fre

ke the pumpowing:- • Shaft e• Foot on• Signs o• Damag

e all transit p

ANY PUMP

al that the fas damage

orces: desigr pipes. Do

pressure: fiAlbany supp

welding the

use hamme brittle.

es to the dur the systemate our war

perating & M

before install

have ‘run ind order. erials, and wving, trouble

dition monitovicing

e range of ler they are

s received. Cms on the rec

eck that themplete. rrect quanti

ee from any

p carefully o

extension. n pump/moof corrosionged paint.

plugs and a

luid passingto the pum

gn your systnot use the

t gauges anplied the pu

e pump can

ers, instead

uty, or the pm. Any un-arranty.

Maintenance

ling, operatin

n’, tested an

workmanshe-free servic

oring

ight, mediunot intend

Carefully chceipt and fre

goods are:

ity. y transportat

out of its bo

tor is intactn on bright m

associated p

g through thp could occ

tem to absoe pump to s

nd check thump for.

cause defo

d use rubbe

pump systemapproved ch

Manual (OM

INFORM

ng or working

nd recorded

ip incorporace. The life

m and heaved for use

heck that eveight bill.

:

tion damag

ox or of its p

. machined p

protective p

he pump is ccur.

orb pipe movsupport pipe

at the actua

ormation. A

er or plastic

m: tell us inhange is the

MM-GP:1.0)

MATION O

g on the pum

d the pump

ated in the cand reliabil

vy viscosity with water

verything is

e.

pallet & chec

arts.

acking prio

clean and f

vements duework.

al condition

seized pum

mallets wh

writing if yoe user’s res

ON ALBAN

mp.

performanc

constructionlity of any p

liquids, depr.

in good ord

ck for dama

r to installat

ree from ab

ue to heat. E

s are not w

mp can resu

en needed.

ou have to msponsibility a

Page: 8

NY PUMPS

ce in

n of Albany pump,

pending on

der. Make

age on the

tion.

brasives or

Exactly line

worse than

ult.

. Castings

modify the and can

8

S

Page 9: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 9

INFORMATION ON ALBANY PUMPS SERIAL NUMBERS Please record the pump model and serial number, Albany will need this information when you require parts or service, should any problems occur with the pump in its lifetime we have a spares and repair service. The use of genuine Albany parts will provide the safest and most reliable operation of your pump. ISO certification and quality control procedures ensure the parts are manufactured to the highest quality and safety levels. Please contact Albany for details on genuine pump parts.

Please e-mail: [email protected] To help us identify the pump Albany will need to know the pump serial Number which is stamped into the pump casing. Typical positions for serial number are shown below.

In the case of pump sets our nameplate can be found on the bedplate.

Albany

YOUR REF:-PART No:-

SERIAL No:-PUMP TYPE:-

CUSTOMER:-

PRESSURE:-L.P.M:-

R.P.M:-

CHURCH ROAD, LYDNEY,GLOS.

GL15 5EQ - UK FAX:- 01594-842574

TEL:- 01594-842275

ATEX MARKING:-

Page 10: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 10

STORAGE AND LIFTING OF GEAR PUMPS STORAGE Albany’s normal packing procedure is designed to protect the pump during shipping only. Upon delivery of equipment, store in a covered and dry location. Store only in dust, and vibration free ambient temperature conditions. The transport packaging is not a suitable place for long term storage. Pumps to be placed in storage should be coated internally with oil or a suitable preservative prior to storage. Rotation of drive shaft by hand to circulate the preservative oil every 8 weeks is recommended. If the shaft has to be hand rotated occasionally to comply with the bearing manufacturer’s recommendations, then the sealing faces of the mechanical seal should be coated with a light film of lubricating oil. Mechanical seal clamping plate bolts can be loosened off approximately 2 to 3 rotations at the throat to relax the spring loading. The corresponding gap left between the stuffing box face and the gland plate should be masked to exclude dirt. Check glands and seals for deterioration. For pump units coupled to motors/engines refer to drive and coupling manufacturers for their storage procedures. LONG  TERM STORAGE Pumps that will not be installed for an extended period should be stored indoors, if possible. The factory installed port plugs will not ensure protection from excessive humidity, splash water or rain. Care should be taken with motor and mechanical seals. Mechanical Seals: Pumps and other equipment subject to long term storage are best stored without the mechanical seal being installed. Seal installation should only then be carried out shortly before the actual start up of the unit. The Seal chamber should be completely dry. The seal faces should ideally be assembled dry also. If hydrostatic or acceptance testing is to be done by the equipment manufacturer, then the seal area must be flushed clean and totally dried afterwards. Suction and discharge flanges are to be covered to exclude the ingress of dirt. Covers should be marked: ‘DO NOT REMOVE UNTIL EQUIPMENT IS INSTALLED’. The open area between the gland plate and shaft sleeve is to be masked to exclude dirt. All open parts in the gland, adaptor plate and stuffing box are to be plugged and sealed. Mechanical Seals – shelf life: Mechanical seals should be stored in accordance with international DIN 7716 and ISO 2230 standards. Brief outlines of the essential recommendations are: All seals should be retained in the original packaging, in a dry, stable, elevated stores location with good air circulation and away from direct sunlight, dust, chemicals and vibrations. Ideally temperature range of -10 to +20 deg C and a humidity level below 65%. If the above storage guide lines are met, the expected shelf life of seals with standard Nitrile, Viton or EPDM elastomers can be considered to be 5 to 10 years.

Page 11: Albany Operation and Maintenance

Albany Eng

Oil seals: Rubber oil compressiominimum sare packedRubbers scontent. Rubbers ssolid mateLip type sedamaged.

If the itemscase every

Electric Mo

1. BeaMopreby

2. LubMo

3. CoMo

Periodicall

If the insula It is preferanot essent

ineering Co.

