ak. engg profile updated

37

Upload: aj

Post on 24-Jun-2015

400 views

Category:

Business


1 download

DESCRIPTION

A K ENGINEERING business profile, for further detail contact us on + 91 9867684550

TRANSCRIPT

Page 1: Ak. engg  profile   updated
Page 2: Ak. engg  profile   updated

We are a Steel fabrication based Company. Over the past ten years, A.K. Engineering Works, has worked hard to build its infrastructure

and system to handle a significant amount of business. Additionally company has configured a high technological equipment and has

experienced staffs and workers, who are well equipped to handle various kind of Steel Structure Projects.

Our clients trust us because…….

Steel Fabrication is our Core business and we offer the industry's most comprehensive and flexible service delivery model—on a large

scale—in today's business scenario.

In-depth knowledge of Steel Fabrication: Our technicians have insight knowledge of products, tools and methologies to provided better

solution to the client in order to complete project on time with quality work.

We work with a strong sense of transparency with all our employees and clients. To maintain transparency of operations with our clients

we regularly provide updates through Daily project report, detailed invoice annexure and copies of challans for statutory payments.

At A K ENGINEERING, We are the Second Generation in Fabrication & Erection process, we have Quality Management team who is

capable to sort out the puzzle of Fabrication management, apart from the management, our biggest asset is our team: We have

periodically upgraded our core team of welders, fitters, designers and operators, and its all come from the long way journey of Steel

Fabrication & Erection

Page 3: Ak. engg  profile   updated

At A K ENGINEERING, Quality has been consider the major part of any Steel Project. Our Team, Monitor quality Control from 2D model on

a paper to actual work done at project site. To achieve a Quality Assurance we have consider following Procedure.

Page 4: Ak. engg  profile   updated

A. As an Fabrication and Erection company, A.K. Engineering Works, is totally committed to the safety of its

employees and labours , as well as to prevent loss of human life, to protect against injury and to prevent

damage / destruction to project, property, equipment and materials at its work sites.

B. To achieve this we has established and implemented an effective Safety and Fire Prevention Program to

create a safe working environment at site. Within the frame work of this Safety and Fire Prevention Program,

we are committed strategy of creating Safety Awareness at all level of work.

i. All individual working in our firm are above 18 years of age & well aware of the risk of working at

the construction site.

ii. The firm provides identity cards to all workers for each project

iii. The firm provides Uniform, safety shoes, safety glasses for welding purpose, safety belts, hand gloves,

and we ensure they are used at the site

iv. The firm also provides fire extinguishers at the Work site

v. All the equipment’s like rectifier welding machines, gas cutting machines, portable cranes are well

maintained and checked before providing at the site

vi. All safety precautions measures are taken if the worker is working on high rise towers

vii. The hierarchy of controls for working at height, working at ground level, using scaffolds, platforms

and ladders and safety netting.

Page 5: Ak. engg  profile   updated

Nos. Year Client Project Scope of Work Cost

A Current Projects

1 2012-2013 LODHA GROUP LODHA LXURIA Fabrication of M S Railing 55 lacs

2 2012-2013 KALPATARU LTD SYNERGY II - SANTACRUZ FABRICATION of M S BEAM 102 lacs

3 2012-2013 RAHEJA UNIVERSAL RAHEJA EXCELSIOR ROOFING WORK 30 Lacs

4 2009-2012 KAPSTONE CONSTRUCTION RUSTOMJEE URBANIA - THANE FABRICATION & ACP WORK 320 lacs

5 2011-12 RNA CORP RNA GRANDEUR FABRICATION Work 10 lacs

6 2010 – 2012 Bombay Dyeing ICC Tower – Dadar FABRICATION WORK 35 lacs

7 2010-2012 MARTHON REALTY MARATHON – FUTURE X FABRICATION Work 54 lacs

B Projects Completed

1 2010 – 2011 AVIGHNA INDIA LTD ONE AVIGHNA FABRICATION WORK 10 Lacs

2 2009-2011 RAHEJA UNIVERSAL RAHEJA ATLANTIS FABRICATION Work 148 Lacs

3 2010-2011 RAHEJA UNIVERSAL RAHEJA POLIS – AMBIVALI Civil Work of Compound Wall 166 lacs

