www.centennialcoal.com.au Airly Mine Community Consultative Committee (CCC) Presentation Airly Mine 21 st June 2016

Upload: others

Post on 18-Jun-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

www.centennialcoal.com.au

Airly Mine

Community Consultative Committee (CCC) Presentation

Airly Mine

21st June 2016

Page 2: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

1. Introduction

Reporting Period: March – June 2016

Site Name/Location: Airly Mine, Capertee, NSW

Summary of Consents and Licences:

Airly Mine Contact Details:

2

Any Change?

DA162/91 (Mod 5) No

ML1331 No

EPL12374 No

A232 No

Position Key Contact Contact Details

Mine Manager Bob Miller (02) 6359 2101

Email: [email protected]

Environment and Community

Coordinator Sam Price

Office: (02) 6359 2108 Mobile: 0427 647 657

Email: [email protected]

Page 3: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

2. Operations Summary

Material Approved Limit

(and source)

This Reporting

Period (Mar-Jun

16)

Year to Date Annual

Forecast

Waste Rock/

Overburden

N/A N/A N/A N/A

ROM Coal 1.8MT/annum 224,439 345,759 823,565

Coarse reject N/A N/A N/A N/A

Fine reject

(Tailings)

N/A N/A N/A N/A

Saleable product 204,357 303,940 823,565

3

Page 4: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

4

Current & Projected Workings

Page 5: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

5

Current & Projected Workings

Page 6: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Overview and Outlook of Activities

• Continue coal supply to Eraring & Delta domestic market and

confirm blending opportunity for export markets.

• Await DPE decision on Airly Extension Project.

• Establish 205 Panel as a ‘single unit’ and continue with 103 Panel

(‘single unit’) and 122 Panel (‘super unit’).

• Plan for preventative maintenance program for upcoming scheduled

shut down period.

6

Page 7: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

3. Environmental Performance

7

Page 8: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Noise Monitoring

• Airly Mine has no specific noise monitoring requirements or noise criteria in either

the Project Approval or EPL Licence.

Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring:

8

Airly Mine Adopted Noise Monitoring Criteria

Location Day/Evening/Night Criteria. LAeq,

15minute

Night Criteria. LA1,1minute

Location A N/A N/A

Location B 35 45

Location C N/A N/A

Location D N/A N/A

Location E N/A N/A

Location F N/A N/A

Page 9: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Noise Monitoring Results

Location Compliant?

Location A IA IA IA N/A Yes

Location B <30 IA IA 35 Yes

Location C <30 29 37 N/A Yes

Location D IA IA IA N/A Yes

Location E IA IA IA N/A Yes

Location F IA <25 <25 N/A Yes

9

• LAeq,15minute noise monitoring was conducted at Airly Mine on 18 and 19

November 2015.

Page 10: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Air Quality Monitoring Results

10

Location

Air Quality (g/m2/month)

Dust Deposition Gauge Results Jan

2016

Feb

2016

Mar

2016

Apr

2016

May

2016

Jun

2016

Jul

2016

Aug

2016

Sep

2016

Oct

2016

Nov

2016

Dec

2016

DM1 2.4 1.6 2.4 1.6 0.5

DM2 0.4 0.9 0.4 0.9 0.2

DM3 1.2 1.8 1.2 1.8 2.9

DM4 0.4 0.8 0.4 0.8 9.4*

Non-compliance

Compliance

* Sample contaminated by droppings and vegetation as noted on ALS field

sheet 13/5/16. (6.3g organic matter).

Airly Mine has four depositional dust gauges located across site. These gauges are

monitored monthly for compliance.

Page 11: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Air Quality Monitoring Results

11

Page 12: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Water Monitoring Results

12

Discharge water quality

pH

Total

Suspended

Solids (mg/L)

Electrical

Conductivity

(μS/cm)

Oil & Grease

(mg/L)

January 2016 – June 2016

LDP1 No discharge

LDP2 No discharge

LDP3 No discharge

Non-compliance

Compliance

Page 13: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Subsidence Monitoring

• Subsidence monitoring results for the 200 Panel showed

maximum subsidence to be 7mm due to extraction at

80m depth of cover.

• Pillar stress cells in the 200 Panel showed very small

increases in stress.

• A second resurvey of the subsidence line is currently

being undertaken and a report will be provided to DPE

and DRE in the Jul-Sep quarter.

• A trial of InSAR remote sensing technique is ongoing.

• An REF is being prepared for the installation of another

subsidence monitoring line over the 121 Panel.

13

Page 14: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

4. Environmental Management

14

Page 15: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Cultural Heritage

15

Historically: Four (4) sites have been undermined

45-1-2746 (Artefact Scatter) - Dec 2010

45-1-2763 (Artefact Scatter) – Mar 2011

45-1-2761 (Shelter) – Jul 2011

45-1-2762 (Artefact Scatter) – Sep 2015

Previous 3 Months: No Sites undermined

45-1-2762 (Artefact Scatter) *RPS Assessment of Site – No Harm.