seals shouon or other since deformd in a strainhould be pr

hould not brials at any

eals should On no acco

s are carefuy detail shou

otor:

arings – Staotors shouldemature beahand, insur

brication otor bearings

ndensation otors should

a. MotorsIn storaso that

b. Motorsventilat(approxused ocondenthis co

y, the insula

IF IN ADO NODO NO(When

ation resista

able to dismial; the dryi

NOTE:PERSODISMAINCOR

Ltd O

uld, wherevedeformatio

mation can -free condit

rotected from

e allowed totime duringalways be s

ount should

ully stored auld be teste

atic Indenta be stored i

aring failurering they are

s are lubrica

be stored is provided wage, the mot any condes without drated, no actiox 3 monthly

or stored in cnsation heandition. N.B

ation resista

A HAZARDOOT USE A TEOT APPLY Tn checking fo

ance has fa

mantle the mng process

: NO HAZARONS OTHERANTLING/ASRRECT ASS

perating & M

er possible,n. If it is implead to craction they shm strong su

o come intog storage stored in su identity lab

as recommeed immediat

ation in an area f

e due to state left in diffe

ated at the

in a warmedwith drain hootors shouldensation, whain holes –on is neces

y) to ensurecold and/or

aters – the hB Heater circ

ance to eart

OUS AREA UEST VOLTA

TEST TO THEor continuity o

allen below

motor to thewill simply

RDOUS ARER THAN THOSSEMBLY MASEMBLY AND

Maintenance

STOR

be stored ipossible to cking and phould be stounlight and s

o contact wi

uch a way abels be tied

ended their tely before a

free from antic indentatierent positio

factory for t

d, ventilatedoles - The dd be stood shich does foProvided th

ssary, althoue it is mainta

damp enviheaters shocuit to be is

th should be

USE AN ‘EX’ GE IN EXCEERMISTORSof thermistor

1 Megohm,

point whertake longer

EA MOTOR SOSE AUTHO

MAY INTRODD WILL INVA

Manual (OM

RAGE AND

n a relaxedavoid deforermanent c

ored in their strong artifi

th solvents,

as to prevento the actu

shelf life is assembly.

ny source ofon. Motor sons.

the shelf life

d store to mdrain holes ssuch that thorm will escahat the enviugh a periodained aboveronments, wuld be perm

solated befo

e checked u

MEGGER.ESS OF 500 S (IF FITTEDrs, voltage m

, the motor

re the rotor cr.

SHOULD BEORISED TO DDUCE THE RALIDATE TH

MM-GP:1.0)

D LIFTING

d condition frmation it shchange of sh

original pacial light wit

, oil, grease

nt the sealinal compone

generally v

f vibration sshafts shoul

e of the grea

minimise theshould be ke drain holeape. ronment is dic insulatio

e 1 megohmwe recomm

manently enore inspectio

using a 500

VOLTS. D) ust not exce

will need to

can be rem

E DISMANTLDO SO. UNA

RISK OF EXPHE MOTOR C

G OF GEA

free from tehould be kehape. Wherckaging. th a high ult

es or any ot

ng edges beents.

very long., b

since this cald be rotate

ase (approx

e risk of conkept open aes are the lo

warmed anon test is adm. If motors end the fittiergised if son.

0 volt insula

ed 6V)

o be dried o

moved. Howe

LED BY AUTHOURISPLOSION DUCERTIFICAT

Page: 11

AR PUMPS

nsion, ept to a re articles

tra-violet

her semi-

eing

but in any

an cause d weekly

x 4 years).

ndensation.nd clean. owest point

d dvisable are to be ng of anti-tored in

tion tester.

ut.

ever, this is

SED UE TO TION.

S

t

s

Page 12: Albany Operation and Maintenance

Albany Eng

LIFTING If connecte Take care permanent

Lifting Poin

Hoist bare sling, undeflange.

Most pump Standard b

AP8 AP9 AP10, HD3 AP11, HD4 HD5

ineering Co.

ed, remove

when movit damage.

All

UseRecpum

Bef

Be the

nts

shaft pumper the suctio

ps below siz

bareshaft pu

LiftinDo n

Ltd O

suction and

ng the pum

operations m

e the lifting pcommended mp should ne

fore lifting the

careful whenentire assem

ps using a son & deliver

ze AP8 are

ump weight 17

21

31

41

55

g motors: chot use this e

perating & M

d discharge

mp. Rough tr

must be carri

points provided hand lift is 2ever be lifted

e pump set,

n moving pummbly.

suitable ry

under the s

ts approxim

HD6 AP12, HD7AP13, HD8HD10 4” SMC, HD

heck that the yebolt to lift

Maintenance

STOR

e hose and p

reatment or

ied out by pro

ed. Do not li21 kg (44 lbs)d by the shaft

check the we

mps. Lifting e

Baseplatechains (othe bedp Be awarealignmen

safe hand li

ate (kg):

D12

eyebolt is futhe complete

Manual (OM

RAGE AND

piping befor

r lifting in an

operly traine

ift pump setss) below shouft end.

eight from th

equipment m

e mounted or slings) colate.

e not to knont.

ft weight of

66

70

73

100

200

ully screwed e pump set.

MM-GP:1.0)

D LIFTING

re attemptin

n unsuitable

d personnel.

s using the mulder, but ab

he delivery no

must be able

units are monnected to

ock pump or

21kgs.

5” SMC,

in.

G OF GEA

ng to lift the

e way may c

.

motor lifting luove ground l

ote.

to adequate

moved with hholes at the

r motor out

, HD14

Page: 12

AR PUMPS

pump.

cause

ug. level. The

ly support

hooks & e side of

of

280

2

S

Page 13: Albany Operation and Maintenance

Albany Eng

GENERAL

Motors: Re Albany pumrotors. Install a filtdrop at theUse a mes Check thatinstallationpump’s rot

A pump shmaintenan Inverters:

If ycou

NOISE The installaamplifies salso increaenclosures Noise levetypical leve

ineering Co.

L INFORM

Pleaseout.

THE IN

All elecMotor in

efer to origin

mps must o

ter if the lique maximum sh size 125

t the pump n. If the diretation before

Use yopropos

hould be locce, and ins

ou decide tuld overhea

ation of pumsound pressase noise les or rubber

els will be abels for your

Ltd O

MATION 

e refer to the

NSTALLATIO

trical work shnstructions re

nal manufac

only be used

uid can conviscosity (ymicrons or

rotation as ection of rote it is instal

our Albany pused change in

cated near tpection. Le

o use an inat.

mp sets musure levels wevels. If noimountings

bove 75 dBApump.

perating & M

Health & Sa

ON MUST BE

hould be caregarding ins

cturer of mo

d to pump c

tain crystalsyou need a less.

ordered is ctation has toled and fille

ump for no on the use sh

the supply oeave space

verter be ca

st be on sowhich may tse exceedsis recomme

A and will u

Maintenance

afety section

E CARRIED O

rried out by qtallation.

otor for mak

clean liquids

s or dirt. Sefiltering are

correct witho be changeed with liquid

other purposeould be chec

of liquid andfor lifting e

areful with s

lid foundatiothen be too

s locally perended.

usually be in

Manual (OM

of this manu

OUT ONLY B

qualified pers

ker’s installa

s. This will a

elect the filtea of over 5

h regard to ted please tad!