4 2006-2010 RAHEJA UNIVERSAL RAHEJA EXOTICA FABRICATION Work 196 lacs

5 2009-2010 KANAKIA GROUP KANAKIA – METRO FABRICATION Work 30 lacs

6 2009-2010 KANAKIA GROUP KANAKIA – BOOMERANG FABRICATION Work 19 lacs

7 2009-2010 KANAKIA GROUP KANAKIA – Marriot FABRICATION Work 22 lacs

8 2009-2010 RAHEJA UNIVERSAL RAHEJA LEGEND FABRICATION Work 90 lacs

9 2008-2009 RAHEJA UNIVERSAL RAHEJA EXOTICA FABRICATION Work 40 lacs

10 2008-2009 RAHEJA UNIVERSAL RAHEJA WILLOWS FABRICATION Work 48 Lacs

11 2008-2009 RAHEJA UNIVERSAL RAHEJA TITANIUM FABRICATION Work 62 lacs

12 2008-2009 RAHEJA UNIVERSAL RAHEJA – TIPCO FABRICATION Work 58 lacs

Page 6: Ak. engg  profile   updated
Page 7: Ak. engg  profile   updated

Work Done 6th Floor – Fabricated Steel Beam

Page 8: Ak. engg  profile   updated
Page 9: Ak. engg  profile   updated

Work Detail Providing, Fabrication and Fixing M S Structural Member with ACP Sheet

Page 10: Ak. engg  profile   updated

Work Detail Providing, Fabrication and Fixing M S Structural Member with ACP Sheet

Page 11: Ak. engg  profile   updated

Work Done 30th Floor Pergola Work

Cost of Project 285 Lacs

Page 12: Ak. engg  profile   updated

Client Name RAHEJA UNIVERSAL LTD.

Project Name RAHEJA ATLANTIS, Worli

Page 13: Ak. engg  profile   updated

Work Done Staging at 17th Floor for erection of H Frame

Page 14: Ak. engg  profile   updated

Approximate Weight 95.50 M.Tons

Page 15: Ak. engg  profile   updated

Project Name Raheja Atlantis, Worli

Detail of Work Fabricated and Erected of M.S. Structure for A.C.P. Sheet fitting.

Page 16: Ak. engg  profile   updated

Project Name Raheja Atlantis, Worli

Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener

Page 17: Ak. engg  profile   updated

Project Name Raheja Atlantis, Worli

Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener

Page 18: Ak. engg  profile   updated

Project Name Raheja Atlantis, Worli

Detail of Work By using ISA, ISMC, Base Plate & HILTI Anchor Fastener

Page 19: Ak. engg  profile   updated

Project Name Raheja Atlantis, Worli

Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level

Page 20: Ak. engg  profile   updated

Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level.

Page 21: Ak. engg  profile   updated

Project Name Raheja Atlantis, Worli

Detail of Work Steel Structure for Crown on Terrace about 430 Ft above the ground level

Page 22: Ak. engg  profile   updated

Client Name RAHEJA UNIVERSAL LTD.

Project Name RAHEJA LEGEND, Worli

Page 23: Ak. engg  profile   updated

Project Name Raheja – Legend - Worli

Detail of Work Fabricated and Erected Triplex Flat Staircase about 20 M.Tos.

Page 24: Ak. engg  profile   updated

Project Name Raheja – Legend - Worli

Detail of Work Fabricated and Erected Service Platform in hollow floor , Mezzanine Floor.

Page 25: Ak. engg  profile   updated

Project Name Raheja – Legend - Worli

Detail of Work Fabricated and Erected Service Platform in hollow floor , Mezzanine Floor.

Page 26: Ak. engg  profile   updated

Project Name KANAKIA – METRO - BORIVALI

Detail of Work Fabricated and Erected M.S. Structure for A.C.P. Sheet fitting @ Terrace

Page 27: Ak. engg  profile   updated
Page 28: Ak. engg  profile   updated

Project Name KANAKIA – METRO - BORIVALI

Detail of Work Fabricated and Erected M.S. Structure for A.C.P. @ Terrace

Page 29: Ak. engg  profile   updated

Scope of Work Lifting & shifting of material Manually, Fabrication and erection at position safely.

Page 30: Ak. engg  profile   updated

Material Used M.S. hollow Pipe 300x150x6mm, Base Plate 20mm & HILTI Anchor Fastener.

Page 31: Ak. engg  profile   updated
Page 32: Ak. engg  profile   updated

Work Detail Fabrication and Fixing Column Jacketing with Anchor Fastener

Page 33: Ak. engg  profile   updated
Page 34: Ak. engg  profile   updated

Project Name Raheja – Acropolis - Govandi

Detail of Work

Fabricated and Erected Circular Dome Structure

Page 35: Ak. engg  profile   updated

Project Name Raheja – Acropolis - Govandi

Detail of Work Fabricated and Erected Circular Dome Structure

Page 36: Ak. engg  profile   updated

Project Name Raheja – Acropolis - Govandi

Detail of Work Fabricated and Erected Ornamental Gate and Grill.

Page 37: Ak. engg  profile   updated

Land line : 022 26525609

Mobile : 91 9867684550

Email : [email protected]

:[email protected]

Web : www.akengg.com

Office Add :

104, Miranda House, Kole Kalyan,

Opp Christina Apt,

Kalina – Kurla - Road,

Santa Cruz West,

Mumbai - 400029