Upcoming 3 Months: No sites to be undermined

Low level subsidence and tilt as a result of

mining, does not pose a risk of harm to these

sites

Fencing activities completed to help mitigate

against any potential harm

Page 16: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Cultural Heritage

16

Page 17: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Rehabilitation & Land Management

• Airly Mine does not currently have any land available or

subject to rehabilitation works. This is not likely to

change until mine closure.

• Weed spraying program implemented and completed

during summer 2016-17. This program will resume in

Spring 2016.

• Surrounding Mine owned land continues to be leased out

for agricultural purposes – Cattle grazing systems.

• Riparian restoration of Airly Creek on-going.

17

Page 18: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

Airly Mine – Flora, Fauna & Aquatic Ecology Monitoring

18

• No flora or fauna monitoring activities were conducted since last CCC

meeting.

• Flora and fauna monitoring activities to be conducted by RPS in spring and

summer 2016.

• REF being prepared for the installation of new subsidence monitoring line in

Mugii Murrum-ban SCA above 121 Panel.

• Aquatic ecology monitoring to take place in spring 2016.

Page 19: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

5. Summary of Incidents / Non-compliances (2016 YTD)

Were all conditions of the relevant approval(s) complied with? DA162/91 YES

ML1331 YES

EPL12374 NO

A232 YES

19

Statement of Compliance:

Relevant

Approval

Condition # Condition

summary

Compliance

Status

Comment / Description

EPL12374

(Requirement

to have PIRMP)

POEO Act

1997, Part

5.7A, Clause

153E & 98E.

Testing of

PIRMP.

Non-compliant. Formal Warning Letter from the EPA, dated 3 March 2016, received 11

March 2016, for failure to test PIRMP within a 12 month period. Airly Mines

Annual Return detailed that the PIRMP was last tested on 12 November

2014. Airly Mine was non-compliant on 13 November 2015.

PIRMP tested on 14 March 2016 and will now be tested annually in line with

Annual Return.

Non-compliance Summary:

Incident Summary:

Nature of Incident Detail of Incident Detail of Mitigation / Remediation

Diesel spill as a result

of a derailed Pacific

National locomotive

on Airly Mine’s rail

loop within ML1331.

The lead locomotive of an unloaded

Pacific National train derailed shortly after

the point intersection on Airly Mines rail

loop. The locomotive came to rest on an

angle that was suffice to cause diesel to

spill from the overflow/breather ports of

the fuel tanks. Less than 200L of diesel

was spilt.

Diesel was siphoned from the tanks into a self bunded trans tank to

prevent further spillage. Once the locomotive was re-railed and the train

removed, contaminated material was excavated and removed from the site

to a designated waste facility. The spill site was also treated with a

hydrocarbon bio-remediation product to mitigate against any residual

contamination. The area where the spill occurred was on hard compacted

ballast and gravel foundations. No diesel migrated from the site. Incident

was reported to the Enviro-line, EPA, Fire & Rescue, HAZMAT and DRE.

Rail repair works have been completed to prevent recurrence.

Page 20: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

6. Community Engagement

• Attended and provided updates at the Capertee Valley Progress Association (CVPA)

Monthly Meetings;

• Volunteered at CVPA Australia Day BBQ;

• Donated steel posts to Capertee Hall for signs.

• Attended Rylstone/Kandos Show and Sponsors Night;

20

Sponsorship:

• Kandos/Rylstone Show;

• Rylstone Street Feast;

• Capertee Public School;

• Kandos High School;

• Rylstone District Wild

Dog Association.

Page 21: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

7. Community Complaints

• No community complaints have been received to date in 2016.

• Community complaints register for 2016 has now been incorporated into monthly EPL

reports which are publically available on the Centennial Airly website.

21

Community Complaints Register 2016.

Jan

-16

Feb

-16

Mar

-16

Apr

-16

May

-16

Jun

-16

Jul-

16

Aug

-16

Sep

-16

Oct

-16

Nov

-16

Dec

-16 Total

Air 0 0 0 0 0

Water 0 0 0 0 0

Noise 0 0 0 0 0

Other 0 0 0 0 0

Subsidence 0 0 0 0 0

Waste 0 0 0 0 0

Visual 0 0 0 0 0

0

Page 22: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

8. Activities for the Next Period

Environment

o Routine business.

o Planned drilling program.

Systems

o Continue to prepare environmental management plans.

o Implementation of compliance database.

Water

o Routine business.

o Commence dewatering of mine workings.

Rehabilitation and Mine Closure

o Nil

Biodiversity

o Routine business

Approvals

o Waiting on DA approval.

o Submit drilling REF for approval from OEH, DRE, DPI-Water.

22

Page 23: Airly Mine - Centennial Coal · the Project Approval or EPL Licence. Airly Mine Adopted Noise Criteria for 2015 Noise Monitoring: 8 ... • LAeq,15minute noise monitoring was conducted

AIRLY MINE

THANK YOU

23