e than that wcked with our

d have adeqquipment to

speed varia

ons. Mouno high. Inadrmitted leve

n the 80 – 9

MM-GP:1.0)

ual before an

BY TRAINED

sonnel. Refer

ation manua

avoid wear o

ter to achievtimes the s

the foundatialk to us. It

which it is supr works.

quate spaceo be used.

ations over 3

ting pump sdequate supls the fitting

90 dBA rang

INSTAL

ny work is car

D PERSONNE

r to the Elect

al.

or seizing o

ve a low presuction pipe

ion and the t is easier to

pplied for. An

e for operati

3:1. Call us

sets on weldpport of pipeg of sound p

ge. Please

Page: 13

LLATION

rried

EL

tric

of the

essure e area).

pipe o change a

ny

ion,

s, the motor

ded stands e work can proof

ask us for

3

N

r

Page 14: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 14

INSTALLATIONDIRECTION OF ROTATION Pumps can be run in either direction and when reversed the direction of flow is reversed. It is advisable to keep the original rotation as a pressure relief system is provided in the covers to prevent hydraulic noise. Some pumps have internal relief passages between suction areas and the gland or seal. These are used to reduce gland pressures and become inoperative in reverse rotation. The Relief Valve becomes inoperative in reverse. In most pumps the valve can be moved to operate with the new rotation (see drawing of Build Configurations). Note, some mechanical seals used in Albany pumps are designed for use in one direction only. BUILD  CONFIGURATION The handing of a pump indicates the direction of flow through the pump looking on the drive shaft. All views below are looking on the pump drive shaft and show a relief valve pump (these views will apply equally to a non relief valve pump).

Top Drive/ Anti Clockwise Rotation (Left hand pump – Flow from right to left)

Top Drive/ Clockwise Rotation (Right hand pump – Flow from left to right)

Bottom Drive/ Clockwise Rotation (Left hand pump – Flow from right to left)

Bottom Drive/ Anti Clockwise Rotation (Right hand pump – Flow from left to right)

REVERSING YOUR PUMP ROTATION To preserve your warranty, please phone us first before making any changes, have the serial number to hand. It maybe that to reverse the direction of rotation on your build of pump could create a hazardous situation. If you have a pump fitted with a pressure relieved gland this will not work in reverse rotation.

DELIVERY SUCTION

SUCTION DELIVERY

SUCTIONDELIVERY

DELIVERYSUCTION

Page 15: Albany Operation and Maintenance

Albany Eng

PIPING The pipes order to avtransferred Flush the pat start up. Suction anthe branchliquid is visalways be when not fsupported Suction anbranches T To avoid scoarse stra Fit a presspump bran Most Albanexternal re

CavitatioCavitation crackling slocal pressinternals. Pumps neethe pumpinand pipes system; va Suction pipand joints. pump, in s Where a hpipe.

ineering Co.

connected void stress id to the pum

pipes and s.

nd delivery phes of the puscous, it wilavoided wh

flexible musotherwise s

nd delivery bTAPER NIP

olids, keep ainer in cas

sure and a vnch.

ny gear pumelief in order

Alwaysvalve in

n is usually c

sound in thesure drop w

ed their inleng temperatto avoid suc

apour press

pes: use maIt is importaome cases

igh lift is req

Ltd O

to the pumpn the pump

mp housing

ystem or co

piping leadiump. In mal be necesshere possibst always bestrain and m

branches arPPLES MUS

the inlet (sue of suspen

vacuum gau

mps are delr to pipe the

s use a reliefn the pipe wo

caused by toe pump, it ocithin the pu

ets to be undture). Espection probleure become

aterials whicant no air isthe pump w

quired (abo

perating & M

p should alwp casing. Axas this may

onsider usin

ng to and frany cases i.sary to use lle and neve

e brought inmal-alignme

re either flaST NOT BE

uction) pipended debris

uge not mor

ivered with e by-passed

f valve if therork

oo high a vaccurs whenmp which w

der a greateecially with sems. High ves greater w

ch will not cs sucked in will stop pum

out 3-4M or

Maintenance

ways be suxial movemey cause the

ng a tempor

rom the pum.e. where thlarger bore er fitted neanto true line ent will resu

nged or scrE USED as t

e 100 – 200s.

re than the e

an internald liquid back

re is any cha

acuum in thn small vapowill cause a

er pressuresolvents or

viscosity cauwith a rise in

collapse undto the pum

mping.

greater), fit

Manual (OM

pported as ent of the ppump to se

rary filter to

mp should nhe length of piping. Sha

ar the pumpwith the pult.

rewed. Whethey may ca

mm above

equivalent i

relief valvek to tank to

nce of runnin

he suction liour bubblesreduction o

e than the vahot liquids,

uses greaten temperatu

der vacuump as it will r

a good qua

MM-GP:1.0)

close as poipe must noeize.

guard agai

never be smpiping is ex

arp bends a branches. mp branche

en the unit ause the pu

the bottom

in length of

e. Our valveprevent the

ng the pump

ne. Cavitatis form in theof flow, and

apour press design the

er pressure ure.

m. Use the breduce the p

ality foot va

INSTAL

ossible to thot be allowe

nst welding

maller in diaxcessive or and elbows Pump cones and exte

has screweump body to

of your tan

4 diameter

es can be se liquid heat

p against a cl

ion is recoge liquid as re

damage to

sure of the l layout of thdrops in the

best air tighperformanc

lve to the su

Page: 15

LLATION

he pump in ed to be

g slag etc.

meter than when the should

nections ernally

ed o fracture.

k. Use a

rs from the

upplied for ting up.

losed

gnised by a esult of a pump

liquid (at he pumps e suction

ht fittings e of the

uction

5

N

Page 16: Albany Operation and Maintenance

Albany Eng

COUPLINThe couplimain types Flexible Ty

• Semby

• Thehub

• Thiwith

Spacer Ty• Wh• Thi• The

alig

ineering Co.

NGS ng is a dev

s of coupling

ype: mi-elastic cmeans of tae flexible cob is a bush s type of cohout damag

pe: here specifies type of coese couplingn the pump

DO NDam

Ltd O

ice that prog used by A

ouplings deaperlock buoupling consfixed by a ta

oupling has ge.

ed we fit spoupling is ofgs need to p set before

NOT use undage can resu

 

perating & M

vides conneAlbany, thes

esigned for sh fixing. sists of two aper. self center

acer couplif rigid desigbe very acc

e test at our

due force to fult leading to

Maintenance

ection betwse being flex

general pur

hubs and a

ing shaft bu

ngs (Metasgn and conscurately aligr works.

fit the couplino a shorter se

Manual (OM

ween the pumxible and sp

rpose use p

a rubber cen

ushes and a

tream or eqsists of two gned. We u

ng halves onervice life.

