a.kovalenko 2 nd lab directors meeting, protvino, january 15/16, 2008 fair: jinr eoi
TRANSCRIPT
A.Kovalenko
2nd Lab Directors Meeting, Protvino, January 15/16, 2008
FAIR: FAIR: JINR EoIJINR EoI
A.Kovalenko
From our SUMMARY at the 1st meeting:
• JINR/GSI COLLABORATIVE R&D COVERED SET OF THE PROBLEMS CONNECTED WITH THE SIS100 FAST-CYCLED SYNCHROTRON;
•We consider, for example, the SIS100 MAGNETS AND
OTHER LATTICE ELEMENTS (TS-2, TS-6,…) as possible contribution OF RUSSIAN INDUSTRY AND LABORATORIES, nevertheless, it should be COLLABORATIVE AGREEMENTS AT GOVERNMENTAL LEVEL
Lab Directors Meeting, Darmstadt, October 1/2, 20072nd Lab Directors Meeting, Protvino, January 15/16, 2008
•JINR NUCLOTRON is considered as the SIS100 prototype system
ring circumference -250 m
Indeed, the SIS100 collaborative R&D are carried out by JINR/GSI team since 2000.The list of considered problems is the following:
- MODEL DIPOLES & QUADRUPOLES; - FULL LENGTH PROTOTYPES; - STEERERS AND MULTIPOLES; - LATTICE STRUCTURE; - BEAM EXTRACTION and TRANSFER; - CLOSE ORBIT CORRECTION; - U(29+) COLLIMATION; - OTHER ELEMENTS (BPM, CATCHERS); - CRYOSTAT MODULES; - COOLING SYSTEM;
A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, 20072nd Lab Directors Meeting, Protvino, January 15/16, 2008
A.Kovalenko 2nd Lab Directors Meeting, Protvino, January 15/16, 2008
•SIS100 WP’s proposed to JINR by the FAIR
A.Kovalenko Lab Directors Meeting, Darmstadt, October 1/2, 20072nd Lab Directors Meeting, Protvino, January 15/16, 2008