airless paint sprayer os

2
Picture of task/equipment: Task: O O PERATING PERATING AN AN A A IRLESS IRLESS P P AINT AINT S S PRAYER PRAYER Name of Shop or Dept: Job Title(s): Analyzed by: Date: Required PPE: 1. Gloves Rubber/Latex 2. Goggles 3. Respirator Required/Recommended Trainings: 1. User Must Read Owners manual 2. User Must Train with Supervisor TASK HAZARDS CONTROLS 1. Inspect Tool before use 2. Must only be operated with solid footing 3. Must be grounded at all times 1. Eye Injury From Particles 2. Eye Injury From Paint 3. Eye Injury From Plaster 4. Eye Injury From Spray 5. Paint Injected into Body/Skin 6. Respiratory irritation from Inhalation of paint 7. Respiratory irritation from Inhalation of Particles 1. Equipment to be Inspected after each use. Injury & Illness Prevention Program Job Safety Analysis Form Ras Al Khair Power Plant Phase-1

Upload: farooq-mohammad

Post on 28-Jan-2016

221 views

Category:

Documents


1 download

DESCRIPTION

aro

TRANSCRIPT

Page 1: Airless Paint Sprayer OS

Picture of task/equipment: Task:OOPERATINGPERATING ANAN A AIRLESSIRLESS PPAINTAINT S SPRAYERPRAYER

Name of Shop or Dept:

Job Title(s):Analyzed by:

Date:Required PPE:

1. Gloves Rubber/Latex2. Goggles3. Respirator

Required/Recommended Trainings:1. User Must Read Owners manual2. User Must Train with Supervisor

TASK HAZARDS CONTROLS1. Inspect Tool before use2. Must only be operated with solid footing3. Must be grounded at all times

1. Eye Injury From Particles2. Eye Injury From Paint3. Eye Injury From Plaster4. Eye Injury From Spray 5. Paint Injected into Body/Skin6. Respiratory irritation from Inhalation of paint 7. Respiratory irritation from Inhalation of Particles

1. Equipment to be Inspected after each use.

Injury & Illness Prevention ProgramJob Safety Analysis Form

Ras Al Khair Power Plant Phase-1