MM-GP:1.0)

mp and thepacer type.

permit quick

ntral piece (

allows some

quivalent) hubs and a

use a laser a

n to the moto

INSTAL

drive. Ther

k and easy a

(spider), wit

e misalignm

spacer. alignment m

r or pump sh

Page: 16

LLATION

re are two

assembly

thin each

ment

machine to

haft.

6

N

Page 17: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 17

INSTALLATION PUMP ALIGNMENT Pumps direct coupled to motors / engines on bedplates are accurately aligned at our Works before despatch. It is essential that this alignment is maintained when the unit is installed and the pipe work connected. If there is any doubt carefully check after installation. Undue force in fitting pipe work can cause serious damage to the pump flange. Most pumps are fitted with Fenner HRC flexible couplings. A flexible coupling is not designed to absorb misalignment. Check for –

Parallel misalignment – shafts are inline angularly and parallel to each other, but are off-set. This is checked by placing a short rule or straight edge on the coupling hub outside diameters. Check top/top and side/side and move or shim motor and pump as required.

Axial Misalignment – includes implicational ‘end float’, Shafts move axially increasing or decreasing the distance between shaft ends.

Angular misalignment – shafts are at an angle to one another. Make sure that the hub faces are parallel by checking top/top and side/side with callipers.

Allowable errors are:-

Coupling Type / Size Maximum Misalignment Parallel Axial Angular

Fenner HRC 70, 90, 110 0.3mm +0.2, +0.5, +0.6mm 1.0 degree Fenner HRC 130 150, 180 0.4mm +0.8, +0.9, +1.1mm

Fenner HRC 230, 280 0.5mm +1.3, +1.7mm Metastream TSK13 ± 0.3mm ± 1.0mm 0.5 degree Metastream TSK33 ± 0.35mm ± 1.3mm No pump, and particularly mechanical seal pumps, will give long service if they are out of alignment. A major misalignment will cause a shorter coupling life & increased bearing wear. Note: Even though the pump was aligned after assembly prior to shipment, checking the alignment before use is the responsibility of the installer and user of the unit.

PARALLEL

AXIAL

AN

GU

LAR

Page 18: Albany Operation and Maintenance

Albany Eng

EQUIPMEBedplate mpoured on permanent The pump bolts are gmixed grou After the coalignment

Prime the leaks. Fit any meand quotat TYPICAL 1 Tank2 Pipe 3 Sucti4 Pipe 5 Filter

ineering Co.

ENT INSTAmounted pu

a solid foott, rigid supp

set should routed and

uting to ens

oncrete has(see pump

Gear pon the

pump and p

echanical setion).

 INSTALL

k Support on IsolationCoupling /

r

Ltd O

ALLATIONmps are noting. The foport for the p

be carefullythe whole b

sure that the

s dried instaalignment p

pumps will rupump you m

pipe system

eal flushing/

ATION 

n Valve Union

2 3

perating & M

N ormally grouundation mpumping un

y lined up wbedplate floe bedplate is

all the pumppage), switc

un in either dimust follow it.

m (this is imp

/cooling pipe

1

4 5

Maintenance

uted onto a ust be able

nit.

with the pipinoated over us quite solid

p set. Connch on the m

irection of ro.

portant whe

es if require

6 S7 P8 D9 D10 S

6

Manual (OM

concrete fo to absorb a

ng, the bedup to the topd and no sp

nect the pipemotor and ch

tation. If we

ere a mecha

ed (see our

Suction PresPump Unit Discharge PDischarge IsSystem Relie

7

MM-GP:1.0)

oundation, wany vibratio

plate wedgp of the bed

pringing pos

es, re-checheck its rota

have marked

anical seal i

General Ar

ssure Gaug

Pressure Gasolation Valvef Valve

8

INSTAL

which has bon and to for

ed after foudplate lugs wssible.

ck the couplation for an

d a direction

is fitted). C

rrangement

ge

auge ve

2

Page: 18

LLATION

een rm a

undation with well

ing instant.

arrow

heck for

t drawing

4

9

10

8

N

Page 19: Albany Operation and Maintenance

Albany Eng

PUMP ST

Before staalignment, place.

1. Opbefvalv

2. Sta

monotrem

3. All

ove

4. Che

5. Wa 6. If a 7. Che

If the pump30 seconddelivery pipfeet), a foo It must be pump muspressure. TPositive Su

ineering Co.

TART UP 

Refer t

rt up proced filled the p

en all valvefore startingves.

art the pumpost applicatiot allow it to rmember me

relief valveser the maxim

eck for leak

atch/look/list

all is well, SL

eck again fo

p should nos. Stop the peline. It shot valve sho

borne in mist be floodedThe NPSHAuction Head

Ltd O

to Health & S

dure, make ump with liq

es in the sysg the pump.

p (making sons an Albarun dry for ochanical se

s are factormum discha

ks whilst ope

ten for exce

LOWLY inc

or leaks.

ot immediatepump and

hould be notould be fitted

ind that whed under as gA (Net Positd required)

perating & M

Safety page o

sure you hquid and ch

stem and m Gear pum

sure rotationany gear puover 30 sec

eals must no

ry set. If yoarge pressu

erating at lo

essive noise

rease the p

ely pump, oprime it eithted on this sd. For highe

en liquids hgreat a heative Suctionof the pump

Maintenance

of this manua

ave installehecked the r

ake sure thmps must ne

n is correct)ump will selfconds. (Refeot run dry.

u have re-bure.

ow pressure

e, vibration

pressure to y

or, accordingher through subject thater lift rather

andled whicad as is posn Head avaip.

Manual (OM

OPE

al before com

ed your pumrotation. The

hat there areever be ope

and check f prime. If yer to our tro

built your pu

e.

etc.

your require

g to the lengthe chargin

t when the tmore primi

ch give off vsible, sufficilable) must

MM-GP:1.0)

ERATING

mmencing w

mp correctlye coupling g

e no obstrucrated again

that liquid iyou have noouble shooti

ump reset th

ement.

gth of suctiong plug provtotal lift excng is neces

vapour, the cient to overt be greater

G & MAINT

work on pump

, checked cguard shou

ctions in thenst closed sh

is being pumot primed thing chapter)

he relief valv

on pipeline vided or threeds 2.5 m

ssary.

suction linercome the vr than the N

Page: 19

TENANCE

p

coupling ld be in

e circuit hut-off

mped. In e pump do ). Please

ve to 10%

within, say ough the etres (8

e to the vapour

NPSHR (Net

9

E

t

Page 20: Albany Operation and Maintenance

Albany Eng

PREVENTPump appabrasive q Regardlesslife of your keep main

Lubricatio

Routinely c

1) 2) 3) 4) 5) 6)

7) Periodicall

1) 2) 3) 4) 5)

ineering Co.

