Ákos tóth : the role of social protection of workers in restructuring restructuring of the in...
TRANSCRIPT
Ákos Tóth :
The role of social protection of workers in
restructuringRestructuring of the in selected new EU member states and
experiences for accession countries
CONFERENCEBalatongyörök, 27-30 April 2006
Coal production and number of employees in Hungary 1938-2002
0
2040
6080
100120
140
Széntermelés (Mt) Létszám (ezer fő)
The state does not want to control energy production – including coal production - via exercising ownership rights.
The state intends to address problems accumulated in coal mining by liquidating state owned coal mines.
Financial resources : the national liquidation fund of the central budget raised from the sales of liquidation assets
Mine- power plant integration – the centres of ongoing operation
Settlement of liabilities of companies under liquidation via mining asset utilisation joint stock companies.
The principles of the coal mining restructuring programme
Mine- power plant integration Pécsi Power Plant Co.
Borsodi Heat Power Station Ltd. Kft.
Vértesi Power Plant Co.
Mátraaljai Power Plant Co.
Bakonyi Power Plant Co.
Komlói Mine Pécs-Karolina open mining Pécs-Vasasi open mining
Lyukóbánya
Márkushegyi Mining Works Mányi Mining Works Oroszlányi XX. pit Dobai open mining
Visontai open mining Bükkábrányi open mining
Ajkai Mining Works Balinkai Mining Works
Mines not operating in integrationDudarEdelényFeketevölgyKányásLencsehegyPécsbányaPutnokRudolfSzászvárVárpalota
Mining asset utilisation companies: scope of effect
Mecsek BVH Rt
Észak-Dunántúli BVH Rt
Borsodi BVH Rt
Mecseki Coal Mines fa Mecseki Training Mine
Veszprémi Coal Mines fa Oroszlányi Coal Mines fa Tatabányai Mines fa Dorogi Coal Mines fa Mogyorósi Training Mine
Borsodi Coal Mines fa Mátraaljai Coal Mines fa Nógrádi Coal Mines fa
Mining asset utilisation companies: typical sales
Sites of closed mines cca. 60 piecesPower plant sharesOffice buildings cca. 35 piecesRecreation centres cca. 15 piecesCultural centres and institutions cca. 25 piecesSports fields, sports centres cca. 15 piecesShares in economic organisations established from ancillary units cca. 40 piecesTrack facilities (water, gas, electrical and sewage water pipelines)
REVENUES OF BVH CO.
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004
Év
MF
t
Asset sales - utilisation
SZÉSZEK-SUPPORT
Other own revenue
Most typical mining technical tasks
Vasasi Mine liquidation (1994.)Szászvári Mine liquidation (1995.)István I-II. pit liquidation (1997.)István III. pit stowing (2002-2003.)Pécsújhegyi waste rock pile landscape architecture (1996-97.)Mecsekjánosi central (sorting) waste rock pile landscape architecture (1999)Rückeri open pits and dumps landscape architecture (2000-2001.)Nagymányoki waste rock pile landscape architecture (2002.)Removing the cableway between the mining plants and central sorters, loading stations, recultivation.
Mecseki BVH Rt.
Várpalotai mining plant (Új-Ferenc és S-II pit) liquidation (1996-1997.)Dudari Mine liquidation (1997-2001)Brennberg, Szt. István pit abandoned (2000)Dorogi drive system and sand rail system abandoned (1996-2000.)Cableway system between Tatabánya-Oroszlány abandoned (2001-2003.)Oroszlány, XXIII./D open-pit mining landscape architecture (1999.)Dorog, Bajnai open mining landscape architecture (2001.)Oroszlány, XX/II pit central waste rock pile landscape architecture (2002.)Nagyegyházi open pits, external dumps complex recultivation Vértessomlói open pits (I-III.) abandoned (1995-től)
Most typical mining technical tasks
Észak-Dunántúli BVH Co.
Edelény Mine Plant (Edelény IV. és Szeles pit) liquidation (1994-96.)Feketevölgyi Mine partially, then completely abandoned (1997-2000.)Putnok Bánya partially, then completely abandoned (1997-2001.)Rudolf Mine Plant abandoned (1999-2000.)Vadnai open mines landscape architecture (1995-2002., in several phases)Nógrád, Kazár-Székvölgy open mine landscape architecture (1996-97.)Nógrád, Besenyőbérci open mine landscape architecture (1998-1999.)Mátra, Petőfibányai central waste rock pile landscape architecture (1997-1998.)Szuhakálló-Alberttelepi waste rock piles, plant-yard complex landscape architecture )Ádámvölgyi central waste rock pile landscape architecture (1998-2002., in several phases)
Most typical mining technical tasks
Borsodi BVH Rt
1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004dismissal, severance pay
pre- pension
benefit-occupational disease, injury
allow ance redemption
other
0
100
200
300
400
500
600
700
800
900
1000
year
Felmondás,végkielégítés Korengedményes nyugdíj Baleseti,egészségkár. járadék
Járadék-megváltás Egyéb
COMPOSITION OF LABOUR COSTS
MF
t
COMPOSITION OF LABOUR COSTS
Felmondás, végkielégítés
Korengedményes nyugdíj
Baleseti, egészségkárosodásijáradékNyugdíjas szénjárandóság
Egyéb
LABOUR MARKET SITUATION IN HUNGARY
Magyarország Budapest Magyarország 19 megyéje Szénbányászattal érintett megyék
THANK YOU FOR YOUR ATTENTION!
Ákos Tóth