TATIVE Mlications areualities, pre

s of the appr pump. Wetenance rec

Refer t

The mahave aAssess

Do notelectric Whereyourse

Flush ahot liqu

on: Adequa

• When tand thegreasinlittle.

• In mosWhere regular

check that t

Excessive ExcessivelFlush or prMechanicaGland comCheck ball4000 hoursCheck pum

y – 6 month

Check pumAny lubricaCheck aligCheck thatIf pump ha

Ltd O

MAINTENAe seldom idessure and

plication howll maintainecords; this w

to Health & S

aintenance ma Permit to Wsment.

t attempt anyc supply.

e possible locelf. Test that

and drain theuids or used

te lubricatio

the liquid beese should ng the bear

st cases the ball thrust

rly, in accor

the pump is

noise and vly Hot beariroduct leaksal seal leaka

mpression al and roller bs.

mp capacity

hs

mp bolting aation? – chegnment t all ancillar

as been idle

perating & M

ANCE entical, andtemperature

wever, folloed equipmenwill help pin

Safety pages

must be carriWork, they are

y inspection o

ck off the swit the motor te

e pump beforon aggressiv

on is essent

eing pumpebe filled witings depend

pumped liqbearings arrdance with

s operating a

vibration ing areas s age nd heat bearings. A

y and pressu

and connecteck it

ry equipmene check the

Maintenance

d pump weae of the liqu

owing a routnt will last lo

npoint poten

s of this manu

ied out by trae able to help

or repair bef

itch gear or rerminals are

re opening itve or toxic liq

tial for a Ro

ed is not a luth Shell Alvads on circum

quid is sufficre used (methe makers

as normal.

Add grease

ure

tions. Chec

nt is in workshaft sealin

Manual (OM

OPE

ar is directlyuid being pu

tine maintenonger and r

ntial causes

ual before co

ained personp prepare a M

fore disconne

remote startenot live befo

t. Take extraquid.

otary Gear P

ubricant, grania Greasemstances b

cient. echanical ses advice.

at 2000 hrs

ck bedplate

king order ng , replace

MM-GP:1.0)

ERATING

y affected byumped.

nance progrrequire feweof problem

ommencing w

nnel. Albany Method State

ecting the pu

ers and post ore starting w

a care if the p

Pump.

rease lubricae 2 or equa

but too much

eals for exa

s, re-pack w

foundation

if required

G & MAINT

y such thing

ram can exter repairs. Y

ms.

work on pum

service persement and a

ump Set from

a permit on work.

pump is pum

ators can bal. The frequh is better t

ample) greas

with new gre

n bolts

Page: 20

TENANCE

gs as the

tend the You should

mp

onnel a Risk

m the

it,

mping

e provided uency of han too

se

ease every

0

E

Page 21: Albany Operation and Maintenance

Albany Eng

STRIPPIN

To strip & Locate the Dismantle

1) In t2) On 3) In t

follo4) On

Using cautsoaked in flubrication Always fit nclearance Refit the p Refit the p Ensure thaalignment. Remove e

Check for f

ineering Co.

NG, CLEAN

Refer t

inspect the

e pump seria

the pump a

the gland armechanica

the shaft beowing (driverotor end fa

tion, as somfresh cleanis required

new gaskettable (see p

ump in a cle

ump into po

at all the cou

lectrical loc

flow rate an

Ltd O

NING  & RE

to Health & S

pump, rem

al number (

and inspect

rea for packal seal facesearings: cheen) shaft. aces and o

me componeing solvent, prior to fina

ts or o’ringspage 22).

ean place.

osition, chec

upling or gla

ks and perm

nd noise.

perating & M

EFITTING

Safety page o

ove the pum

see page 9

the parts, c

ked or lip ses (care museck shafts a

utside diam

ents may ha, make sureal assembly

s, select gas

ck for leaks

and guards

mits and ke

Maintenance

of this manua

mp to a clea

9) if spares a

check for sig

eal pumps.st be taken and bearings

meters

ave sharp ee all the party clean lubr

skets to ma

s and refit an

have been

ep other pe

Manual (OM

OPE

al before com

an, light wo

are required

gns of wear

as ceramic s, particular

edges, cleants are fully cicating oil is

intain the co

ny mechani

n refitted afte

ersonnel aw

MM-GP:1.0)

ERATING

mmencing w

rkshop.

d.

r:-

seal faces r attention is

n the pump cleaned prios to be used

orrect clear

ical seal flus

er checking

way when re

G & MAINT

work on pump

are fragile) s to be give

parts with aor to fitting. d.

rances using

shing pipes

g the couplin

e-starting.

Page: 21

TENANCE

p.

en to the

a cloth Where

g the

s

ng

E

Page 22: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 22

OPERATING & MAINTENANCE CLEARANCE GUIDE  

Gear Pump Range/Model Total end clearances Diametrical Clearances Albany Barclay Kellett Low viscosity liquid

(eg: Paraffin 1 to 3 cst)High viscosity liquid 1200 cst and over

AP2, 3, 3.5 25 Series

0.025 – 0.050 mm (.001”-.002”)

0.050 -0.076 mm (.002”-.003”)

0.050 – 0.101 mm (.002”-.004”)

AP4, 5 40 Series

0.025 – 0.050 mm (.001”-.002”)

0.050 -0.076 mm (.002”-.003”)

0.050 – 0.101 mm (.002”-.004”)

AP6, 7 0.025 – 0.050 mm

(.001”-.002”) 0.152 – 0.203 mm

(.006”-.008”) 0.050 – 0.152 mm

(.002”-.006”) AP8,9 1” SMC 56 Series

0.025 – 0.076 mm (.001”-.003”)

0.152 – 0.203 mm (.006”-.008”)

0.050 – 0.152 mm (.002”-.006”)

1¼” SMC, SBL3 AP10,11,11.5 HD3,4,5,6

1¾”, 2½”, 3½”, 4½”/8T

0.076 – 0.152 mm (.003”-.006”)

0.203 – 0.304 mm (.008”-.012”)

0.101 – 0.254 mm (.004”-.010”)

1½” , 2”SMC & larger AP12, 13, 13.5 & larger HD7,8,10

22/8T, 33/8T, 44/8T, 4/10T

0.101 – 0.020 mm (.004“-.008“)

0.020 – 0.508 mm (.008“-.020“)

0.203 – 0.508 mm (.008“-.020“)

For pressure under 7 bar (102 psi) these figures are a general guide. At low speeds and with large suction lifts, smaller clearances are needed. With very high viscosities, larger clearances than those given above are needed. When pumping hot (200’C or over) liquids use wider clearances to guard against possible pump seizure due to expansion.

End Clearance Distance measured between rotor and pump cover face. Total end clearance is the distance measured either side of the rotor and added together. Diametrical Clearance Distance measured around outside diameter of rotor and the inside diameter of body face.

END CLEARANCE END CLEARANCE

DIA

ME

TRIC

ALC

LEA

RA

NC

E

Page 23: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 23

SEALING METHODS The shaft seal is often the most sensitive component in a pump as it must seal between a rotating shaft and the stationary pump housing. In general Albany provides three types of shaft sealing:

Mechanical Seal Design (picture shows optional thrust bearing) The mechanical seals consist of two parts.

1) Rotary face assembly with spring(s) fixed to drive shaft

2) Stationary face mounted to the clamp plate

Seal faces are lapped to high standards of flatness. Mating materials are chosen for long life operation in the pumped liquid by Albany and their seal supplier.

Packed Gland Design The packed gland seal is Albany’s most common form of shaft sealing for pumping applications.

Lip seal Design Lip seals are usually used on flange mounted and Pelton wheel driven pumps. Cartridge fitted lip seal assemblies with hardened sleeves are available for certain liquids. Lip seals retain the pumping liquid within the pump while keeping air, dust and dirt from entering along the rotating shaft.

Page 24: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 24

SEALING METHODS MECHANICAL SEALS In practice seals leak tiny amounts of liquid particularly at start up. This leakage helps prolong the seal life. Should leakage be forbidden due to the liquid’s toxicity etc. Albany can fit double seals or magnet drives to its gear pumps. Note: The life of a mechanical seal depends on various factors such as cleanliness of liquid handled and its lubricating properties. Due to the variety of operating conditions it is, however, not possible to forecast its life. Single mechanical seal design Single seals are used on most hydrocarbon fluids of under 150°C as standard. We offer internal or external flushing, internal pressure reduction passages and heated or cooled seal housings as required by the application. Do not use carbon faces on applications where viscosities over 2000cst may occur. Use a pinned seat on liquids of over 750cst. Seal maintenance Detailed maintenance and operation information is available from our mechanical seal manufacturers. Mechanical seals should not be run dry. To avoid dry start up it is recommended that the pump cavity is filled with lubricating oil if possible or the duty fluid. Check both faces for wear or damage. Clean the housing, clamping plate and shaft. Remove any keyway burrs or damage to the drive shafts before re assembly. Avoid damage to the new seal O rings or rubber bellows. Check the shaft, to make sure it is not bent. Lubricate with light oil the faces and the shaft before carefully sliding the seal into the front cover of the pump. After re-fitting the pump to the bedplate check the coupling alignment, misalignment shortens seal life. Refit all recirculation, quench or cooling pipes if fitted. Re-prime the pump before start up.

1 Rotary face assembly with spring

2 Stationary face

3 Gasket

4 Clamping plate

5 Clamping plate fixing bolts

6 Thrust bearing (when supplied)

7 Shaft

Page 25: Albany Operation and Maintenance

Albany Eng

 PACKED Packed glalubrication recommensometimes(sediments General G

1) 2)

3)

4)

At start up gland muspump musnot, this op

ineering Co.

GLAND and sealingof the glan

ndation's ares extend to s, additives,

Gland Maint

Remove aAlways chefound it wilWhen re-ppositions inRe-assemAfter the pnuts by onevenly, by adjustmenthe overheeliminatedshould be temperatureconomica or after rept weep. Un

st be stoppeperation sho

Ovefailu

Glacom

Ltd O

may requird packing re to be obseseveral yea, overheatin

tenance

ll old packineck that thell be hard to

packing stagn relation toble the glanump has bee sixth of a one sixth ot is complet

eating does , particularlymade in there and presal than over

packing, prentil steady sed and allowould be repe

erheating anure to re-pac

ands need to mpressed.

perating & M

re regular crequires a cerved. Servars in favoung) can how

ng rings, che shaft is noo prevent eagger the joino the flush hnd and tighteen runningfull turn. T

of a full turnted, there snot take play under lighe same wayssure. Fairlyr tightening

essurise theeepage tak

wed to cool.eated, glan

nd fire risk cack the gland

be repacked

Maintenance

hecks and mcertain leakavice life experable condit

wever drasti

heck the numot scored or arly leakagents by 120° holes. ten the nutsg for 10 minTighten the g, until leakahould be a ace. With cht operatingy when the y frequent rleading to t

e stuffing bokes place, th When re-sd nuts may

an be causedwhen neede

d as soon as

Manual (OM

maintenancage rate. Glectancy is btions. Extrecally cut sh

mber of ringgrooved be

e without rereplacing a

s, about hanutes with stgland nuts a

age is reducdrip leakag

careful runng conditionsequipment replacementhe scoring

ox, ensuringhe gland mastarted, leakneed to be

d by over tighd.

s the packing

MM-GP:1.0)

SE

ce adjustmeland packinbetween 1 aemely bad flhort gland se

gs efore repacplacement

any lantern r

nd tight. Stateady seepaat ten minut

ced to an acge from the ning-in, leak. Subsequeis operating

nt of the glanand replace

g air is not tray overheatkage should

e slackened

htening the g

g has been fu

EALING M

ents. Properg manufactand 2 yearsuid conditioervice life.

king. If damof the shaftrings in the

art the pumage, tightente intervals,cceptable legland, ensu

kage may vient adjustmg at normal nd packing ement of pu

rapped. A pt. If this hapd take placea small am

gland or by

ully

1 Packi2 Gland3 Studs4 Gland5 Shaft

Page: 25

METHODS

r turer’s s, this can ons

mage is ts, ir correct

p. n the gland , each time

evel. When uring that rtually be

ments working is more

ump shafts.

packed ppens, the e. If it does

mount.

ng Rings d s d Nuts

5

S

Page 26: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 26

SEALING METHODS LIP SEALS In general, lip seals are more sensitive, than mechanical seals, to shaft run out and surface irregularities. A lip seal will often leak oil if the shaft has a total indicated run out of more than only a few thousands of an inch. A lip seal pump is provided with an internal passage connecting the suction side of the pump to the seal chamber. These pumps cannot run in two directions without modification or special order. These pumps must not be subjected to a static head of more than 0.34 bar g. If the system this pump is fitted to has to be hydrostatically tested the pump must be isolated from the test. Failure to do this will blow the lip seal out. Maintenance Remove any burrs or damage to the drive shaft before fitting a lip seal. Lubricate the new lip seal faces and the drive shaft with oil or grease before sliding the lip seal over the shaft.

1 Lip seal 2 Circlip / Seal Cover Plate 3 Shaft

Page 27: Albany Operation and Maintenance

Albany Eng

Albany norrelieve thepressure. TThese intepressuriza

Relief valvat a speciwithin certascrew in to How it wo

The valve of the adju We can su

Relief valv If the pump Relief valv Dome capsleakage or

ineering Co.

rmally has ae pressure They are noernal relief tion.

ves are incofied pressuain limits by

o increase p

orks:

is positionesting screw

upply inbuilt

Albanypressu

es operate

p is to opera

e springs a

s are availar entry of air

The daresult surrou

Contincan be

Ltd O

an option toon the discormally not f valves sh

orporated inure or 10%y slackeningpressure or

ed on its seaw.

or separate

y relief valveure.

in one direc

ate in both d

re available

able for pumr.

angers of thein an explos

unding factor

nual re-circule dangerous

perating & M

o supply an charge sidefull ported,

hould be u

the pump above theg the adjusout to decre

at and lappe

e relief valv

es cannot be

ction only.

directions o

e for a varie

mps with a h

e pump goinsion or extremrs such as pe

lation of liquis in explosive

Maintenance

internal rele of a pum i.e. cannot

used for pu

body and the working pting screw ease pressu

ed in and th

es to return

used as con

See “Direct

of rotation, t

ety of pump

high lift or a

g beyond its me damage teople.

id through the atmosphere

Manual (OM

ief valve. Tp operatingt by pass alump protec

hey are prepressure. Tlocknut andure.

In the diaarrow (A)pump sucbranch at When thepressure direction Note: theflow of a Thanded p

he spring len

n the excess

ntrol valves o

tion of Rota

two separat

pressures a

large positi

designed prto the pump

he relief valvees.

MM-GP:1.0)

These relief g against all the flow pction again

e-set at our The pressurd either by s

gram norm, the fluid flction and out the require

e relief valvebuild up, thof arrow (B

e diagram inTop- drive,

pump.

ngth is set d

s liquid to ta

or regulators

ation” sectio

te relief valv

and overpre

ive suction

ressure limitscomponents

e causes ove

RELIEF

valves will a over exceproduced bynst a temp

works to rere range is screwing th

al flow is shows througut of the deled pressure

e opens, duhe fluid follo)

ndicates theClock-wise

during our t

ank.

for flow or

on (see page

ves will be n

essure rang

head to pre

s are that it cs, the line itse

erheating wh

Page: 27

F VALVES

temporarilyessive backy the pump.porary over

elieve eitheradjustable

he adjusting

hown with h the livery

e.

ue to a ws in

e pumping e right

test by use

e 14).

needed.

ges.

event

could elf and

hich

7

S

y k

r

r e g

Page 28: Albany Operation and Maintenance

Albany Eng

MAINTEN 

For replace

1. Tur

2. Me

rem

3. Wit

4. Retapa m

5. Re

6. Forthe

Plug (ITEMthe pump rwas remov

ineering Co.

NANCE OF

Refer

Do no

Do norelief v

ement of th

rn off power

easure distamove from p

thdraw the s

move valvepped hole, Inmagnet or g

place any p

r the correce correct len

M 6) & sealirotation is toved.

Ltd O

F RELIEF V

to Health &

ot compress t

ot unscrew thvalve spring.

e spring / re

r to the pum

ance ‘X’ & lopump body w

spring (ITEM

e (or ball) (ITnsert screwreased stick

parts & refit

t pumping dngth (distanc

ng washer o be change

perating & M

VALVE 

Safety page

the relief valv

he adjusting s.

elief valve (

mp & allow t

oosen locknwith locknu

M 4) from th

TEM 5) fromwed rod or a

k can be us

in the oppo

duty to be ace ‘X’), that

(ITEM 7) doed, in which

Maintenance

of this manu

ve spring so

screw so tha

vertical type

to cool, ven

ut (ITEM 2)t and sealin

he body.

m pump bod file tang an

sed).

osite sequen

achieved, th was measu

o not need th case it sho

Manual (OM

ual before co

that it is ‘coi

at the valve is

e RV):

t pressure e

), then unwing washer (

dy. The reliend carefully

nce.

e adjustingured when

to be removould be refit

5

4

3

2

1

MM-GP:1.0)

ommencing w

il bound’.

s not held in

etc.

ind adjustin(ITEM 3) sti

ef valve haswithdraw th

screw shouremoving, is

ved from thetted to the p

RELIEF

work on pum

position by t

ng screw (ITll attached.

s a central dhe valve (al

uld be tightes achieved.

e pump bodport where t

Page: 28

F VALVES

mp.

the

TEM 1) &

drilled and ternatively

ened until .

dy unless the valve

8

S

Page 29: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 29

RELIEF VALVES For replacement of the spring / relief valve (horizontal type RV):

1. Turn off power to pump & allow the pump to cool, vent pressure etc.

2. Measure distance ‘X’, slacken the locknut and then unwind adjusting screw (ITEM 1) to relieve spring tension, but do not remove completely.

3. Remove four cap screws (ITEM 4) from flange (ITEM 5), being very careful of any tension left in spring (ITEM 8).

4. Remove very carefully adjusting screw flange (ITEM 5) with the adjusting screw (ITEM 1), locknut (ITEM 2) and fibre washer (ITEM 3) still in situ. The gasket (ITEM 6), spring (ITEM 8) and relief valve (ITEM 9) should all come away with item 5. Take great care to ensure that all parts come out together & the valve does not drop down into the suction port of the pump.

5. Replace any parts & refit in the opposite sequence.

6. For the correct pumping duty to be achieved, the adjusting screw should be tightened until the correct length (distance ‘X’) that was measured when removing is achieved.

Item 10, 11 & 12 do not need to be removed from the pump body unless the pump rotation is to be changed, in which case they should be refitted to the port where the valve was removed.

Page 30: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 30

SPARES & REPAIRS SPARES To ensure the correct spares are supplied we need to know the pump serial number which is stamped into the metal of the pump body, or cover, in a prominent position on the top area of the pump. Make sure that the correct spares are to hand before starting work on the pump. Contact our works if you need assistance before starting the job. If you are using a custom designed Albany pump we recommend that you stock non-standard parts. Horizontal RV Pump

1 Gland / Seal Housing 12 Locknut 2 Shaft Sealing * 13 Adjusting Screw 3 Front cover 14 Spring 4 Bushes – Front Cover* 15 Relief Valve 5 Rotors (2) * 16 Body 6 Key (2) 17 RV Flange 7 Driving shaft* 18 Bushes – Back Cover* 8 Spring Seat 19 Back cover 9 Gasket* 20 Body Gaskets *

10 Adjusting Screw Flange 21 Following Shaft * 11 Sealing Washer

Recommended spares (*)

21

34

56

7

2120

1312

1110

9

1415

1619

17 18

8

Page 31: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 31

12

34

5

67

8

15

18

9

811

12

16

17

14

15

13

10

SPARES & REPAIRS Vertical RV Pump

1 Gland / Seal Housing 10 Body 2 Shaft Sealing * 11 Bushes – Back Cover* 3 Front cover 12 Back cover 4 Bushes – Front Cover* 13 Relief Valve 5 Driving shaft* 14 Spring 6 Rotors (2) * 15 Sealing Washer 7 Key 16 Locknut 8 Body Gaskets * 17 Adjusting Screw 9 Following Shaft * 18 Plug

Recommended spares (*)

                       REPAIRS Albany operates a repair service at our works and can quote for the repair of pumps returned to us for inspection. Pumps returned for repair must be cleaned of the pumped fluid. Where the nature of the fluid is not disclosed to us a HAZARD RISK DOCUMENT CERTIFICATE must be supplied with the pump proving no hazardous substances are present meaning that the pump is safe to work on. Motor Repairs: Use accredited competent engineers or repair shops. The user is responsible for the validity of Ex Certificates after repair.

Page 32: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 32

INFORMATION ON ‘ALTERNATIVE’ ALBANY MODELS

Superimposed Remote Bearings Pumps are always provided with lubricators and these should be filled with Shell Alvania grease or equal. Pumps with remote bearings should be treated in the same way.

Pumps with Back Gears should have the gear case half filled with Shell Grease or equal.

Pumps with Reduction Gear Box, should have the gear box filled with Shell Omala or equivalent to sight level indicator when pump is not running.

Pumps With Ball and Roller Bearing lubricated by Product. These pumps must only be used on filtered, non abrasive fluids with lubricating properties. Maximum temperature is usually 120’C.

Page 33: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 33

ATEX DIRECTIVE 94/9/EC (ATEX) Albany positive displacement rotary pumps are supplied to work in explosive atmospheres under duty conditions advised to us by the customer. Atex certified pumps are:-

1) for the conditions of service stated in the purchase order 2) for the gas group and temperature class stated on our nameplate

Any changes to the above must be approved by Albany in writing. A new declaration of conformity and a nameplate will need to be supplied by Albany. ATEX assessment Hazards ProtectionsExternal contact monitor pump temperature Mechanical contact

correct alignment of coupling support pipe work line up pipe work

Bearing failure monitor bearing temperature

Gasket check for leaks

Excess temperature

do not run dry check for excess pressure fit a liquid flush to the mechanical seal (API 1 or 13) or gland relief valve to be designed for external relief

Coupling failure correct alignment non sparking coupling is fitted

Mechanical contact non sparking guard fitted

Rotating parts guard of adequate strength

Static electricity bond pump set to earth

Explosive dust end user to monitor and clean pump and coupling

At start-up Check pump rotation is correct (2-3 seconds). Check flushing liquid to seal or gland is available at the pump. Check for alignment and a dust free coupling.

Page 34: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 34

TROUBLE SHOOTING 1 No liquid delivered: (a) Pump not primed. (b) Suction lift too high. Check with a gauge at the pump suction (c) Wrong direction of rotation (d) Pump not rotating (failure of drive from prime mover) (e) Suction & Delivery pipes connected on wrong sides of pump 2 Not enough liquid delivered: (a) Air leaks in suction or through stuffing box (b) Speed too low (c) Suction lift too high, or not enough suction head (for hot liquids) (d) Foot valve too small or obstructed (e) Foot valve or end of suction pipe not immersed deeply enough (f) Piping improperly installed permitting air or gas to pocket in pump (g) Mechanical defects: Pump damaged Pump badly worn Packing defective (h) Relief valve not seating or jammed by foreign matter. (i) Relief valve set for too low a pressure. 3 Pump works for a while then loses suction: (a) Leaky suction lines (b) Suction lift too high (c) Air or gases in the liquid 4 Pump takes too much power: (a) Speed too high (b) Liquid heavier or more viscous than we quoted for (c) Suction or discharge line obstructed (d) Mechanical defects Shaft bent Rotating element binds Stuffing boxes too tight Misalignment due to improper connection of pipe lines or driver (g) Check pressure is being measured at the pump and not some distance away from the

pump thus ignoring pressure losses in piping, valves, etc. (h) Discharge pressure higher than quoted for. 5 Noisy pump: (a) Speed too high (b) Suction lift or viscosity too high (piping diameter too small) preventing filling of gear tooth

spaces (c) Wrong direction of rotation (Note: recesses in the pump covers to prevent hydraulic noise

operate only in one direction) (d) Badly supported pipes or bedplates causing resonant vibration. Rubber mounting can

help. (e) Relief valve chattering (f) Pressure too low: an increase in pressure can prevent gear noise in low pressure

applications (g) Worn pump, check for wear

Page 35: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 35

TROUBLE SHOOTING 6 Excessive Gland leakage: (a) Packing hard and shafts scored (b) Pressure on pump too high or pressure relief passage blocked (c) Shaft run out excessive (d) When repacking a gland all the old packing must be removed. It is not good enough just

to add extra rings as the original packing becomes compressed 7 Excessive wear: (a) Abrasive liquid / Contaminated liquid (b) Excessive speed (c) Misalignment (d) Excessive loading on drive shaft, axial or radial (e) Pump is running dry (f) Viscosity less than stated 8 Motor running hot and overheating: (a) Back pressure too great (b) Incorrect supply voltage (c) Motor phasing (d) Pump operating outside temperature range (e) Air temperature too high (f) Motor covered in dust (g) Electrical connections not correct for starting method (h) Natural ventilation blocked 9 Pump overheating: (a) Re-circulating small amount of liquid (b) Over tight gland (c) Running dry (d) Pump out of alignment

Page 36: Albany Operation and Maintenance

Albany Engineering Co. Ltd Operating & Maintenance Manual (OMM-GP:1.0) Page: 36

CONTACTS

Albany Engineering Company Limited Church Road Lydney Gloucestershire GL15 5EQ England Telephone: +44 (0) 1594 842275 e-mail: [email protected]

For information about Albany pumps visit:

www.albany-pumps.co.uk

Albany Standard Pumps Richter Works Garnett Street BD3 9HB Telephone: +44 (0) 1274 725 351 e-mail: [email protected]

Notes: